At least 1,459 records · Page 81

Evaluating the Durability of Balance of Systems Components Using Combined-Accelerated Stress Testing

The degradation of photovoltaic (PV) balance of systems (BoS) components is not well-studied, but the consequences include: offline-modules, -strings, -inverters; system shutdown; arc-faults; and fires. A utility provider experienced a ~30% failure rate in their power transfer chain, attributed to branch connectors. Field-failed specimen assemblies were therefore examined, consisting of cable connector, branch connector and discrete fuse components. Unused field-vintage specimens are presently being examined using combined-accelerated stress testing (C-AST) to clarify the most influential environmental stressors as well as the effect of external mechanical perturbation. A benchtop prototype fixture was used to develop the perturbation capability for C-AST. The benchtop experiments were also used to develop the in-situ data acquisition of specimen: current, voltage, and temperature. A significant increase in operating temperature, ~100 deg C from ~40 deg C, and a different failure mode was observed immediately once periodic mechanical perturbation was applied. The current at failure was decreased from 35 A (with failure occurring in the fuses) to 15 A (failure at the male/female metal pin connection). After initial examination using X-ray computed tomography, the external plastic was machined away from failed specimens to allow failure analysis, including the extraction of the internal convolute springs for morphological examination (optical- and electron-microscopy). Chemical composition analysis included: energy-dispersive X-ray spectroscopy, differential scanning calorimetry, and Fourier transform infrared spectroscopy.

balance of systems↗

Evaluating the Durability of Balance of Systems Components Using Combined-Accelerated Stress Testing: Preprint

The degradation of photovoltaic (PV) balance of systems (BoS) components is not well-studied, but the consequences include: offline-modules, -strings, -inverters; system shutdown; arc-faults; and fires. A utility provider experienced a ~30% failure rate in their power transfer chain, originally attributed to branch connectors. Field-failed specimen assemblies were therefore examined, consisting of cable connector, branch connector, and discrete fuse components. Unused field-vintage specimens are presently being examined using combined-accelerated stress testing (C-AST) to clarify the most influential environmental stressors as well as the effect of external mechanical perturbation. A benchtop prototype fixture was used to develop the perturbation capability for the C-AST chamber. The benchtop experiments were also used to develop the in-situ data acquisition of specimen: current, voltage, and temperature. A significant increase in operating temperature, ~100 deg C from ~40 deg C, and a different failure mode was observed promptly once periodic mechanical perturbation was applied. The current at failure was decreased from 35 A (with failure in the fuses) to 15 A (failure at the male/female metal pin connection). After initial examination using X-ray computed tomography, the external plastic was machined away from failed specimens to allow failure analysis, including the extraction of the internal convolute springs for morphological examination (optical- and electron-microscopy).

balance of systems↗

Evaluating the Durability of Balance of Systems Components Using Combined-Accelerated Stress Testing

The degradation of photovoltaic (PV) balance of systems (BoS) components is not well-studied, but the consequences include offline modules, strings, and inverters; system shutdown; arc faults; and fires. A utility provider experienced a ~30% failure rate in their power transfer chain, originally attributed to branch connectors. Field-failed specimen assemblies were therefore examined, consisting of cable connector, branch connector, and discrete fuse components. Previous papers and presentations have focused on the development of the test method using a benchtop prototype. This presentation covers the early results of C-AST aging of static and dynamic specimens.

balance of systems↗

Integrated Risk-Informed Condition Based Maintenance Capability and Automated Platform: Technical Report 3

This project is a collaborative research effort between PKMJ Technical Services LLC, Idaho National Laboratory, and Public Service Enterprise Group (PSEG) Nuclear, LLC. The collaboration, led by PKMJ Technical Services LLC, is part of the industry Funding Opportunity Announcement (FOA) award under Advanced Nuclear Technology Development FOA #DE-FOA-0001817. The pilot demonstration focuses on the Circulating Water System (CWS), an important non-safety-related system that impacts the power generation capability of the plant site. Achieving riskinformed condition-based Predictive Maintenance (PdM) on the CWS will result in significant economic benefits, and the developed methodologies can also be applied to other plant systems. This approach supports an industry goal of ensuring that nuclear power generation remains a viable, economically competitive option in the energy market. Operation and Maintenance (O&M) costs include labor-intensive Preventive Maintenance (PM) programs that involve manually performed inspection, calibration, testing, and maintenance of plant assets at periodic frequencies as well as time-based replacement of assets, irrespective of condition. This project offers an alternative by focusing on riskinformed condition-based maintenance to reduce O&M costs while still maintaining plant health and safety. This report summarizes the progress made toward achieving a risk-informed condition-based maintenance approach. The research and development (R&D) activities presented in this report are associated with development of a nuclear digital platform application, integration of fault signature models, and automated work management processes. The fault signatures and Machine Learning (ML) models are key components in predictive analytics and are heavily leveraged to improve the insights received by existing plant process data sources. Availability of the analysis results within a centralized digital platform enhances efficiency by enabling automation of activities otherwise performed manually. Personnel are presented with enhanced information that can be used to evaluate plant status and risks. Utilizing the enhancements to data analytics supports automated responses, (i.e. issuance of work orders) to address developing equipment faults and thus preventing forced, unplanned shutdowns of components or systems. The R&D activities described within this report lay the foundation for developing and demonstrating a digital automated platform to centralize the implementation of condition monitoring and response to equipment faults. The digital automated platform is cloud-based and designed to enable improved efficiency of plant processes. The digital platform includes content related to maintenance optimization, fault signature analysis, and plant records, which can all be used to support efficiencies when located within a centralized digital platform. These efficiencies could be further enhanced when deployed through industry-wide deployment of the technology to improve insights and processes based upon economies of scale.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The CMS Outer Tracker for the High Luminosity LHC

The High Luminosity LHC (HL-LHC) is expected to deliver an integrated luminosity of 3000 - 4000 fb -1 in its lifetime with peak instantaneous luminosities reaching about 5 - 7.5×10 34 cm -2 s -1 . During the Long Shutdown 3 period, several components of the CMS detector will undergo major changes, called Phase-2 upgrades, to be able to operate in the challenging environment of the HL-LHC, including the replacement of the entire silicon tracker. The Phase-2 Outer Tracker (OT) will have high radiation tolerance, higher granularity, and the capability to handle higher data rates. Another key feature of the OT will be to provide tracking information to the Level-1 trigger, allowing trigger rates to be kept at a sustainable level without sacrificing physics potential. For this, the OT will be made of modules that have two closely spaced sensors read out by the same electronics, which can correlate hits in the two sensors creating short track segments called ”stubs”. The stubs will be used for tracking at 40 MHz. In this contribution, the design of the CMS Phase-2 OT, the technological choices, and highlights of research and development activities are reported.

Ravera, Fabio↗

System Analysis Modeling and Intermodal Transportation for Commercial Spent Nuclear Fuel

The United States Department of Energy (DOE) has long term goals to develop solutions for managing the nation’s spent nuclear fuel (SNF) and high-level waste (HLW) inventory. The Integrated Waste Management (IWM) program under the DOE office of Nuclear Energy (DOE-NE) is employing system-level engineering and analysis principles to inform potential future waste management system architectures. Managing the spent nuclear waste requires the use of system-level analysis software that takes various aspects of the fuel cycle into account like waste generation, on-site/centralized storage, transportation infrastructure, and long-term disposal. The Next Generation System Analysis Model (NGSAM) is an agent-based model that was developed to simulate the transportation and storage of SNF and HLW. As an agent-based model, NGSAM has the capability to detail the interaction and movement of individual components and groups, such as rail cars and casks. The SNF inventory from commercial nuclear reactors is currently in temporary storage at multiple locations spread across the United States. Shipping of SNF from these locations relies on one of three transportation modes: rail, heavy-haul truck, or barge. Out of the three modes identified, rail is generally the most preferred due to the size of the canisters and casks the SNF would be shipped in. However, under some scenarios, a direct rail route might not be readily available to a reactor site or improving the rail infrastructure at shutdown sites might be too cost-prohibitive for utilities to opt for a direct rail transfer. Under such scenarios, using a barge or heavy haul truck to de-inventory the site and transfer the SNF to a nearby intermodal transfer site with adequate rail infrastructure where the payload could be transferred to a rail car might prove to be an attractive option. This work initially presents the various intermodal transportation options that could be used to transfer SNF from reactor sites to rail cars. This is followed by exploring the operational steps in each of these modes to move the SNF from a reactor site and transfer it to a rail car. This work also presents the procedure of implementing the intermodal transfer methodology in NGSAM using various Java methods. Finally, the process times for accomplishing each of the individual steps are furnished. The implementation ideology, assumptions, and future steps are presented in this work.

Gadey, Harish Reddy↗

Signal Processing for Beam Loss Monitor System at Jefferson Lab

Ion Chamber and Photomultiplier Tube (PMT) are both used for beam loss monitor in the Machine Protection System (MPS) at Jefferson Lab. The requirements of signal processing of these detectors are different, so two VME-based signal processing boards, Beam Loss Monitor (BLM) board and Ion-Chamber board, were developed. The BLM board has fast response (< 1us) and 5 decades dynamic range from 10nA to 1 mA, while the Ion-Chamber board has 8 decades dynamic range from 100 pA to 10 mA and slower response. Both of boards provide functions of machine protection and beam diagnostics, and features of fast shutdown (FSD) interface, beam sync interface, built-in-self-test, remotely controlled bias signals, and on-board memory buffer.

Yan, J.↗

ARCS Replacement at TREAT for TRTR 2020 - Abstract

The Transient REActor Test (TREAT) facility was restarted in 2017 to perform reactor fuels testing under transient conditions, following shutdown in 1994 and 23 years in non-operational standby. TREAT is a transient reactor that, like most pulsing reactors, can create natural shaped power pulses. However, TREAT provides the ability to shape the power pulse and control the energy deposition rate on the test specimens by automatically controlling the amount of reactivity insertion over time. The original automatic reactor control system (ARCS) was created in the 1980s using INTEL 8086 CPU boards and software written in assembly code. The need to maintain the system for the next 40+ years of TREAT life led to the decision to replace ARCS with modern hardware while maintaining the original functionality. After a prototyping effort, the replacement was successfully completed in the first quarter of 2020. The process and results of that effort are reported here.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Powering CEBAF's Extraction Cavities At 12 GeV

CEBAF (Continuous Electron Beam Accelerator Facility) at Jefferson Lab was initially designed to deliver up to a 4 GeV electron beam simultaneously to three experimental halls. The maximum deliverable energy was raised to 6 GeV and CEBAF ran there until May of 2012 after which CEBAF entered an upgrade shutdown. After the upgrade, scientists plan to use CEBAF to deliver 11 GeV beam to the three original experimental halls and 12 GeV to new hall ? Hall D. Delivering beams to multiple halls at the new energy requires increased RF power to drive the separation cavities and adding a 750 MHz beam repetition rate to deliver beam to all halls simultaneously. Doubling the beam energy means doubling field strength in the cavities by quadrupling delivered power. 750 MHz beam repetition rate requires new 750 MHz capable cavities and a frequency change to one of the existing IOT amplifiers powering these cavities, and new 499 MHz Solid State Amplifiers to power four downstream cavities. Topics covered will include: verifying the Cavity?s power capabilities, modifications to the 750 MHz system and new cavities, and the decision process in selecting an amplifier type to power four downstream cavities.

Wissmann, Mark↗

The Role of the CEBAF Element Database in Commissioning the 12GeV Accelerator Upgrade

The CEBAF Element Database (CED) was first developed in 2010 as a resource to support model-driven configuration of the Jefferson Lab Continuous Electron Beam Accelerator (CEBAF). Since that time, its uniquely flexible schema design, robust programming interface, and support for multiple concurrent versions has permitted it to evolve into a more broadly useful operational and control system tool. The CED played a critical role before and during the 2013 startup and commissioning of CEBAF following its 18-month long shutdown and upgrade. Information in the CED about hardware components and their relations to one-another facilitated a thorough Hot Checkout process involving more than 18,000 system checks. New software relies on the CED to generate EDM screens for operators on-demand thereby ensuring that the information on those screens is correct and up-to-date. The CED also continues to fulfill its original mission of supporting model-driven accelerator setup. Using the new ced2elegant and eDT (elegant Download Tool), accelerator physicists have proven able to compute and apply energy-dependant set points with greater efficiency than ever before.

Larrieu, T.↗

Signal Processing Board for Beam Loss Monitors

This paper describes a new VME based machine protection Beam Loss Monitor (BLM) signal processing board designed at Jefferson Lab which features high sensitivity, high resolution, and low cost per channel. This double-wide VME board provides eight-channel signal processing with each channel having linear, logarithmic, and integrating amplifiers that simultaneously provide the optimal signal processing for both machine protection and beam diagnostics. Amplified signals are independently sampled by 16-bit, fast ADCs and then further processed through a Field Programmable Gate Array (FPGA). It also has features of fast shutdown interface (FSD), beam sync interface, built-in-self-test, remotely controlled bias signals, and on-board memory buffer. The initial experimental test shows that the BLM board has fast response (<< 1us) for integrating and wide dynamic range from 10 nA to 1 mA (>50 dB) for logarithmic signals. The board is suitable for signal processing from photomultiplier (PMT) and ion chamber detectors. Notice: Authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE-AC05-06OR23177. The U.S. Government retains a non-exclusive, paid-up, irrevocable, world-wide license to publish or reproduce this manuscript for U.S. Government purposes.

Yan, Jianxun↗

ATR LEU fuel and burnable absorber neutronics performance optimization by fuel meat thickness variation

The Advanced Test Reactor (ATR) is a high power density and high neutron flux research reactor operating in the United States. Powered with highly enriched uranium (HEU), the ATR has a maximum thermal power rating of 250 MWth. Because of the large test volumes located in high flux areas, the ATR is an ideal candidate for assessing the feasibility of converting an HEU driven reactor to a low-enriched core. The present work investigates the necessary modifications and evaluates the subsequent operating effects of this conversion. A detailed plate-by-plate MCNP ATR 1/8th core model was developed and validated for a fuel cycle burnup comparison analysis. Using the current HEU U-235 enrichment of 93.0 % as a baseline, an analysis can be performed to determine the low-enriched uranium (LEU) density and U-235 enrichment required in the fuel meat to yield an equivalent K-eff between the HEU core th and the LEU core versus effective full power days (EFPD). The MCNP ATR 1/8th core model will be used to optimize the U-235 loading in the LEU core, such that the differences in K-eff and heat flux profile between the HEU and LEU core can be minimized. The depletion methodology MCWO was used to calculate K-eff versus EFPDs in this paper. The MCWO-calculated results for the LEU cases with foil (U-10Mo) types demonstrated adequate excess reactivity such that the K-eff versus EFPDs plot is similar to the reference ATR HEU case. Each HEU fuel element contains 19 fuel plates with a fuel meat thickness of 0.508 mm. In this work, the proposed LEU (U-10Mo) core conversion case with a nominal fuel meat thickness of 0.381 mm and the same U-235 enrichment (19.7 wt%) can be used to optimize the radial heat flux profile by varying the fuel meat thickness from 0.191 mm (7.5 mil) to 0.343 mm (13.5 mil) at the inner 4 fuel plates (1-4) and outer 4 fuel plates (16-19). In addition, 0.8g of a burnable absorber, Boron-10, was added in the inner and outer plates to reduce the initial excess reactivity, and the inner/outer heat flux more effectively. The optimized LEU relative radial fission heat flux profile is bounded by the reference ATR HEU case. However, to demonstrate that the LEU core fuel cycle performance can meet the Updated Final Safety Analysis Report (UFSAR) safety requirements, additional studies will be necessary to evaluate and compare safety parameters such as void reactivity and Doppler coefficients, control components worth (outer shim control cylinders, safety rods and regulating rod), and shutdown margins between the HEU and LEU cores. (author)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Measuring progress on HEU minimization - The need for acceleration and addressing 'out-of- scope' activities

Currently, 294 reactors and isotope production facilities use HEU fuel or target material, out of which 154 are used for naval propulsion. These facilities are in annual need of more than 3 500 kg HEU for naval propulsion, more than 900 kg HEU in research reactors, and more than 80 kg HEU for isotope production in civilian facilities, in addition to 6 000 kg HEU in various other types of reactors. 48 civilian research reactors, representing a decrease in the HEU consumption on 278 kg - or 19% compared to the amount of HEU consumed in 1978 in similar facilities, have completed the conversion to LEU as a result over continued international assistance over three decades. The establishment of baseline measurements for assessing the results of the current HEU minimization effort calls for additional focus on the scope and methodology for HEU minimization. The justification for addressing only 54% of the remaining HEU-fueled research reactors as part of the GTRI program should be addressed together with increased focus on facility decommissioning as 120 HEU-fueled reactors with HEU consumption on 450 kg have been shutdown since 1978. There should be no need for converting all the remaining 133 HEU-fueled research reactors as decommissioning and dismantling should play a more prominent role in the future HEU minimization effort. As other sectors reduce the HEU fuel inventory, there is a need to evaluate the risk associated with the continued use of large quantities of weapons-grade HEU fuel for naval propulsion. (author)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Preliminary study on new configuration with LEU fuel assemblies for the Dalat nuclear research reactor

The fuel conversion of the Dalat Nuclear Research Reactor (DNRR) is being realized. The DNRR is a pool type research reactor which was reconstructed from the 250 kW TRIGA- MARK II reactor. The reconstructed reactor attained its nominal power of 500 kW in February 1984. According to the results of design and safety analyses performed by the joint study between RERTR Program at Argonne National Laboratory (ANL) and Vietnam Atomic Energy Commission (VAEC) the mixed core of irradiated HEU and new LEU WWR-M2 fuel assemblies will be created soon. This paper presents the results of preliminary study on new configuration with only LEU fuel assemblies for the DNRR. The codes MCNP, REBUS and VARI3D are used to calculate neutron flux performance in irradiation positions and kinetics parameters. The idea of change of Beryllium rod reloading enables to get working configuration assured shutdown margin, thermal-hydraulic safety and increase in thermal neutron flux in neutron trap at the center of DNRR active core. (author)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Challenges for Lithuania: Ignalina NPP Early Closure

As a condition of accession into the European Union (EU), Lithuania is committed to the closure and decommissioning of Ignalina NPP comprising two RBMK-1500 reactor units (Fig. 1). It was agreed in a special protocol to the Accession Treaty that, in return for adequate EU financial assistance, Unit 1 would be closed before 2005 and Unit 2 by the end of 2009. The first unit was duly shut down on December 31, 2004. Lithuania, which has borders with Russia (Kaliningrad territory), Poland, Latvia and Belarus, spent fifty years as part of the Soviet Union and was deeply integrated into its economy and electrical infrastructure. At the break-up of the USSR, Lithuania inherited electricity generating capacity designed to supply the north-west region including ownership of Ignalina NPP located in the north-east of the country. Ignalina NPP Unit 1 was commissioned in 1983, Unit 2 in 1987; the planned lifespan of each unit was 30 years. Construction of a third unit was started but never completed. Since Lithuania became independent in 1990, Ignalina NPP has typically contributed more than 70% of national power supply. The town of Visaginas (population approx. 30,000) was purpose built to serve the plant and staff were brought in from throughout the USSR. With 3200 direct employees, Ignalina NPP remains by far the largest employer. Although there are pockets of Russian-language speakers in communities throughout Lithuania, Visaginas is the only example on a whole-town scale. Thus closure of Ignalina NPP within the restricted timescale required by the EU Accession Treaty commitment set an exceptional challenge to Lithuania. However, since the preparatory phase of decommissioning started in 2000, notable progress has been made, experience gained and lessons learnt. At present Unit 1 remains partially fueled in a state of care and maintenance. Partly burnt fuel is being transferred from Unit 1 to Unit 2 for further irradiation in order to minimize the commitment of new fuel thereby reducing operating costs and the final quantity of spent fuel. Design and construction of the facilities for spent fuel storage, waste processing and free-release is ongoing. The siting of the Near Surface Repository is now in the final stages of approval and construction of the landfill facility is under tendering. In order to facilitate the approval process and minimize the transport of waste, both disposal facilities will be within the boundary of the NPP site. Approximately 450 staff are employed at the shutdown Unit 1 for the safe maintenance of essential systems. The total staffing level at the plant is currently being reduced by around 200 each year, with a larger release to take place at the closure of Unit 2. It is envisaged that 2000 staff will be required for the dismantling operations. Although Ignalina NPP is still in the early stages of closure and decommissioning, some important lessons have already been learnt: Firstly, the importance considering social and financial issues as well as technical factors in deciding the decommissioning strategy. This should be done before the preparation is started of the FDP. The same broad consideration should also be given to the economic restructuring of the local area. Consultation is necessary with local and national authorities, and other stakeholders up to ensure a common vision. At Ignalina NPP it was considered essential to staff morale and the maintenance of a strong safety culture to guarantee the special social and employment benefits to dismissed staff in law [9]. At the same time, measures were also adopted to encourage certain key personnel to remain at the plant until closure. The case of Lithuania, which at independence had no legislative framework or management infrastructure for radioactive waste, may be exceptional; however, for all decommissioning projects it is necessary to have, from the outset, a clear strategy on waste storage and disposal. Finally, coordination at all levels must be assured, especially with the involvement of the nuclear regulators and other regulatory authorities, to achieve a smooth progression from operation into decommissioning.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Clean-out and Reuse of GCEP Facilities at Portsmouth

PORTS began operations in 1956 to enrich uranium for both civilian and military use. It operated under Goodyear Atomic Corporation and Lockheed-Martin as a government-owned contractor-operated facility until the formation of the United States Enrichment Corporation (USEC) as a government corporation in 1993. In 1998, USEC was privatized as a publicly traded corporation. USEC leases the Portsmouth and Paducah GDPs from the U.S. Department of Energy (DOE). Enrichment operations were terminated at Portsmouth in 2001, although USEC continues to lease and maintain the Portsmouth GDP in Cold Shutdown and conduct some DOE projects there. LPP found that removal of old equipment to allow reuse of a facility can present unexpected challenges. Classified components create significant logistics issues. In this case, teamwork and attention to detail by USEC, LATA/Parallax, and DOE resulted in solutions and success. Lessons learnt: - Transportation logistics are particularly important when shipping waste streams with special requirements. - Investment in extra equipment yields tangible benefits where other resources (cleared drivers) are scarce. - An early start to providing specially qualified drivers, in this case providing security clearances, is essential. Availability is limited, and the time required to qualify new drivers may be lengthy. - A dedicated communications station, rather than reliance on existing resources (shift superintendent), is invaluable.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Detroit Edison's Fermi 1 - Preparation for Reactor Removal

This paper is intended to provide information about the ongoing decommissioning tasks at Detroit Edison's Fermi 1 plant, and in particular, the work being performed to prepare the reactor for removal and disposal. In 1972 Fermi 1 was shutdown and the fuel returned to the Atomic Energy Commission. By the end of 1975, a retirement plan was prepared, the bulk sodium removed, and the plant placed in a safe store condition. The plant systems were left isolated with the sodium containing systems inert with carbon dioxide in an attempt to form a carbonate layer, thus passivating the underlying reactive sodium. In 1996, Detroit Edison determined to evaluate the condition of the plant and to make recommendations in relation to the Fermi 1 future plans. At the end of 1997 approval was obtained to remove the bulk asbestos and residual alkali-metals (i.e., sodium and sodium potassium (NaK)). In 2000, full nuclear decommissioning of the plant was approved. To date, the bulk asbestos insulation has been removed, and the only NaK remaining is located in six capillary instrument tubes. The remaining sodium is contained within the reactor, two of the three primary loops, and miscellaneous removed pipes and equipment to be processed. The preferred method for removing or reacting sodium at Fermi 1 is by injecting superheated steam into a heated, nitrogen inert system. The byproducts of this reaction are caustic sodium hydroxide, hydrogen gas, and heat. The decision was made to separate the three primary loops from the reactor for better control prior to processing each loop and the reactor separately. The first loop has already been processed. The main focus is now to process the reactor to allow removal and disposal of the Class C waste prior to the anticipated June 2008 closure of the Barnwell radioactive waste disposal facility located in South Carolina. Lessons learnt are summarized and concern: the realistic schedule and adherence to the schedule, time estimates, personnel accountability, back up or fill in work, work packages, condensation control, radiological contamination control, and organization of the waste stream.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗