Search NASA⌕ Search

SEARCH · Search NASA

Results for “Mission Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,459 records · Page 81

The Mars Pathfinder Mission and Science Results

Mars Pathfinder, the first low-cost, quick Discovery class mission to be completed, successfully landed on the surface of Mars on July 4, 1997, deployed and navigated a small rover, and collected data from 3 science instruments and 10 technology experiments. The mission operated on Mars for 3 months and returned 2.3 Gbits of new data, including over 16,500 lander and 550 rover images, 16 chemical analyses of rocks and soil, and 8.5 million individual temperature, pressure and wind measurements. The rover traversed 100 m clockwise around the lander, exploring about 200 square meters of the surface. The mission captured the imagination of the public, and garnered front page headlines during the first week. A total of about 566 million internet "hits" were registered during the first month of the mission, with 47 million "hits" on July 8th alone, making the Pathfinder landing by far the largest internet event in history at the time. Pathfinder was the first mission to deploy a rover on Mars. It carried a chemical analysis instrument, to characterize the rocks and soils in a landing area over hundreds of square meters on Mars, which provided a calibration point or "ground truth" for orbital remote sensing observations. The combination of spectral imaging of the landing area by the lander camera, chemical analyses aboard the rover, and close-up imaging of colors, textures and fabrics with the rover cameras offered the potential of identifying rocks (petrology and mineralogy). With this payload, a landing site in Ares Vallis was selected because it appeared acceptably safe and offered the prospect of analyzing a variety of rock types expected to be deposited by catastrophic floods, which enabled addressing first-order scientific questions such as differentiation of the crust, the development of weathering products, and the nature of the early Martian environment and its subsequent evolution. The 3 instruments and rover allowed seven areas of scientific investigation: the geology and geomorphology of the surface, mineralogy and geochemistry of rocks and soils, physical properties of surface materials, magnetic properties of airborne dust, atmospheric science including aerosols, and rotational and orbital dynamics of Mars. Scientists were assembled into 7 Science Operations Groups that were responsible for requesting measurements by the 3 instruments, rover and engineering subsystems for carrying out their scientific investigations and for analyzing the data and reporting on their findings. The spacecraft was launched on December 4, 1996 and had a 7 month cruise to Mars, with four trajectory correction maneuvers. The vehicle entered the atmosphere directly following cruise stage separation. Parachute deployment, heatshield and lander separation, radar ground acquisition, airbag inflation and rocket ignition all occurred before landing at 2:58 AM true local solar time (9:56:55 AM PDT). The lander bounced at least 15 times up to 12 in high without airbag rupture, demonstrating the robustness of this landing system. Reconstruction of the final landing sequence indicates that the parachute/backshel1/1ander was tilted due to a northwest directed wind and wind shear, which resulted in the lander bouncing about I km to the northwest and initially downhill about 20 m from where the solid rockets fired. Two anomalously bright spots located in the lander scene are likely the heatshield, which continued in a ballistic trajectory about 2 km downrange (west southwest), and the backshell/parachute, which stayed nearer to where the rockets fired. Unconnected disturbed soil patches in the scene indicate that the final few bounces of the lander were from the east-southeast and were followed by a gentle roll to the west before coming to rest on the base petal. The location of the lander away from where the solid rockets fired and considerations of the exhaust products used to inflate the airbags and their fate, indicate that the Pathfinder landing system is one of the cleanest designed leaving the local area essentially contaminant free. The radio signal from the low-=gain antenna was received at 11:34 AM PDT indicating a successful landing.

Golombek, M. P.↗

Manned space platforms, payloads and tending

A concept has been developed for providing for a permanent manned presence in space for science, applications, and technology plus growth potential to support major future operational missions. An initial crew of two to four is accommodated along with installations for interior, exterior and tended payloads. Tended payloads support includes servicing of remote free-flying spacecraft, basing of reusable orbital transfer vehicles and basing of teleoperator-mounted payloads for near-station excursions. Candidate payloads, plus configuration, flight operation, subsystem and ground logistics aspects are described, as are Shuttle interactions.

Runge, F. C.↗

Ascent Guidance Comparisons

This paper contains results from ascent guidance studies conducted at the NASA Marshall Space Flight Center. The studies include investigation of different guidance schemes for a variety of potential launch vehicles. Criteria of a successful ascent guidance scheme are low operations cost, satisfaction of load indicator constraints, and maximization of performance. Results show that open-loop designs as a function of altitude or velocity are preferable to designs that are functions of time. Optimized open-loop trajectories can increase performance while maintaining load indicators within limits. Closed-loop atmospheric schemes that involve linear tangent steering or feedback of velocity terms for trajectory modification did not yield any improvement. Early release of vacuum closed-loop guidance, including use during solid rocket booster operation, yields some improvements. Evaluation of a closed-loop optimization scheme for flying through the atmosphere shows no advantages over open-loop optimization. Dispersion study results for several potential guidance schemes and launch vehicles are included in the paper and are not a discriminator between guidance schemes. The primary cost driver is mission operations philosophy, not choice of guidance scheme. More autonomous guidance schemes can help in movement towards a philosophy that would reduce operations costs.

Hanson, John M.↗

NASA's THEMIS Mission: Multipoint Observations of Substorms, the Foreshock, and the Magnetopause

From launch on February 17 through the repositioning to final orbits that began in September 2007, the five-spacecraft of the THEMIS mission operated nominally in nearly identical 14.6 RE apogee near-equatorial orbits. On March 23, while aligned from east to west in the duskside magnetotail, the spacecraft observed two substorm sequences in fast survey mode. Timing the motion of these signatures served as an early proof of concept for the main phase of the mission: particle injection and dipolarization signatures propagated duskward from one probe to another, as did auroral intensifications seen by the dedicated array of ground-based observatories. During the summer of 2007, the spacecraft were on the dayside, where the three inner spacecraft (C, D, E) were separated by 100-500 km and the two outer probes (B, -4) by 5,000 - 10,000 km. Here the THEMIS probes repeatedly encountered the magnetopause and bow shock, dissecting flux transfer events (FTEs), determining the instantaneous width of the low-latitude boundary layer, and simultaneously observing hot flow anomalies upstream and downstream from the bow shock at the moment of their inception. From January to March 2008, the spacecraft were in the Earths magnetotail with apogees of 31.0, 19.5, 11.8 (2) and 10.0 RE corresponding to periods of 4, 2, and 1 days. Radial alignments once each four days offered an opportunity to pinpoint when and where substorms begin. This talk reviews THEMIS discoveries to date, with an emphasis on model-data comparisons of FTE characteristics

Sibeck, D. G.↗

It's Not a Big Sky After All: Justification for a Close Approach Prediction and Risk Assessment Process

There is often skepticism about the need for Conjunction Assessment from mission operators that invest in the "big sky theory", which states that the likelihood of a collision is so small that it can be neglected. On 10 February 2009, the collision between Iridium 3; and Cosmos 2251 provided an indication that this theory is invalid and that a CA process should be considered for all missions. This paper presents statistics of the effect of the Iridium/Cosmos collision on NASA's Earth Science Constellation as well as results of analyses which characterize the debris environment for NASA's robotic missions.

Newman, Lauri Kraft↗

HyspIRI Intelligent Payload Module(IPM) and Benchmarking Algorithms for Upload

Features: Hardware: a) Xilinx Virtex-5 (GSFC Space Cube 2); b) 2 x 400MHz PPC; c) 100MHz Bus; d) 2 x 512MB SDRAM; e) Dual Gigabit Ethernet. Support Linux kernel 2.6.31 (gcc version 4.2.2). Support software running in stand alone mode for better performance. Can stream raw data up to 800 Mbps. Ready for operations. Software Application Examples: Band-stripping Algiotrhmsl:cloud, sulfur, flood, thermal, SWIL, NDVI, NDWI, SIWI, oil spills, algae blooms, etc. Corrections: geometric, radiometric, atmospheric. Core Flight System/dynamic software bus. CCSDS File Delivery Protocol. Delay Tolerant Network. CASPER /onboard planning. Fault monitoring/recovery software. S/C command and telemetry software. Data compression. Sensor Web for Autonomous Mission Operations.

Mandl, Daniel↗

Extreme Problem Solving II: How Can 4 Astronauts do the Jobs of 80 Experts?

On past and present space missions, resilience is largely dependent on the problem-solving expertise of flight controllers at Mission Control on the ground. Missions to Mars will instead experience long communication delays and blackouts that require a small crew to detect, diagnose, and respond to critical events with only intermittent and limited real-time ground support. Our 2021 SpaceCHI paper “Extreme Problem Solving: The New Challenges of Deep Space Exploration” introduced the paradigm shift of increasingly Earth-independent mission operations and identified the capabilities that are not currently available on-board but will be needed to enable safe exploration beyond low-Earth orbit [1]. This paper investigates how the ground team achieves resilience today to inform what will be needed to achieve human-systems resilience on future long duration exploration missions – how can a crew of four generalists achieve the same outcomes as a team of 80+ experts? An actual ISS anomaly is analyzed and then reimagined under Mars transit conditions, to reveal critical decision-points and the onboard capabilities that will be needed for successful resolution. This paper also presents criteria for what makes urgent, unanticipated events so challenging to resolve.

human-systems integration architecture↗

Entry, Descent, and Landing Operations Analysis for the Genesis Re-Entry Capsule

On September 8, 2004, the Genesis spacecraft returned to Earth after spending 29 months about the sun-Earth libration point collecting solar wind particles. Four hours prior to Earth arrival, the entry capsule containing the samples was released for entry and subsequent landing at the Utah Test and Training Range. This paper provides an overview of the entry, descent, and landing trajectory analysis that was performed during the Mission Operations Phase leading up to final approach to Earth. The operations effort accurately delivered the entry capsule to the desired landing site. The final landing location was 8.3 km from the target, and was well within the allowable landing area. Preliminary reconstruction analyses indicate that the actual entry trajectory was very close to the pre-entry prediction.

Desai, Prasun N.↗

Entry, Descent, and Landing Operations Analysis for the Genesis Entry Capsule

On September 8, 2004, the Genesis spacecraft returned to Earth after spending 29 months about the sun-Earth libration point (L1) collecting solar wind particles. Four hours prior to Earth arrival, the sample return capsule containing the samples was released for entry and subsequent landing at the Utah Test and Training Range. This paper provides an overview of the entry, descent, and landing trajectory analysis that was performed during the mission operations phase leading up to final approach to Earth. The final orbit determination solution produced an inertial entry flight-path angle of -8.002 deg (which was the desired nominal value) with a 3-sigma error of +/-0.0274 deg (a third of the requirement). The operations effort accurately delivered the entry capsule to the desired landing site. The final landing location was 8.3 km from the target, and was well within the allowable landing area. Overall, the Earth approach operation procedures worked well and there were no issues (logistically or performance based) that arose. As a result, the process of targeting a capsule from deep space and accurately landing it on Earth was successfully demonstrated.

Desai, Prasun N.↗

The 1975 Viking mission to Mars

An overall description is presented of the Viking mission and systems as well as what may be learned from this mission. Pre-space-age knowledge about Mars is summarized together with information obtained by the Mariner probes. It is noted that the subject of life on Mars is a prominent theme of the Viking mission, and brief descriptions are given of the mission profile and landing sites. The thirteen scientific investigations to be conducted are outlined, including atmospheric-water mapping, surface thermal mapping, orbiter and lander imaging, radio experiments, measurements of the present physical and chemical state of the Martian atmosphere, and the three biochemical experiments. Relatively detailed descriptions are provided for the space vehicles, launch operations, mission profile, and management responsibilities.

Martin, J. S., Jr.↗

Exploration Capabilities Data Analysis: An Integrated Approach

In preparation for humanity’s return to the Moon, it is necessary to advance technologies and capabilities that will allow for human sustainability on the lunar surface, as well as on eventual missions to send humans to Mars. Guided by Space Policy Directive-1 and through the National Aeronautical and Space Administration (NASA) Artemis program, the advancement and development of technologies on the lunar surface will be leveraged towards technologies and knowledge needed for humans to successfully and safely go to Mars and return. In order to understand the capability needs for lunar and Mars missions, the Capabilities Integration Team identifies integration approaches and overlaps between missions to develop strategies for advancing key capabilities that support those needs. Since 2013, the Capabilities Integration Team has reached out to subject matter experts, principal technologists, and system capability leadership teams throughout NASA to gather information about the critical technologies and capabilities needed in order to support the lunar and Mars exploration missions. To properly gather this data, the Capabilities Integration Team used a capability-driven approach to identify gaps between the current state of the art and the needs of proposed exploration missions, as well as activities that may close those gaps. These inputs are used to shape technology investment strategies and are incorporated in missions to the lunar and Mars surfaces. Data collected included: gap definitions and identifying information; gap closure information and metrics for success; mapping of gaps to elements of NASA's Artemis program and future exploration architecture. . The data collected, specifically from the technology gap list, has been used to support the NASA Human Exploration and Operations Mission Directorate Planning, Programming, Budgeting, and Execution processes, as well as the NASA Space Technology Mission Directorate Strategic Technology Plans. This paper discusses the integration approach used by the Capabilities Integration Team to identify current capability gaps for the Moon to Mars architecture and what capabilities exist or must be developed to support those architecture needs. In addition, this paper also details the performance, gap characterization, current capability gap closure opportunities, and risk impacts towards Artemis, and the overall Moon to Mars architecture.

Gregory Benjamin↗

A Selection of Current NASA and Other Space Related Work in Christchurch and the Antarctic with Ideas for the Future

Outline: A brief (extremely) overview of NASA missions and how they relate to Christchurch and the Antarctic; Airborne missions operating out of Christchurch - SOFIA - DC-8 - ER-2 - Super Pressure Balloons; Uses of the Antarctic by NASA and others, examples - mega dunes, a Mars topological analog in the Antarctic - The Don Juan Pond, geology, geography and weather interaction to Mars - jurisdictional analog for a Mars Station - Human Research Program - Balloons on Ice; Looking Forward - Europa mission tests - Technology test beds for Lunar/Martian stations - Earth science.

outreach↗

Collaborative Mission Design at NASA Langley Research Center

NASA Langley Research Center (LaRC) has developed and tested two facilities dedicated to increasing efficiency in key mission design processes, including payload design, mission planning, and implementation plan development, among others. The Integrated Design Center (IDC) is a state-of-the-art concurrent design facility which allows scientists and spaceflight engineers to produce project designs and mission plans in a real-time collaborative environment, using industry-standard physics-based development tools and the latest communication technology. The Mission Simulation Lab (MiSL), a virtual reality (VR) facility focused on payload and project design, permits engineers to quickly translate their design and modeling output into enhanced three-dimensional models and then examine them in a realistic full-scale virtual environment. The authors were responsible for envisioning both facilities and turning those visions into fully operational mission design resources at LaRC with multiple advanced capabilities and applications. In addition, the authors have created a synergistic interface between these two facilities. This combined functionality is the Interactive Design and Simulation Center (IDSC), a meta-facility which offers project teams a powerful array of highly advanced tools, permitting them to rapidly produce project designs while maintaining the integrity of the input from every discipline expert on the project. The concept-to-flight mission support provided by IDSC has shown improved inter- and intra-team communication and a reduction in the resources required for proposal development, requirements definition, and design effort.

Gough, Kerry M.↗

Innovations for ISS Plug-In Plan (IPiP) Operations

Limited resources and increasing requirements will continue to influence decisions on ISS. The ISS Plug-In Plan (IPiP) supports power and data for utilization, systems, and daily operations through the Electrical Power System (EPS) Secondary Power/Data Subsystem. Given the fluid launch schedule, the focus of the Plug-In Plan has evolved to anticipate future requirements by judicious development and delivery of power supplies, power strips, Alternating Current (AC) power inverters, along with innovative deployment strategies. A partnership of ISS Program Office, Engineering Directorate, Mission Operations, and International Partners poses unique solutions with existing on-board equipment and resources.

Moore, Kevin D.↗

Multi-Mission Simulation and Visualization for Real-Time Telemetry Display, Playback and EDL Event Reconstruction

he Jet Propulsion Laboratory's Entry, Descent and Landing (EDL) Reconstruction Task has developed a software system that provides mission operations personnel and analysts with a real time telemetry-based live display, playback and post-EDL reconstruction capability that leverages the existing high-fidelity, physics-based simulation framework and modern game engine-derived 3D visualization system developed in the JPL Dynamics and Real Time Simulation (DARTS) Lab. Developed as a multi-mission solution, the EDL Telemetry Visualization (ETV) system has been used for a variety of projects including NASA's Mars Science Laboratory (MSL), NASA'S Low Density Supersonic Decelerator (LDSD) and JPL's MoonRise Lunar sample return proposal.

Entry, Descent and Landing (EDL) Reconstruction↗

NASA Aerosciences Activities to Support Human Space Flight

The Lyndon B. Johnson Space Center (JSC) has been a critical element of the United State's human space flight program for over 50 years. It is the home to NASA s Mission Control Center, the astronaut corps, and many major programs and projects including the Space Shuttle Program, International Space Station Program, and the Orion Project. As part of JSC's Engineering Directorate, the Applied Aeroscience and Computational Fluid Dynamics Branch is charted to provide aerosciences support to all human spacecraft designs and missions for all phases of flight, including ascent, exo-atmospheric, and entry. The presentation will review past and current aeroscience applications and how NASA works to apply a balanced philosophy that leverages ground testing, computational modeling and simulation, and flight testing, to develop and validate related products. The speaker will address associated aspects of aerodynamics, aerothermodynamics, rarefied gas dynamics, and decelerator systems, involving both spacecraft vehicle design and analysis, and operational mission support. From these examples some of NASA leading aerosciences challenges will be identified. These challenges will be used to provide foundational motivation for the development of specific advanced modeling and simulation capabilities, and will also be used to highlight how development activities are increasing becoming more aligned with flight projects. NASA s efforts to apply principles of innovation and inclusion towards improving its ability to support the myriad of vehicle design and operational challenges will also be briefly reviewed.

LeBeau, Gerald J.↗

Modular space station phase B extension: Shuttle interface requirements

The interface requirements cover both the ground and orbital phases of operation from the launch of the first MSS module until the initial modular station has been manned and in routine operation. As a point of reference, the two-stage, fully reusable space shuttle was selected. The space shuttle is briefly described from the standpoint of its features most important to the interface requirements with the MSS. The environment induced upon the MSS elements when transported to and from orbit by the shuttle orbiter also is included. The mission operation includes the space shuttle launch facilities, the ground flow of the MSS modules, and the orbital operations of rendezvous, MSS buildup, resupply of the manned station, and orbiter descent and landing. The shuttle's once-around abort case is described as it affects the MSS interface requirements. The interfaces between the orbiter and the MSS resulting from the ground and orbital operations, are also described.

Source record↗

Operations automation using the Link Monitor and Control Operator Assistant

The Link Monitor and Control Operator Assistant (LMC OA) is a knowledge-based prototype system which uses AI techniques to provide semiautomated monitor and control functions to support operations of the Deep Space Network (DSN) 70-m antenna at the Goldstone Deep Space Communications Complex (DSCC). The manual and time-consuming process of configuring the 70-m antenna and its associated communications and processing equipment, known as precalibration, is an overhead activity; the time spent in precalibration is time which cannot be spent supporting actual mission operations. Therefore, the major goal of the LMC OA task is to demonstrate techniques that reduce precalibration time, decrease operations overhead, and increase the availability of this valuable and oversubscribed NASA resource. The LMC OA prototype was tested in a parallel, experimental mode at the Goldstone DSCC performing semiautomated precalibration using the actual operational equipment. This test demonstrated that a reduction of 40 percent in precalibration time can be achieved with the LMC OA prototype.

Lee, Lorrine F.↗