Search NASA⌕ Search

SEARCH · Search NASA

Results for “complex materials”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,441 records · Page 80

A parallel geometric multigrid method for finite elements on octree meshes

In this article, we present a parallel geometric multigrid algorithm for solving variable-coefficient elliptic partial differential equations on the unit box (with Dirichlet or Neumann boundary conditions) using highly nonuniform, octree-based, conforming finite element discretizations. Our octrees are 2:1 balanced, that is, we allow no more than one octree-level difference between octants that share a face, edge, or vertex. We describe a parallel algorithm whose input is an arbitrary 2:1 balanced fine-grid octree and whose output is a set of coarser 2:1 balanced octrees that are used in the multigrid scheme. Also, we derive matrix-free schemes for the discretized finite element operators and the intergrid transfer operations. The overall scheme is second-order accurate for sufficiently smooth right-hand sides and material properties; its complexity for nearly uniform trees is {Omicron}(N/n{sub p} log N/n{sub p}) + {Omicron}(n{sub p} log n{sub p}), where N is the number of octree nodes and n{sub p} is the number of processors. Our implementation uses the Message Passing Interface standard. We present numerical experiments for the Laplace and Navier (linear elasticity) operators that demonstrate the scalability of our method. Our largest run was a highly nonuniform, 8-billion-unknown, elasticity calculation using 32,000 processors on the Teragrid system, 'Ranger,' at the Texas Advanced Computing Center. Our implementation is publically available in the Dendro library, which is built on top of the PETSc library from Argonne National Laboratory.

99 GENERAL AND MISCELLANEOUS↗

Scanning Probe Microscopy in the Information Age

Scanning probe microscopy (SPM) has brought scientific exploration, visualization, and control to nanoscale. A plethora of measurement approaches and techniques devised around SPM enabled probing structure and functionalities crucial for virtually all areas of science. While high-resolution electron microscopy techniques preceded scanning probes, SPM effectively opened the door to probing the structure–property relationship on length scales spanning 100s of micrometers down to a single atom. As the complexity of the material systems and the scientific questions increased, so too did the SPM techniques. Substantial efforts have been dedicated toward the development of better instrumentation platforms, probes, and novel spectroscopic measurements; however, many opportunities related to data processing and acquisition in SPM are just being realized now. This chapter will describe the recent progress in data-driven SPM by giving a broad overview of the field, the foundation of the scanning tunneling microscope (STM) and the atomic force microscope (AFM), as well as a description behind the operating principles and dynamic modes. A comprehensive overview of the multi-frequency techniques, Band excitation, and general acquisition mode SPM is given, setting the context for the application of big data, machine learning, and artificial intelligence in the field of dynamic SPM.

Collins, Liam↗

Accelerating Advanced Light Source Science Through Multi-Facility HPC Workflows

Synchrotron light sources support a wide array of techniques to investigate materials, often producing complex, high-volume data that challenge traditional workflows. At the Advanced Light Source (ALS), we developed infrastructure to move microtomography data over ESnet to ALCF and NERSC, where CPU- and GPU-based algorithms generate 3D reconstructed volumes of experimental samples. We employ two data movement and reconstruction models: real-time processing as data streams directly to NERSC compute nodes, and automated file transfer to NERSC and ALCF file systems. The streaming pipeline provides users with feedback in under ten seconds, while the file-based workflow produces high-quality reconstructions suitable for deeper analysis in 20-30 minutes. This infrastructure enables users to utilize HPC resources without direct access to backend systems. We plan to extend this architecture to more endstations, supporting our beamline scientists and users.

Abramov, David↗

Density of States–Based Molecular Simulations

One of the central problems in statistical mechanics is that of finding the density of states of a system. Knowledge of the density of states of a system is equivalent to knowledge of its fundamental equation, from which all thermodynamic quantities can be obtained. Over the past several years molecular simulations have made considerable strides in their ability to determine the density of states of complex fluids and materials. Here we report on some of the more promising approaches proposed in the recent literature along with their advantages and limitations.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Determining the Length Scale of Transport Impedances in Li-Ion Electrodes: Li(Ni 0.33 Mn 0.33 Co 0.33 )O 2

Battery cathodes are complex multiscale, multifunctional materials. The length scale at which the dominant impedance arises may be difficult to determine even with the most advanced experimental characterization efforts, and thus modeling can play an important role in analysis. Discharge and voltage relaxation curves, interrogated with theory, are used to distinguish between transport impedance that arise on the scale of the active crystal and on the scale of agglomerates (secondary particles) comprised of nanoscale crystals. Model-selection algorithms are applied to determine that the agglomerate scale is dominant in the Li Ni 0.33 Mn 0.33 Co 0.33 O 2 electrode studied here. Furthermore, conditions where the agglomerate and crystal-scale models yield distinct simulation results are demonstrated, providing approaches that can be applied to other systems.

25 ENERGY STORAGE↗

Isothermal Microcalorimetry Analysis of Li/ β -MnO 2 Discharge

Despite widespread use over several decades, the lithium/manganese dioxide (Li/MnO 2 ) discharge mechanism is not completely understood owing to the structural complexity of the material. However, an improved understanding could lead to broader adoption as a primary and even secondary cathode material. Here, we examine the discharge of single-phaseβ-MnO 2 using isothermal microcalorimetry for the first time. Equilibrium voltage and entropy changes are characterized over the entire discharge range and used to rationalize the results. These measurements are supplemented by electrochemical impedance and X-ray diffraction data that give the clearest picture of theβ-MnO 2 lithiation process to date. We find that the first half of discharge is dominated by a two-phase reaction to form Li 0.5 MnO 2 followed by single-phase insertion to a composition of Li 1.0 MnO 2 , which confirms prior first-principles calculations. The tetragonalβ-MnO 2 lattice undergoes asymmetric expansion from Jahn-Teller distorted Mn 3+ to form an orthorhombic LiMnO 2 phase which retains the 1 × 1 tunnel structure. Microcalorimetry results suggest the presence of parasitic reactions occurring during the second half of discharge, which could arise from decomposition of electrolyte or release and reaction of residual water retained in the structure.

Electrochemistry↗

Stress and Strain in Silicon Electrode Models

While the high capacity of silicon makes it an attractive negative electrode for Li-ion batteries, the associated large volume change results in fracture and capacity fade. Composite electrodes incorporating silicon have additional complexity, as active material is attached to surrounding material which must likewise experience significant volume change. In this paper, a finite-deformation model is used to explore, for the first time, mechanical interactions between a silicon particle undergoing lithium insertion, and attached binder material. Simulations employ an axisymmetric model system in which solutions vary in two spatial directions and shear stresses develop at interfaces between materials. The mechanical response of the amorphous active material is dependent on lithium concentration, and an equation of state incorporating reported volume expansion data is used. Simulations explore the influence of active material size and binder stiffness, and suggest delamination as an additional mode of material damage. Computed strain energies and von Mises equivalent stresses are in physically-relevant ranges, comparable to reported yield stresses and adhesion energies, and predicted trends are largely consistent with reported experimental results. It is hoped that insights from this work will support the design of more robust silicon composite electrodes.

36 MATERIALS SCIENCE↗

Thermal evaluation of alternative shipping cask for irradiated experiments

Results of a thermal evaluation are provided for a new shipping cask under consideration for transporting irradiated experiments between the test reactor and post-irradiation examination (PIE) facilities. Most of the experiments will be irradiated in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL), then later shipped to the Hot Fuel Examination Facility (HFEF) located at the Materials and Fuels Complex for PIE. To date, the General Electric (GE)-2000 cask has been used to transport experiment payloads between these facilities. However, the availability of the GE-2000 cask to support future experiment shipping is uncertain. In addition, the internal cavity of the GE-2000 cask is too short to accommodate shipping the larger payloads. Therefore, an alternate shipping capability is being pursued. The Battelle Energy Alliance, LLC, Research Reactor (BRR) cask has been determined to be the best alternative to the GE-2000 cask. An evaluation of the thermal performance of the BRR cask is necessary before proceeding with fabrication of the newly designed cask hardware and the development of handling, shipping and transport procedures. This paper presents the results of the thermal evaluation of the BRR cask loaded with a representative set of fueled and non-fueled payloads. When analyzed with identical payloads, experiment temperatures were found to be lower with the BRR cask than with the GE-2000 cask. Furthermore, from a thermal standpoint, the BRR cask was found to be a suitable alternate to the GE-2000 cask for shipping irradiated experiment payloads.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Idaho National Laboratory Ten-Year Site Plan Project Description Document: Descriptions of the capital projects delineated in the Idaho National Laboratory 2013 - 2022 Ten-Year Site Plan as of June 2011

This document describes the currently active and proposed infrastructure projects listed in Appendix B of the Idaho National Laboratory 2013-2022 Ten Year Site Plan (DOE/ID-11449). It was produced in accordance with Contract Data Requirements List I.06. The projects delineated in this document support infrastructure needs at INL's Research and Education Campus, Materials and Fuels Complex, Advanced Test Reactor Complex and the greater site-wide area. The projects provide critical infrastructure needed to meet current and future INL operational and research needs. Execution of these projects will restore, rebuild, and revitalize INL's physical infrastructure; enhance program execution, and make a significant contribution toward reducing complex-wide deferred maintenance.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Advanced Post-Irradiation Examination Capabilities Alternatives Analysis Report

An alternatives analysis was performed for the Advanced Post-Irradiation Capabilities (APIEC) project in accordance with the U.S. Department of Energy (DOE) Order DOE O 413.3B, “Program and Project Management for the Acquisition of Capital Assets”. The Alternatives Analysis considered six major alternatives: 1. No Action, 2. Modify Existing DOE Facilities – capabilities distributed among multiple locations, 3. Modify Existing DOE Facilities – capabilities consolidated at a few locations, 4. Construct New Facility, 5. Commercial Partnership, and 6. International Partnerships. Based on the alternatives analysis documented herein, it is recommended to DOE that the advanced post-irradiation examination capabilities be provided by a new facility constructed at the Materials and Fuels Complex at the Idaho National Laboratory.

42 ENGINEERING↗

Permanent Closure of MFC Biodiesel Underground Storage Tank 99ANL00013

This closure package documents the site assessment and permanent closure of the Materials and Fuels Complex biodiesel underground storage tank 99ANL00013 in accordance with the regulatory requirements established in 40 CFR 280.71, “Technical Standards and Corrective Action Requirements for Owners and Operators of Underground Storage Tanks: Out-of-Service UST Systems and Closure.”

02 PETROLEUM↗

Imaging of molybdenum erosion and thermography at visible wavelengths in Alcator C-Mod ICRH and LHCD discharges

The spatially complex plasma-material interactions (PMI) in magnetic fusion devices which can deposit excess heat and particle fluxes causing respective melting and erosion of plasma facing components (PFC’s) requires the use of imaging diagnostics to understand experimental operations. In future magnetic fusion devices, imaging diagnostics must over come difficulties which do not occur in many present machines.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Summary of Calcine Disposal Development Using Hot Isostatic Pressing

Battelle Energy Alliance, LLC, has demonstrated the effectiveness of the hot isostatic press (HIP) process for treatment of hazardous high-level waste known as calcine that is stored at the Idaho Nuclear Technology and Engineering Center (INTEC) at Idaho National Laboratory. HIP trials performed with simulated calcines at Idaho National Laboratory’s Materials and Fuels Complex and an Australian Nuclear Science and Technology Organization facility from 2007 to 2010 produced a dense, monolithic waste form with increased chemical durability and effective (storage) volume reductions of ~10 to ~70% compared to granular calcine forms. In December 2009, the U.S. Department of Energy signed an amended Record of Decision selecting HIP technology as the treatment method for the 4,400 m3 of granular zirconia and alumina calcine stored at INTEC. Testing showed that HIP treatment reduces the risks associated with radioactive and hazardous constituent release, post-production handling, and long-term (repository) storage of calcines and would result in estimated storage cost savings in the billions of dollars. Battelle Energy Alliance has the ability to complete pilot-scale HIP processing of INTEC calcine, which is the next necessary step in implementing HIP processing as a calcine treatment method.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

What is the current state of the science of Cyber defense?

My overall sense of the cyber defense field is one of an adolescent discipline currently bogged down in a cloud of issues, the most iconic of which is the great diversity of approaches that are being aggregated to form a coherent field. Because my own expertise is complex systems and materials physics research, I have limited direct experience in cyber security sciences except as a user of secure networks and computing resources. However, in producing this report, I have found with certainty that there exists no calculus for cyber risk assessment, mitigation, and response, although some hopeful precepts toward this end are emerging.

Computer Science↗

Application of Frequency of Detection Methods in Design and Optimization of the INL Site Ambient Air Monitoring Network

This report presents an evaluation of a hypothetical INL Site monitoring network and the existing INL air monitoring network using frequency of detection methods. The hypothetical network was designed to address the requirement in 40 CFR Part 61, Subpart H (2006) that “emissions of radionuclides to ambient air from U.S. DOE facilities shall not exceed those amounts that would cause any member of the public to receive in any year an effective dose equivalent exceeding 10 mrem/year.” To meet the requirement for monitoring only, “radionuclide releases that would result in an effective dose of 10% of the standard shall be readily detectable and distinguishable from background.” Thus, the hypothetical network consists of air samplers placed at residence locations that surround INL and at other locations where onsite livestock grazing takes place. Two exposure scenarios were used in this evaluation: a resident scenario and a shepherd/rancher scenario. The resident was assumed to be continuously present at their residence while the shepherd/rancher was assumed to be present 24-hours at a fixed location on the grazing allotment. Important radionuclides were identified from annual INL radionuclide National Emission Standards for Hazardous Pollutants reports. Important radionuclides were defined as those that potentially contribute 1% or greater to the annual total dose at the radionuclide National Emission Standards for Hazardous Pollutants maximally exposed individual location and include H-3, Am-241, Pu-238, Pu 239, Cs-137, Sr-90, and I-131. For this evaluation, the network performance objective was set at achieving a frequency of detection greater than or equal to 95%. Results indicated that the hypothetical network for the resident scenario met all performance objectives for H-3 and I-131 and most performance objectives for Cs-137 and Sr-90. However, all actinides failed to meet the performance objectives for most sources. The shepherd/rancher scenario showed that air samplers placed around the facilities every 22.5 degrees were very effective in detecting releases, but this arrangement is not practical or cost effective. However, it was shown that a few air samplers placed in the prevailing wind direction around each facility could achieve the performance objective of a frequency of detection greater than or equal to 95% for the shepherd/rancher scenario. The results also indicate some of the current sampler locations have little or no impact on the network frequency of detection and could be removed from the network with no appreciable deterioration of performance. Results show that with some slight modifications to the existing network (i.e., additional samplers added north and south of the Materials and Fuels Complex and ineffective samplers removed), the network would achieve performance objectives for all sources for both the resident and shepherd/rancher scenario.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AGR-3/4 Irradiation Test Train Disassembly and Component Metrology First Look Report

The AGR-3/4 experiment was designed to study fission product transport within graphitic matrix material and nuclear-grade graphite. To this end, this experiment consisted of 12 capsules, each fueled with 4 compacts containing UCO TRISO particles as driver fuel and 20 UCO designed-to-fail (DTF) fuel particles in each compact. The DTF fuel was fabricated with a thin pyrocarbon layer which was intended to fail during irradiation and provide a source of fission products. These fission products could then migrate through the compact and into the surrounding concentric rings of graphitic matrix material and/or nuclear graphite. Through post-irradiation examination (PIE) of the rings (including physical sampling and gamma scanning) fission product concentration profiles within the rings can be determined. These data can be used to elucidate fission product transport parameters (e.g. diffusion coefficients within the test materials) which will be used to inform and refine models of fission product transport. After irradiation in the Advanced Test Reactor (ATR) had been completed in April 2014, the AGR-3/4 experiment was shipped to the Hot Fuel Examination Facility (HFEF) at the Materials and Fuels Complex (MFC) for inspection, disassembly, and metrology. The AGR-3/4 test train was received at MFC in two separate shipments between February and April 2015. Visual examinations of the test train exterior did not indicate dimensional distortion, and only two small discolored areas were observed at the bottom of Capsules 8 and 9. No corresponding discoloration was found on the inside of these capsules, however. Prior to disassembly, the two test train sections were subject to analysis via the Precision Gamma Scanner (PGS), which did not indicate that any gross fuel relocation had occurred. A series of specialized tools (including clamps, cutters, and drills) had been designed and fabricated in order to carry out test train disassembly and recovery of capsule components (graphite rings and fuel compacts). This equipment performed well for separating each capsule in the test train and extracting the capsule components. Only a few problems were encountered. In one case, the outermost ring (the sink ring) was cracked during removal of the capsule through tubes. Although the sink ring will be analyzed in order to obtain a mass balance of fission products in the experiment, these cracks do not pose a major concern because the sink ring will not be analyzed in detail to obtain the spatial distribution of fission products. In Capsules 4 and 5, the compacts could not be removed from the inner rings. Strategies for removing the compacts are being evaluated. Sampling the inner rings with the compacts in-place is also an option. Dimensional measurements were made on the compacts, inner rings, outer rings, and sink rings. The diameters of all compacts decreased by 0.5 to 2.0 %. Generally, the extent of diametric shrinkage increased linearly with increasing neutron fluence. Most compact lengths also decreased. Compact lengths decreased with increasing fluence, reaching maximum shrinkage of about 0.9 % at a fast fluence of 4.0x10 25 n/m 2 E > 0.18 MeV. Above this fluence, the extent of length shrinkage appeared to decrease with fluence, and two compacts from Capsule 7 were found to have slightly increased in length (< 0.1 %) after a fluence of 5.2x10 25 n/m 2 .

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

SSHAC Level 1 Probabilistic Seismic Hazard Analysis for the Idaho National Laboratory

A Probabilistic Seismic Hazard Analysis (PSHA) was completed for the Materials and Fuels Complex (MFC), Naval Reactors Facility (NRF), and the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) (Figure 1-1). The PSHA followed the approaches and procedures appropriate for a Study Level 1 provided in the guidance advanced by the Senior Seismic Hazard Analysis Committee (SSHAC) in U.S. Nuclear Regulatory Commission (NRC) NUREG/CR-6372 and NUREG-2117 (NRC, 1997; 2012a). The SSHAC Level 1 PSHAs for MFC and ATR were conducted as part of the Seismic Risk Assessment (SRA) project (INL Project number 31287) to develop and apply a new-risk informed methodology, respectively. The SSHAC Level 1 PSHA was conducted for NRF to provide guidance on the potential use of a design margin above rock hazard levels. The SRA project is developing a new risk-informed methodology that will provide a systematic approach for evaluating the need for an update of an existing PSHA. The new methodology proposes criteria to be employed at specific analysis, decision, or comparison points in its evaluation process. The first four of seven criteria address changes in inputs and results of the PSHA and are given in U.S. Department of Energy (DOE) Standard, DOE-STD-1020-2012 (DOE, 2012a) and American National Standards Institute/American Nuclear Society (ANSI/ANS) 2.29 (ANS, 2008a). The last three criteria address evaluation of quantitative hazard and risk-focused information of an existing nuclear facility. The seven criteria and decision points are applied to Seismic Design Category (SDC) 3, 4, and 5, which are defined in American Society of Civil Engineers/Structural Engineers Institute (ASCE/SEI) 43-05 (ASCE, 2005). The application of the criteria and decision points could lead to an update or could determine that such update is not necessary.

58 GEOSCIENCES↗

ATR Spent Fuel Options Study

The Advanced Test Reactor (ATR) is a materials and fuels test nuclear reactor that performs irradiation services for the U.S. Department of Energy (DOE) Office of Nuclear Energy (NE), Naval Reactors, the National Nuclear Security Administration (NNSA), and other research programs. ATR achieved initial criticality in 1967 and is expected to operate in support of needed missions until the year 2050 or beyond. It is anticipated that ATR will generate approximately 105 spent nuclear fuel (SNF) elements per year through the year 2050. Idaho National Laboratory (INL) currently stores 2,008 ATR SNF elements in dry storage, 976 in wet storage, and expects to have 1,000 elements in wet storage before January 2017. A capability gap exists at INL for long-term (greater than the year 2050) management, in compliance with the Idaho Settlement Agreement (ISA), of ATR SNF until a monitored retrievable geological repository is open. INL has significant wet and dry storage capabilities that are owned by the DOE Office of Environmental Management (EM) and operated and managed by Fluor Idaho, which include the Idaho Nuclear Technology and Engineering Center’s (INTEC’s) CPP-666, CPP-749, and CPP-603. In addition, INL has other capabilities owned by DOE-NE and operated and managed by Battelle Energy Alliance, LLC (BEA), which are located at the Materials and Fuel Complex (MFC). Additional storage capabilities are located on the INL Site at the Naval Reactors Facility (NRF). Current INL SNF management planning, as defined in the Fluor Idaho contract, shows INTEC dry fuel storage, which is currently used for ATR SNF, will be nearly full after transfer of an additional 1,000 ATR SNF from wet storage. DOE-NE tasked BEA with identifying and analyzing options that have the potential to fulfill this capability gap. BEA assembled a team comprised of SNF management experts from Fluor Idaho, Savannah River Site (SRS), INL/BEA, and the MITRE Corp with an objective of developing and analyzing options for fulfilling the capability gap. This management options analysis is not an alternatives analysis as defined by DOE Order 413.3B; rather, it is an evaluation of near-term, mid term and long-term actions needed to fulfill the capability gap. The actions are described in sufficient detail to inform stakeholders and DOE decision makers regarding a potential path forward. The recommended path forward will inform Fiscal Year 2019 budget formulation, support potential National Environmental Policy Act (NEPA) analyses, and may or may not include capital asset projects.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗