Search NASA⌕ Search

SEARCH · Search NASA

Results for “work”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,441 records · Page 80

Virtual reality at work

The utility of virtual reality computer graphics in telepresence applications is not hard to grasp and promises to be great. When the virtual world is entirely synthetic, as opposed to real but remote, the utility is harder to establish. Vehicle simulators for aircraft, vessels, and motor vehicles are proving their worth every day. Entertainment applications such as Disney World's StarTours are technologically elegant, good fun, and economically viable. Nevertheless, some of us have no real desire to spend our lifework serving the entertainment craze of our sick culture; we want to see this exciting technology put to work in medicine and science. The topics covered include the following: testing a force display for scientific visualization -- molecular docking; and testing a head-mounted display for scientific and medical visualization.

Brooks, Frederick P., Jr.↗

Working Group 1: Current plans of various organisations for lunar activities

Summaries of presentations by representatives of several space agencies and the International Academy of Astronautics concerning lunar activities are presented. Participating space agencies reported two different types of lunar planning, long term planning and scenarios and lunar missions competing within regular programs. The long term plans of the various agencies look remarkably similar. They all involve a phased approach (coincidentally all incorporating four phases) and all address three prime scientific elements: science of, on, and from the Moon. The missions under consideration by the second group of agencies could readily fit as elements in the longer term program. There is great interest in lunar astronomy. There is a great deal of potential infrastructure and lunar transport capability already available. There is also a wide range of interesting technological developments that could form part of a lunar program. A well concerted and coordinated international effort could lead to an affordable program. Recommendations are: an international conference on lunar exploration should be held every other year; an electronic network should be established for the daily exchange of information; and a mechanism should be established for regular working level coordination of activities.

Balsiger, H.↗

Development work for a superconducting linear collider

For future linear e(+)e(-) colliders in the TeV range several alternatives are under discussion. The TESLA approach is based on the advantages of superconductivity. High Q values of the accelerator structures give high efficiency for converting RF power into beam power. A low resonance frequency for the RF structures can be chosen to obtain a large number of electrons (positrons) per bunch. For a given luminosity the beam dimensions can be chosen conservatively which leads to relaxed beam emittance and tolerances at the final focus. Each individual superconducting accelerator component (resonator cavity) of this linear collider has to deliver an energy gain of 25 MeV/m to the beam. Today s.c. resonators are in use at CEBAF/USA, at DESY/Germany, Darmstadt/Germany KEK/Japan and CERN/Geneva. They show acceleration gradients between 5 MV/m and 10 MV/m. Encouraging experiments at CEA Saclay and Cornell University showed acceleration gradients of 20 MV/m and 25 MV/m in single and multicell structures. In an activity centered at DESY in Hamburg/Germany the TESLA collaboration is constructing a 500 MeV superconducting accelerator test facility (TTF) to demonstrate that a linear collider based on this technique can be built in a cost effective manner and that the necessary acceleration gradients of more than 15 MeV/m can be reached reproducibly. The test facility built at DESY covers an area of 3.000 m2 and is divided into 3 major activity areas: (1) The testlinac, where the performance ofthe modular components with an electron beam passing the 40 m long acceleration section can be demonstrated. (2) The test area, where all individual resonators are tested before installation into a module. (3) The preparation and assembly area, where assembly of cavities and modules take place. We report here on the design work to reach a reduction of costs compared to actual existing superconducting accelerator structures and on the facility set up to reach high acceleration gradients in a reproducible way.

Matheisen, Axel↗

Minutes of TOPEX/POSEIDON Science Working Team Meeting and Ocean Tides Workshop

This third TOPEX/POSEIDON Science Working Team meeting was held on December 4, 1994 to review progress in defining ocean tide models, precision Earth orbits, and various science algorithms. A related workshop on ocean tides convened to select the best models to be used by scientists in the Geophysical Data Records.

Fu, Lee-Lueng↗

Development of methods for predicting large crack growth in elastic-plastic work-hardening materials in fully plastic conditions

The objects of the first, exploratory, stage of the project were listed as: (1) to make a detailed and critical review of the Boundary Element method as already published and with regard to elastic-plastic fracture mechanics, to assess its potential for handling present concepts in two-dimensional and three-dimensional cases. To this was subsequently added the Finite Volume method and certain aspects of the Finite Element method for comparative purposes; (2) to assess the further steps needed to apply the methods so far developed to the general field, covering a practical range of geometries, work hardening materials, and composites: to consider their application under higher temperature conditions; (3) to re-assess the present stage of development of the energy dissipation rate, crack tip opening angle and J-integral models in relation to the possibilities of producing a unified technology with the previous two items; and (4) to report on the feasibility and promise of this combined approach and, if appropriate, make recommendations for the second stage aimed at developing a generalized crack growth technology for its application to real-life problems.

Ford, Hugh↗

Phase Distribution Phenomena for Simulated Microgravity Conditions: Experimental Work

This report summarizes the work accomplished at Rensselaer to study phase distribution phenomenon under simulated microgravity conditions. Our group at Rensselaer has been able to develop sophisticated analytical models to predict phase distribution in two-phase flows under variety of conditions. These models are based on physics and data obtained from carefully controlled experiments that are being conducted here. These experiments also serve to verify the models developed.

Singhal, Maneesh↗

Working toward a three-dimensional fatigue closure model for surface cracks

The first reliable elastic fracture mechanics solutions for a surface crack in a plate were obtained by Newman and Raju. The authors, both from the Mechanics of Materials Branch at NASA-Langley, used a highly detailed finite element solution requiring substantial computational resources. Computers have since become more powerful and available; however, many important related problems remain computationally expensive. The problem of three-dimensional fatigue crack growth taking into account plasticity-induced crack closure is one such problem. It is the goal of this research to provide an efficient method to account for three-dimensional crack closure in fatigue. Newman developed a two-dimensional plasticity-induced crack closure model for center cracked specimens. This model requires iterations to determine both the contact solution at each growth step and the extent of the plastic zone at the crack tip. A three-dimensional version of this model would require obtaining these nonlinear variables all along the crack front. This model must be efficient so that repeated calculations can be performed during crack growth simulations. The highly versatile line spring model (LSM) with contact, fatigue, and plasticity will form the basis of the closure model. There are several required additions to past work to address the three-dimensional crack closure problem. Initially, these additions will include (1) an improved LSM to more accurately obtain the crack opening displacement, stress intensity factors, and elastic T-stress near the ends of the surface crack; (2) a method to determine the extent of the plastic zone all along the crack front; (3) a method to determine the contact zone given a perfectly plastic layer of material on the crack surfaces; (4) a method to determine the magnitude of the compressive contact stress; and (5) a way to implement the degree of constraint along the curved crack front. During the summer ASEE program an enhanced LSM was developed. A method similar to that of 'strip synthesis' first introduced by Fujimoto was used. Briefly, the crack opening displacements of 'slices' of the surface crack in a direction parallel to the plate surface are considered in addition to the standard LSM approach that makes use of springs obtained from slices perpendicular to the plate surface. This enhancement is necessary so that an accurate three-dimensional representation of quantities such as contact zone size, plastic zone size, stress intensity factors, T-stress, and crack opening displacement can be determined. By combining results of previous investigations with the LSM, the problem of three-dimensional crack closure will be addressed. In addition to a closure model, the enhanced LSM can be used for many other problems including interacting surface cracks and fatigue crack growth of a through crack with a curved crack front.

Joseph, Paul F.↗

The new organization: Rethinking work in the age of virtuality

Like two enormous steam engines, throttles wide-open, bells clanging and whistles screeching, careening toward each other down the same track, two powerful forces are about to collide and the point of collision will be smack in the middle of the white-collar workplace. Moreover, once the dust has settled, it is quite likely that we will never be able to think about the white-collar workplace in quite the same way again. The forces couldn't be more different. One force, the theory of complex adaptive systems, has its roots in the radical new sciences of chaos and complexity. The other force, the notion of organizations being learning systems, more like living organisms than 'information factories,' is an outgrowth of the new management thinking of leading organizational theorists like the Claremont Graduate School's Peter Drucker, MIT's Peter Senge, and Hitotsubashi University's Ikujiro Nonaka. Nevertheless, both the new science and the new management thinking seem to point to a similar and perhaps even startling conclusion: the business organization of the 21st century will look nothing like the bureaucratic organizational model that prevails in most companies today, a model that has remained largely unchanged since the manufacturing heydays of 1950s. While the details of the new organization remain sketchy, its rough outline is already beginning to take shape. Rather than simply being flatter through the elimination of layer upon layer of 'middle management,' the new organization is likely to be made up of networks of specialists who will be, for all practical purposes, self-managing. Rather than focusing on issues like re-engineering business processes, a holdover from Taylorism, the focus will be on supporting the continuous learning of an organization's specialists, the sharing of this learning with other specialists, and the embedding of this learning in the organization's physical structure. Finally, rather than viewing themselves as going through relatively long periods of stability punctuated by shorts bursts of 'reorganization,' business enterprises will come to realize that their very survival depends upon their being in a state of continuous organization. The implications of the new organization with respect to how companies approach the planning, design, and management of the technology infrastructure that enables individual learning, self-management, and continuous orgsnization, are both numerous and far-reaching. As part of this technology infrastructure, the white-collar workplace exists in the form it does today as a direct result of management's beliefs about how time, space, and tools ought to be organized and managed in order to accomplish useful intellectual work. Obviously, if these beliefs change radically, as both the new science and the new management thinking suggest is about to happen, then it is almost inevitable that the form and function of the white-collar workplace will change radically, as well. Will there even be a white-collar workplace in the 21st century, in the sense of purpose-built facilities designed to support the co-location of large numbers of white-collar workers? Only time will tell. However, the leading indicators seem to suggest that, as the old saying goes, 'We ain't seen nothin' yet!'

Sutherland, Duncan B., Jr.↗

Preliminary work toward the development of a dimensional tolerance standard for rapid prototyping

Rapid prototyping is a new technology for building parts quickly from CAD models. It works by slicing a CAD model into layers, then by building a model of the part one layer at a time. Since most parts can be sliced, most parts can be modeled using rapid prototyping. The layers themselves are created in a number of different ways - by using a laser to cure a layer of an epoxy or a resin, by depositing a layer of plastic or wax upon a surface, by using a laser to sinter a layer of powder, or by using a laser to cut a layer of paper. Rapid prototyping (RP) is new, and a standard part for use in comparing dimensional tolerances has not yet been chosen and accepted by ASTM (the American Society for Testing Materials). Such a part is needed when RP is used to build parts for investment casting or for direct use. The objective of this project was to start the development of a standard part by using statistical techniques to choose the features of the part which show curl - the vertical deviation of a part from its intended horizontal plane.

Kennedy, W. J.↗

A Chemical Containment Model for the General Purpose Work Station

Contamination control is a critical safety requirement imposed on experiments flying on board the Spacelab. The General Purpose Work Station, a Spacelab support facility used for life sciences space flight experiments, is designed to remove volatile compounds from its internal airpath and thereby minimize contamination of the Spacelab. This is accomplished through the use of a large, multi-stage filter known as the Trace Contaminant Control System. Many experiments planned for the Spacelab require the use of toxic, volatile fixatives in order to preserve specimens prior to postflight analysis. The NASA-Ames Research Center SLS-2 payload, in particular, necessitated the use of several toxic, volatile compounds in order to accomplish the many inflight experiment objectives of this mission. A model was developed based on earlier theories and calculations which provides conservative predictions of the resultant concentrations of these compounds given various spill scenarios. This paper describes the development and application of this model.

Flippen, Alexis A.↗

Sprint: The first flight demonstration of the external work system robots

The External Works Systems (EWS) 'X Program' is a new NASA initiative that will, in the next ten years, develop a new generation of space robots for active and participative support of zero g external operations. The robotic development will center on three areas: the assistant robot, the associate robot, and the surrogate robot that will support external vehicular activities (EVA) prior to and after, during, and instead of space-suited human external activities respectively. The EWS robotics program will be a combination of technology developments and flight demonstrations for operational proof of concept. The first EWS flight will be a flying camera called 'Sprint' that will seek to demonstrate operationally flexible, remote viewing capability for EVA operations, inspections, and contingencies for the space shuttle and space station. This paper describes the need for Sprint and its characteristics.

Price, Charles R.↗

Phase Distribution Phenomena for Simulated Microgravity Conditions: Experimental Work

This report summarizes the work accomplished at Rensselaer to study phase distribution phenomenon under simulated microgravity conditions. Our group at Rensselaer has been able to develop sophisticated analytical models to predict phase distribution in two-phase flows under a variety of conditions. These models are based on physics and data obtained from carefully controlled experiments that are being conducted here. These experiments also serve to verify the models developed.

Singhal, Maneesh↗

Extrinsic germanium photoconductors for far-IR astronomy: Research results and works in progress

Some Ge:Ga and Ge:Sb photoconductor materials and detectors that are currently under development are reported. The best Ge:Ga devices exhibit dark currents of lower than 200 electrons/s, with a concurrent responsivity of 2 A/W and a detective quantum efficiency (DQE) of 5 percent. For higher backgrounds, an operating temperature of 3 K can be used. This increases the DQE to 7 percent and the responsivity to 4.5 A/W. Investigations were initiated into n-type Ge:Sb as an alternative photoconductive material. Two crystals of Ge:Sb were grown and a number of test detectors were fabricated and evaluated. At 2 K, the best device produced dark currents of less than 100 electrons/s with concurrent responsivity of 1 A/W and DQE of 4 percent, and at 3 K, produced currents of 10(exp 5) electrons/s with a DQE of 7 percent and a responsivity of 4 A/W. Using p-type Ge:Ga crystals, two dimensional monolithic photoconductor arrays are being constructed. Future work will focus on measuring pixel-to-pixel homogeneity, cross talk issues, overall sensitivity and suitability for photometric instruments.

Beeman, J. W.↗

The World Wide Web as a Medium of Instruction: What Works and What Doesn't

A conference was held on March 18-20, 1997 to investigate the lessons learned by the Aeronautics Cooperative Agreement Projects with regard to the most effective strategies for developing instruction for the World Wide Web. The conference was a collaboration among the NASA Aeronautics and Space Transportation Technology Centers (Ames, Dryden, Langley, and Lewis), NASA Headquarters, the University of Idaho and The Pennsylvania State University. The conference consisted of presentations by the Aeronautics Cooperative Agreement Teams, the University of Idaho, and working sessions in which the participants addressed teacher training and support, technology, evaluation and pedagogy. The conference was also undertaken as part of the Dryden Learning Technologies Project which is a collaboration between the Dryden Education Office and The Pennsylvania State University. The DFRC Learning Technology Project goals relevant to the conference are as follows: conducting an analysis of current teacher needs, classroom infrastructure and exemplary instructional World Wide Web sites, and developing models for Web-enhanced learning environments that optimize teaching practices and student learning.

McCarthy, Marianne↗

Proposal Improvements That Work

Rocketdyne Propulsion and Power, an operating location of Boeing in Canoga Park, California is under contract with NASA's Marshall Space Flight Center (MSFC) in Huntsville, Alabama for design, development, production, and mission support of Space Shuttle Main Engines (SSMEs). The contract was restructured in 1996 to emphasize a mission contracting environment under which Rocketdyne supports the Space Transportation System launch manifest of seven flights a year without the need for a detailed list of contract deliverables such as nozzles, turbopumps, and combustion devices. This contract structure is in line with the overall Space Shuttle program goals established by the NASA to fly safely, meet the flight manifest, and reduce cost. Rocketdyne's Contracts, Pricing, and Estimating team has worked for the past several years with representatives from MSFC, the local Defense Contract Management Command, and the DCAA to improve the quality of cost proposals to MSFC for contract changes on the SSME. The contract changes on the program result primarily from engineering change proposals for product enhancements to improve safety, maintainability, or operability in the space environment. This continuous improvement team effort has been successful in improving proposal quality, reducing cycle time, and reducing cost. Some of the principal lessons learned are highlighted here to show how proposal improvements can be implemented to enhance customer satisfaction and ensure cost proposals can be evaluated easily by external customers.

Dunn, F.↗

Work on Planetary Atmospheres and Planetary Atmosphere Probes

A major objective of the grant was to complete the fabrication, test, and evaluation of the atmosphere structure experiment on the Galileo Probe, and to receive, analyze, and interpret data received from the spacecraft. The grantee was competitively selected to be Principal Investigator of Jupiter's atmosphere structure on the Galileo Probe. His primary motivation was to learn as much as possible about Jupiter's atmosphere by means of a successful atmosphere structure experiment, and to support the needs and schedule of the Galileo Project. After a number of launch delays, the Flight instrument was shipped to Kennedy Space Center 2 years after the start of this collaboration, on April 14, 1989, at which time it was determined from System level tests of the ASI on the Probe that the instrument was in good working order and ready for flight. The spacecraft was launched on October 18, 1989. Data analysis of test and calibration data taken over a period of years of instrument testing was continued in preparation for the encounter. The initial instrument checkout in space was performed on October 26, 1989. The data set received by telemetry was thoroughly analyzed, and a report of the findings was transmitted to the Probe Operations Office on Feb. 28, 1990. Key findings reported were that the accelerometer biases had shifted by less than 1 mg through launch and since calibration at Bell Aerospace in 1983; accelerometer scale factors, evaluated by means of calibration currents, fell on lines of variation with temperature established in laboratory calibrations; pressure sensor offsets, correlated as a function of temperature, fell generally within the limits of several years of ground test data; atmospheric and engineering temperature sensor data were internally consistent within a few tenths of a degree; and the instrument electronics performed all expected functions without any observable fault. Altogether, this checkout was highly encouraging of the prospects of instrument performance, although performed greater than 5 years prior to Jupiter encounter. Capability of decoding the science data from the Experiment Data Record to be provided at encounter was developed and exercised using the tape recording of the first Cruise Checkout data. A team effort was organized to program the selection and combination of data words defining pressure, temperature, acceleration, turbulence, and engineering quantities; to apply decalibration algorithms to convert readings from digital numbers to physical quantities; and to organize the data into a suitable printout. A paper on the Galileo Atmosphere Structure Instrument was written and submitted for publication in a special issue of Space Science Reviews. At the Journal editor's request, the grantee reviewed other Probe instrument papers submitted for this special issue. Calibration data were carefully taken for all experiment sensors and accumulated over a period of 10 years. The data were analyzed, fitted with algorithms, and summarized in a calibration report for use in analyzing and interpreting data returned from Jupiter's atmosphere. The sensors included were the primary science pressure, temperature, and acceleration sensors, and the supporting engineering temperature sensors. This report was distributed to experiment coinvestigators and the Probe Project Office.

Seiff, Alvin↗