Search NASA⌕ Search

SEARCH · Search NASA

Results for “projects”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,441 records · Page 80

Borehole EM Monitoring at Aquistore: Final Report to the Carbon Capture Project (CCP)

Geologic carbon sequestration (GCS) is a technology whose goal is to prevent atmospheric release of greenhouse gases via injection of carbon dioxide (CO 2 ) into an underground reservoir for long term storage. GCS is typically part of a program of carbon capture and storage (CCS) that captures CO 2 from point sources such as power plants, transports the CO 2 to a storage site, and operates an injection facility. One recent CCS pilot project is the Aquistore CO 2 sequestration project, near Estevan, Saskatchewan, Canada. The Aquistore project is managed by the Petroleum Technology Research Centre (PTRC) and will be one of the first integrated CCS projects storing CO 2 in a deep saline aquifer from a coal fired power plant (PTRC, 2011). Aquistore is expected to store 500,000 tons of CO 2 during its lifetime (Ministry of Environment, 2012). Assuring the long-term, safe storage of CO 2 requires the development of effective monitoring strategies. As part of the geophysical monitoring effort at Aquistore, there were initial plans for deployment of borehole electrodes for electrical or electromagnetic measurements to monitor CO 2 within the reservoir. The injected CO 2 displaces saline brine in the reservoir, and because CO 2 has a high resistivity compared to brine, the overall resistivity of the formation increases and can be monitored by measuring electric or magnetic fields. Previous work by Lawrence Berkeley National Laboratory (LBNL) had indicated that borehole-to-surface electromagnetic monitoring, using an electric dipole source near the bottom of a well penetrating the reservoir, could detect the resistivity change induced by GCS. To assess the potential application of electromagnetic monitoring at Aquistore, Lawrence Berkeley National Laboratory and Multi-Phase Technologies collaborated on a two-part study including (1) numerical forward modeling of a time-lapse, controlled-source electromagnetic (CSEM) monitoring survey, and (2) an initial engineering study of instrumentation and proposed design for a borehole electric dipole source and electrode sensors.

54 ENVIRONMENTAL SCIENCES↗

Performance assessment of the PNM Prosperity electricity storage project

The purpose of this study is to characterize the technical performance of the PNM Prosperity electricity storage project, and to identify lessons learned that can be used to improve similar projects in the future. The PNM Prosperity electricity storage project consists of a 500 kW/350 kWh advanced lead-acid battery with integrated supercapacitor (for energy smoothing) and a 250 kW/1 MWh advanced lead-acid battery (for energy shifting), and is co-located with a 500 kW solar photovoltaic (PV) resource. The project received American Reinvestment and Recovery Act (ARRA) funding. The smoothing system is e ective in smoothing intermittent PV output. The shifting system exhibits good round-trip efficiencies, though the AC-to-AC annual average efficiency is lower than one might hope. Given the current utilization of the smoothing system, there is an opportunity to incorporate additional control algorithms in order to increase the value of the energy storage system.

25 ENERGY STORAGE↗

Transportation Energy Futures Series. Projected Biomass Utilization for Fuels and Power in a Mature Market

The viability of biomass as transportation fuel depends upon the allocation of limited resources for fuel, power, and products. By focusing on mature markets, this report identifies how biomass is projected to be most economically used in the long term and the implications for greenhouse gas (GHG) emissions and petroleum use. In order to better understand competition for biomass between these markets and the potential for biofuel as a market-scale alternative to petroleum-based fuels, this report presents results of a micro-economic analysis conducted using the Biomass Allocation and Supply Equilibrium (BASE) modeling tool. The findings indicate that biofuels can outcompete biopower for feedstocks in mature markets if research and development targets are met. The BASE tool was developed for this project to analyze the impact of multiple biomass demand areas on mature energy markets. The model includes domestic supply curves for lignocellulosic biomass resources, corn for ethanol and butanol production, soybeans for biodiesel, and algae for diesel. This is one of a series of reports produced as a result of the Transportation Energy Futures (TEF) project, a Department of Energy-sponsored multi-agency project initiated to pinpoint underexplored strategies for abating GHGs and reducing petroleum dependence related to transportation.

09 BIOMASS FUELS↗

Energy Efficiency Measures to Incorporate into Remodeling Projects

Energy improvements in a home are often approached as one concerted effort, beginning with a simple walk-through assessment or more in-depth energy audit and followed by the installation of recommended energy measures. While this approach allows for systems thinking to guide the efforts, comprehensive energy improvements of this nature are undertaken by a relatively small number of U.S. households compared to piecemeal remodeling efforts. In this report, the U.S Department of Energy Building America Retrofit Alliance research team examines the improvement of a home’s energy performance in an opportunistic way by examining what can be done to incorporate energy efficiency measures into general remodeling work and home repair projects. This allows for energy efficiency upgrades to occur at the same time as remodeling projects. There are challenges to this approach, not the least of which being that the work will take place over time in potentially many separate projects. The opportunity to improve a home’s energy efficiency at one time expands or contracts with the scope of the remodel. As such, guidance on how to do each piece thoughtfully and with consideration for potential future projects, is critical.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Draft evaluation of the frequency for gas sampling for the high burnup confirmatory data project

This report fulfills the M3 milestone M3FT-15SN0802041, “Draft Evaluation of the Frequency for Gas Sampling for the High Burn-up Storage Demonstration Project” under Work Package FT-15SN080204, “ST Field Demonstration Support – SNL”. This report provides a technically based gas sampling frequency strategy for the High Burnup (HBU) Confirmatory Data Project. The evaluation of: 1) the types and magnitudes of gases that could be present in the project cask and, 2) the degradation mechanisms that could change gas compositions culminates in an adaptive gas sampling frequency strategy. This adaptive strategy is compared against the sampling frequency that has been developed based on operational considerations. Gas sampling will provide information on the presence of residual water (and byproducts associated with its reactions and decomposition) and breach of cladding, which could inform the decision of when to open the project cask.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Pilot Project Technology Business Case: Mobile Work Packages

Performance advantages of the new pilot project technologies are widely acknowledged, but it has proven difficult for utilities to derive business cases for justifying investment in these new capabilities. Lack of a business case is often cited by utilities as a barrier to pursuing wide-scale application of digital technologies to nuclear plant work activities. The decision to move forward with funding usually hinges on demonstrating actual cost reductions that can be credited to budgets and thereby truly reduce O&M or capital costs. Technology enhancements, while enhancing work methods and making work more efficient, often fail to eliminate workload such that it changes overall staffing and material cost requirements. It is critical to demonstrate cost reductions or impacts on non-cost performance objectives in order for the business case to justify investment by nuclear operators. The Business Case Methodology (BCM) was developed in September of 2015 to frame the benefit side of II&C technologies to address the “benefit” side of the analysis—as opposed to the cost side—and how the organization evaluates discretionary projects (net present value (NPV), accounting effects of taxes, discount rates, etc.). The cost and analysis side is not particularly difficult for the organization and can usually be determined with a fair amount of precision (not withstanding implementation project cost overruns). It is in determining the “benefits” side of the analysis that utilities have more difficulty in technology projects and that is the focus of this methodology. The methodology is presented in the context of the entire process, but the tool provided is limited to determining the organizational benefits only. This report describes a the use of the BCM in building a business case for mobile work packages, which includes computer-based procedures and other automated elements of a work package. Key to those impacts will be identifying where the savings are “harvestable,” meaning they result in an actual reduction in headcount and/or cost. The report describes the specific activities conducted with a partner utility to examine the various work activities associated with mobile work packages to determine what time savings and error rate reductions are available. The report summarizes these findings in the form of a business case for the technology.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

SkyMine Beneficial CO 2 Use Project

This Final Report addresses accomplishments achieved during Phase 1 and Phase 2 of the SkyMine® Carbon Mineralization Commercial Scale Pilot Project. The primary objectives of this project were to design, construct, and operate a system to capture CO₂ from a slipstream of flue gas from a commercial coal-fired cement kiln, convert that CO₂ into products having commercial value as an example of Carbon Capture and Beneficial Re-Use, show the economic viability of the CO₂ capture and conversion process, and thereby advance the technology to a level of commercial scale completion with the ability for further proliferation. The project also substantiates market opportunities for the technology by sales of chemicals into existing markets, and has identified opportunities to improve technology performance and reduce costs during the normal course of operations. The primary objectives of Phase 1 of the project were to elaborate proven SkyMine® process chemistry to commercial pilot-scale operation and complete the preliminary design for the pilot plant to be built and operated in Phase 2. During Phase 2, Pilot System Engineering Design, Construction and Testing, supporting research and development was conducted at a field test unit to collect data that aided in detailed designs of the commercial scale pilot unit; final detailed designs were completed; the commercial scale pilot plant is in its final stages of construction; and a test program has been designed and will be implemented to collect data from the facility to evaluate the technical viability of the process for resulting in an overall net reduction in CO 2 emitted into the atmosphere through a process that is run and conducted in a carbon negative manner. The objective of Phase 2b was to build the commercial scale pilot plant to be operated and tested in Phase 2c. By June 30, 2015, the plant was +99% constructed and completed.

54 ENVIRONMENTAL SCIENCES↗

Colorado State Capitol Geothermal project

Colorado State Capitol Geothermal Project - Final report is redacted due to space constraints. This project was an innovative large-scale ground-source heat pump (GSHP) project at the Colorado State Capitol in Denver, Colorado. The project employed two large wells on the property. One for pulling water from the aquifer, and another for returning the water to the aquifer, after performing the heat exchange. The two wells can work in either direction. Heat extracted/added to the water via a heat exchanger is used to perform space conditioning in the building.

15 GEOTHERMAL ENERGY↗

Final Technical Report for Year 5 Early Career Research Project "Viscosity and equation of state of hot and dense QCD matter"

The Section below summarizes research activities and achievements during the fifth (last) year of the PI’s Early Career Research Project (ECRP). Unlike the first four years of the project, the last year was not funded under the American Recovery and Reinvestment Act (ARRA). The ECRP advanced two main areas: i) radiative 3 ↔ 2 radiative transport, via development of a new computer code MPC/Grid that solves the Boltzmann transport equation in full 6+1D (3X+3V+time); and ii) application of relativistic hydrodynamics, via development of a self-consistent framework to convert viscous fluids to particles. In Year 5 we finalized thermalization studies with radiative gg ↔ ggg transport (Sec. 1.1.1) and used nonlinear covariant transport to assess the accuracy of fluid-to-particle conversion models (Sec. 1.1.2), calculated observables with self-consistent fluid-to-particle conversion from realistic viscous hydrodynamic evolution (Secs. 1.2.1 and 1.2.2), extended the covariant energy loss formulation to heavy quarks (Sec. 1.4.1) and studied energy loss in small systems (Sec. 1.4.2), and also investigated how much of the elliptic flow could have non-hydrodynamic origin (Sec 1.3). Years 1-4 of the ECRP were ARRA-funded and, therefore, they have their own report document ’Final Technical Report for Years 1-4 of the Early Career Research Project “Viscosity and equation of state of hot and dense QCD matter”’ (same award number DE-SC0004035). The PI’s group was also part of the DOE JET Topical Collaboration, a multi-institution project that overlapped in time significantly with the ECRP. Purdue achievements as part of the JET Top- ical Collaboration are in a separate report “Final Technical Report summarizing Purdue research activities as part of the DOE JET Topical Collaboration” (award DE-SC0004077).

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Large Area Projection Microstereolithography: Characterization and Optimization of 3D Printing Parameters

Large Area Projection Microstereolithography (LAPμSL) is a new technology that allows the additive manufacture of parts that have feature sizes spanning from centimeters to tens of microns. Knowing the accuracy of builds from a system like this is a crucial step in development. This project explored the capabilities of the second and newest LAPμSL system that was built by comparing the features of actual builds to the desired structures. The system was then characterized in order to achieve the best results. The photo polymeric resins that were used were Autodesk PR48 and HDDA. Build parameters for Autodesk PR48 were found that allowed the prints to progress while using the full capacity of the system to print quality parts in a relatively short amount of time. One of the larger prints in particular had a print time that was nearly eighteen times faster than it would have been had printed in the first LAPμSL system. The characterization of HDDA resin helped the understanding that the flux of the light projected into the resin also affected the quality of the builds, rather than just the dose of light given. Future work for this project includes exploring the use of other resins in the LAPμSL systems, exploring the use of Raman Spectroscopy to analyze builds, and completing the characterization of the LAPμSL system.

36 MATERIALS SCIENCE↗

FY16 Safeguards Technology Cart-Portable Mass Spectrometer Project Final Report

The Oak Ridge National Laboratory project for the Next Generation Safeguards Initiative Safeguards Technology Development Subprogram has been involved in the development of a cart portable mass spectrometer based on a Thermo ITQ ion trap mass spectrometer (referred to simply as the ITQ) for the field analysis of 235U/238U ratios in UF6. A recent discovery of the project was that combining CO2 with UF6 and introducing the mixture to the mass spectrometer (MS) appeared to increase the ionization efficiency and, thus, reduce the amount of UF6 needed for an analysis while also reducing the corrosive effects of the sample. However, initial experimentation indicated that mixing parameters should be closely controlled to ensure reproducible results. To this end, a sample manifold (SM) that would ensure the precise mixing of UF6 and CO2 was designed and constructed. A number of experiments were outlined and conducted to determine optimum MS and SM conditions which would provide the most stable isotope ratio analysis. The principal objective of the project was to provide a retrofit ITQ mass spectrometer operating with a SM capable of achieving a variation in precision of less than 1% over 1 hour of sampling. This goal was achieved by project end with a variation in precision of 0.5 to 0.8% over 1 hour of sampling.

47 OTHER INSTRUMENTATION↗

Assessing the Potential of Social Networks as a Means for Information Diffusion the Weatherization Experiences (WE) Project.

In April 2009, U.S. Department of Energy (DOE) formally tasked Oak Ridge National Laboratory (ORNL) with conducting two impact and process evaluations of DOE’s Weatherization Assistance Program (WAP), known as the retrospective and American Recovery and Reinvestment Act of 2009 (ARRA) period evaluations, respectively. The former focused on WAP Program Year (PY) 2008, which covers the period from April 2008 to June 2009. The latter focused on PY 2010. This report presents in-depth analyses from ORNL’s social network study, the Weatherization Experiences (WE) Project, an exploratory study conducted as part of the ARRA period WAP evaluation. The WE Project explored the potential for WAP recipients and staff to influence energy savings beyond their homes and day jobs. Several studies conducted through ORNL’s evaluation of WAP found that the program has the ability to profoundly impact the lives of the people it serves (Tonn et al. 2014b). Recipients of WAP provided statements ranging from the newfound ability to pay utility bills and prescription medication to reduced emergency department visits for asthma and medical conditions associated with thermal stress. Through this exploratory research project, the stories of hundreds of weatherization recipients and providers were documented. The WE Project was designed to further investigate whether or not shared experiences with weatherization have the power to stimulate home energy saving action within an individual’s social network.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Fort Mason Center: Pier 2 Project

The rooftop Photovoltaic (PV) panels and radiant piping project was constructed by Fort Mason Center as part of its $21 million comprehensive rehabilitation of the Pier 2 shed which include the shed’s electrical, natural gas and water systems. Fort Mason Center improved performance while reducing energy and water usage and costs to demonstrate the efficiencies and opportunities available to large multi-function facilities. The scalable demand of these facilities required a layered approach to conservation, control and production. The project employed a comprehensive retrofit of electrical natural gas, and plumbing systems to maximize efficiency and lower carbon footprint specifically to demonstrate the effectiveness of these strategies in a public setting with varied and diverse use. The project was completed in July 2014 and met the expected outcomes regarding increased comfort and operational efficiency throughout the Pier 2 shed as well as on site electrical generation of current consumption. The entire Pier 2 shed project won a 2015 California Preservation Foundation design award for historic rehabilitation.

14 SOLAR ENERGY↗

Final Scientific/Technical Report for project “Geomechanical Monitoring for CO 2 Hub Storage: Production and Injection at Kevin Dome

After learning that the TDS value in the target injection formation at the Kevin Dome site is too low to qualify for an EPA Class VI CO2 injection permit, the BSCSP project was re-scoped such that injection of CO2 is no longer planned. With no injection planned, the Geomechanics project was closed. In this final report, we describe the objective and approach of the project as proposed, and the limited results obtained before stopping work. The objective of the proposed research was the development & validation of an integrated monitoring approach for quantifying the interactions between large-scale geological carbon storage (GCS) and subsurface geomechanical state, particularly perturbations relevant to reservoir integrity such as fault reactivation and induced fracturing. In the short period of work before knowing the fate of the Kevin Dome project, we (1) researched designs for both the proposed InSAR corner reflectors as well as the near-surface 3C seismic stations; (2) developed preliminary elastic geomechanical models; (3) developed a second generation deformation prediction for the BSCSP Kevin Dome injection site; and (4) completed a preliminary map of InSAR monuments and shallow MEQ wells in the vicinity of the BSCSP injection pad.

58 GEOSCIENCES↗

A Preliminary Review of U.S. Forest Service Business Practices To Authorize Special Uses, Including Energy Infrastructure Projects, on National Forest System Lands

The U.S. Forest Service (USFS) Special Uses-Lands Program is in jeopardy. Although this program, authorized in Title 36, Part 251, of the U.S. Code of Federal Regulations (36 CFR Part 251), ranks among the top four revenue-generating programs for use of National Forest System (NFS) lands, along with the Timber, Minerals, and Special Uses-Recreation Programs, the Special Uses-Lands Program is in a state of neglect. Repeated cuts in funding (a decrease of 26% from fiscal years 2010 to 2014) are adversely affecting staffing and training, which in turn is affecting timely permit processing and ultimately the public’s ability to use and benefit from NFS lands. In addition, highly experienced staff with valuable institutional knowledge of the program have begun to retire. The ability of the program to function under these dire circumstances can be attributed to the dedication of Special Uses staff to the program and their commitment to the public. The initial focus of this report was to identify opportunities for improving performance of permitting and review for large energy infrastructure-related projects. However, it became clear during this analysis that these projects are generally adequately staffed and managed. This is due in large part to the availability of cost-recovery dollars and the high-profile nature of these projects. However, it also became apparent that larger issues affecting the bulk of the work of the Special Uses-Lands Program need to be addressed immediately. This report is a preliminary examination of the state of the Special Uses-Lands Program and focuses on a few key items requiring immediate attention. Further investigation through case studies is recommended to dig deeper into the Special Uses-Lands Program business process to determine the most costeffective strategies for streamlining the overall process and the metrics by which performance can be evaluated, including for the permitting and tracking of energy infrastructure projects.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Final Project Report for DOE/EERE High-Capacity and Low-Cost Hydrogen-Storage Sorbents for Automotive Applications

This report provides a review of the objectives, progress, and milestones of the research conducted during this project on the topic of developing innovative metal-organic frameworks (MOFs) and porous organic polymers (POPs) for high-capacity and low-cost hydrogen-storage sorbents in automotive applications.1 The objectives of the proposed research were to develop new materials as next-generation hydrogen storage sorbents that meet or exceed DOE’s 2017 performance targets of gravimetric capacity of 0.055 kg H 2 /kg system and volumetric capacity of 0.040 kg H 2 /L system at a cost of $400/kg H 2 stored . Texas A&M University (TAMU) and Argonne National Laboratory (ANL) collaborated in developing low-cost and high-capacity hydrogen-storage sorbents with appropriate stability, sorption kinetics, and thermal conductivity. The research scope and methods developed to achieve the project’s goals include the following: Advanced ligand design and synthesis to construct MOF sorbents with optimal hydrogen storage capacities, low cost and high stability; Substantially improve the hydrogen uptake capacity and chemical stability of MOF-based sorbents by incorporating high valent metal ions during synthesis or through the post-synthetic metal metathesis oxidation approach; Enhance sorbent storage capacity through material engineering and characterization; Generate a better understanding of the H 2 -sorbent interaction through advanced characterization and simulation. Over the course of the project 5 different MOFs were developed and studied: PCN-250, PCN-12, PCN-12’, PCN-608 and PCN-609.2-3 Two different samples were submitted to the National Renewable Energy Laboratory (NREL) in order to validate their hydrogen adsorption capacity, PCN-250 and PCN-12. Neither of these samples reached the project’s Go/No-Go requirements but the data obtained did further prove the hypothesis that the presence of open metal sites oriented towards MOF pores help to surpass the predicted hydrogen uptakes described by Chahine’s rule.4 These observations are believed to have a major impact on the hydrogen storage community, and may potentially lead to the development of a material that could meet the DOE goals for hydrogen storage systems for automotive applications.

08 HYDROGEN↗

Merging symmetry projection methods with coupled cluster theory: Lessons from the Lipkin model Hamiltonian

Coupled cluster and symmetry projected Hartree-Fock are two central paradigms in electronic structure theory. However, they are very different. Single reference coupled cluster is highly successful for treating weakly correlated systems, but fails under strong correlation unless one sacrifices good quantum numbers and works with broken-symmetry wave functions, which is unphysical for finite systems. Symmetry projection is effective for the treatment of strong correlation at the mean-field level through multireference non-orthogonal configuration interaction wavefunctions, but unlike coupled cluster, it is neither size extensive nor ideal for treating dynamic correlation. We here examine different scenarios for merging these two dissimilar theories. We carry out this exercise over the integrable Lipkin model Hamiltonian, which despite its simplicity, encompasses non-trivial physics for degenerate systems and can be solved via diagonalization for a very large number of particles. We show how symmetry projection and coupled cluster doubles individually fail in different correlation limits, whereas models that merge these two theories are highly successful over the entire phase diagram. Despite the simplicity of the Lipkin Hamiltonian, the lessons learned in this work will be useful for building an ab initio symmetry projected coupled cluster theory that we expect to be accurate in the weakly and strongly correlated limits, as well as the recoupling regime.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗