Search NASA⌕ Search

SEARCH · Search NASA

Results for “Nuclear Waste Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,459 records · Page 81

Panel Session 12: Effective Aspects of the 2016 Consent Order between DOE-EM-LA Field Office - NM Environment Department and Identifying Comparable Approaches

This panel focused on the extremely effective 2016 Compliance Order on Consent executed between the US Department of Energy (DOE) Office of Environmental Management - Los Alamos Field Office (EM-LA) and the New Mexico Environment Department (NMED) and highlights practices and concepts toward developing an environmental compliance agreement that is mutually productive to both the NMED and the DOE. To further demonstrate successful practices, the panel also highlighted another very effective compliance agreement with comparable approaches - the 1993 Savannah River Site (SRS) Federal Facility Agreement (FFA) executed between DOE, the South Carolina Department of Health and Environmental Control (SCDHEC), and the Environmental Protection Agency (EPA). EM-LA, NMED, SRS, and SCDHEC representatives provided attendees an opportunity to understand and compare extremely effective approaches to regulatory compliance across the complex.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 25: DOE Waste Isolation Pilot Plant (WIPP) Update 2020

This panel focused on the WIPP operational efficiencies and capital improvement progress in the year 2020. Because WIPP is a key component of the US DOE EM cleanup strategy, the progress on returning WIPP to full design capacity and throughput by 2021 is of importance. Panelists with presentations: Status of WIPP Capital Asset Projects (Stephen Smith); WIPP Update (Sean Dunagan); CBFO Update (Greg Sosson)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

IMPROVEMENTS IN CONTAINER MANAGEMENT OF TRANSURANIC (TRU) AND LOW LEVEL RADIOACTIVE WASTE STORED AT THE CENTRAL WASTE COMPLEX (CWC) AT HANFORD

The Central Waste Complex (CWC) is the interim storage facility for Resource Conservation & Recovery Act (RCRA) mixed waste, transuranic waste, transuranic mixed waste, low-level and low-level mixed radioactive waste at the Department of Energy's (DOE'S) Hanford Site. The majority of the waste stored at the facility is retrieved from the low-level burial grounds in the 200 West Area at the Site, with minor quantities of newly generated waste from on-site and off-site waste generators. The CWC comprises 18 storage buildings that house 13,000 containers. Each waste container within the facility is scanned into its location by building, module, tier and position and the information is stored in a site-wide database. As waste is retrieved from the burial grounds, a preliminary non-destructive assay is performed to determine if the waste is transuranic (TRU) or low-level waste (LLW) and subsequently shipped to the CWC. In general, the TRU and LLW waste containers are stored in separate locations within the CWC, but the final disposition of each waste container is not known upon receipt. The final disposition of each waste container is determined by the appropriate program as process knowledge is applied and characterization data becomes available. Waste containers are stored within the CWC based on their physical chemical and radiological hazards. Further segregation within each building is done by container size (55-gallon, 85-gallon, Standard Waste Box) and waste stream. Due to this waste storage scheme, assembling waste containers for shipment out of the CWC has been time consuming and labor intensive. Qualitatively, the ratio of containers moved to containers in the outgoing shipment has been excessively high, which correlates to additional worker exposure, shipment delays, and operational inefficiencies. These inefficiencies impacted the LLW Program's ability to meet commitments established by the Tri-Party Agreement, an agreement between the State of Washington, the Department of Energy, and the Environmental Protection Agency. These commitments require waste containers to be shipped off site for disposal and/or treatment within a certain time frame. Because the program was struggling to meet production demands, the Production and Planning group was tasked with developing a method to assist the LLW Program in fulfilling its requirements. Using existing databases for container management, a single electronic spreadsheet was created to visually map every waste container within the CWC. The file displays the exact location (e.g., building, module, tier, position) of each container in a format that replicates the actual layout in the facility. In addition, each container was placed into a queue defined by the LLW and TRU waste management programs. The queues were developed based on characterization requirements, treatment type and location, and potential final disposition. This visual aid allows the user to select containers from similar queues and view their location within the facility. The user selects containers in a centralized location, rather than random locations, to expedite shipments out of the facility. This increases efficiency for generating the shipments, as well as decreasing worker exposure and container handling time when gathering containers for shipment by reducing movements of waste container. As the containers are collected for shipment, the remaining containers are segregated by queue, which further reduces future container movements.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DEVELOPMENT OF VADOSE-ZONE HYDRAULIC PARAMETER VALUES

Several approaches have been developed to establish a relation between the soil-moisture retention curve and readily available soil properties. Those relationships are referred to as pedotransfer functions. Described in this paper are the rationale, approach, and corroboration for use of a nonparametric pedotransfer function for the estimation of soil hydraulic-parameter values at the yucca Mountain area in Nevada for simulations of net infiltration. This approach, shown to be applicable for use at Yucca Mountain, is also applicable for use at the Hanford Site where the underlying data were collected.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Study on Optimized Management Options for the Wolsong Low- and Intermediate - Level Waste Disposal Center in Korea - 13479

The safe and effective management of radioactive waste is a national task required for sustainable generation of nuclear power and for energy self-reliance in Korea. Currently, for permanent disposal of low- and intermediate-level waste (LILW), the Wolsong LILW Disposal Center (WLDC) is under construction. It will accommodate a total of 800,000 drums at the final stage after stepwise expansion. As an implementing strategy for cost-effective development of the WLDC, various disposal options suitable for waste classification schemes would be considered. It is also needed an optimized management of the WLDC by taking a countermeasure of volume reduction treatment. In this study, various management options to be applied to each waste class are analyzed in terms of its inventory and disposal cost. For the volume reduction and stabilization of waste, the vitrification and plasma melting methods are considered for combustible and incombustible waste, respectively. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2016 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analyses

The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan.The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for federal fiscal year (FY) 2016. This annual summary report presents results and conclusions of the FY 2016 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2016 include the following: Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2016, Evaluation of new or revised waste streams by special analysis, and Development and acceptance of version 4.200 of the Area 5 RWMS GoldSim PA/CA model. The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. The FY 2016 review of operations, facility design, closure plans, monitoring results, and R&D results for the Area 3 RWMS indicates no changes that would impact PA validity. The conclusion of the annual review is that all performance objectives can be met and the Area 3 RWMS PA remains valid. There is no need to revise the Area 3 RWMS PA. Review of Area 5 RWMS operations, design, closure plans, monitoring results, and R&D activities indicates that no significant changes have occurred. The FY 2016 PA results, generated with the Area 5 RWMS v4.200 GoldSim PA model, indicate that there continues to be a reasonable expectation of meeting all performance objectives. All results remain less than 50% of their performance objectives. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. A review of changes potentially impacting the CAs indicates that no significant changes occurred in FY 2016. A new Corrective Action Unit (CAU), CAU 576, with corrective action sites near the Area 3 RWMS and Area 5 RWMS was identified in FY 2016. The sites are currently under investigation and not expected to be important sources for the CA. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter the CAs’ results or conclusions were found. The revision of the Area 3 RWMS CA, which will include the Yucca Flat Underground Test Area (CAU 97) source, is scheduled for FY 2024, following the completion of the Corrective Action Decision Document/Corrective Action Plan. Inclusion of the Frenchman Flat Underground Test Area (CAU 98) source in the Area 5 RWMS CA is planned pending the completion of the CAU 98 Closure Report in FY 2017. Near-term R&D efforts will focus on continuing development of the PA, CA, and inventory models for the Area 3 and Area 5 RWMSs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RCRA Part B Permit Application Nevada National Security Site (NNSS) for Waste Management Activities at the NNSS Mixed Waste Storage Unit (MWSU)

This volume of the Resource Conservation and Recovery Act (RCRA) permit application to the Nevada Division of Environmental Protection focuses on continued operation of the Mixed Waste Storage Unit at the Nevada National Security Site (NNSS), under the auspices of DOE’s National Nuclear Security Administration Nevada Field Office (NNSA/NFO). Low-level mixed waste (LLMW) accepted at the NNSS contains both radioactive and hazardous material components as defined by various laws and regulations. The Mixed Waste Storage Unit (MWSU) is located at the Area 5 Radioactive Waste Management Complex (RWMC). Existing facilities at the RWMC are used to store LLMW generated at or shipped to the NNSS prior to disposal at the Mixed Waste Disposal Unit (MWDU). The document describes the MWSU, its general design, its operation, the materials it stores, and relevant health and safety regulations with which NNSS complies. The currently permitted MWSU has been operated since December 2010. Each of the four designated storage areas is RCRA-compliant for the storage of hazardous waste. This application represents a renewal request by DOE for the permitted MWSU. For security reasons, some of the contents of the full application are not available for public viewing. This version of the application contains most but not all of the contents as submitted to the regulatory agencies.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of the Office of Civilian Radioactive Waste Management National Transportation Plan

The Director of the Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM) designated development of the National Transportation Plan (NTP) as one of his four strategic objectives for the program. The Office of Logistics Management (OLM) within OCRWM was tasked to develop the plan, which will accommodate state, local, and tribal concerns and input to the greatest extent practicable. The plan will describe each element of the national transportation system that OCRWM is developing for shipping spent nuclear fuel and high-level radioactive waste to the proposed geologic repository at Yucca Mountain, Nevada. The plan will bring together OCRWM's approach for acquiring capital assets (casks, rail cars, and a rail line in Nevada) and its operational planning efforts in a single, comprehensive document. It will also provide a timetable for major transportation decisions and milestones needed to support a 2017 start date for shipments to the Yucca Mountain repository. The NTP will be revised to incorporate new developments and decisions as they are finalized. This paper will describe the elements of the NTP, its importance in providing a comprehensive overview of the national transportation system, and the role of stakeholders in providing input on the NTP and the national transportation system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Verification and Validation of START: A Spent Nuclear Fuel Routing and Decision Support Tool

The Stakeholder Tool for Assessing Radioactive Transportation (START) is a web-based geospatial decision-support tool being developed by the US Department of Energy’s Office of Integrated Waste Management (IWM) to support federal interim storage for spent nuclear fuel (SNF) and associated transportation. START provides many functions for the IWM program including: serving as a communications tool for conveying geospatial data and information, an options analysis tool for exploring potential transport modes and routes for transporting SNF from nuclear power plants to future federal interim storage facilities, an emergency response planning tool for Tribes and States to identify training needs along potential SNF transport corridors, an environmental analysis tool for estimating potential radiation dose exposure from incident-free and incident-case SNF transport conditions, and a systems analysis support tool providing route-related inputs for system throughput analysis. As part of the START development process, a verification and validation (V&V) effort is being undertaken. In the initial V&V phase, several outputs of the START tool were checked such as the total distance, population and population densities within the buffer zone, and incident free dose. The V&V process is fluid as it will be utilized after each version change to ensure that the core functionalities of the tool are maintained and the results are consistent with the previous versions. Efforts have also been put into developing scripts to aid in the process of automating certain sections of the V&V work. As some of the V&V efforts use Environmental Systems Research Institute’s (ESRI) tools upon which the START framework is built, the START data were compared against outputs from tools like Quantum Geographic Information System (QGIS) for buffer zone populations and route lengths to ensure independence of the V&V process. Good agreement was observed between the START results and the independent V&V studies with the majority of the differences falling between 1% and 5% for populations within the buffer zone and route distance. This presentation describes the development and design of the START tool, V&V methods employed for various metrics of interest and their respective results, and future plans.

START, transportation, GIS, V&V↗

Iraq liquid radioactive waste tanks maintenance and monitoring program plan.

The purpose of this report is to develop a project management plan for maintaining and monitoring liquid radioactive waste tanks at Iraq's Al-Tuwaitha Nuclear Research Center. Based on information from several sources, the Al-Tuwaitha site has approximately 30 waste tanks that contain varying amounts of liquid or sludge radioactive waste. All of the tanks have been non-operational for over 20 years and most have limited characterization. The program plan embodied in this document provides guidance on conducting radiological surveys, posting radiation control areas and controlling access, performing tank hazard assessments to remove debris and gain access, and conducting routine tank inspections. This program plan provides general advice on how to sample and characterize tank contents, and how to prioritize tanks for soil sampling and borehole monitoring.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons-Learned from D and D Activities at the Five Gaseous Diffusion Buildings (K-25, K- 27, K-29, K-31 and K-33) East Tennessee Technology Park, Oak Ridge, TN - 13574

The East Tennessee Technology Park (ETTP) is the site of five former gaseous diffusion plant (GDP) process buildings that were used to enrich uranium from 1945 to 1985. The process equipment in the original two buildings (K-25 and K-27) was used for the production of highly enriched uranium (HEU), while that in the three later buildings (K-29, K-31 and K-33) produced low enriched uranium (LEU). Equipment was contaminated primarily with uranium and to a lesser extent technetium (Tc). Decommissioning of the GDP process buildings has presented several unique challenges and produced many lessons-learned. Among these is the importance of good, up-front characterization in developing the best demolition approach. Also, chemical cleaning of process gas equipment and piping (PGE) prior to shutdown should be considered to minimize the amount of hold-up material that must be removed by demolition crews. Another lesson learned is to maintain shutdown buildings in a dry state to minimize structural degradation which can significantly complicate characterization, deactivation and demolition efforts. Perhaps the most important lesson learned is that decommissioning GDP process buildings is first and foremost a waste logistics challenge. Innovative solutions are required to effectively manage the sheer volume of waste generated from decontamination and demolition (D and D) of these enormous facilities. Finally, close coordination with Security is mandatory to effectively manage Special Nuclear Material (SNM) and classified equipment issues. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Thermal Process Technology for Nuclear Applications - 20379

ANSTO's Synroc technology has been developed to provide a safe, secure matrix for the immobilization and final disposal of radioactive waste. Synroc technology will be used to manage radioactive wastes from the production of the radioisotope Molybdenum-99 (Mo-99). This paper shall outline various stages of the process development with specific reference to the thermal treatment technology of calcination. Calcination is a key step in the Synroc process [1-2].The rotary thermal processing system includes: an advanced heating element design for increased robustness and ease of remote operation and maintenance, an enhanced modular design of components for ease of remote maintenance in a hot cell and in compliance with hot cell radioactive environment requirements for safety, reliability and maintainability. In addition to thermal treatment of waste from nuclear medicine production, this technology provides solutions for a variety of nuclear materials processing applications including sintering UO{sub 2} pellets for reactor fuel rods, oxidation of UO{sub 2} pellets, swarf, and powder to U{sub 3}O{sub 8}, de-nitration of Uranyl nitrate and hydrofluorination of UO{sub 2} pellets. The paper will also discuss thermal processing solutions for a range of nuclear applications. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Audit Report on Management Controls over the Use of Service Contracts at the Office of River Protection

The Department of Energy's (Department) Office of River Protection (ORP) is responsible for the storage, treatment, and disposal of over 53 million gallons of highly radioactive waste from over 40 years of plutonium production at the Hanford Site. Because of the diversity, complexity, and large scope of its mission, coupled with its small staff, ORP told us that it has found it necessary to engage in service contracts to obtain consulting services, technical expertise, and support staff. Federal policy generally permits contractors to perform a wide range of support service activities, including, in most situations, the drafting of Government documents subject to the review and approval of Federal employees. Federal policy issued by the Office of Management and Budget, however, prohibits contractors from drafting agency responses to Congressional inquiries and reports issued by the Office of Inspector General and Government Accountability Office (GAO) because they are so closely related to the public interest and provide the appearance of private influence. To provide a majority of its needed services, ORP issued a Blanket Purchase Agreement to Project Assistance Corporation (PAC) in 2003. Through the Blanket Purchase Agreement, ORP acquired services in the areas of project management, risk assessment, program assessment, quality assurance, safety, cost and schedule estimating, budgeting and finance, and engineering. PAC has, in turn, subcontracted with various other firms to obtain some of the services needed by ORP. From 2005 to 2008, the total annual cost for the contract with PAC had grown from $4.7 million to $9.2 million. Because of the extent of the services provided and growing costs of the contract, we conducted this review to determine whether ORP appropriately administered its contract with the Project Assistance Corporation. Our review disclosed that, in some instances, ORP had not appropriately administered all work performed under the PAC contract. Specifically, ORP allowed PAC employees to perform work that was inherently governmental and created situations where a potential conflict of interest occurred. Specifically: (1) ORP assigned PAC employees responsibility for providing information and responses to Congressional inquiries and reports issued by the GAO and the Department of Energy's Office of Inspector General (OIG); and (2) PAC employees were also allowed to perform functions that created potential conflicts of interest. ORP permitted PAC employees, for example, to develop statements of work and approve funding of work to be performed under PAC's own contract. We concluded that these problems occurred, at least in part, because ORP had not established controls necessary to effectively administer the PAC contract. Federal procurement regulations recommended that agencies provide additional management controls over contractors whose work has the potential to influence the action of government officials. ORP, however, had not implemented the controls specifically recommended in Federal policy guidance for administering contracts, including: (1) Performing conflict of interest reviews; and (2) Separating contractor and Department employees either physically or organizationally. By not effectively administering its contract with PAC, ORP increased the risk that decisions based on work performed by the contractor may not have been made in the best interests of the Department. For example, ORP increased the risk that approved work would be unnecessary or too costly. As we also recently noted in our report on 'Management Challenges at the Department of Energy' (DOE/IG-0808, December 2008), contract administration issues such as those discussed in this report remain a significant vulnerability. Continued efforts to improve this area are vitally important since the risk that contractors receive payments for unallowable costs could also increase as the Department expands its contracting activities under the American Recovery and Reinvestment Act. To its credit, however, ORP has recognized that there are weaknesses in its oversight of the PAC contract and is in the process of taking certain corrective actions. ORP indicated that it had reassigned responsibility to a Federal employee for responding to Congressional requests, GAO reviews, and OIG reports, and, planned to physically separate PAC employees from their government counterparts. While positive, those actions do not sufficiently address the issues identified in our report. Accordingly, we have made several recommendations designed to strengthen internal controls over this area.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EDF industrial strategy for the management of radioactive waste - 15204

In France, EDF is in charge of electronuclear power operation since the sixties and consequently has to manage radioactive waste. Radioactive waste management is based on the control of each industrial step, taking into account the classification by activity level and radioactive half life. The main steps are to limit waste quantities at the generation stage, sort out non-rad and recoverable items from the waste, recycle, treat and package the radioactive waste as soon as it is generated, limit the use of interim storage, prepare and achieve as soon as reasonably practicable conditioning and disposal. EDF aims to empower operators in charge of NPP operating and of decommissioning and to centralize interfaces with the stakeholders in order to pool management routes and to guarantee the consistency of our industrial policy. The French regulatory framework for the management of radioactive waste and material is set by the French 2006 planning Act, in line with the European Directive. The legal framework structures interactions between EDF and the regulatory bodies (Nuclear Safety Authority, General Directorate for Energy and Climate), the French National Radioactive Waste Management Agency (ANDRA) and other waste producer (mainly AREVA Company and CEA). Regarding short lived waste, management routes are in current operation for the large majority of this waste generated both by power plants in service and during decommissioning. EDF is working on new management route for metallic materials knowing the future evolution of deposits is the field of large refit and decommissioning activities. Regarding long lived waste, disposal development represents a major stake for EDF. EDF contributes to design studies of the geological disposal center and collaborates with ANDRA for the acceptance of future national waste disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multi-discipline Waste Acceptance Process at the Nevada National Security Site - 13573

The Nevada National Security Site low-level radioactive waste disposal facility acceptance process requires multiple disciplines to ensure the protection of workers, the public, and the environment. These disciplines, which include waste acceptance, nuclear criticality, safety, permitting, operations, and performance assessment, combine into the overall waste acceptance process to assess low-level radioactive waste streams for disposal at the Area 5 Radioactive Waste Management Site. Four waste streams recently highlighted the integration of these disciplines: the Oak Ridge Radioisotope Thermoelectric Generators and Consolidated Edison Uranium Solidification Project material, West Valley Melter, and classified waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗