Search NASA⌕ Search

SEARCH · Search NASA

Results for “Workforce”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,441 records · Page 80

Considerations for recovery of large areas of a nuclear facility for re-use - 15147

This paper highlights a number of factors an organization might consider for recovery of a facility, using a successful example from the UK. In 2013 a power failure led to the shutdown of the ventilation system that caused loose contamination to be deposited over large sections of man-accessible areas of plant after the evacuation of personnel. The successful initiation of emergency Command and Control arrangements during the Response phase, saw several key responders brought together to offer technical direction across many disciplines. The actions of the Command and Control unit prevented any further spread contamination to other areas of the facility and any external release. This enabled the return of the plant to an operational status which forms an important mission enabler for the site hazard reduction programme. Intervention at an early stage during the Response phase of the incident saw the cessation of traditional dilute chemical wet decontamination approach that would otherwise leave a legacy of slow leaching contamination; to that of containment and ultimate removal of loose contamination using strippable coatings. Doing so established a more rapid and reliably 'clean' access or pathway into the plant to establish the full extent of the situation. The scale and scope of the decontamination requirement was steadily revealed through a number of controlled re-entries to the plant. A number of other techniques were considered and employed to address the different areas making use of available plant resources to deliver the successful 'self-help' recovery of the plant using multi-disciplinary teams. As Response switched to Recovery, it was important to set out and agree which strategic option should be adopted to return the facility to normal operation. Equally, it was necessary to verify which equipment had been affected by the power outage and repair as required. Furthermore, equipment with designated safety functions had to be maintained alongside the Recovery activities. A careful balance of priorities demanded an unparalleled depth of plant knowledge to address this, whilst still keeping site and external stakeholders informed. The engagement by the plant workforce to take on the decontamination challenge to enable recovery of their plant supported by other teams formed a critical step in the speed of recovery. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Knowledge management information tool Web analytics - 15182

The Knowledge Management Information Tool (KM-IT) is a web-based [01] system developed to maintain and preserve the Department of Energy's (DOE's) D and D knowledge base. The system was developed by Florida International University's Applied Research Center (FIU-ARC) with the support of the D and D community including the DOE Office of Environmental Management, and with the active collaboration and support of the DOE's Energy Facility Contractors Group (EFCOG). The KM-IT system is a D and D community driven system tailored to serve the technical issues faced by the D and D workforce across the DOE Complex. The D and D KM-IT is an interactive web-based system operational and available for free access at www.dndkm.org. [02] The D and D KM-IT is currently composed of the following tailored D and D modules: Web Crawler, Hotline, Technology, Document Library (including Hanford's and Savannah River Sites' ALARA Center Reports), Specialist Directory, Lessons Learned, Best Practices, Video/Picture Library, Vendors, Collaboration Tools, Training, and Mobile Systems. The Web Crawler dynamically searches through the D and D KM-IT repository as well as the web and displays search results based on the search criteria. The Hotline allows registered users to post questions/problems related to D and D and to receive solutions from a subject-matter specialist. The Technology module serves as repository of D and D technologies and contains technology/ demonstration fact sheets and vendor information. D and D community members can add Lessons Learned, Best Practices, Documents, and Pictures/Videos to the D and D KM-IT repository, after a formal approval process. The Vendor module provides a directory of commercial vendors who provide D and D related technologies, supplies, and services. D and D KM-IT makes excellent use of the knowledge that exists within the D and D community by allowing D and D project managers around the DOE complex to collaborate by sharing innovative ideas, past experiences, and practices and by maintaining a directory of subject matter specialists. The mobile version of the KM-IT can be accessed from m.dndkm.org [03] and currently has six active modules: Vendor, Technology, Picture/Video Library, Hotline, Lessons Learned and Specialist Directory. Web analytics is a key tool being implemented by the D and D KM-IT project team in an effort to enhance the system to better meet users' needs. The D and D KM-IT project team incorporates web analytics as part of its operational elements to analyze information and key data points on how the system is being used. Web analytics is the measurement, collection, analysis and reporting of internet data for the purposes of understanding and optimizing web usage. The use of web analytics retains or attracts D and D community members to access and share knowledge through virtual collaboration on the KM-IT platform. D and D KM-IT web analytics measures details on the overall usage of the system without tracking personal information or specific user behavior: how many users visited the application, how many of those users were unique visitors, how visitors come to the system (i.e., by following a link to the system or by using the web site URL via bookmark or directly typing the address), what keywords were used to perform searches with the search engine, how long the average user stayed on a given screen or on the entire system and what links were clicked on. This information is used to identify which areas of the system are more popular than the others and provides information that can be used to streamline the application for a better user experience. (authors)

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Managing work flow and logistic at waste processing facilities using the waste compliance and tracking system - 15392

Work flow and logistics at a busy radioactive waste processing complex or permitted treatment, storage, and disposal facility (TSDF) can pose a monumental challenge. An efficient operation requires good communication between engineering, logistics, and waste operators. The Los Alamos National Laboratory (LANL) has implemented an application that facilitates seamless communication of work flow requirements, between engineering, logistics, and waste operations personnel in the field. The Waste Compliance and Tracking System (WCATS), a comprehensive waste management system designed at LANL, provides four key elements to support logistics: (a) the container work path, (b) directed unit operation requests, (c) notification of pending operations, and (d) real-time status tools for office and field workers. The combination of these elements allows everyone to function as a team, with a shared knowledge of what is needed to accomplish facility objectives. The first element is like a road map indicating which unit operations are needed and in what sequence they should be performed; this is referred to as a 'work path'. It automatically routes a waste item or container from operation to operation. For example, a given work path might indicate that waste items require radiological survey, radioassay, and a technical review, in that order. When the work path is assigned to a container, the system enforces the correct order of operations. Directed unit operation 'requests', the second element, fills a gap between pre-planned, formal 'work path' activities and the need for flexibility to direct preparatory operations or deal with unexpected issues, like staging or mining containers in preparation for a shipment or transferring containers from one storage unit to another to clear a path for building maintenance. Logistics engineers prepare these 'requests', and the system monitors the status and completion of the work. The third element, notifications, allows team members to subscribe to and receive notice that an operation is pending, initiated, or complete. This functionality supports a range of communication options, including e-mail, cell phone, pager, or application in-box messaging. Notifications allow waste operations personnel to multi-task, and remain in the loop on the status of facility-wide activities. Finally, the fourth element provides tools that communicate work path pending operations and directed requests to field workers on their mobile computer, allowing them to mine or pick containers from storage units, and leverage the capabilities of a bar-code scanner to avoid selection mistakes. Oversight and summary tools are provided, allowing logistics personnel to monitor work path and request task status, identify work-flow bottlenecks, and maximize the efficiency of waste operations. The Waste Compliance and Tracking System (WCATS) provides an innovative, comprehensive set of tools that allow large-scale radioactive waste processing facilities to manage logistics, maximize efficient use of the workforce, and create a team environment, where everyone from management to the waste handlers have an understanding of the work load and what needs to be accomplished. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Benefits of Lean Management in liquid waste operations - One company's journey - 15402

For Savannah River Remediation, LLC (SRR), Lean Management is the culmination of a number of years of searching for an effective process improvement methodology. SRR formally applies Lean Management as the cornerstone to transforming the way we work and lead. Two foundational principles support all Lean efforts: respect for people and continuous process improvement. Respect for people means we respect the work they do and the knowledge they have attained. Continuous process improvement focuses on continuous because to be successful we must continuously return to the process to refine, improve, and optimize. Like every other US DOE contractor, SRR is faced with challenges to accomplish more with less. Our initial round of Lean events focused on value streams such as Work Planning and Control, Supply Chain, and Tank Closure acceleration. We have completed a first pass through these programs. As a result, in general terms, process times were cut in half, while reducing rework and quality issues significantly. SRR reduced Corrective Maintenance backlogs without any appreciable increase in the workforce. This paper chronicles our search for improvement, what we did right, what we did wrong, and where we go next. In short, we want to challenge the management, contractors, and employees in US DOE complex to take this journey. The work we do is vitally important to our nation, our families, and our future. We owe it to the US DOE mission to do all we can with entrusted facilities, personnel, and taxpayer dollars. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Anticipating Change - A Means to Save Time and Rethink the Implementation of the 10 Code of Federal Regulations 770 Real Property Transfer Process - 15662

The Department of Energy (DOE) issued 10 Code of Federal Regulations (CFR) 770 in 2000 for the 'Transfer of Real Property at Defense Nuclear Facilities for Economic Development'. The rule was issued in order to 'offset negative impacts on communities caused by unemployment from related DOE down-sizing, facility close-outs and workforce restructuring'. There is a sense of urgency implied in efforts designed to address economic conditions, especially in communities that have hosted DOE facilities and are experiencing negative impacts of mission changes. Despite the urgency, the transfer of real property from DOE or any federal agency is a lengthy, complex, iterative, but necessarily diligent effort. After all, the aim of the process is to be able to demonstrate that the property proposed for transfer is protective of human health and the environment for the intended use. Notwithstanding the efforts of the economic development organization to market, recruit, and prepare a robust proposal to request property, and the efforts of DOE to perform the many due diligence activities in response to that request, the actual results of the evaluations are an unknown until a major portion of the process is completed. Will the property be determined to be suitable for transfer? Will there be deed restrictions? Is indemnification available? Has a mission need for the property arisen while working through the reviews? There are many points along the way that can sidetrack or delay progress and, in the interim, the economic viability of the proposal can collapse. Even without the unforeseen events, the process in and of itself is lengthy. It is often heard (loudly) that it takes far too long to obtain a piece of property once a request is made; that observation/criticism is worthy of serious attention. Rather than revisit old debates, why not learn from them? Why not look at the transfer process from a different point of view and ameliorate it so it can be more responsive to community needs? Why not anticipate change, anticipate requests, and make property available before a request as well as responding to requests to make property available? There are several ways to rethink and modify the way the transfer process is implemented to reduce the time following a request. The modifications would arise from both internal information sharing, integrated and timely up-front planning and, in particular, by varying how and when certain elements of the process to enable transfer are performed. This paper will address: 1. How a unified overall vision can be created from the cleanup input of Site-Specific Advisory Boards with the Community Reuse Organizations' planning for economic development and can help inform site cleanup to end state to future use; 2. Why DOE is in the best position to know its site conditions and could determine ahead of a transfer request what property is indeed available and notify of that determination; 3. How a range of disposition paths for real property are available to DOE; and 4. Why broadening the understanding of 'best interest of the government' to one that is clearly able to recognize non-monetary benefits is in the best interest of the government. Anticipating change helps prepare DOE and their host communities for the future. It creates opportunities for flexibility and time savings. The sooner DOE's unneeded and under-utilized real property can be made available to the communities that need it most, the sooner those communities can work to moderate the adverse effects of DOE mission changes. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

To Decommission or Not To Decommission? That is the Question... Revisited

Major Highlights Comparing 1998 to 2014: Favoring Plant Shutdown: Electric utility deregulation has created greater competition; Markets have been disrupted by cheap natural gas; Despite high availability, cost of electric power from natural gas still below break-even cost of nuclear generation; Emerging ISO acceptance of fluctuating renewable energy on the grid. Favoring DECON: D and D technologies have matured; Reactor Vessel and Internals segmentation methods still being refined; Nuclear workforce is 16 years older and leaving the nuclear industry (Impact on D and D TBD); Avoiding risk of more restrictive regulation and higher LLW disposal costs. Favoring SAFSTOR: Full funding of NDT still major driver for deferring immediate dismantlement. SAFSTOR vs. near term D and D influenced by: Status of and confidence in decommissioning fund (NDT) and cost estimate; Local and state politics; Public pressure. Most early shutdown plants tend to have under-funded decommissioning funds and opt for SAFSTOR. SAFSTOR allows for fund growth through interest compounding, but must assume that cost increase is less than fund growth: May not be true across the board, Much uncertainty/risk in waste disposal costs, regulatory requirements, etc. when projected out several decades. Once initiated SAFSTOR decision is not easily changed to DECON: Plant infrastructure equipment and components not readily available, RCS chemical decontamination can be very challenging, Key/knowledgeable plant personnel are gone. Consideration for phased approach to DECON: Remove >95% of the radiological source term under today's known regulations and cost by full System Decontamination of the primary circuit systems, and removal of NSSS and decontamination of the Containment Building; Improves risk profile in those areas most vulnerable to excessive cost growth; Able to defer D and D of the remainder of the plant to allow for the NDT to grow with interest.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Advanced Mixed Waste Treatment Project: Optimizing use of This National Asset to Treat Challenging Radioactive Waste From Other Department of Energy Sites - 16064

The U.S. Department of Energy's (DOE) Advanced Mixed Waste Treatment Project (AMWTP) is a world-class radioactive waste treatment facility with a highly experienced and innovative workforce located at the Idaho National Laboratory (INL). The AMWTP's state-of-the-art capabilities include a 62-ton super-compactor, remote cutting and sorting, macro-encapsulation systems, assay units, drum repackaging, waste characterization, and payload assembly and loading. Since operations began in 2003, the facility has been the largest shipper for contact-handled (CH) transuranic (TRU) waste to the Waste Isolation Pilot Plant (WIPP). It has successfully processed over 56,000 cubic meters (m{sup 3}) of CH TRU waste and mixed low-level waste (MLLW) from the Idaho Site and approximately 700 m{sup 3} of CH TRU waste from 15 other DOE sites. While the AMWTP is nearing successful completion of its Idaho mission, other DOE environmental cleanup sites will require safe and proven capabilities to treat, package, characterize, and certify legacy radioactive waste inventories well into the next decade. In addition, DOE's national security, nuclear energy, and science programs need sustainable treatment capabilities to support ongoing and new missions. The AMWTP could continue to serve a vital role beyond its current Idaho mission to help address these larger DOE needs. To this end and in recognition that AMWTP's current priority is to complete the processing and removal of Idaho waste, DOE's Office of Environmental Management has initiated strategic planning to assess the feasibility of continued AMWTP operations to treat challenging radioactive waste from other generator sites consistent with existing regulatory agreements. This paper describes AMWTP's unique capabilities and identifies potential benefits, opportunities, and possible solutions to packaging and transportation challenges to fully use AMWTP as a national asset. A panel discussion of subject matter experts with audience participation would help to inform DOE's strategic planning on how best to use this national asset into the future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Robotics Technologies on Knowledge Management Information Tool (KM-IT) Platform - 16465

The Knowledge Management Information Tool (KM-IT) is a web-based system developed to maintain and preserve the deactivation and decommissioning (D and D) knowledge base across the Department of Energy (DOE) complex. The system was developed by the Applied Research Center (ARC) at Florida International University (FIU) with the support of the D and D community, including the DOE Office of Environmental Management (DOE EM), and with the active collaboration and support of the DOE's Energy Facility Contractors Group (EFCOG). The KM-IT system is a D and D community driven system tailored to serve the technical issues faced by the D and D workforce across the DOE Complex. New information, including vendors and technologies related to D and D, are researched and added to KM-IT on an ongoing basis. In late 2014, DOE EM provided a database of 471 robotic technologies, originally developed by NuVision Engineering and Cogentus Consulting, with a request to evaluate the potential for integrating the data into the KM-IT framework for ongoing hosting/maintenance of the information. All of the data from the original database as well as photographs, documents, and videos are now available on KM-IT. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving the Safety Culture by Strengthening Leadership Skills - 16563

As a primary contractor for the U.S. Department of Energy (DOE), CH2M HILL Plateau Remediation Company (CH2M) is managing a team of approximately 1,400 employees at the Hanford Site in Southeast Washington. The work on this 10-year, $5.7 billion contract ranges from design and construction to decommissioning and cleanup. In 2013, CH2M began the second half of its contract and expanded its leadership development program to focus on succession planning and strengthening the leadership skills of its employees. The goal is to create and sustain qualified leaders to lead the Hanford cleanup mission today and into the future. CH2M launched the Leadership Impact Initiative, a training program modeled from best practices used at other CH2M projects, including the Idaho Cleanup Project. Based on the results of a CH2M HILL Plateau Remediation Company site-wide safety culture survey, the company developed an improvement strategy focused on leadership development with emphasis on the front-line leadership. The strategy stresses core leadership principles and skill development to help managers more effectively engage the workforce. The two-day workshop gives employees the opportunity to build leadership on the job in an audience of their peers. CH2M expanded the workshops to include employees from all levels of the organization, including bargaining unit employees. The workshops are reinforced at quarterly all-manager meetings, communications among team members and regular sharing of lessons learned and experiences in the field. The Leadership Impact Initiative advances CH2M's vision of quality leadership and project delivery anchored by health and safety performance excellence. Since 2013, CH2M hosted more than 25 Leadership Impact Initiative workshops, reaching approximately 500 participants. Meanwhile, the company achieved the best safety record since the start of its contract, and results from its 2015 safety culture survey show improvements in the safety climate. A DOE assessment of the CH2M worker health and safety culture for the Voluntary Protection Program (VPP) found the workshop was a contributing factor to the contractor achieving VPP Star and VPP Star of Excellence Status. This paper summarizes the strategy behind the leadership development program, the outcomes and its relevance for other companies, particularly those on DOE Environmental Management decommissioning projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The DISTINCTIVE University Consortium: An Overview - 18102

The UK government remains committed to nuclear energy having an important role to play in delivering a secure, low carbon and affordable energy future. Successful delivery of their strategy recognises the need for underpinning research, in addition to the provision of a skilled workforce and international collaboration as key enablers. One crucial area is the decommissioning and clean-up of all existing civil nuclear licensed sites and the implementation of geological disposal of highly active wastes, with the Nuclear Decommissioning Authority responsible for the delivery of policy aims with respect to legacy wastes. A central component of public acceptance of this strategy is a demonstrated ability to safely manage and dispose of waste, with acceptance linked to having scientifically robust routes for its safe clean-up and disposal. Similarly, the UK Engineering and Physical Sciences Research Council (EPSRC) strategy is to maintain investment in nuclear fission, with the development of approaches for implementing safe, cost-effective clean-up, decommissioning and waste disposal of existing and future nuclear sites and facilities a strategic focus. The EPSRC-supported DISTINCTIVE (Decommissioning, Immobilisation and Storage Solutions for Nuclear Waste Inventories) consortium is carrying out research that addresses the broad area of nuclear waste and decommissioning, bringing together academic researchers from 11 of the UK's leading research intensive universities and key industry partners. When allied to the strong links of the partners with the industrial and international R and D community, the project provides an excellent route for building a greater capacity for R and D within the UK, underpinning the strategic needs noted. The consortium also addresses the skills agenda in training a significant number of researchers with high level skills of direct relevance to nuclear waste and decommissioning. This paper describes the aims and objectives of the work being undertaken, and the technical work underway within each of the research theme areas: AGR, Magnox and exotic spent fuels; PuO{sub 2} and fuel residues; legacy ponds and silo wastes; and structural integrity. Projects using radioactive materials are also considered. As the project enters its final year, consideration is given to the impacts of the project for both academic and non-academic beneficiaries. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The DISTINCTIVE University Consortium: Structural Integrity - 18272

The Engineering and Physical Sciences Research Council (EPSRC) sponsored DISTINCTIVE consortium (Decommissioning, Immobilisation and Storage Solutions for Nuclear Waste Inventories) is developing technologies for civil infrastructure repair, in-situ subsurface waste immobilisation, and groundwater protection during construction and decommissioning. The consortium has contributed to the development of skilled cross-disciplinary civil engineers and scientists, that have the knowledge and experience required to develop engineering solutions tailored for application within radiologically contaminated sites. The Structural Integrity Theme focuses on challenges ranging from site-scale infrastructure preservation and restoration, through injectable ground barriers for risk mitigation, to the remote characterisation and handling of individual waste packages. The main aim of the theme is to develop novel engineering solutions, tailored for use on radiologically contaminated sites, for: ground protection; infrastructure characterisation; concrete restoration and waste characterisation. Technologies should minimise current, and future, radiation exposure of the workforce whilst providing economically viable engineering solutions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Wearable Robotics and Exoskeletons for WM Workers: Potential Benefits and Challenges - 18506

Wearable robotic and exoskeleton systems are emerging that have the potential to augment workers and reduce musculoskeletal injury and fatigue. To fully realize this potential, developers and workers should collaborate to ensure that the devices' benefits are realized without inducing secondary side-effects that outweigh the benefits. This paper describes the development of a prototype system for both injury and fatigue reduction. It also provides a summary of several important considerations when integrating wearable robotics with a workforce, such as comfort, fit, and hygiene. We recommend that an integration plan be developed before providing these systems to workers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Talent Programs; Engaging Young Professionals to Increase Engagement in the Radwaste Environment - 19075

In 2015, Millennials became the most populous workforce demographic in the United States. As the largest generation ever, they will have a major influence in the workplace for decades to come. The challenge now faced by employers is the ability to attract, engage, and retain this new generation in a highly competitive labor market. While the Baby Boomer generation continues to retire, maximizing the transfer of knowledge and preparing future leaders in the Radwaste Environment is of utmost importance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Robotics on KM-IT platform - 19107

The Knowledge Management Information Tool (KM-IT) is a web-based system developed to maintain and preserve the Department of Energy's (DoE's) knowledge base. The system was developed by Florida International University's Applied Research Center (FIU-ARC) with the support of the D and D community including the DOE Office of Environmental Management, and with the collaboration and support of the DoE's Energy Facility Contractors Group (EFCOG) and the former ALARA Centers at Hanford and Savannah. The KM-IT system is a community driven system tailored to serve the technical issues faced by the workforce across the DOE Complex. This KM-IT web-based interactive system is operational and available for use at www.dndkm.org and is currently comprised of the following modules: Web Crawler, Hotline, Technology, Hanford's ALARA Center Reports, Specialist Directory, Lessons Learned, Best Practices, Video/Picture Library, Vendors and Industry News. The Web Crawler dynamically searches through the KM-IT repository as well as the web and displays search results based on the search criteria. The Hotline allows registered users to post questions/problems related to D and D and to receive solutions from a subject-matter specialist. The Technology module serves as repository of D and D technologies and contains technology/ demonstration fact sheets and vendor information. D and D community members can add Lessons Learned, Best Practices, and Pictures/Videos to the D and D repository, after a formal approval process. The Vendor module provides a directory of commercial vendors who provide D and D related technologies, supplies, and services. KM-IT makes an excellent use of the knowledge that exists within the D and D community by allowing D and D project managers around the DOE complex to collaborate by sharing innovative ideas, past experiences, and practices and by maintaining a directory of subject matter specialists. FIU is working on developing a new knowledge base using the existing KM-IT framework to provide focused information on robotics. FIU will develop the robotics technology and vendor modules to provide information related to robotics technologies and its application to many different areas including D and D, remote systems and waste processing. This robotics knowledge base will provide the ability to search through the information repository as well as display customized summary information including robotics technology descriptions, benefits, limitations, videos and pictures. The vendor module will provide information related to industry vendors for these technologies and include updated vendor contact information. The vendor module will also provide a search capability based on keywords as well as categories. The robotics knowledge base will publish commercially available technologies as well as the technologies that are still in the research and development phase with national laboratories and academic universities. The robotics KM-IT will be developed in phases to support all of the features of the KM-IT platform and will be published on www.rkmit.org. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 73: DOE-EM End-State Contracting

US DOE-EM's new end-state contracting model, the ID/IQ (Indefinite Delivery/Indefinite Quality) approach, is intended to give EM the flexibility to better define discrete scopes of work for site closure or end states. This is the result of several years of dialogue between industry and DOE about the way to collectively improve the way to do business more safely, quickly and cost effectively. This model requires a fine balance between incentives and clearly defined end states, with the ability for contractors and DOE to react quickly to respond to changes. By March 6, DOE and industry were one month into the new end-state contracting model with two requests for proposals issued and contractors responding. The purpose of the panel was to hear from DOE and industry about the status so far. DOE and the contractor community are generally supportive of the new model, but it will require closer partnership and a new mindset and approach among DOE, contractors, regulator and the workforce. This panel focused on the implementation of DOE EM's new End State Contracting Model, which uses a single-award ID/IQ approach to give EM the flexibility to better define discrete scopes of work for site closure or end states. The panelists provided their perspective on the initial implementation of the new approach and the path forward for upcoming opportunities utilizing this model. Presentation proposed: DOE EM End State Contracting (Tamara Miles, US DOE (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving Effectiveness of Waste Management Processes with Information and Communications Technology (ICT) - 19524

Improving the effectiveness of waste estimation, tracking, management and disposal processes is a key objective for Waste Management. Project Teams face common challenges producing waste estimates that are accurately accounted for in the project plan, tracking and reporting waste record actuals against the estimate, and communicating the status of waste through the organization. These challenges impact the effectiveness of waste management from a cost and schedule perspective, which can have a significant impact on the bottom line and on future business. By leveraging information and communications technology (ICT) waste management project teams can create a mobile workforce that closes the gaps between creating estimates and tracking actuals against estimates by gathering real time data at each step in the process. This results in significant gains on schedule and cost, improved communication and visibility across the project team, and an improvement in the overall effectiveness of waste processing and disposal procedures. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving PCM Waste Management Through New Approaches to Screening for LLW Treatment and Disposal - 20145

A major step forward in the management of Plutonium Contaminated Material (PCM) Waste has been taken at the Sellafield site with the introduction of new capabilities to enable wastes previously conservatively designated as PCM Intermediate Level Waste (ILW) to be re-classified for treatment as Low Level Waste (LLW). The Sellafield site, located in the North West of England, within the United Kingdom (UK), has operated plutonium processing plants and waste facilities for almost 70 years. During this time management of the raw PCM waste produced has presented a variety of challenges. The waste is currently processed by high force waste compaction in the Waste Treatment Complex (WTC). The WTC converts 200 litre drums of raw PCM waste into a compacted, grout encapsulated monolith form within stainless steel containment, ready for emplacement within the UK's Geological Disposal Facility (GDF) when it becomes available. To help progress some of the wastes waiting for treatment, recent improvements have been made with the introduction of new waste assay instrumentation which enables the identification of a 'candidate' waste potentially suitable for disposal via the LLW treatment route. Opening a new LLW route for previously designated PCM has been a major advance in PCM waste management policy. It has required a range of technical assessment arrangements to be developed, tested and commissioned and involved the engagement of a wide range of stakeholders. In particular, very detailed technical analysis methods have been developed to ensure that there is a robust and conservative approach to the final sentencing of waste. Following completion of commissioning tests, the first 86 m{sup 3} of previously designated PCM waste was successfully treated through the LLW route and consigned to LLW disposal in June 2019. The direct benefit of sentencing waste to the correct waste route (LLW) is the significant cost savings across the complete range of waste management activities. This work is also strategically important for demonstrating to a range of stakeholders including workforce and regulators, that waste previously designated as PCM can be re-classified in a systematic and justifiable way without increasing risk to personnel or the wider environment. By ensuring that waste is being managed appropriately it will be possible to carry out more remediation work safely, in less time, and at a lower cost. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The TRANSCEND University Consortium: Theme 2 - Site Decommissioning, Deconstruction and Remediation - 20329

This paper will discuss the aims, objectives and progress to-date under Theme 2 of the TRANSCEND consortium project: Site decommissioning, deconstruction and remediation. Decommissioning nuclear sites involves waste retrieval, decontamination, deconstruction and, where necessary, containment and/or remediation of the remaining structure and surrounding land. Critical to management of these processes is limiting radiation exposure for the workforce, restricting the spread of radionuclides in groundwater, surface water and airborne particulates, and minimising the volume of contaminated waste for disposal. The aim of Theme 2 research is to develop new technologies for monitoring, remediation and containment that serve to minimise the volume of radioactively contaminated waste for disposal, for application prior to, during and after retrieval, deconstruction and decontamination operations. Prior research, conducted under the previous DISTINCTIVE project, demonstrated that colloidal silica grout can penetrate low permeability materials (including cement) for hydraulic barrier formation, and improved sorption capacity. The silica grout can be injected at surface using extremely small (potentially gravity-driven) fluid pressures, without the need for borehole drilling. Current work is investigating the erodibility of silica-grouted soils for inhibition of airborne and water-borne particulates as well as enhancing the grout's sorption capacity by addition of other materials to provide a chemical, as well as hydraulic, barrier to subsurface migration. EK remediation uses low voltage DC current to control migration of contaminants in porous media as well as to remove or degrade them. Researchers in the consortium have already demonstrated that low-energy ex-situ EK techniques can be used to provide remediation and volume minimisation for AWE legacy wastes in the UK. Under the current project researchers are building EK test cells containing simulated site materials at laboratory and intermediate(m)-scales to: remove, focus or degrade contaminants (remediation or waste minimisation); and direct subsurface water, chemical and colloid flow (fencing/containment or forced migration). This lab-based research is being informed by numerical models of EK processes that can subsequently be used to design full-scale on-site applications by nuclear site holders. Research under theme 2 of TRANSCEND will ultimately combine novel non-invasive detection technologies with EK techniques and colloidal silica grout barriers, to optimise the containment of radionuclide contamination in soils. Thus, allowing us to detect in-situ contamination, mobilise it to a selected location and grout it in-situ, prior to the initiation of decommissioning and deconstruction operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗