Search NASA⌕ Search

SEARCH · Search NASA

Results for “explorations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,459 records · Page 81

Exploration Toilet Integration Challenges on the International Space Station

On the International Space Station (ISS) there are currently two toilets. One is located in the Russian segment's Service Module and the other is located in the U.S. segment's Node 3. A new Exploration Toilet will be integrated next to the existing Node 3 Waste and Hygiene Compartment (WHC). The Toilet will be evaluated as a technology demonstration for a minimum of three years. In addition, it will support an increase in ISS crew size due to Commercial Crew flights to ISS. The Toilet is designed to minimize mass and volume for Orion, the first Exploration vehicle. Currently ISS does not have a designated volume for an additional Toilet. Furthermore, operating the Toilet on ISS presents a different set of challenges as it must integrate into existing vehicle systems for urine processing. To integrate the Toilet on ISS, a suite of hardware was developed to provide mechanical, electrical, data, and fluid interfaces. This paper will provide an overview of the Toilet Integration Hardware design as well as the engineering challenges, crew interface provisions and vehicle integration complexities encountered during the concept and design phases.

Integration Hardware↗

Exploration Toilet Integration Challenges on the International Space Station

On the International Space Station (ISS) there are currently two toilets. One is located in the Russian Service Module and the other is located in the U.S. segment's Node 3. A new Exploration Toilet will be integrated next to the existing Node 3 Waste and Hygiene Compartment (WHC). The Toilet will be evaluated as a technology demonstration for a minimum of three years. In addition, it will support an increase in ISS crew size due to Commercial Crew flights to ISS. The Toilet is designed to minimize mass and volume for Orion, the first Exploration vehicle. Currently ISS does not have a designated volume for an additional Toilet. Furthermore, operating the Toilet on ISS presents a different set of challenges as it must integrate into existing vehicle systems for urine processing. To integrate the Toilet on ISS, a suite of hardware was developed to provide mechanical, electrical, data, and fluid interfaces. This paper will provide an overview of the Toilet Integration Hardware design as well as the engineering challenges, crew interface provisions and vehicle integration complexities encountered during the concept and design phases.

Node 3↗

The Flexible Lunar Architecture for Exploration (FLARE): Designed for the Artemis-3 Moon 2024 Mission and Beyond

The Flexible Lunar Architecture for Exploration (FLARE) is a concept to deliver four crew to the lunar surface for 7 to 14 days and then return them safely to Earth by 2024. This meets NASA’s internal 2024 lunar landing deadline directed by President Trump (Trump, 2017) and the “5-year” goal set forth by Vice President Pence (Pence, 2019). FLARE is an alternative to NASA’s Human Landing System reference architecture from the Design Analysis Cycle (DAC) #2 (NASA, 2019b). The minimum FLARE concept uses one Space Launch System launch, one Orion, one European Service Module (ESM), and one human lander to deliver four crew to the Moon for a minimum surface duration of 7 days and return them to Earth. FLARE adds a new capability, called the SpaceTug, based upon the mature and successful United Launch Alliance “Common” Centaur Upper Stage vehicle, with modifications. In FLARE, the SpaceTug provides propulsion needed to return the Orion+ESM from the Moon to Earth. The SpaceTug also provides propulsion to deliver the human lander Descent Element (DE) and Ascent Element (AE) separately to lunar orbit. The Orion+ESM then completes a rendezvous with the mated DE+AE in lunar orbit. FLARE also offers optional phases to the Moon 2024 mission. The SpaceTug can also deliver components of the planned Gateway - including the Power and Propulsion Element and the Habitation and Logistics Outpost - to lunar orbit; however, the planned FLARE destination is a Low Lunar Frozen Polar Orbit unlike the NASA DAC2 plan for a Near Rectilinear Halo Orbit. FLARE also provides an option to deliver precursor equipment - including a habitation module, crew mobility devices and an In-Situ Resource Utilization demonstration - to the lunar surface for enhanced crew exploration and science with the extended 14-day surface mission.

Commercial Launch Vehicles (CLV)↗

A Flexible Lunar Architecture for Exploration (FLARE) Supporting NASA’s Artemis Program

The Flexible Lunar Architecture for Exploration (FLARE) is a concept to deliver four crew to the lunar surface for a minimum of seven days and then return them safely to Earth. FLARE can be implemented whenever the component vehicles are operational. FLARE was developed as an alternative to NASA’s Human Landing System (HLS) reference architecture from the Design Analysis Cycle (DAC) #2 created in 2019. The DAC2 guidelines required utilization of the Gateway vehicle in a Near- Rectilinear Halo Orbit (NRHO). Instead, FLARE chooses a Low Lunar Frozen Polar Orbit (LLFPO) for lunar rendezvous of components, and an optional Gateway vehicle. The LLFPO provides a stable orbit that overflies the south pole every 2 h, ensuring easy access to the lunar surface for surface aborts with a much lower propellant requirement than NRHO. The minimum FLARE concept uses one Space Launch System (SLS) launch, one Orion, one European Service Module (ESM), and one human lander (launched on commercial vehicle(s)). FLARE adds the SpaceTug, based upon the mature and successful ULA “Common” Centaur Upper Stage vehicle, with modifications to create an Earth-Moon transfer vehicle. In the FLARE baseline mission, the SpaceTug provides propulsion needed to return the Orion + ESM from LLFPO to Earth. The SpaceTug also provides propulsion to deliver the separate human lander components – the Descent Element (DE) and the Ascent Element (AE) - from Low Earth Orbit (LEO) to LLFPO. The SLS Block 1 then launches the Orion + ESM and completes a rendezvous with the mated DE + AE components in LLFPO. FLARE offers optional phases beyond the baseline mission. The SpaceTug can deliver components of the planned Gateway, including the Power and Propulsion Element (PPE) and the Habitable and Logistics Outpost (HALO), to LLFPO. FLARE provides an option to deliver precursor equipment to the lunar surface to enhance and extend the human mission. With these components, including an inflatable habitation module and airlock, individual crew mobility vehicle(s), an In-Situ Resource Utilization (ISRU) demonstration, and science and technology experiments, the crew can explore and conduct science on the lunar surface for up to 14 days.

Moon 2024↗

Development Requirements for the Exploration PLSS (xPLSS) Feedwater Supply Assembly (FSA)

The "Development Requirements for the Exploration PLSS (xPLSS) Feedwater Supply Assembly (FSA)" provides information regarding the current requirements for the Exploration Extravehicular Mobility Unit (xEMU). Specifically, the document provide an overview of expected features, capabilities, and requirements for safe integration of the components within the Portable Life Support System (PLSS) and the xEMU program.

Exploration PLSS (xPLSS)↗

Titan Turtle: NIAC Phase II Design for a Submersible Vehicle for Titan Exploration

Conceptual designs for a submersible vehicle for exploration of the hydrocarbon seas of Saturn’s moon Titan were done by the NASA Glenn COMPASS systems engineering team, as part of the NASA’s Innovative Advanced Concepts (NIAC) program. The efforts investigated what approaches and technologies would allow exploration below the surface of the low temperature (–180 °C) hydrocarbon seas of Titan. The Phase-II design refined the design concepts, looking at a smaller design supported by an orbital relay, the “Titan Turtle”. The phase-II project resulted in a smaller vehicle using an orbiter supported relay/navigation link to eliminate the requirement for a large phased-array antenna. Eliminating the DTE communications requirement also reduced the associated high power required by the communications system.

Lunar and Planetary Scientific Exploration↗

Mars and the Search for Life Elsewhere: Innovations in the Third Era of Space Exploration

It has been thirty-six years since the Mariner 2 flyby of Venus opened the first era of space exploration, during which the main technical challenge was getting there. This led to the second era in which the technical and scientific challenge was the development and operation of large, comprehensive observational systems to find what was out there. We are now in the third era of space exploration, . . .

Mars↗

Biomorphic Explorers

Biomorphic explorers are small, dedicated, low-cost explorers that capture some of the key features of biological systems.

Biomorphic↗

Low Cost Planetary Exploration Via Micromissions

Planetary exploration budgets and schedules continued to push the limits of affordability and feasibility. Micromissions are a way to revolutionize planetary exploration. This paper examines the factors and technologies that make this revolution possible.

Mars↗

Solar System Exploration Technology Requirements and Planning Process

The NASA Office of Space Science, in alliance with the Office of Advanced Concepts and Technology, has developed an Integrated Technology Strategy to guide its investment in technology for space science missions. This strategy establishes goals and strategic objectives that ensure that NASA and the nation derive the greatest possible scientific and economic benefits from investments in space science missions and technologies. Within the Office of Space Science, the Solar System Exploration Division in collaboration with the Office of Space Access and Technology, is developing a Technology Plan to implement these goals and to identify specific goals and to identify specific technology needs for solar system missions. This paper describes the philosophy, processes, and preliminary results of the systematic process being established for the identification and prioritization of solar system exploration technology needs.

space↗

CIF Report - Information Fusion and Data Analytics for Human Lunar Exploration

This project leverages the Concept Exploration Laboratory (CEL) to collect, warehouse, and augment data relevant to human lunar exploration as a platform for NA (S&MA) to develop operational data integration techniques. The project capitalizes on 16+ years of CEL experience applied to NASA, DoD, the City of Houston, the State of Texas, and private industry. The integrated data will be utilized in the two scenarios described in a definition of concept for development of a full scale data analysis suite and storage solution, useful to all JSC organizations engaged in real time operations and safety tasks, and may be useful as pathfinders for the Digital Transformation Program.

information fusion↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

The Role of Tactile Cueing in Multimodal Displays: Application in Complex Task Environments for Space Exploration

This paper reviews the potential role of tactile cueing in multimodal displays that will need to be developed to enable Extravehicular Activity (EVA) and telerobotic exploration for both Moon and Mars missions. Specific missions to be accomplished during EVA surface and space operations will include construction and assembly, surface and geologic exploration, and excavation for protective shelter from radiation and significant solar particle events. EVA crews have limited time, resources, mobility, visibility and dexterity, and activities take place in a perceptually impoverished environment. Limitations include a loss of spatial reference frame leading to spatial disorientation, a loss of information normally provided by the auditory and somato-sensory systems, and a restricted field of view. In addition, in non-surface operations crew must be able to navigate and operate in a fully six degree of freedom (DoF) environment. Fatigue resulting from suited EVA tasks will also critically affect performance and safety. In order to mitigate these factors, it is important that crews be well trained prior to executing actual missions. There is a critical need to design multimodal interfaces to optimize performance under these conditions for both training and actual operations. Because of the high level of complexity of the EVA environment on the one hand, and the “sensory restrictions” on the other, it makes sense to envisage enhancements to the astronauts’ visual environment. Such an enriched environment may include virtual auditory as well as tactile inputs.

multimodal displays↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Exploring the Neotectonics of the Moon: The Young, Rocky, Dorsa Aldrovandi Wrinkle Ridge Northwest of Taurus-Littrow

Lunar Reconnaissance Orbiter Camera (LROC) observations have established that some of the small wrinkle ridges on the Moon are certainly Copernican, and possibly active within a few Ma or even active at present. Recently, Valantinas and Schultz pointed out that some of these wrinkle ridges show an excess abundance of meter-scale blocks in Diviner rock abundance data, which supports the idea that tectonic activity must be recent, because the half-life of meter-scale blocks on the Moon is only 40-80 Ma. These wrinkle ridges also have sharp topography and cross-cutting relationships with fresh craters that also speak to their youth. We argue here that these block-rich, young wrinkle ridges are interesting exploration targets. We first describe some objectives and concepts for exploring these landforms in a general sense, and then focus on one candidate landing area, Dorsa Aldrovandi.

Moon↗

Crop Production In Support Of Exploration

The History of Food and Exploration, an Overview of the History of Space Food Systems, the Vision of Space Crop Production and its Role in Exploration, an Overview of Challenges and Knowledge Gaps with Reference to Recent Flight Testing on the International Space Station, Crop Production Challenges Beyond Low Earth Orbit including the Lunar Operations, the Transit Mission to Mars and Mars Surface Operations.

Crop production↗

Role of Low Cost Missions in Preparing for Human Mars Exploration

Developing an enterprise-level architecture encompassing future human-robotic science and exploration at the Moon and Mars requires a visionary approach to ensure NASA is responsive to national priorities and global science and technology advancement objectives. While the initial capabilities needed to return humans to the Moon may be well understood, NASA is still formulating a long-term infrastructure at the Moon and working to narrow the trade space for the first human missions to Mars. This talk will focus on the formulation and current status of engineering and design applications for a long-term and robust exploration architecture.

Mars↗