Search NASA⌕ Search

SEARCH · Search NASA

Results for “WASHING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,441 records · Page 80

Facile etching for single crystal cathode materials

A recycling and synthesis of charge material for secondary batteries generates single-crystal charge materials for producing batteries with greater charge cycle longevity. Charge material particles undergo a heating for fusing or enhancing grain boundaries between polycrystalline particles. The resulting, more well-defined grain boundaries are easily etched by a relatively weak mineral acid solution. The acid solution removes material at the grain boundaries to separate secondary particles into primary particles along the grain boundaries. The resulting single crystal (monocrystalline) charge material particles are washed and filtered, and typically re-sintered to accommodate any needed lithium (lithium carbonate), and result in a charge material with larger surface area, higher lithium diffusivity and lower cation ordering.

Wang, Yan↗

Characterization of Highly Active Cells in Preparation for Post Operational Clean Out at Sellafield - 18139

The Highly Active Liquor Evaporation and Storage (HALES) Plant at Sellafield receives highly active (HA) raffinate liquors from the Magnox and Thermal Oxide (THoRP) Reprocessing Plants. These liquors are concentrated through evaporation into Highly Active Liquor (HAL), conditioned and stored in HALES before immobilisation in glass in the Waste Vitrification Plant (WVP). Reprocessing operations at Sellafield are nearing completion and hence these liquor feeds will soon cease. Therefore, HALES is starting its planning and preparation phases for Post Operational Clean Out (POCO) and decommissioning. POCO is a transitional phase between operations and decommissioning and encompasses activities undertaken to remove residual inventory and activity from the facility. Key drivers for POCO include risk and hazard reduction and facilitating subsequent decommissioning activities (including potential surveillance and maintenance or care and maintenance regimes). Characterization is a critical enabler for development and implementation of effective POCO. In addition to the key drivers above characterization within HALES will be used to: - Define the start and end points of POCO (radiological condition, inventory sources and location, configuration, etc.); - Develop and technically underpin the wash out strategy (volumes, rates, reagent types, etc.; - Monitor the effectiveness of POCO activities (reduction in inventory/activity, points of diminishing return, confirmation of end points for POCO). There are a number of significant challenges that present to characterization of the HALES facilities. Perhaps the most significant of these is the radiological status of the facility. HALES is an HA facility meaning that the high dose rates limit not only the technology selection for characterization (i.e. those with a very high radiation tolerance) but also place constraints on the access and deployment for the selected technology. Additionally, parts of the facility are circa 60 years old which brings its own challenges such as poor quality construction drawings and limited operational knowledge. Finally, limited sampling capability and minimal data regarding historic operations has resulted in uncertainties that will need to be addressed in order to undertake POCO as efficiently and effectively as possible. The solution to this challenge requires a novel and innovative approach and an example of this is the technique which is described in this paper. This is a radiometric characterization technique which utilizes remotely deployed dosimetry to determine the activity distribution within the vessels of interest to POCO. The results to date have been extremely promising, and the ability to produce concise visual representation of these results has already begun to facilitate better informed discussions around the POCO of the facility. It is expected that in the future this technique will be applicable to other areas of Sellafield which face similar characterization challenges. This paper presents a summary of the development and implementation of the solution along with the results obtained so far. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Plans for the Removal of Inventory from HLW Storage Tanks and Impact on Vitrification Feeds - 18175

Over the next 4 years Sellafield will cease reprocessing nuclear fuel. This represents a significant change in the mission of Sellafield Ltd, shifting the site focus from reprocessing operations to preparations for decommissioning. The storage tanks which have stored the acidic high level waste produced during reprocessing will require washing out. These tanks have been used since the 1950's and over time the nature of this waste has changed. It poses unique challenges for both removal and vitrification. A large collaborative programme of work is underway at Sellafield to characterise this inventory and prepare a strategy for its removal and vitrification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Robotic Cleaning of the Total Dissolved Solids Tanks at the Palo Verde Nuclear Generating Station - 18337

Westinghouse is executing a contract from Arizona Public Services to provide a system capable of removing highly radioactive sediment from eight Total Dissolved Solids (TDS) Tanks located at the Palo Verde Nuclear Generating Station. The scope of work covers the design, procurement, fabrication, and eventual operation of the system at the Palo Verde Site. It also includes the factory acceptance testing of the system, prior to operation at the site. Previous attempts to clean the tanks involved working inside and around the tanks for extended periods of time in a high radiation field. Spray hoses were used to wash down the sediment, and hand tools were used to scrape out the remaining sludge at the bottom. This methodology also required the lower manway to be removed. As a result, the worker radiation exposure limit was exceeded on the first of the nine tanks. As a solution to the high radiation environment of the TDS tanks, Westinghouse will provide and operate a pneumatically powered robotic crawler. This crawler traverses the bottom of the tank with a 4,000 psi high-pressure spray head affixed to the front of the crawler to blast sediment from the walls and floor of the TDS tanks. This paper will present the conceptual design of the TDS Tank cleaning system, noting the key benefits of specific components in the overall technology basis. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pre-Combustion Technique for Desulphurization of Waterberg Coalfield: Biological Treatment - 18444

The current study evaluates a microbial desulphurization of medium - sulphur type coal containing total sulphur (1.45 wt.%) and pyritic sulphur (≥ 0.51 wt. %) as a pre-combustion technique. Coal sample containing particle size in the range of - 0.85 mm was used in the experiments with bacteria isolated from nearby stockpiles of newly commissioned South African National Power Utility's (Eskom's) Medupi Power Station. After a stipulated hydraulic retention time (HRT), the coal samples were filtered, washed, dried and analyzed for total sulphur, ash content and calorific values. The calorific value of the coal significantly improved from 20.42 MJ/Kg to 24.16 MJ/Kg on the 5. day. The process removed up to 72% of the total sulphur content in the coal samples at a HRT of day 9. Furthermore, ash content reduced by 16%. This study provides a novel breakthrough of an alternative microbial desulphurization process of Waterberg steam coal as a further pre-treatment technique in order to meet stringent environmental emissions standards for SO{sub 2}. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Current Status of Decommissioning Plans and Chemical Decontamination of Metal Scraps in Chinshan NPP - 19304

The decommissioning of nuclear facilities has become a significantly attractive and worldwide topic due to the end of lifetime of many nuclear power plants within next coming years. In Taiwan, Chinshan nuclear power plant owned by the Taiwan Power Company will be the first candidate to be decommissioned according to the Nuclear Reactor Facilities Regulation Act. The Chinshan nuclear power plant located in New Taipei City has two units of 636 MWe boiling water reactors (BWRs) for the generation of 9 billion kWh of electricity per year. The date of cessation of operation of Unit No. 1 and Unit No. 2 will be December in 2018 and July in 2019, respectively. Based on the Regulations for the Review and Approval of Applications for a Decommissioning Permit of Nuclear Reactor Facilities, Taiwan Power Company have submitted a decommissioning plan of Chinshan nuclear power plant to the authority, Atomic Energy Council (AEC). After the review process, the decommissioning plan of Chinshan nuclear power plant has been permitted by AEC in 2017. Decontamination is generally utilized during the period of decommissioning of nuclear facility in order to minimize the radiation exposure of personnel and the cost of management of radioactive wastes. The successful decontamination also probably provides the benefits of lowering the level of radioactive wastes, facilitating potential releases, permitting the reuse of metals and facilitating the radiation principle of As Low As Reasonably Achievable (ALARA) management. Decontamination aims at the removal of radioactive materials from the contaminated surfaces by several technologies such as washing, heating, chemical reaction and mechanical process. The selection of proper decontamination technologies are depended on the requirement of the target materials and the purpose of the decontamination. Chemical decontamination has been proven to be an effective in reducing the radioactivity for metallic materials by using chemical reagents in contact with the contaminated surfaces. During the operation of Chinshan nuclear power plant, chemical decontamination was performed for Unit No.1 and No.2 in 2000 to decontaminate the Reactor Recirculation System (RRS) and Reactor Water Clean-up Systems (RWCU) by using LOMI-NP-LOMI process. Based on the previous experience of chemical decontamination, the dismantled metallic piping is provided as sample by Chinshan nuclear power plant for the evaluation of the feasibility of chemical decontamination. The provided metallic sample is composed of carbon steel with dose rate around 0.2 mSv/hr. In this report, a multistep decontamination process using strongly oxidizing solution and organic acid solution is performed to remove the contaminated oxide layer from the metal surface, and the resulting contact dose rate and decontamination factor (DF) are also shown to discuss the performance in relation to the process control factors. In this paper, the recent progress in decommissioning programs and preliminary results of the decontamination experiment are described to provide usable information regarding the future decommissioning for Chinshan nuclear power plant. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Erosion Challenges at the L-Bar Disposal Site - 19561

The L-Bar, New Mexico, Disposal Site is located in the northeast corner of Cibola County, 10 miles north of Laguna, and was the former site of a uranium mill and underground mine. The mill operated from 1977 to 1981 where a total of 1.9 x 10{sup 6} tonnes (2.1 million tons) of ore was processed. Solid and liquid byproduct, or tailings, from the milling process were impounded behind a dam constructed of native weathered Mancos Shale, which is a predominant geologic formation in the area. The tailings were encapsulated in place, and the resulting 40.5-hectare (100-acre) engineered disposal cell was completed in 2000. The 299-hectare (738-acre) Uranium Mill Tailings Radiation Control Act Title II site was transferred to the US Department of Energy (DOE) Office of Legacy Management under a US Nuclear Regulatory Commission general license in 2004. During reclamation activities, channels were designed and constructed into the surrounding weathered shale to protect the disposal cell from high-precipitation events. Due to the highly erodible soils and anticipated sediment deposition into the diversion channels, a sediment trap was also excavated. By excavating the channels and sediment trap, the local base elevation was altered, which exacerbated erosional forces. Recontouring surrounding drainage basins during the reclamation activities also promoted erosion by reducing natural rock armoring and vegetation that aids in soil stability. To compound the erosion issue, the L-Bar site is susceptible to short-duration, high-intensity, localized convective storms. Because the local geomorphology includes soils consisting of weathered shale, these precipitation events are not conducive to absorption into the soils, but rather to sheet flows that follow topography and concentrate in lower elevation areas where flow volumes and velocities increase. These factors result in the formation of deeply incised gullies and promote soil piping, which is an important geomorphic process in the widening of arroyos and the advancement of head-cutting, evident at the L-Bar site and surrounding areas. At the first annual inspection by DOE in 2005, it was noted that extensive erosion was occurring upgradient of the sediment trap. DOE determined that the design of the site's drainage system was the cause of extensive erosion. It is believed that by lowering the base elevation of the local drainage system through excavation of the sediment trap, the geomorphic response common to fluvial systems in a semiarid environment has increased the incision and remobilization of sediment downstream. Over time, these sediments would be deposited in the channels, which are designed to divert runoff away from the disposal cell, effectively limiting their capacities. The development of alluvial fans on one side of the channel directs flows to the opposite side of the channel, presenting the risk of cutting into the side slopes of the disposal cell. In addition, the upstream migrating gullies could intersect access roads and create hazards for adjacent stakeholders, including their grazing livestock. Current estimates conclude that potential offsite impacts could occur within the next 20 years, with gully migrations of up to 19 meters (63 feet) per year. In 2009, several erosion-control structures were constructed to reduce runoff velocities and ease the elevation differential created by the construction of the sediment trap and diversion channels. The first measurable storm events after construction occurred in August and September 2011, where one structure washed out and another structure was bypassed when runoff breached an earthen berm. DOE has conducted site assessments, continues to monitor erosion, and has applied lessons learned in the process of evaluating options to repair or modify the structures to stabilize the site and prevent potential short-term damage to adjacent properties as well as long-term damage to the disposal cell. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Effect of Glass Chemistry on Caesium Volatility

The UK currently has 99,000 m3 of intermediate level waste (ILW). The current preferred treatment route is cementation. However, thermal treatment could offer a better long term option due to higher waste loading and lower storage costs. This project will focus on volatile retention in the vitrification process to make thermal treatment a more viable option. A series of iron phosphate base glasses were prepared with the nominal molar composition xM{sub y}O{sub z}(40 - x)Fe{sub 2}O{sub 3}-P{sub 2}O{sub 5} (M{sub y}O{sub z} = B{sub 2}O{sub 3}, MnO, ZnO with x = 5%). Samples are given names of the form IPG-1-X5 where X = B, Mn or Zn. For all batches, reagents were weighed and mechanically mixed to produce 150 g of glass. melted at 1150 deg. C for 3 h, Samples were immediately transferred to an annealing furnace and annealed at 450 deg. C for 1 h before being cooled to room temperature at 1 deg. C min{sup -1}. 75 g batches was produced with a target of 2 wt.% caesium oxide. Each batch was placed into a mullite crucible and placed in the sealed system seen below. Each canister was placed into a top-loading resistance furnace and ramped to 950 deg. C at a rate of 3 deg. C min{sup -1} under a nitrogen atmosphere with a flowrate of ∼0.9 L min{sup -1}. The samples were held at this temperature for 3 h before power to the furnace was removed and the system allowed to cool naturally. Once cool, the steel canister was opened and the entire apparatus (steel canister, mullite crucible and tubing) was washed through with ∼50 ml of 0.5 M HNO{sub 3} to allow for a complete mass balance of the caesium species. A series of Iron Phosphate glasses have been produced and characterised to investigate the influence of glass chemistry on the volatility of caesium. All glasses were doped with ∼2 wt.% Cs{sub 2}O and re-melted at 950 deg. C for 3 hours in a specially designed furnace set-up. Results of these experiments showed that the addition of 5 mol. % ZnO greatly increased the retention of Cs{sub 2}O whilst B{sub 2}O{sub 3} was detrimental to the Cs{sub 2}O retention. A series of iron phosphate based glasses have been produced with 5 mol.% additions of B{sub 2}O{sub 3}, MnO and ZnO, substituted in place of Fe{sub 2}O{sub 3}. All samples were analysed before and after being doped and re-melted with a 2 wt.% addition of Cs{sub 2}O. The effect of each additive on the base glass has been reported showing that both B{sub 2}O{sub 3} and ZnO increase the glass transition temperature, whilst MnO additions decrease the thermal stability of the glass. The Q-speciation of the glasses was investigated, and the results showed that the additives did not significantly influence the Q-speciation in comparison to the base glass. It has been shown that the addition of ZnO dramatically increases the retention of Cs during re-melting by almost a factor of 10 in comparison to the base glass, whilst the addition of MnO addition increased the caesium retention but only by a factor of ∼3. The addition of B{sub 2}O{sub 3} had a detrimental effect on the volatility in comparison to the 40Fe{sub 2}O{sub 3}-60P{sub 2}O{sub 5} base glass.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Simulation of DWPF Chemical Process Cell Using a Reaction Calorimeter

The Defense Waste Processing Facility (DWPF) converts liquid radioactive waste into glass using a Sludge Receipt Adjustment Tank (SRAT) and Slurry Mix Evaporator (SME) in addition to other processes. The SRAT and SME processes can be simulated on a small-scale using the Mettler-Toledo Reaction Calorimeter (RC1). This equipment is able to automate the execution and monitoring of experiments involving nonradioactive chemical simulants. During the chemical processing of sludge in the SRAT process, foam begins to form and can foam over the reaction vessel. The current antifoam used at DWPF creates a risk of increased flammability and has a limited pH range. Usually, mercury is circulated back into the reaction vessel during the SRAT process, making it difficult to remove. To combat foam over, novel antifoams will be tested during the boil-up process using the RC1. To improve mercury extraction, 3D-printed coalescer columns will be tested within the Mercury Water Wash Tank (MWWT) of the RC1. Testing of Simulant Sludge Batch 6 (SB6) was performed to ensure: the sludge would form a stable foam at boiling during full SRAT/SME runs; the antifoam would reduce the amount of foam within the vessel The sludge and a Precipitate Reactor Feed Tank (PRFT) simulant with monosodium titanate (MST) were mixed separately, combined, and then heated to boiling. As shown below, the antifoam used was able to eliminate the foam within the vessel, as expected. The FormLabs Form2 3D Printer can be used to create roughly 3-inch tall and 1-inch diameter columns from clear and ceramic resins. The columns will utilize chemical and physical forces to draw the mercury out of a condensed offgas stream leaving the RC1 reaction vessel. These columns will be tested during full SRAT/SME runs on the basis of how well they are able to collect elemental mercury. In preparation for full-scale runs, the RC1 equipment was assembled onto a custom table and tested with water runs. The software used to control automation, iControl, has a user-friendly interface that allows the experiment to be altered as needed. An example of the data recorded during an experimental run is represented in Figure 1 below. Water runs were utilized as a way to prove if the RC1 system was functioning in the following areas: Boil-up rates, Chemical additions using pumps, Temperature readings, Balance readings, Probe readings, Offgas system, Agitation. Future Plans: Five novel antifoams will be tested during full SRAT/SME runs. The most effective antifoam will be utilized in DWPF's Chemical Process Cell. The design of the Mercury Extraction Coalescer can be further manipulated to increase the extraction of not only elemental mercury, but other heavy metals in environmental remediation processes as well.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Trace Chemical Detection Using Intercalated MXenes as a Signal Enhancing Substrate in Optical Probes

MXenes are 2D materials composed of layered transition metal nitrides or carbides. These materials are synthesized by HF exfoliation from MAX phases (Ti{sub 3}AlC{sub 2}). The 2D nanomaterial was synthesized by the removal of the 'A' element, resulting in a Mxene product (Ti{sub 3}C{sub 2}). MXenes have the general formula M{sub n+1}X{sub n}T{sub x}, where M is an early transition metal, X is Carbon and/or Nitrogen, and T accounts for surface terminated functional groups such as Fluoride, hydroxyl, and oxygen. These materials have very unique properties, similar to graphene, that allows them to be applied in a variety of trace detection techniques including surface-enhanced Raman spectroscopy (SERS). MXenes have also been demonstrated to selectively uptake uranyl ion, UO{sub 2}{sup 2+}. If this property can be combined with SERS or fluorescence detection, it may be possible to use MXenes as the basis for an alternative method to kinetic phosphorescence analysis (KPA) for trace uranyl measurements. Objectives: To confirm that MXene Nano materials are suitable substrates for SERS and sensor development by enhancing Raman signaling. To determine if certain MXene preparation methods yield materials that are more suitable for trace sensing methods. To determine uranyl uptake properties of these MXene materials and test them for analytical signals. Sample Preparation: Preparation of Ti{sub 3}C{sub 2}MXene (at FSU). MXenes were prepared by etching Al from Ti{sub 3}AlC{sub 2} (MAX phase)material. Two etching techniques yield different MXene products: LiF/HCl: Milder reaction, larger MXene flakes. HF: Harsher reaction, smaller flakes, larger layer separation. Products washed to remove etchant, vacuum filtered, and dried. Dried MXene flakes are air-stable. Film preparation for sensor testing (at SRNL): Suspend powder in diH{sub 2}O, purge with Ar, sonicate for 30 min. Centrifuge and collect supernate with suspended particles. Observed LiF-etched Mxene yielded a higher density of particles and darker collected solution. Drop-cast (4 ml) supernate onto slides and dried with Ar. For Rhodamine B (RhB) testing, drop-cast 4 ml drops onto Mxene spots and dried with Ar. Scanning Electron Microscopy conditions: 10 kV Beam energy, high vacuum; Working distance of 8 mm; beam penetration depth appx. 4 microns, beam spot size appx. 2 nanometers. Results: Detection of aluminum correlates with bright spots on image. Presence of aluminum shows that LiF/HCl etching was less thorough than HF etching. Trace Cl detection in LiF images suggests incomplete rinsing. HF has smaller feature size, more layer structure, and increased homogeneity, consistent with expectations. Macroscopic Raman spectroscopy measurements: 532 nm excitation, ∼50 mW with a ∼100 micron spot size (InPhotonics RPB probe). Kaiser Optical Holospec f/1.8 spectrometer with cooled (-60 deg.C) Andor iDus OE420 CCD. LiF 1x supernate showed good signal for trace measurements of Rhodamine B. HF and 1/4x LiF supernates showed little Mxene or Rhodamine B signal. Low deposition densities led to excess background signal from glass slides. For LiF film, response is linear with Rhodamine B concentration over range tested. Will retest with Raman microscope (∼1 micron spot size) to characterize SERS of more dilute LiF and HF etched Mxenes. Conclusions: The LiF etched material was more suitable for macroscopic SERS measurements because it was more concentrated, resulting in a thicker film than the HF etched Mxene and diluted LiF sample. However, the other materials may give greater SERS enhancements, which we hope to determine from measurements with the Raman microscope. From characterization with SEM we concluded that the HF etched Mxene is more uniform/homogenous and has smaller particle size than the LiF etched Mxene. There is still aluminum present in both samples indicating that etching wasn't complete, but the removal of the aluminum was more efficient in the HF method. Path Forward: Observe SERS with Raman microscopy, to obtain better signals for the more diluted samples and be able to compare enhancement effects for the different MXenes. Characterize uranyl sorption into MXene films and test Raman and fluorescence signals. Revisit the etching conditions to improve removal of aluminum. FSU and SRNL will continue to collaborate to create and characterize different Mxene materials and test their usefulness for sensor applications.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

2D Dam-Break Analysis of L Lake and PAR Pond Dams Using HEC-RAS

In 1991 a dam-break study was conducted for the high hazard dams located at L Lake and PAR Pond on the Savannah River Site. Two scenarios were considered, over topping from a Probable Maximum Flood (PMF), and a fair weather dam-break for either or both dams. Unfortunately, no inundation map was developed from the study. The purpose of this project was to redo the original dam-break study with improved data and methodology to generate Inundation maps to assist with emergency response and evacuation plans. The Hydrologic Engineering Center's River Analysis System (HEC-RAS) is a free to download river analysis modeling program developed by the US Army Corps of Engineers capable of 1D and 2D hydraulic calculations. Version 5.0.7 (released March 2019) was used for this project. Digital elevation models for the area were retrieved from the US Geological Survey database and converted to a .hdf file within the program. Then the 2D flood area was identified from the contours. Both L Lake and PAR Pond were inputted as 1D storage areas because DEM data does not contain elevation values under water bodies. An elevation vs volume curve was available for both storage areas. Initial elevations were set for both scenarios. Both dams are earthen dams. The Steel Creek dam at L Lake has 6 ft diameter conduit with an upper and lower sluice gate. PAR pond dam consist of a weir and sluice gate connected to an 8 x 8 ft channel. Both outlets were modeled with a pool elevation vs discharge curve. The steel creek dam sluice gates were assumed to be fully open in all cases. As in the previous study, the dams were set to breach when they were overtopped by 1.5 ft during PMF conditions (Figure 1). A fair weather breach was set to be due to a piping failure (Figure 1). In the dual dam break during fair weather conditions the PAR pond dam fails 3 hours after Steel Creek to achieve maximum flooding in the down stream reaches. Simulation was run 3 days for each case and with a 1 minute computational interval. Maximum flooding occurs under PMF conditions with the failure of both dams. PAR pond dam fails first 16 hours and 32 minutes after the start of the simulation with the Steel creek dam failing 6 minutes later. In all cases, the bridges and roads spanning Steel Creek and Lower Three Runs will be inundated and potentially washed away. The Burtons Ferry Highway south of the storage areas will be partially flooded during PMF failure, dual fair weather failure, and PAR pond failure under fair weather conditions.

54 ENVIRONMENTAL SCIENCES↗

Utilizing Commercial Submersible Mixer Pumps for Sludge Removal in Savannah River Site's Tank 26 - 20289

The Savannah River Site (SRS) Liquid Waste System (LWS) safely manages, stores, treats, and dispositions liquid radioactive waste. The LWS consists of 51 underground waste storage tanks (eight of which are operationally closed and filled with grout), waste evaporators, treatment facilities, and solidification facilities, known as the Defense Waste Processing Facility (DWPF) and Saltstone Production Facility (SPF). One of the waste storage tanks, Tank 26, was placed into service in 1980 as an F Tank Farm (FTF) Evaporator Feed Tank. From 1980 to 2013, Tank 26 received F Canyon receipts and dilute supernate that was then transferred to the 242-16F FTF Evaporator for volume reduction. In 2013, the steam tube bundle failed in the FTF Evaporator, and the decision was made not to repair/resume evaporator operation. During operation of Tank 26, solids built up to a level of 2.03 m in the tank with a volume of 1062.9 kL. Due to the evaporator failure and subsequent shutdown, the solids in Tank 26 were selected to feed Sludge Batch 10, which is collected and prepped prior to being sent to DWPF for final disposition. To accomplish solids removal, Commercial Submersible Mixer Pumps (CSMPs) were selected to slurry the solids in preparation to be sent to Tank 51. Four CSMPs were installed in Tank 26 with each one installed in a separate quadrant of Tank 26. This work would mark the first deployment of CSMPs in an SRS waste tank. The CSMPs were developed in response to operational issues from previous mixing pumps and budgetary constraints. The CSMPs use the concept of modifying commercially available equipment for nuclear waste applications. The CSMPs consist of a 230-horsepower submersible mixing pump (manufactured by GPM, Inc.) joined to a mast fabricated at SRS. For this application, Savannah River Remediation (SRR) design services was challenged to provide a mast design that required no steel superstructure support system on top of Tank 26. Also, SRR design services provided a simplified Tank 26 riser interface that did not require extensive machine parts to adjust height of the suction screen of the CSMP within the tank. Other design improvements include no requirements for tank top radiation monitors and no requirements for flushing of the CSMPs during startup/shutdown operations. The CSMPs were operated at an initial height of 2.29 m above the Tank 26 bottom for 10 days. After sludge sounding, the CSMPs were lowered to a height of 1.52 m with no issues due to proper work planning and the simplified riser interface. With the CSMPs lowered to a level of 1.52 meters above the tank bottom, the CSMPs were operated for 12 days and another sounding was performed. The sounding level came back matching the disturbance depth results of the first pump run. Chemistry samples were analyzed while the tank was left to settle. The analysis revealed enough weight percent solids to provide good feed to Sludge Batch 10. Also, the results revealed the supernate within the mixture would provide good salt solution feed to Salt Waste Processing Facility (SWPF) Salt Batch 3. So, the plan was modified to let the disturbed solids settle and decant the salt solution for addition to SWPF Salt Batch 3. Then water will be added back to Tank 26, and the CSMPs run in order to wash the solids to decrease settling time prior to being sent to Tank 51 for Sludge Batch 10. Utilizing CSMPs for waste removal in an SRS Tank has provided a cost-effective means for further waste removal efforts. In addition, the CSMPs are easier to operate by utilizing a robust and simplified design. The CSMPs performed quite well with no process shutdown or delays during operation. As a result, CSMPs are integral to the future of removing radioactive waste from storage tanks at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design of a Symbiotic Device to Harvest Uranium from Seawater through the use of Shell Enclosures

At the current consumption rate, the global conventional reserves of uranium, 7.6 million tonnes, could be depleted in a little over a century. As reserves decrease, future uranium is expected to come from lower quality sites, resulting in higher extraction costs and even greater environmental impact. Fortunately, uranium is present in the ocean as uranyl ions at low concentrations of 3 ppb, which, over the total volume of the oceans, amounts to approximately 4.5 billion tonnes of uranium, nearly a thousand times that of conventional reserves. Methods to extract uranium from seawater have been studied since the early 1960's, when, at a time when uranium production was uncertain, post-World War II Britain desired a secure uranium supply. A recent review of uranium recovery technologies by found that uranium adsorbent by chelating polymers was the most promising in terms of adsorbent capacity, environmental footprint, and cost. In this technology, chelating polymers are deployed in seawater and remain submerged until the amount of captured uranium approaches the adsorption capacity. Then, an elution bath is used to strip metal ions, such as uranium, off the adsorbent polymer. A polymer may be immersed in a number of elution baths before it is regenerated by an alkali wash to free its functional groups, allowing for the reuse of the polymer. The output from the elution process undergoes purification and precipitation typical for mined uranium to produce yellowcake. Offshore systems for the extraction of uranium from seawater have been developed since the early 2000's. In these systems, the adsorbent is deployed and moored for extended periods of time, brought back to shore for the elution process, and redeployed afterward. The first system, developed by, used non-woven adsorbents that were immersed for 30 days in seawater. Due to the low mechanical strength of these fibers, they had to be incorporated into stacks composed of spacer nets and holders placed on large, heavy, floating frames, which resulted in a design that was too costly for implementation. More recently, buoyant braided adsorbents have been studied as a way to decrease the weight and cost of the system. In these systems, continuous polyethylene fibers are braided around a porous polypropylene float that can be made into long lengths. However, because this deployment scheme requires the adsorbent be brought back to shore for the elution process and redeployed afterward, this stand-alone, intermittent operation system has significant practical and economic deployment challenges and to date none of these systems have become economically viable. Detailed economic analysis by found that a major cost driver of seawater uranium extraction is the mooring and recovery of the adsorbent. Based on these results, first developed the development of a system that is attached to an offshore wind turbine and continuously takes the adsorbent from the ocean through an elution process and then returns it to the ocean. More recent designs by further build upon this idea. The integration of the design of a uranium harvesting system into an offshore wind turbine tower is pursued because the development of offshore wind or uranium harvesting by themselves bears a high capital cost for the structures, but if the mooring function can be shared, the overall cost for each will be lower. Furthermore, initial design analysis and prototyping of these symbiotic systems has proven they are technical feasible. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Experimental study of the downstream effect of LOCA-generated debris on the pressure drop of full scale fuel assembly

The emergency core cooling system (ECCS) works to cool the reactor core in the event of a postulated loss-of-coolant accident (LOCA). The long-term reactor cooling water of ECCS comes from containment sump. Usually, the containment sump contains one or more screens to prevent the components of the ECCS from debris which could be washed into the sump. Large debris is blocked by the sump screens. However, some of the debris, such as fibrous, chemical precipitates and small particles may be ingested into the ECCS and subsequently into the reactor coolant systems (RCS), which would challenge the long-term core cooling (LTCC) and threaten the reactor core safety. NRC address this concern Generic Letter 2004-02. Westinghouse has evaluated the AP1000 1/4 height fuel assembly head-loss test in response to the issue. AVERA also perform the scaled 1/3 height mock-up fuel assembly test. The debris effect on the pressure drop of half-length mock-up PLUS7 fuel assembly of APR1400 were performed in KHNP. Numerical simulation by RELAP5-3D were performed for the debris-generated core blockage and full core as well as core bypass blockage condition were considered. However, the test in the works mentioned above use the scaled down FA (1/4, 1/3 or 1/2 length of a full FA), and didn't give the relationship between pressure drop and debris batches. The purpose of this study was to extend the debris effect to the full scale PWR fuel assembly, and identified batch by batch effect of debris to head loss of FA. The specific experimental procedure is concluded. The pressure drop test without adding debris is performed at the beginning and then three kinds of debris are added to the test loop step by step to test their effect on the pressure drop of fuel assembly. Two kinds of tests have been carried out, and the quantitative pressure data are obtained and analysis is provided. This work provides reliable and quantitative data for nuclear power plant (NPP) downstream effect analysis and safety analysis program, which is important to for licensing of NPP and further benchmark exercise. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Cost Analysis of Wind and Uranium from Seawater Acquisition symbiotic Infrastructure using Shell Enclosures

At current consumption rates, global conventional reserves of uranium, estimated to be 7.6 million tonnes, could be depleted in a little over a century. As these reserves decrease, extraction of uranium is expected to shift to lower quality sites, resulting in higher extraction costs and greater environmental impact. Fortunately, the ocean contains approximately 4.5 billion tonnes of uranium, as uranyl ions at low concentrations of about 3 ppb. Uranium from seawater is a widely studied topic due to the long term security it can assure the nuclear fuel cycle. Additionally, harvesting uranium from seawater could reduce some of the environmental impacts associated with the recovery of land-based uranium. Seawater uranium is meant to create a cost ceiling that provides economic stability and potential savings, not to act as a direct competitor to terrestrial uranium. A recent review of uranium recovery technologies by found uranium adsorption by chelating polymers to be the most promising in terms of adsorbent capacity, environmental footprint, and cost. In this technology, chelating polymers are deployed in seawater and remain submerged until the amount of captured uranium approaches the adsorption capacity. Then, an elution bath is used to strip metal ions, such as uranium, off the adsorbent polymer. A polymer may be immersed in a number of elution baths before it is regenerated by an alkali wash to free its functional groups, allowing for the reuse of the polymer. The output from the elution process undergoes purification and precipitation typical for mined uranium to produce yellowcake. Offshore systems for the extraction of uranium from seawater have been developed since the early 2000's. The system currently studied by a nationwide consortium of national laboratory and university partners utilizes continuous adsorbent polyethylene fibers that are braided around a porous polypropylene float which can be made into long lengths. However, because this deployment scheme requires the adsorbent be brought to a mother-ship for the elution process and redeployed afterward, it has significant practical and economic deployment challenges. Detailed economic analysis have identified the adsorbent production and mooring as the most expensive components of the recovery process. Based on these results, proposed an alternative deployment method that is attached to an offshore wind turbine and continuously takes the adsorbent, that is fabricated into a belt, from the ocean through an elution process and before submerging it back into the sea. However, it has been found that adsorbents with high tensile strength and durability often have very low uranium adsorption properties. Hence, the Wind and Uranium from Seawater Acquisition symbiotic Infrastructure (WUSABI) previously studied, which requires the adsorbent into a belt held in tension, could face difficulties in an ocean environment. Instead, the design, further referred to in this paper as WUSABI-Koosh, utilized a two-part system to decouple the mechanical and chemical needs of an adsorbent for seawater harvesting of uranium. In these designs, the uranium adsorbent material with high adsorbent capacity is enclosed in a hard permeable outer shell with sufficient mechanical strength and durability for use in an offshore environment and chemical resilience against elution treatments. The integration of the design of a uranium harvesting system into an offshore wind turbine tower is pursued because the development of offshore wind or uranium harvesting by themselves bears a high capital cost for the structures, but if the mooring function can be shared, the overall cost for each will be lower. Furthermore, initial design analysis and prototyping of these symbiotic systems has proven they are technically feasible. This paper presents preliminary cost analysis for comparison to uranium recovery via alternative deployment schemes.

07 ISOTOPE AND RADIATION SOURCES↗

Modeling and Analysis of a Heat Pump Clothes Dryer with Thermal Energy Storage

Clothes drying is an energy-intensive process that causes significant electricity consumption and carbon emissions in the US. Approximately 83% of Households in the US own a tumble clothes dryer at home and 80% of dryers are electrical resistance dryers with low energy efficiency. Heat pump technology makes it possible for highly efficient and clean drying. Additionally, the ventless design of heat pump clothes dryers (HPCD) provides more installation flexibility. HPCD involves three primary mediums: wet clothes, a closed air loop, and a refrigerant circuit. The evaporator is used to dehumidify the wet air and the condenser is used to re-heat the dry air. One of the critical technological barriers to HPCD market penetration is its long drying time, primarily due to the relatively low discharging temperature and the slow response during the warm-up period. In this study, the thermal energy storage (TES) technology is adopted to address this challenge by providing pre-heating of air prior to the condenser to increase the operating temperature of the process air. The heat pump will charge the phase change material (PCM) in the TES device with heating energy during clothes washing and the PCM will discharge the stored heat to facilitate air heating during clothes drying. To analyze the optimal design and potential for energy saving and drying time reduction, a mathematical model of the HPCD system was developed. The HPCD is a highly dynamic system with a coupled heat and mass transfer and heat pumping cycle. This paper provides solutions to simulate the transient behavior of the system while maintaining low computational cost. The modeling result indicates reduced energy consumption and drying time by integrating TES with HPCD, as compared to electrical resistance dryers. The study can provide significant insights into improving building flexibility with TES and smart appliances.

Liu, Xiaoli↗

ARC-100 Reactor Security-by-Design Summary

This report applies the security-by-design methodology developed in a previous National Nuclear Security Administration–sponsored work to the Advanced Reactor Concepts 100 (ARC-100) sodium-cooled fast reactor (SFR) design. The report contains no proprietary information specific to the ARC 100 reactor. The insights developed in this report are high-level, and generally applicable to other sodium fast reactor designs. The information presented here is the result of a qualitative safety-based analysis and would not inform any potential adversary beyond what would be found in a docketed safety analysis report. The scope of this present report covers ARC-100’s reactor core, used fuel storage, and used fuel assembly wash station. These systems are also compared to a generic SFR design assumed in the previous study. The security assessment results show changes in structures, systems, and components (SSCs) safety importance relative to the generic SFR SSCs. However, the consequence assessment results are the similar to a previously assessed generic SFR. Several SSCs have higher importance rankings than others, and it is recommended that protection efforts are prioritized for these SSCs. This work will continue in the Fiscal Year 2025 for the remaining ARC-100 systems, including cesium trap, sodium cold trap, noble gas decay tanks (dewar bottles), and used fuel dry storage facility, to provide safety-and-security-by-design insights and recommendations on non-core systems. Results from this work will furnish a technical justification for the feasibility of these solutions for the ARC reactor's design and, where applicable, identify any regulatory benefits conferred by the proactive design aspect within a risk management framework. This initiative will contribute to a more secure design of the ARC reactor and support its licensing process.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Zeolite membranes, molecular separation methods, and manufacturing processes for zeolite membranes

Disclosed are methods of manufacturing a zeolite membrane, comprising: providing at least one porous substrate; and coating the at least one porous substrate with a membrane. In some embodiments, the method further comprises hydrothermally treating the membrane with a first hydrothermal treatment step with tetrapropylammonium fluoride (TPAF) and a second hydrothermal treatment step with tetraethylammonium hydroxide (TEAOH). In some embodiments, coating the substrate with a membrane comprises surrounding at least a portion of the at least one porous substrate with a precursor gel, the gel comprising a gel phase and a plurality of CHA or MFI crystals; heating the at least one porous substrate and the precursor gel; washing the at least one porous substrate; drying the at least one porous substrate; and calcining the at least one porous substrate.

Nair, Sankar↗