Search NASA⌕ Search

SEARCH · Search NASA

Results for “COST PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,459 records · Page 81

Flexible Coal: An Example Evolution from Baseload to Peaking Plant (Presentation)

Twenty-first century power systems, with higher penetration levels of low-carbon energy, smart grids, and other emerging technologies, will favor resources that have low marginal costs and provide system flexibility (e.g., the ability to cycle on and off to follow changes in variable renewable energy plant output). Questions remain about both the fate of coal plants in this scenario and whether they can cost-effectively continue to operate if they cycle routinely. The experience from the CGS plant demonstrates that coal plants can become flexible resources. This flexibility - namely the ability to cycle on and off and run at lower output (below 40% of capacity) - requires limited hardware modifications but extensive modifications to operational practice. Cycling does damage the plant and impact its life expectancy compared to baseload operations. Nevertheless, strategic modifications, proactive inspections and training programs, among other operational changes to accommodate cycling, can minimize the extent of damage and optimize the cost of maintenance. CGS's cycling, but not necessarily the associated price tag, is replicable. Context - namely, power market opportunities and composition of the generation fleet - will help determine for other coal plants the optimal balance between the level of cycling-related forced outages and the level of capital investment required to minimize those outages. Replicating CGS's experience elsewhere will likely require a higher acceptance of forced outages than regulators and plant operators are accustomed to; however, an increase in strategic maintenance can minimize the impact on outage rates.

01 COAL, LIGNITE, AND PEAT↗

Flexible Coal: An Example Evolution from Baseload to Peaking Plant (Presentation)

Twenty-first century power systems, with higher penetration levels of low-carbon energy, smart grids, and other emerging technologies, will favor resources that have low marginal costs and provide system flexibility (e.g., the ability to cycle on and off to follow changes in variable renewable energy plant output). Questions remain about both the fate of coal plants in this scenario and whether they can cost-effectively continue to operate if they cycle routinely. The experience from the CGS plant demonstrates that coal plants can become flexible resources. This flexibility - namely the ability to cycle on and off and run at lower output (below 40% of capacity) - requires limited hardware modifications but extensive modifications to operational practice. Cycling does damage the plant and impact its life expectancy compared to baseload operations. Nevertheless, strategic modifications, proactive inspections and training programs, among other operational changes to accommodate cycling, can minimize the extent of damage and optimize the cost of maintenance. CGS's cycling, but not necessarily the associated price tag, is replicable. Context - namely, power market opportunities and composition of the generation fleet - will help determine for other coal plants the optimal balance between the level of cycling-related forced outages and the level of capital investment required to minimize those outages. Replicating CGS's experience elsewhere will likely require a higher acceptance of forced outages than regulators and plant operators are accustomed to; however, an increase in strategic maintenance can minimize the impact on outage rates.

01 COAL, LIGNITE, AND PEAT↗

EM Program Expectations on Implementation of DOE O 458: Radiation Protection of Public/Environment - 19553

DOE Order 458.1, Radiation Protection of the Public and Environment, was issued in 2011. DOE sites were given 18 months to implement. The revised Order promulgates requirements for property clearance actions and independent verification. DOE Order 458.1 allows for preapproved authorized limits for the clearance of property. However, when property with the potential to contain residual radioactive material does not meet preapproved authorized limits, an authorized limits package must be developed. The Order contains a range of requirements for demonstrating with reasonable assurance that dose constraints are met for any actual or likely future use of the property to be released. EM has developed a draft guidance document that provides the elements of an authorized limits package. These elements are used to review all authorized limits packages that are submitted to EM. Expected elements include property description and process knowledge documentation, current and likely future use, the conceptual site model, dose modeling methodologies, specific authorized limits, dose- or concentration-based constraints, collective dose estimate to the potentially exposed population, stakeholder communications, description of the As Low As Reasonably Achievable (ALARA) analysis, implementation plan, evaluation of difficult to assess surfaces, and independent verification plan. The draft guidance document also provides further explanation of the desired elements of an independent verification (IV) plan. An IV plan should describe the planning phase, implementation phase, assessment phase, and decision phase of an activity. The planning phase includes scope and cost, concurrent with cleanup contractor procurement, and review and approval of site radiological survey clearance program and IV program plans. The implementation phase assures sufficient collection of data and adjustment can be made as necessary. During the assessment phase, data and reports are reviewed, and coordination between the clean-up contractor and IV personnel occurs. A decision of whether or not the clearance actions need to be altered occurs during the decision phase. IV certification that the clearance action is complete also occurs during the decision phase. Issuance of the final guidance document is meant to improve the consultation process and minimize iterative interactions with EM. Standardizing and formalizing property clearance and IV actions also helps assure that cleanup actions are transparent and sustainable for future scrutiny. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impacts of Biogas-to-Electricity Purchase Incentive on Electric Vehicle Market Penetration

The biogas-to-electricity pathway under the Renewable Fuel Standards allows for Renewable Identification Number (RIN) credits to be generated when electricity produced from biogas is used in the transportation sector. This study describes and evaluates a potential credit allocation method under that pathway that distributes electricity RIN (E-RIN) credits between electricity generators and plug-in electric vehicle (PEV) users and assesses the impact on EV deployment. In this study, one part of the credit value is allocated to electricity generators to offset potential higher biogas electricity generation cost, measured by the levelized cost of electricity. The other part of credit value is allocated to consumers in terms of the PEV purchase incentive to stimulate PEV sales. An iterative simulation procedure is developed to fulfill two tasks: (1) one task is to estimate the incentive amount based on various factors, such as vehicle mileage, E-RIN equivalence value, and biogas capacity, and (2) the other task is to evaluate potential impacts of the E-RIN program on electrification of the future light duty vehicle fleet and energy use. Results indicate that the E-RIN program can significantly increase PEV market share by up to 2.3 million in sales and by up to 19.7 million in fleet size in 2030. However, effectiveness of the program is subject to different factors, such as the E-RIN equivalence value, biogas electricity generation cost, biogas electricity generation capacity, and potential competition in E-RIN credits by other entities.

Xie, Fei↗

Sun Grant Initiative Regional Biomass Feedstock Partnership Competitive Grants Program

The Sun Grant Initiative partnered with the US Department of Energy (DOE) in 2008 to create the Regional Biomass Feedstock Partnership Competitive Grants Program. The overall goal of this project was to utilize congressionally directed funds to leverage the North Central Regional Sun Grant’s Competitive Grant program at South Dakota State University (SDSU) to address key issues and research gaps related to development of the bioeconomy. Specific objectives of this program were to: 1. Identify research projects through a Regional Competitive Grants program that were relevant to the sustainable production, harvest, transport, delivery, and processing/conversion of cost-competitive, domestically grown biomass. 2. Build local expertise and capacity at the North Central Regional Sun Grant Center at SDSU through an internal selection of key bioenergy research projects. To achieve these, three nationwide Request for Applications (RFA) were developed: one each in 2008, 2009, and 2010. Internal, capacity building projects at SDSU were also selected during each one of these RFAs. In 2013 and 2015, two additional Proof of Concept RFAs were developed for internal SDSU projects. Priority areas for each RFA were 1) Biomass feedstock logistics including biomass harvesting, handling, transportation, storage, and densification; 2) Sustainable biomass feedstock production systems including biomass crop development, production, and life-cycle analysis; 3) Biomass production systems that optimize biomass feedstock yield and economic return across a diverse landscape while minimizing negative effects on the environment and food/feed production; and 4) Promotion of knowledge-based economic development in science and technology and to advance commercialization of inventions that meet the mission of the Sun Grant Initiative. A total of 33 projects were selected for funding through this program. Final reports for each of these diverse projects are included in this summary report. Projects funded under this award have contributed significantly to and advanced the bioeconomy body of knowledge. Specifically, no fewer than 109 peer-reviewed publications, 2 patents, 4 invention disclosures, 5 book chapters, 30 conference papers, 224 professional presentations, 31 outreach publications, and 1 website have been generated. This contribution to the scientific community (peer-reviewed literature, presentations, etc.) and to the public (outreach publications, websites, etc.) has been significant. In addition, a number of projects funded through this award included significant industry involvement and support both in terms of funding (both in-kind and direct) and input. Key industry stakeholders included AGCO, Alliant Energy, Applied Nanofilms, Archer Daniels Midland, ConocoPhillips, DuPont-Danisco Cellulosic Ethanol, EcoSun Prairie Farm, Federal Machine Co., Hawkeye Renewables, John Deere, Mendel, SD Innovation Partners, and Thermo-Ag.

09 BIOMASS FUELS↗

Soft costs and EVSE – Knowledge gaps as a barrier to successful projects

There has been a recent push to increase access to electric vehicle (EV) charging infrastructure. The National Electric Vehicle Infrastructure (NEVI) program, part of the Bipartisan Infrastructure Law (BIL) has made significant funding available for major charging infrastructure projects along state thruways, and many state and local incentives exist for EV owners to install chargers in their homes. However, deployment of these chargers has not kept up with demand, primarily due to issues in project planning, permitting processes, and unforeseen delays. This paper serves as a review of the current understanding of these and other non-hardware costs in EV charging infrastructure projects (collectively known as “soft costs”). We found that soft costs in EV charging infrastructure projects are not well understood. Specifically, there is little agreement on how soft costs should be categorized and tracked, and less agreement still on best practices for controlling these costs and lowering barriers to infrastructure deployment. A broader review of EV charging infrastructure cost analyses shows that these costs can have significant impacts on project outcomes. EV charging infrastructure projects may be able to examine the success of the solar industry in lowering soft costs, and a similar effort may lower project costs significantly. Further work on standardizing and collecting data on EV charging infrastructure costs is required to begin addressing and controlling these costs.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

PV Solar Power for the Santo Domingo Tribe's Community Water Pump and Treatment Facility

The Santo Domingo Tribe’s endeavor to seek a solution to the high electricity costs for the operation of the drinking water pumphouse was made viable through the Department of Energy (DOE) Office of Indian Energy grant program for the installation of 100,000-watt photovoltaic (PV) solar power system. This source of alternative renewable energy was and is imperative to the Tribe in identifying a solution to off-set the costs of the Water Pump and Treatment Facility (WPT). The Tribe has a great interest in continuing their development of a model for future energy saving projects that will greatly eliminate or reduce costly electric utility bills and save the Tribe money.

14 SOLAR ENERGY↗

High Temperature Capacitor Development

The absence of high-temperature electronics is an obstacle to the development of untapped energy resources (deep oil, gas and geothermal). US natural gas consumption is projected to grow from 22 trillion cubic feet per year (tcf) in 1999 to 34 tcf in 2020. Cumulatively this is 607 tcf of consumption by 2020, while recoverable reserves using current technology are 177 tcf. A significant portion of this shortfall may be met by tapping deep gas reservoirs. Tapping these reservoirs represents a significant technical challenge. At these depths, temperatures and pressures are very high and may require penetrating very hard rock. Logistics of supporting 6.1 km (20,000 ft) drill strings and the drilling processes are complex and expensive. At these depths up to 50% of the total drilling cost may be in the last 10% of the well depth. Thus, as wells go deeper it is increasingly important that drillers are able to monitor conditions down-hole such as temperature, pressure, heading, etc. Commercial off-the-shelf electronics are not specified to meet these operating conditions. This is due to problems associated with all aspects of the electronics including the resistors and capacitors. With respect to capacitors, increasing temperature often significantly changes capacitance because of the strong temperature dependence of the dielectric constant. Higher temperatures also affect the equivalent series resistance (ESR). High-temperature capacitors usually have low capacitance values because of these dielectric effects and because packages are kept small to prevent mechanical breakage caused by thermal stresses. Electrolytic capacitors do not operate at temperatures above 150oC due to dielectric breakdown. The development of high-temperature capacitors to be used in a high-pressure high-temperature (HPHT) drilling environment was investigated. These capacitors were based on a previously developed high-voltage hybridized capacitor developed at Giner, Inc. in conjunction with a unique high-temperature electrolyte developed during the course of the program. During this program the feasibility of operating a high voltage hybridized capacitor at 230oC was demonstrated. Capacitor specifications were established in conjunction with potential capacitor users. A method to allow for capacitor operation at both ambient and elevated temperatures was demonstrated. The program was terminated prior to moving into Phase II due to a lack of cost-sharing funds.

03 NATURAL GAS↗

Renewable electricity capacity planning with uncertainty at multiple scales

Abstract We formulate and compare optimization models of investment in renewable generation using a suite of social planning models that compute optimal generation capacity investments for a hydro-dominated electricity system where inflow uncertainty results in a risk of energy shortage. The models optimize the expected cost of capacity expansion and operation allowing for investments in hydro, geothermal, solar, wind, and thermal plant, as well as battery storage for smoothing load profiles. A novel feature is the integration of uncertain seasonal hydroelectric energy supply and short-term variability in renewable supply in a two-stage stochastic programming framework. The models are applied to data from the New Zealand electricity system and used to estimate the costs of moving to a 100% renewable electricity system by 2035. We also explore the outcomes obtained when applying different forms of CO 2 constraint that limit respectively non-renewable capacity, non-renewable generation, and CO 2 emissions on average, almost surely, or in a chance-constrained setting, and show how our models can be used to investigate the merits of a proposed pumped-hydro scheme in New Zealand’s South Island.

Ferris, Michael C.↗

International Collaboration Activities in Geologic Disposal Research: FY2021 Progress

This report describes the FY21 status of international collaboration regarding geologic disposal research in the Spent Fuel and Waste Disposition (SFWD) Campaign. Since 2012, in an effort coordinated by Lawrence Berkeley National Laboratory, SFWD has advanced active collaboration with several international geologic disposal programs across the world. Such collaboration has allowed the SFWD Campaign to benefit from a deep knowledge base in regards to alternative repository environments developed over decades and has provided a framework for active peer-to-peer research participation in international groups which conduct, analyze, and model performance-relevant processes. Via international collaboration, the SFWD Campaign also benefits from substantial international investments in research facilities (such as underground research laboratory testing and modeling) and achieves cost savings via joint funding of expensive field experiments. To date, SFWD’s International Disposal R&D Program has established formal collaboration agreements with multiple international initiatives and various international partners, and national lab scientists associated with SFWD have conducted a large number of specific collaborative R&D activities that align well with its R&D priorities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Human Factors Engineering Insights and Guidance for Implementing Innovative Technologies from the Nuclear Innovation Workshop: A Summary Report

The Nuclear Innovation Workshop was sponsored by the United States Department of Energy Light Water Reactor Sustainability Program and held at Idaho National Laboratory on June 26-28, 2019. The objectives of this workshop were to [1] promote an innovation ecosystem that reduces cost and risk through early evaluations, [2] provide hands-on activities that demonstrate the value of using advanced tools, methods, and capabilities offered by the Light Water Reactor Sustainability Program, [3] provide a platform to enable broad innovation in the nuclear industry, [4] enable industry leaders the opportunity for networking and sharing of their experiences, and [5] take inspiration from other industries to push the envelope for transformation in the nuclear industry. These objectives were supported through the facilitation of detailed discussions and industry presentations that were presented within the context of a four-phased approach to nuclear innovation. Open conversation about key challenges and considerations for innovation in the nuclear industry was collected at each of facilitated discussions, which were focused on one of the four phases (see Section 3). Further, a survey was administered to attendees at the close of workshop to collect feedback on the quality of the workshop and their impressions of future initiatives for promoting an innovation ecosystem such as with developing an Innovation Portal or establishing an Innovation Working Group (see Section 4). Key recommendations that came from the workshop broadly included the development of an Innovation Portal, establishment of an Innovation Working Group, and subsequent meetings with industry partners including utilities, vendors, and research organizations to exchange lessons learned in innovation, progress of the Innovation Portal, and other related matters specific to nuclear innovation.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Oscilloscope Data Push Program

This paper details the development of a Python program designed to automate the data acquisition and conversion for an oscilloscope for the purposes of a one-off/temporary data acquisition system for users that readily need data, and do not have the option of obtaining a Data Acquisition (DAQ) solution. Creating DAQ systems for analyzing a system requires expensive electronics and a dedicated team of engineers for support. Traditionally, manual data collection and processing are time consuming and prone to error. By automating these processes, the cost, efficiency and accuracy of data handling are improved upon. This project involves the creation of a program that interacts with the oscilloscope. During this interaction, there are various functions being performed such as the acquisition of waveform data via floating points, generating plots with the acquired wave points, and storing of floating points in a CSV file format for future reference and plotting purposes. While the initial aim of the project included continuous logging to a cloud database, this was deferred due to time constraints. The results portrayed an almost-instant rate of data collection with a buffer time, showcasing the potential for further integration and real-time data processing.

Osei-Tutu, Jason↗

An Evaluation of The Dynamic Physical Security Risk Assessment Methodology for Fleet-Wide Applications

The requirements for U.S. nuclear power plants to maintain a large onsite physical security force contribute to their high operational costs. The cost of maintaining the current physical security posture is approximately 10% of the overall operation and maintenance budget for commercial nuclear power plants. The goal of the Light Water Reactor Sustainability (LWRS) program’s physical security pathway is to develop tools, methods, and technologies and provide the technical basis for an optimized physical security posture. The conservatisms built into current security postures may be analyzed and minimized to reduce security costs while still ensuring adequate security and operational safety. The research performed at Idaho National Laboratory within LWRS program’s physical security pathway has successfully developed a dynamic force-on-force modeling framework using various computer simulation tools and integrating them with the dynamic assessment Event Modeling Risk Assessment using Linked Diagrams (EMRALD) tool. This integrated process for physical security analysis is named Modeling and Analysis for Safety Security using Dynamic EMRALD Framework (MASS-DEF). This document provides an update on the progress in applying the MASS-DEF process to an operating commercial nuclear power plant as well as additional industry feedback regarding use of the tool for other physical security risk-informed topics. This report is only a summary of the progress and does not contain specific modeling results as those contain sensitive security information. Previous reports described how a user could integrate their plant-specific force-on-force models with the dynamic simulation tool EMRALD, model operator actions, and integrate with probabilistic risk assessment tools, such as CAFTA (Computer Aided Fault Tree Analysis System) or SAPHIRE (Systems Analysis Programs for Hands-on Integrated Reliability Evaluations), and with thermal-hydraulic tools, such as RELAP-5 or MAAP. Previous reports applied various combinations of available simulations codes with EMRALD using generic plant models to demonstrate how to perform the analysis. This report is an update the progress of applying the dynamic computational framework to an actual nuclear facility using their security scenarios and timelines. This report also provides an update to the procedural guidance for the MASS-DEF process and an overview of the generic models available for use by utilities. This report does not contain any plant’s sensitive information and/or safeguards information. This study’s purpose was to verify that the results achieved using generic models are similar to actual plant results and refine our guidance on the use of the framework. This assessment enables further analysis, such as what-if scenarios and staff-reduction evaluation, thereby optimizing physical security at plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Optimal guidance law in quantum mechanics

Following de Broglie’s idea of a pilot wave, this paper treats quantum mechanics as a problem of stochastic optimal guidance law design. The guidance scenario considered in the quantum world is that an electron is the flight vehicle to be guided and its accompanying pilot wave is the guidance law to be designed so as to guide the electron to a random target driven by the Wiener process, while minimizing a cost-to-go function. After solving the stochastic optimal guidance problem by differential dynamic programming, we point out that the optimal pilot wave guiding the particle’s motion is just the wavefunction Ψ(t,x), a solution to the Schrödinger equation; meanwhile, the closed-loop guidance system forms a complex state–space dynamics for Ψ(t,x), from which quantum operators emerge naturally. Quantum trajectories under the action of the optimal guidance law are solved and their statistical distribution is shown to coincide with the prediction of the probability density function Ψ{sup ∗}Ψ. -- Highlights: •Treating quantum mechanics as a pursuit-evasion game. •Reveal an interesting analogy between guided flight motion and guided quantum motion. •Solve optimal quantum guidance problem by dynamic programming. •Gives a formal proof of de Broglie–Bohm’s idea of a pilot wave. •The optimal pilot wave is shown to be a wavefunction solved from Schrödinger equation.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Time-Dependent Electric Bus and Charging Station Deployment Problem

Battery electric buses (BEBs) have gained popularity due to their emission-free and energy-efficient features. Many transit authorities worldwide have set goals to gradually replace their bus fleets with BEBs. Considering the potential decline in BEB battery and charger prices, this study proposes a time-dependent bus fleet transition model to determine the optimal bus fleet transition plan, which includes selecting the bus lines to be electrified, determining the timing and type of BEBs to be purchased, and deploying on-route fast chargers and depot chargers. The model is a bi-objective integer linear program that considers the trade-off between electrified transit mileages and bus electrification costs. A normalized normal constraint method is applied to solve the bi-objective optimization model. The effectiveness of the proposed model is tested using a real-world bus network. Additionally, sensitivity analyses are conducted to better understand the impact of different parameter values on the optimal solutions. Our proposed model can provide transit authorities with a powerful tool to make informed decisions about their BEB fleet replacement plans.

ADVANCED PROPULSION SYSTEMS↗

Century: Zap Energy’s 100-kW-Scale Repetitive Sheared-Flow-Stabilized Z -Pinch System with Liquid Metal Cooling

Zap Energy is developing the sheared-flow-stabilized (SFS) Z-pinch concept for commercial applications. The SFS Z pinch relies on plasma self-organization, in the sense that plasma dynamics play a critical role in confinement. Using plasma axial current for confinement and compression eliminates the need for external confinement or heating technologies. This compact magnetic confinement technology could, in turn, provide the basis for a cost-effective deuterium-tritium fusion power plant. In addition to a robust experimental program pushing plasma performance towards breakeven conditions, Zap Energy has parallel programs developing power handling systems suitable for future power plants. Technologies under development include high average-power repetitive pulsed power, high duty-cycle cathodes, and liquid metal wall systems. Century is the name of Zap Energy’s first effort to integrate these three components into an operational system capable of firing non-reacting hydrogen SFS Z-pinch plasmas into a liquid-metal-lined container at sustained repetition rates on the order of 0.1 Hz. Here, the pulsed power driver and liquid metal heat exchanger are both designed to sustain input powers of 100 kW. Construction and initial operations with an interim ~10 kW liquid metal heat exchanger are described.

Century↗

Real-Time Ecodriving Control in Electrified Connected and Autonomous Vehicles Using Approximate Dynamic Programing

Connected and automated vehicles (CAVs), particularly those with a hybrid electric powertrain, have the potential to significantly improve vehicle energy savings in real-world driving conditions. In particular, the ecodriving problem seeks to design optimal speed and power usage profiles based on available information from connectivity and advanced mapping features to minimize the fuel consumption over an itinerary. This paper presents a hierarchical multilayer model predictive control (MPC) approach for improving the fuel economy of a 48 V mild-hybrid powertrain in a connected vehicle environment. Approximate dynamic programing (DP) is used to solve the receding horizon optimal control problem, whose terminal cost is approximated with the base policy obtained from the long-term optimization. The controller was tested virtually (with deterministic and Monte Carlo simulation) across multiple real-world routes, demonstrating energy savings of more than 20%. The controller was then deployed on a test vehicle equipped with a rapid prototyping embedded controller. In-vehicle testing confirm the energy savings obtained in simulation and demonstrate the real-time ability of the controller.

Automation & Control Systems↗