Search NASA⌕ Search

SEARCH · Search NASA

Results for “Resource scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,459 records · Page 81

Enabling machine learning-ready HPC ensembles with Merlin

With the growing complexity of computational and experimental facilities, many scientific researchers are turning to machine learning (ML) techniques to analyze large scale ensemble data. With complexities such as multi-component workflows, heterogeneous machine architectures, parallel file systems, and batch scheduling, care must be taken to facilitate this analysis in a high performance computing (HPC) environment. Here, we present Merlin, a workflow framework to enable large ML-friendly ensembles of scientific HPC simulations. By augmenting traditional HPC with distributed compute technologies, Merlin aims to lower the barrier for scientific subject matter experts to incorporate ML into their analysis. As a producer–consumer workflow model, Merlin enables multi-machine, cross-batch job, dynamically allocated yet persistent workflows capable of utilizing surge-compute resources. Key features of Merlin are a flexible HPC-centric interface, low per-task overhead, multi-tiered fault recovery, and a hierarchical sampling algorithm that allows for $\mathscr{O}$(N) task execution and $\mathscr{O}$(N ln N) task queuing to ensembles of millions of tasks. In addition to Merlin’s design, we test the algorithm’s performance in an HPC center and demonstrate the ability to enqueue 40 million simulations in 100 s, with a 30 millisecond per-task overhead that is independent of ensemble size. Finally, we describe some example applications that Merlin has enabled on leadership-class HPC resources, such as the ML-augmented optimization of nuclear fusion experiments and the calibration of infectious disease models to study the progression of and possible mitigation strategies for COVID-19.

97 MATHEMATICS AND COMPUTING↗

A Transactive Network Template for Decentralized Coordination of Electricity Provision and Value

Transactive energy systems facilitate and plan for an allocation of electricity based on distributed, value-based negotiations. They are currently extending the usage of market-based principles and transactions from wholesale electricity markets where they exist today downward into distribution systems. While many interesting transactive energy systems have been proposed, few fully decentralize price discovery and price-responsive control. Even fewer plan for extensibility that will be needed for the ultimate growth of transactive networks and for the inclusion of additional and new objectives and new flexible, responsive assets. This paper introduces a transactive network template from which an agent may be configured at its network node to negotiate for electricity with other neighboring network agents, manage a set of locally-owned supply and demand assets, and induce local power balance through price discovery. A set of base object classes defines the template and may be extended. Three important basic computational responsibilities are allocated among the base object classes—scheduling, balancing, and network coordination. These several basic classes and responsibilities may be used to represent the perspective of large and small devices and regions anywhere in the electric power grid because they are based on the self-similarity of these objects and responsibilities. Agents in a transactive network are not at all unique in these basic responsibilities. So far, these following dynamic values have been addressed by extension of the base classes: energy value, demand charges, transport losses, and impacts of distributed renewable resources. The template is designed to be further extended to address and monetize still other valuable objectives.

Transactive, Transactive network, Transactive netw↗

Final Technical Report: Commercial Advanced Lighting Control (ALC) Demonstration and Deployment

This three-year demonstration and deployment project sought to address market barriers to accelerating the adoption of Advanced Lighting Controls (ALCs), an underutilized technology with low market penetration. ALCs are defined as networked, addressable lighting control systems that utilize software or intelligent controllers to combine multiple energy-saving lighting control strategies in a single space (e.g., smart-time scheduling, daylight harvesting, task tuning, occupancy control, personal control, variable load-shedding, and plug-load control). The networked intelligent aspect of these systems allows applicable lighting control strategies to be combined in a single space, layered over one another, maximizing overall energy-savings. The project included five real building demonstrations of ALCs across the Northeast US region. The demonstrations provided valuable data and experience to support deployment tasks that are necessary to overcome market barriers. These deployment tasks included development of training resources for building designers, installers, and trades, as well as development of new energy efficiency rebates for the technology from Efficiency Forward’s utility partners. Educating designers, installers, and trades on ALCs is a critical task for reducing the cost of the technology that is currently inflated due to perceived complexity and unfamiliarity with how to design and install the systems. Further, utility and non-utility energy efficiency programs continue to relegate the technology to custom or ill-suited prescriptive program designs that do not effectively deploy the technology at scale. This project developed new, scalable rebate approaches for the technology. Efficiency Forward utilized their DesignLights Consortium® (DLC) brand and network of 81 DLC member utilities to develop and deploy the results of the project. The outputs of the project have included five published case studies, a six-hour ALC technology training curriculum that has already been deployed in five US states, and new rebates offered for the technology that have been deployed by a dozen utilities across the US. Widespread adoption of ALC technology in commercial buildings would provide tremendous benefits. The current market penetration of ALC systems is estimated at <0.1% in commercial buildings. If ALC systems were installed in all commercial buildings, approximately 1,051 TBtu of energy could be saved. This would translate into customer cost savings of approximately $10.7 billion annually.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Literature Survey on Operational Voltage Control and Reactive Power Management on Transmission and Sub-Transmission Networks

Voltage and reactive power system control is generally performed following usual patterns of loads, based on off-line studies for daily and seasonal operations. This practice is currently challenged by the inclusion of distributed renewable generation, such as solar. There has been focus on resolving this problem at the distribution level; however, the transmission and sub-transmission levels have received less attention. This paper provides a literature review of proposed methods and solution approaches to coordinate and optimize voltage control and reactive power management, with an emphasis on applications at transmission and sub-transmission level. The conclusion drawn from the survey is that additional research is needed in the areas of optimizing switch shunt actions and coordinating all available resources to deal with uncertain patterns from increasing distributed renewable generation in the operational time frame. These topics are not deeply explored in the literature.

capacitors↗

VTOL as it applies to resource development in the Canadian north

It is pointed out that, for many of the natural resource development projects planned in Canada between now and the end of the century, it may be necessary for the work force to commute to the site by air. Examples of successful operations, including those involving VTOL, are given. A computer program developed for determining the least expensive type of aircraft for commuting to remote projects is described. It is noted that the program can select both fixed-wing and helicopter aircraft types for a specific project, employing such variables as the size and shift schedules of the work force and the commuting distance. Capital and operating costs of existing and proposed aircraft types, as well as groundside infrastructure operations and maintenance costs, are compared for competing aircraft.

Lightfoot, R. N.↗

The Ares I-1 Flight Test--Paving the Road for the Ares I Crew Launch Vehicle

In accordance with the U.S. Vision for Space Exploration and the nation's desire to again send humans to explore beyond Earth orbit, NASA has been tasked to send human beings to the moon, Mars, and beyond. It has been 30 years since the United States last designed and built a human-rated launch vehicle. NASA is now building the Ares I crew launch vehicle, which will loft the Orion crew exploration vehicle into orbit, and the Ares V cargo launch vehicle, which will launch the Lunar Surface Access Module and Earth departure stage to rendezvous Orion for missions to the moon. NASA has marshaled unique resources from the government and private sectors to perform the technically and programmatically complex work of delivering astronauts to orbit early next decade, followed by heavy cargo late next decade. Our experiences with Saturn and the Shuttle have taught us the value of adhering to sound systems engineering, such as the "test as you fly" principle, while applying aerospace best practices and lessons learned. If we are to fly humans safely aboard a launch vehicle, we must employ a variety of methodologies to reduce the technical, schedule, and cost risks inherent in the complex business of space transportation. During the Saturn development effort, NASA conducted multiple demonstration and verification flight tests to prove technology in its operating environment before relying upon it for human spaceflight. Less testing on the integrated Shuttle system did not reduce cost or schedule. NASA plans a progressive series of demonstration (ascent), verification (orbital), and mission flight tests to supplement ground research and high-altitude subsystem testing with real-world data, factoring the results of each test into the next one. In this way, sophisticated analytical models and tools, many of which were not available during Saturn and Shuttle, will be calibrated and we will gain confidence in their predictions, as we gain hands-on experience in operating the first of two new launch vehicle systems. The Ares I-1 flight test vehicle (FTV) will incorporate a mix of flight and mockup hardware, reflecting a configuration similar in mass, weight, and shape (outer mold line or OML) to the operational vehicle. It will be powered by a four-segment reusable solid rocket booster (RSRB), which is currently in Shuttle inventory, and will be modified to include a fifth, inert segment that makes it approximately the same size and weight as the five segment RSRB, which will be available for the second flight test in 2012. The Ares I-1 vehicle configuration is shown. Each test flight has specific objectives appropriate to the design analysis cycle in progress. The Ares I-1 demonstration test, slated for April 2009, gives NASA its first opportunity to gather critical data about the flight dynamics of the integrated launch vehicle stack, understand how to control its roll during flight, and other characterize the severe stage separation environment that the upper stage will experience during future operational flights. NASA also will begin the process of modifying the launch infrastructure and fine-tuning ground and mission operational scenarios, as NASA transitions from the Shuttle to the Ares/Orion system.

Davis, Stephan R.↗

ATD-2 Surface Scheduling and Metering Concept

This presentation describes the concept of ATD-2 tactical surface scheduling and metering. The concept is composed of several elements, including data exchange and integration; surface modeling; surface scheduling; and surface metering. The presentation explains each of the elements. Surface metering is implemented to balance demand and capacity• When surface metering is on, target times from surface scheduler areconverted to advisories for throttling demand• Through the scheduling process, flights with CTOTs will not get addedmetering delay (avoids potential for ‘double delay’)• Carriers can designate certain flights as exempt from metering holds• Demand throttle in Phase 1 at CLT is through advisories sent to rampcontrollers for pushback instructions to the flight deck– Push now– Hold for an advised period of time (in minutes)• Principles of surface metering can be more generally applied to otherairports in the NAS to throttle demand via spot-release times (TMATs Strong focus on optimal use of airport resources• Flexibility enables stakeholders to vary the amount of delay theywould like transferred to gate• Addresses practical aspects of executing surface metering in aturbulent real world environment• Algorithms designed for both short term demand/capacityimbalances (banks) or sustained metering situations• Leverage automation to enable surface metering capability withoutrequiring additional positions• Represents first step in Tactical/Strategic fusion• Provides longer look-ahead calculations to enable analysis ofstrategic surface metering potential usage

Departure↗

Demonstrations of System-Level Autonomy for Spacecraft

System-level autonomy refers to autonomously meeting the crosscutting needs of a system through awareness and coordinated control spanning the system's breadth of capabilities. In contrast to function-level autonomy, which focuses on capabilities required to achieve a specific function such as surface navigation or image recognition, system-level autonomy addresses the needs to coordinate and manage activities and resources, and estimate the state, across subsystems. This paper describes demonstrations that were conducted on a spacecraft workstation testbed. The autonomy was provided by system-level planning and execution integrated with system-level estimators of orbit knowledge and spacecraft hardware health. These components are embedded in a system-level framework defining how goals are formed and executed, which elements exist, and how control authority is distributed among components. The planning and execution system at the heart of the framework has the capability to schedule, execute and monitor completion of tasks, as well as plan around unexpected events including new science opportunities and anomalies. The planning and scheduling system is the Multi-mission EXECutive (MEXEC), supported by the system-level health state estimator Model-Based Off-Nominal State Identification and Detection (MONSID), and Autonomous Navigation (AutoNav) algorithms, which determine the orbital system state based on optical observation of other targets. These components are applicable to many kinds of missions on different platforms. These demonstrations were elaborations of earlier experiments conducted on the ASTERIA (Arcsecond Space Telescope Enabling Research In Astrophysics) CubeSat, described in a companion submission [1]. The spacecraft’s extended mission served as an in-flight test platform, during which some individual autonomous capabilities were flown successfully. The autonomy experiments described here were performed on the ASTERIA workstation testbed.

Prather, Maurice↗

Sewer System Management Plan

The Sandia National Laboratories is a multi-mission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC (NTESS), a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy's National Nuclear Security Administration (DOE/NNSA) under contract DE-NA0003525. In 2008, a Notice of Intent (NOI) was filed for the Sandia National Laboratories, California (SNL/CA) facility to be covered under the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit) and was issued the WDID No. 2SSO11605. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. Provision D.11 of the General Permit requires the development and implementation of a written Sewer System Management Plan (SSMP). This SSMP is prepared according to the mandatory elements required by Provision D.13 and D.14, as well as the schedule for a population less than 2,500 as outlined in Provision D.15.

42 ENGINEERING↗

System services and architecture of the TMI satellite mobile data system

The North American Mobile Satellite Service (MSS) system being developed by AMSC/TMI and scheduled to go into service in early 1995 will include the provision for real time packet switched services (mobile data service - MDS) and circuit switched services (mobile telephony service - MTS). These services will utilize geostationary satellites which provide access to mobile terminals (MT's) through L-band beams. The MDS system utilizes a star topology with a centralized data hub (DH) and will support a large number of mobile terminals. The DH, which accesses the satellite via a single Ku band beam, is responsible for satellite resource management, for providing mobile users with access to public and private data networks, and for comprehensive network management of the system. This paper describes the various MDS services available for the users, the ground segment elements involved in the provisioning of these services, and a summary description of the channel types, protocol architecture, and network management capabilities provided within the system.

Gokhale, D.↗

Base Support Building Solid Waste Management Unit (SWMU) 014 PlumeStop Injection Pilot Study Work Plan

This document is a Pilot Study Work Plan (PSWP) for a PlumeStop® permeable reactive barrier (PRB) at the Base Support Building (BSB; the Site) located at the John F. Kennedy Space Center (KSC), Florida. The Site has been designated as Solid Waste Management Unit (SWMU) 014 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action program. This document was prepared by AECOM Technical Services, Inc. (AECOM) for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity Contract 80KSC019D0010, Task Order 80KSC021F0096. This PSWP details the permeable reactive barrier (PRB) being installed at the BSB to decrease concentrations of per- and polyfluoroalkyl substances (PFAS) in downgradient groundwater using PlumeStop®. PlumeStop® is a colloidal activated carbon that PFAS compounds readily adsorb to. This PSWP outlines the design criteria, injection plan, and performance monitoring schedule for the proposed PlumeStop® PRB study that will guide the possible selection for use and future design of future full-scale PlumeStop® PRBs at KSC.

PFAS↗

Composite Analysis for Low-Level Waste Disposal in the Hanford Site Central Plateau (FY 2020) (Rev. 2)

This document provides an updated Hanford Site composite analysis (CA). A Hanford Site CA was prepared and issued in 1998 (PNNL-11800) with an addendum provided in 2002 (PNNL-11800 Addendum 1). The CA was approved in 2002 (Frei, 2002) and has been maintained (DOE/RL-2000-29 and subsequent revisions) to support low-level waste disposal performance assessments (PAs) and disposal authorizations for facilities at the Hanford Site, including the following: Continued operation of the Environmental Restoration Disposal Facility (ERDF) and the 200 East and 200 West Low-Level Burial Grounds; Construction of the Integrated Disposal Facility (IDF); Forthcoming closure of tank residual waste systems such as Waste Management Area (WMA) C. The CA maintenance program resulted in a determination in 2015 (DOE/RL-2015-66) that the Hanford Site CA needed an update for the following reasons: While the initial Hanford Site CA has been maintained since 2001, the accumulation of basis changes reported in the annual summary reports over the succeeding 14 years merit evaluation in an updated analysis; The U.S. Department of Energy (DOE) Headquarters requested in a memorandum in 2015 (Gilbertson and Marcinowski, 2015) that “as soon as the relevant PAs are complete, the CA will be revised to account for all of the new information.” This updated Hanford Site CA accounts for the following new information: 1. Inclusion of a detailed Hanford Site baseline disposition that projects remedial activities through site closure. There have been significant changes through decision making in the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) process that were not available when the original CA was produced; 2. Inclusion of an updated inventory basis, new modeling capabilities, and new decisions reached in the associated record of decision (ROD) that was provided by issuance of DOE/EIS-0391 in fiscal year (FY) 2013. Development of a Hanford Site groundwater model from the baseline provided in a technical transfer of models for the Final Tank Closure and Waste Management Environmental Impact Statement (DOE/EIS-0391) commenced in FY 2014 and resulted in the plateau-to-river (P2R) groundwater flow model that is used in this updated Hanford Site CA; 3. Accounting for pump and treat systems, which were not evaluated in the initial CA. Pump and treat systems have had significant impact on groundwater flow system behavior, contaminant transport, and contaminant removal from Hanford Site groundwater. This process is accounted for in the use of the P2R model for this updated Hanford Site CA; 4. Inclusion of water-level data collected since the initial CA was completed. Data collected as the unconfined aquifer water levels continue to recede since the cessation of large liquid discharges in the late 1990s have led to marked improvement in understanding of the flow system for future conditions, particularly regarding northward flow potential in the critical Gable Gap area. The calibration in the latest version of the P2R model accounts for this information; 5. Inclusion of results from the revised ERDF PA completed in 2013 (WCH-5209) that account for updated inventory and expansion of the ERDF facility to about twice the size that was evaluated in the original CA; 6. Use of updated geoframeworks to provide the structural basis for numerical fate and transport models in the groundwater pathway of this updated CA. The geologic basis for groundwater models has continued to improve with additional data collection and interpretation with the creation and maintenance of the Hanford South Geoframework and the Central Plateau Vadose Zone Geoframework tools; 7. Incorporation of updated tank residual inventory estimates. Tank residual inventory estimates have improved with the incorporation of tank retrieval inventory data for those tanks that have completed retrieval. The CA inventory data package includes this updated information; 8. Incorporation of WMA C PA results. Two additional PAs for tank farm closure decisions are in preparation during the period required to prepare an updated Hanford Site CA: WMA C (FY 2016) and WMA A-AX (in preparation). The WMA C PA results are incorporated into the updated Hanford Site CA, and its grouted residuals model is used as the basis for a release model to account for the other tank farm systems modeling in this updated CA; 9. An update to the IDF PA was submitted in FY 2017 and has been reviewed and approved. The results of the IDF PA are incorporated into this updated CA; 10. Updated risk assessment scenarios. The risk assessment scenarios currently in use for Hanford Site CERCLA and Resource Conservation and Recovery Act of 1976 (RCRA) analyses differ from those evaluated in the initial Hanford Site CA. The representative person exposure scenario evaluated in this updated Hanford Site CA is consistent with recent PAs and CERCLA and RCRA analyses as the Hanford Site. This updated Hanford Site CA provides the following: A comparison of the updated Hanford Site CA all-pathway dose results with the performance measures during the compliance period, which is assumed to begin with site closure in calendar 2070 with the last scheduled disposal action and continue for 1,000 years postclosure (to calendar year 3069); A comparison of Hanford Site CA all-pathway dose results with the performance measures during the postcompliance period to address potential peaks beyond the compliance period. This is accomplished by evaluating dose in the period for 9,000 years following the compliance period (i.e., from calendar year 3070 to 12070).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Recent results in Mars Relay Network planning and scheduing

At different time periods in the future, Mars missions will overlap and previous studies indicate that during such periods existing deep space communication infrastructure will not be able to handle all Mars communication needs. A plausible solution is to perform optimal resource allocation for the Mars relay communication network; a network consisting of multiple surface units and orbiters on Mars and the Deep Space Stations. Unlike direct-to-earth, a relay communication, either in real-time or store-and-forward, can increase network science data return, reduce surface unit's direct-to-earth communication demands, and enable communication even when the surface unit is not facing Earth. It is the objective of this paper to take advantage of the relay operation to efficiently plan and schedule the network communications.

Relay Network planning and scheduling constrained ↗

Product Lifecycle Management and the Quest for Sustainable Space Explorations

Product Lifecycle Management (PLM) is an outcome of lean thinking to eliminate waste and increase productivity. PLM is inextricably tied to the systems engineering business philosophy, coupled with a methodology by which personnel, processes and practices, and information technology combine to form an architecture platform for product design, development, manufacturing, operations, and decommissioning. In this model, which is being implemented by the Engineering Directorate at the National Aeronautics and Space Administration's (NASA's) Marshall Space Flight Center, total lifecycle costs are important variables for critical decision-making. With the ultimate goal to deliver quality products that meet or exceed requirements on time and within budget, PLM is a powerful concept to shape everything from engineering trade studies and testing goals, to integrated vehicle operations and retirement scenarios. This paper will demonstrate how the Engineering Directorate is implementing PLM as part of an overall strategy to deliver safe, reliable, and affordable space exploration solutions. It has been 30 years since the United States fielded the Space Shuttle. The next generation space transportation system requires a paradigm shift such that digital tools and knowledge management, which are central elements of PLM, are used consistently to maximum effect. The outcome is a better use of scarce resources, along with more focus on stakeholder and customer requirements, as a new portfolio of enabling tools becomes second nature to the workforce. This paper will use the design and manufacturing processes, which have transitioned to digital-based activities, to show how PLM supports the comprehensive systems engineering and integration function. It also will go through a launch countdown scenario where an anomaly is detected to show how the virtual vehicle created from paperless processes will help solve technical challenges and improve the likelihood of launching on schedule, with less hands-on labor needed for processing and troubleshooting.

Caruso, Pamela W.↗

Product Lifecycle Management and the Quest for Sustainable Space Exploration Solutions

Product Lifecycle Management (PLM) is an outcome of lean thinking to eliminate waste and increase productivity. PLM is inextricably tied to the systems engineering business philosophy, coupled with a methodology by which personnel, processes and practices, and information technology combine to form an architecture platform for product design, development, manufacturing, operations, and decommissioning. In this model, which is being implemented by the Engineering Directorate at the National Aeronautics and Space Administration's (NASA's) Marshall Space Flight Center, total lifecycle costs are important variables for critical decisionmaking. With the ultimate goal to deliver quality products that meet or exceed requirements on time and within budget, PLM is a powerful tool to shape everything from engineering trade studies and testing goals, to integrated vehicle operations and retirement scenarios. This paper will demonstrate how the Engineering Directorate is implementing PLM as part of an overall strategy to deliver safe, reliable, and affordable space exploration solutions. It has been 30 years since the United States fielded the Space Shuttle. The next generation space transportation system requires a paradigm shift such that digital tools and knowledge management, which are central elements of PLM, are used consistently to maximum effect. The outcome is a better use of scarce resources, along with more focus on stakeholder and customer requirements, as a new portfolio of enabling tools becomes second nature to the workforce. This paper will use the design and manufacturing processes, which have transitioned to digital-based activities, to show how PLM supports the comprehensive systems engineering and integration function. It also will go through a launch countdown scenario where an anomaly is detected to show how the virtual vehicle created from paperless processes will help solve technical challenges and improve the likelihood of launching on schedule, with less hands-on labor needed for processing and troubleshooting. Sustainable space exploration solutions demand that all lifecycle phases be optimized. Adopting PLM, which has been used by the automotive industry for many years, for aerospace applications provides a foundation for strong, disciplined systems engineering and accountable return on investment by making lifecycle considerations variables in an iterative decision-making process. This paper combines the perspectives of the founding father of PLM, along with the experience of Engineering leaders who are implementing these processes and practices real-time. As the nation moves from an industrial-based society to one where information is a valued commodity, future NASA programs and projects will benefit from the experience being gained today for the exploration missions of tomorrow.

Caruso, Pamela W.↗

[Determine and Implement Updates to Be Made to MODEAR (Mission Operations Data Enterprise Architecture Repository)]

My main project was to determine and implement updates to be made to MODEAR (Mission Operations Data Enterprise Architecture Repository) process definitions to be used for CST-100 (Crew Space Transportation-100) related missions. Emphasis was placed on the scheduling aspect of the processes. In addition, I was to complete other tasks as given. Some of the additional tasks were: to create pass-through command look-up tables for the flight controllers, finish one of the MDT (Mission Operations Directorate Display Tool) displays, gather data on what is included in the CST-100 public data, develop a VBA (Visual Basic for Applications) script to create a csv (Comma-Separated Values) file with specific information from spreadsheets containing command data, create a command script for the November MCC-ASIL (Mission Control Center-Avionics System Integration Laboratory) testing, and take notes for one of the TCVB (Terminal Configured Vehicle B-737) meetings. In order to make progress in my main project I scheduled meetings with the appropriate subject matter experts, prepared material for the meetings, and assisted in the discussions in order to understand the process or processes at hand. After such discussions I made updates to various MODEAR processes and process graphics. These meetings have resulted in significant updates to the processes that were discussed. In addition, the discussions have helped the departments responsible for these processes better understand the work ahead and provided material to help document how their products are created. I completed my other tasks utilizing resources available to me and, when necessary, consulting with the subject matter experts. Outputs resulting from my other tasks were: two completed and one partially completed pass through command look-up tables for the fight controllers, significant updates to one of the MDT displays, a spreadsheet containing data on what is included in the CST-100 public data, a tool to create a csv file with specific information from spreadsheets containing command data, a command script for the November MCC-ASIL testing which resulted in a successful test day identifying several potential issues, and notes from one of the TCVB meetings that was used to keep the teams up to date on what was discussed and decided. I have learned a great deal working at NASA these last four months. I was able to meet and work with amazing individuals, further develop my technical knowledge, expand my knowledge base regarding human spaceflight, and contribute to the CST-100 missions. My work at NASA has strengthened my desire to continue my education in order to make further contributions to the field, and has given me the opportunity to see the advantages of a career at NASA.

Fanourakis, Sofia↗

CLINICAL DECISION SUPPORT: PATH TO FUNCTIONAL REQUIREMENTS

Long-duration, deep-space exploration missions present significant challenges to crew health and performance. These challenges include the individual and combined effects of microgravity, radiation exposure, isolation, limited resources (mass, volume, power, data and crew time), limited options for evacuation and those associated with delayed or constrained communications, all of which demand greater crew autonomy. Specifically, as the communication delays intensify the further we explore space, the unqualified need for Earth-independent medical operations focused on autonomous diagnosis, treatment and prevention will be key to mission continuation and success. To augment the requisite knowledge, skills and abilities (KSAs) of a time-constrained crew operating under stressful conditions, combatting fatigue, and facing a potential medical crisis, a robust clinical decision support system (CDSS) is a probable solution that would facilitate, guide and inform Earth-independent medical operations, while assisting crewmembers through various clinical presentations. The Exploration Medical Capability (ExMC) Element of the Human Research Program (HRP) is expanding the boundaries of space medical systems to advance the care of astronauts on future exploration missions beyond low Earth orbit. ExMC is actively identifying and testing next-generation medical care and crew health maintenance technologies. The Clinical Decision Support (CDS) project addresses gap Medical-701 within the Inflight Medical Conditions risk: “Enhance medical capabilities within an exploration medical system.” Though mass, volume, and power will face increasing constraints, the projected computational capabilities of spacecraft systems will increase exponentially as information technology continues to advance this decade and beyond. Hence, data, software and computational resources will play an essential and synergistic role in maintaining crew health, wellness and performance in deep space missions. The focus of the CDS project is to develop recommended requirements for an in-vehicle CDSS that acts as a ‘virtual assistant’ for delivering optimal health, performance and medical care during exploration missions. The CDSS is envisioned as an integrated, software-based tool deployed on a laptop computer or handheld device. The CDSS will assist the crew and ground support when interacting with knowledge/databases (e.g. records, pharmacy, schedule), instrumentation (e.g. imaging, physiological monitoring devices), and habitat (e.g. wellness system, task performance system) and vehicle systems (e.g. environmental system, communication system). In addition, the human interface will employ a context-based approach that accounts for the crew’s situation. Thus, extraneous and clinically/operationally non-relevant information are reduced to avoid an increase in cognitive load. The framework of an ideal spaceflight CDSS is to include core and advanced analytical features that incorporate work from collaborators yet maintain a flexible platform for integrating new technology in the future. In fiscal year 2021 (FY21), the CDS project identified requirements through two primary mechanisms: (i) the development of software implementation prototypes and (ii) the application of systems engineering processes. The CDS project developed and tested a series of increasingly complex system prototypes that were based on use cases derived from the CDSS concept of operations (ConOps). These software implementations yielded insights on CDSS functionality as well as lessons learned that provided the initial requirements for CDSS capability. By applying a systems engineering (SE) approach, medical scenarios provided in the ConOps and the use cases for software implementation underwent functional decomposition to identify CDSS functionality. Also, systems-based modeling language (SysML) tools such as activity diagrams were developed from the same ConOps and use cases to identify CDSS functionality. The lessons learned from software implementation defined both specific requirements and broad areas of requirements. Within these defined broad requirement areas, further analysis of the SE products identified specific capability that resulted in the final functional requirements. In summary, the software prototypes, functional decomposition of the ConOps and use cases, and SysML diagrams provided the basis for the CDSS requirements developed in FY21. In the upcoming year, these requirements will be refined for their final ExMC baseline review in latter FY22.

clinical decision support↗

Clinical Decision Support: Path to Functional Requirements

Long-duration, deep-space exploration missions present significant challenges to crew health and performance. These challenges include the individual and combined effects of microgravity, radiation exposure, isolation, limited resources (mass, volume, power, data and crew time), limited options for evacuation and those associated with delayed or constrained communications, all of which demand greater crew autonomy. Specifically, as the communication delays intensify the further we explore space, the unqualified need for Earth-independent medical operations focused on autonomous diagnosis, treatment and prevention will be key to mission continuation and success. To augment the requisite knowledge, skills and abilities (KSAs) of a time-constrained crew operating under stressful conditions, combatting fatigue, and facing a potential medical crisis, a robust clinical decision support system (CDSS) is a probable solution that would facilitate, guide and inform Earth-independent medical operations, while assisting crewmembers through various clinical presentations. The Exploration Medical Capability (ExMC) Element of the Human Research Program (HRP) is expanding the boundaries of space medical systems to advance the care of astronauts on future exploration missions beyond low Earth orbit. ExMC is actively identifying and testing next-generation medical care and crew health maintenance technologies. The Clinical Decision Support (CDS) project addresses gap Medical-701 within the Inflight Medical Conditions risk: “Enhance medical capabilities within an exploration medical system.” Though mass, volume, and power will face increasing constraints, the projected computational capabilities of spacecraft systems will increase exponentially as information technology continues to advance this decade and beyond. Hence, data, software and computational resources will play an essential and synergistic role in maintaining crew health, wellness and performance in deep space missions. The focus of the CDS project is to develop recommended requirements for an in-vehicle CDSS that acts as a ‘virtual assistant’ for delivering optimal health, performance and medical care during exploration missions. The CDSS is envisioned as an integrated, software-based tool deployed on a laptop computer or handheld device. The CDSS will assist the crew and ground support when interacting with knowledge/databases (e.g. records, pharmacy, schedule), instrumentation (e.g. imaging, physiological monitoring devices), and habitat (e.g. wellness system, task performance system) and vehicle systems (e.g. environmental system, communication system). In addition, the human interface will employ a context-based approach that accounts for the crew’s situation. Thus, extraneous and clinically/operationally non-relevant information are reduced to avoid an increase in cognitive load. The framework of an ideal spaceflight CDSS is to include core and advanced analytical features that incorporate work from collaborators yet maintain a flexible platform for integrating new technology in the future. In fiscal year 2021 (FY21), the CDS project identified requirements through two primary mechanisms: (i) the development of software implementation prototypes and (ii) the application of systems engineering processes. The CDS project developed and tested a series of increasingly complex system prototypes that were based on use cases derived from the CDSS concept of operations (ConOps). These software implementations yielded insights on CDSS functionality as well as lessons learned that provided the initial requirements for CDSS capability. By applying a systems engineering (SE) approach, medical scenarios provided in the ConOps and the use cases for software implementation underwent functional decomposition to identify CDSS functionality. Also, systems-based modeling language (SysML) tools such as activity diagrams were developed from the same ConOps and use cases to identify CDSS functionality. The lessons learned from software implementation defined both specific requirements and broad areas of requirements. Within these defined broad requirement areas, further analysis of the SE products identified specific capability that resulted in the final functional requirements. In summary, the software prototypes, functional decomposition of the ConOps and use cases, and SysML diagrams provided the basis for the CDSS requirements developed in FY21. In the upcoming year, these requirements will be refined for their final ExMC baseline review in latter FY22.

Clinical decision support↗