Search NASA⌕ Search

SEARCH · Search NASA

Results for “program verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,441 records · Page 80

Reported Energy and Cost Savings from the DOE ESPC Program: FY 2014

The objective of this work was to determine the realization rate of energy and cost savings from the Department of Energy’s Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 156 Measurement and Verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year. Because the quality of the reports varied, it was not possible to determine all of these parameters for each project. For all 156 projects, there was sufficient information to compare estimated, reported, and guaranteed cost savings. For this group, the total estimated cost savings for the reporting periods addressed were $\$$210.6 million, total reported cost savings were $\$$215.1 million, and total guaranteed cost savings were $\$$$204.5 million. This means that on average: ESPC contractors guaranteed 97% of the estimated cost savings; projects reported achieving 102% of the estimated cost savings; and projects reported achieving 105% of the guaranteed cost savings. For 155 of the projects examined, there was sufficient information to compare estimated and reported energy savings. On the basis of site energy, estimated savings for those projects for the previous year totaled 11.938 million MMBtu, and reported savings were 12.138 million MMBtu, 101.7% of the estimated energy savings. On the basis of source energy, total estimated energy savings for the 155 projects were 19.052 million MMBtu, and reported saving were 19.516 million MMBtu, 102.4% of the estimated energy savings.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reported Energy and Cost Savings from the DOE ESPC Program: FY 2015

The objective of this work was to determine the realization rate of energy and cost savings from the Department of Energy’s Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 151 Measurement and Verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year. Because the quality of the reports varied, it was not possible to determine all of these parameters for each project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

How To Maintain Effective IAEA Safeguards While Reducing Facility Impact

For almost twenty years, inspectors from the International Atomic Energy Agency have been visiting the K-Area Material Storage facility at the Savannah River Site where excess plutonium has been placed under IAEA safeguards as part of the United States Volunatary Offer Agreement. During that time, the mission of K-Area Complex has expanded from storage of nuclear matieral to glovebox operations in support of the National Nuclear Security Administration’s Plutonium Disposition program. With this change in mission, it is becoming increasingly challenging to manage facility staff radiation exposure and operating activities during the IAEA’s annual Physcial Inventory Verifications (PIV). This study has identified both near-term and long-term recommendations for IAEA monitoring protocols that would allow the IAEA to maintain effective safeguards of the material while decreasing the impact to the facility. A statisitical analysis has shown that reducing the number of containers measured during an annual PIV from 12 to 4 still ensures a high level of confidence in the confidence while reducing the inspector time in the facility amd with a corresponding significant reduction in personnel radiation exposure. A modified installation pattern of Remotely Monitored Sealing Arrays (RMSAs) is also proposed utilizing only the outer rows of arrays of stored material containers in the Stack Area (SA). The modified RMSA placement will provide equivalent protection, while significantly reducing personnel radiological exposure, manpower requirements and associated costs. With advances in technology, there are additional potential options in containment/surveillance and continuity of knowledge that would allow the agency to be outside of the facility during PIV measurements and have confidence in the accuracy and authencitity of the results.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY2021

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 201 measurement and verification (M&V) reports covering 193 projects to determine reported, estimated, and guaranteed cost savings and the associated reported and estimated energy savings for the previous contract performance year. This report covers projects that had a performance year ending in fiscal year 2021, between October 1, 2020 and September 30, 2021, and had an M&V report issued. Additionally, the annual cost to perform M&V was extracted from the individual project Task Order (TO) Schedules.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2022

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 190 measurement and verification (M&V) reports covering 182 projects to determine reported, estimated, and guaranteed cost savings and the associated reported and estimated energy savings for the previous contract performance year. This report covers projects that had a performance year ending in fiscal year 2021, between October 1, 2021 and September 30, 2022, and had an M&V report issued. Additionally, the annual cost to perform M&V was extracted from the individual project Task Order (TO) Schedules.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Analysis of Radioactive 65 Zn Contamination using 3D Position Sensitive CdZnTe Detectors

SRNL NMG Goal: In collaboration with ORNL, the aim is to identify and explore innovative technology opportunities that accelerate disposition, reduce life cycle costs, minimize worker radiation exposure, and improve worker safety and minimize program risks. • This process will include 3 glovebox systems that require personnel to dilute and package the plutonium for safe storage at WIPP. • For holdup monitoring and verification, gamma ray spectroscopy and imaging are the methods employed to achieve real time analysis of the plutonium waste. 2

Nwadeyi, Valerie E.↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2023

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 201 measurement and verification (M&V) reports covering 191 projects to determine reported, estimated, and guaranteed cost savings and the associated reported and estimated energy savings for the previous contract performance year. This report covers projects that had a performance year ending in fiscal year 2023, between October 1, 2022 and September 30, 2023, and had an M&V report issued. Additionally, the annual cost to perform M&V was extracted from the individual project Task Order (TO) Schedules.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Flight instrument and telemetry response and its inversion

Mathematical models of rate gyros, servo accelerometers, pressure transducers, and telemetry systems were derived and their parameters were obtained from laboratory tests. Analog computer simulations were used extensively for verification of the validity for fast and large input signals. An optimal inversion method was derived to reconstruct input signals from noisy output signals and a computer program was prepared.

Weinberger, M. R.↗

Expert systems and imaging - NASA's start-up work in intelligent image management

The problem of image management for NASA's Space Shuttle program and the future role of expert systems are considered. The difficulties involved in the storage and retrieval of the estimated 100,000 color photographs used for verification of essential installation, test, and repair procedures for Space Shuttle prelaunch are discussed. It is noted that the collection, classification, storage, and retrieval of high-quality pictoral images is possible through the use of pixels and an expert systems-assisted relational data base management system. The development of a query by pictorial example process is discussed. The NASA Intelligent Interactive Visual Data Base Management Systems project is detailed. It aims to conduct a systems analysis of a large-scale traditional image processing operation, collect data on critical human performance factors in the areas of image creation, processing, classification, storage, and retreival, and validate the attributes identified through the creation and testing of prototype models.

Ragusa, James M.↗

Space Station Freedom ground systems program - A survey

The key facilities identified to support Space Station Freedom Program (SSFP) integrated operations and their SSFP roles are described in detail. The ground infrastructure, which must be able to support both assembly and long-term operations, will consist of ground facilities, support systems, and the associated planning and management procedures. During 1992 the SSFP is conducting a major program review of the ground infrastructure including the definition of all facility and support system functional capabilities, interfaces, and data-flow requirements. Operations functionality and interface verification tests are being identified, and operations readiness dates are being set.

Accola, A.↗

Implementation of an Adaptive Controller System from Concept to Flight Test

The National Aeronautics and Space Administration Dryden Flight Research Center (Edwards, California) is conducting ongoing flight research using adaptive controller algorithms. A highly modified McDonnell-Douglas NF-15B airplane called the F-15 Intelligent Flight Control System (IFCS) is used to test and develop these algorithms. Modifications to this airplane include adding canards and changing the flight control systems to interface a single-string research controller processor for neural network algorithms. Research goals include demonstration of revolutionary control approaches that can efficiently optimize aircraft performance in both normal and failure conditions and advancement of neural-network-based flight control technology for new aerospace system designs. This report presents an overview of the processes utilized to develop adaptive controller algorithms during a flight-test program, including a description of initial adaptive controller concepts and a discussion of modeling formulation and performance testing. Design finalization led to integration with the system interfaces, verification of the software, validation of the hardware to the requirements, design of failure detection, development of safety limiters to minimize the effect of erroneous neural network commands, and creation of flight test control room displays to maximize human situational awareness; these are also discussed.

Larson, Richard R.↗

James Webb Space Telescope (JWST) Integrated Science Instruments Module (ISIM) Cryo-Vacuum (CV) Test Campaign Summary

JWST Integrated Science Instruments Module (ISIM) has completed its system-level testing program at the NASA Goddard Space Flight Center (GSFC). In March 2016, ISIM was successfully delivered for integration with the Optical Telescope Element (OTE) after the successful verification of the system through a series of three cryo-vacuum (CV) tests. The first test served as a risk reduction test; the second test provided the initial verification of the fully-integrated flight instruments; and the third test verified the system in its final flight configuration. The complexity of the mission has generated challenging requirements that demand highly reliable system performance and capabilities from the Space Environment Simulator (SES) vacuum chamber. As JWST progressed through its CV testing campaign, deficiencies in the test configuration and support equipment were uncovered from one test to the next. Subsequent upgrades and modifications were implemented to improve the facility support capabilities required to achieve test requirements. This paper: (1) provides an overview of the integrated mechanical and thermal facility systems required to achieve the objectives of JWST ISIM testing, (2) compares the overall facility performance and instrumentation results from the three ISIM CV tests, and (3) summarizes lessons learned from the ISIM testing campaign.

Yew, Calinda↗

ARRISTOTLE Simulation Demo

NASA’s Katherine Johnson Independent Verification and Validation (NASA IV&V) Jon McBride Software Testing and Research (JSTAR) laboratory has developed the Advanced Risk Reduction Integrated Software Test and Operations Tri-program Lightweight Environment (ARRISTOTLE). ARRISTOTLE is a digital twin of NASA’s Artemis mission. ARRISTOLE executes the true SLS and Orion flight binaries integrated on a single laptop computer. This demo will showcase the execution of the full Artemis liftoff. Once airborne, an inflight anomaly will be injected, resulting in Orion detaching from the booster. The Launch Abort System (LAS) will safely bring Orion back to earth. The Unity game engine is used to visualize the flyout as flight software executes.

emulation↗

IAEA CRP on HTGR Uncertainty Analysis: Benchmark Definition and Test Cases

Uncertainty and sensitivity studies are essential elements of the reactor simulation code verification and validation process. Although several international uncertainty quantification activities have been launched in recent years in the LWR, BWR and VVER domains (e.g. the OECD/NEA BEMUSE program, from which the current OECD/NEA LWR Uncertainty Analysis in Modelling (UAM) benchmark effort was derived), the systematic propagation of uncertainties in cross-section, manufacturing and model parameters for High Temperature Reactor (HTGR) designs has not been attempted yet. This paper summarises the scope, objectives and exercise definitions of the IAEA Coordinated Research Project (CRP) on HTGR UAM. Note that no results will be included here, as the HTGR UAM benchmark was only launched formally in April 2012, and the specification is currently still under development.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Viability of an Unattended Verification Station for UF6 Cylinders: Phase I Findings

In recent years, the International Atomic Energy Agency (IAEA) has pursued innovative techniques and an integrated suite of safeguards measures to address the verification challenges posed by the front end of the nuclear fuel cycle. Among the unattended instruments currently being explored by the IAEA is an Unattended Cylinder Verification Station (UCVS), which could provide automated, independent verification of the declared relative enrichment, 235U mass, total uranium mass, and identification for all declared uranium hexafluoride (UF6) cylinders in a facility (e.g., uranium enrichment plants and fuel fabrication plants). Under the auspices of the United States and European Commission Support Programs to the IAEA, a project was undertaken to assess the technical and practical viability of the UCVS concept. Phase I of the UCVS viability study was centered on a long-term field trial of a prototype UCVS system at the Westinghouse Fuel Fabrication Facility in South Carolina, USA. A key outcome of the study was a quantitative performance evaluation of two nondestructive assay (NDA) methods being considered for inclusion in a UCVS: Hybrid Enrichment Verification Array (HEVA), and Passive Neutron Enrichment Meter (PNEM). This paper will provide context for the UCVS and potential implementation concepts, a description of the UCVS prototype design, and an overview of the long-term field trial at a fuel fabrication facility. Selected field-trial results and interpretation are presented, including the performance of PNEM and HEVA for the verification of declared enrichment and 235U mass in over 200 “typical” Type 30B cylinders. Example results from a modeling study provide a preliminary assessment of sensitivity to material-substitution scenarios, for the as-fielded NDA methods.

Smith, Leon E.↗

TH-C-12A-01: Develop a Patient-Specific QA Program for Radiation Therapy with On-Board MRI

Purpose: This work describes development of the first patient-specific quality assurance (QA) program for magnetic resonance imaging guided radiation therapy (MR-IGRT). Methods: The program consisted of following components: 1) multipoint ionization chamber (IC) measurement using a 15 cm3 cubic phantom, 2) 2D stacked radiographic film dosimetry using a 30×30×20 cm3 phantom with multiple inserted ICs, 3) 3D ArcCHECK measurement with a centrally inserted IC, 4) machine delivery file verification, 5) 3D Monte-Carlo dose re-calculation with machine delivery file and phantom CT, 6) 2-head mode delivery validation in case of a malfunctioning head, and 7) independent beam-on time calculation for non-IMRT fields. Both ADCL calibrated ICs and ArcCHECK were MRI compatible. Experimental data were analyzed for the first 10 patients treated at our institution. Results: The customized phantoms allowed measuring multiple points with ICs in one delivery. Absolute IC measurements were all within 3% in all phantom geometry/shape/material combinations. Despite known uncertainty associated with film dosimetry, passing rates greater than 90% were achieved in both absolute and composite modes using TG-129 criteria. Due to the simultaneous irradiation by three radiation sources, ArcCHECK was used as a 3D relative dosimeter with angular and energy dependences uncorrected. 95–100% passing rates were obtained and the centrally inserted IC measurement assured that the overall dose normalization was within 3%. Machine delivery file verification and MC recalculated dose to the phantom results showed 98–100% passing rates, providing opportunity of moving from gamma passing rates to patient DVHbased QA metrics. Same results were obtained for the 2-head delivery mode. Manual beam-on time calculation for non-IMRT fields showed better than 5% agreement. Conclusion: We have successfully developed the first MRIGRT patient specific QA program by adopting experimental and computational dosimetry methods that were developed in the past decade for other radiation therapy modalities.

60 APPLIED LIFE SCIENCES↗

Viability Study for an Unattended UF 6 Cylinder Verification Station: Phase I Final Report

In recent years, the International Atomic Energy Agency (IAEA) has pursued innovative techniques and an integrated suite of safeguards measures to address the verification challenges posed by the front end of the nuclear fuel cycle. Among the unattended instruments currently being explored by the IAEA is an Unattended Cylinder Verification Station (UCVS) that could provide automated, independent verification of the declared relative enrichment, 235 U mass, total uranium mass and identification for all declared UF 6 cylinders in a facility (e.g., uranium enrichment plants and fuel fabrication plants). Under the auspices of the United States and European Commission Support Programs to the IAEA, a project was undertaken to assess the technical and practical viability of the UCVS concept. The US Support Program team consisted of Pacific Northwest National Laboratory (PNNL, lead), Los Alamos National Laboratory (LANL), Oak Ridge National Laboratory (ORNL) and Savanah River National Laboratory (SRNL). At the core of the viability study is a long-term field trial of a prototype UCVS system at a Westinghouse fuel fabrication facility. A key outcome of the study is a quantitative performance evaluation of two nondestructive assay (NDA) methods being considered for inclusion in a UCVS: Hybrid Enrichment Verification Array (HEVA), and Passive Neutron Enrichment Meter (PNEM). This report provides context for the UCVS concept and the field trial: potential UCVS implementation concepts at an enrichment facility; an overview of UCVS prototype design; field trial objectives and activities. Field trial results and interpretation are presented, with a focus on the performance of PNEM and HEVA for the assay of over 200 “typical” Type 30B cylinders, and the viability of an “NDA Fingerprint” concept as a high-fidelity means to periodically verify that the contents of a given cylinder are consistent with previous scans. A modeling study, combined with field-measured instrument uncertainties, provides an assessment of the partial-defect sensitivity of HEVA and PNEM for both one-time assay and (repeated) NDA Fingerprint verification scenarios. The findings presented in this report represent a significant step forward in the community’s understanding of the strengths and limitations of the PNEM and HEVA NDA methods, and the viability of the UCVS concept in front-end fuel cycle facilities. This experience will inform Phase II of the UCVS viability study, should the IAEA pursue it.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Structural technology challenges for evolutionary growth of Space Station Freedom

A proposed evolutionary growth scenario for Space Station Freedom was defined recently by a NASA task force created to study requirements for a Human Exploration Initiative. The study was an initial response to President Bush's July 20, 1989 proposal to begin a long range program of human exploration of space including a permanently manned lunar base and a manned mission to Mars. This growth scenario evolves Freedom into a critical transportation node to support lunar and Mars missions. The growth scenario begins with the Assembly Complete configuration and adds structure, power, and facilities to support a Lunar Transfer Vehicle (LTV) verification flight. Evolutionary growth continues to support expendable, then reusable LTV operations, and finally, LTV and Mars Transfer Vehicle (MTV) operations. The significant structural growth and additional operations creating new loading conditions will present new technological and structural design challenges in addition to the considerable technology requirements of the baseline Space Station Freedom program. Several structural design and technology issues of the baseline program are reviewed and related technology development required by the growth scenario is identified.

Doiron, Harold H.↗