Search NASA⌕ Search

SEARCH · Search NASA

Results for “pilot program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,454 records · Page 81

Prediction of Coronal Mass Ejections From Vector Magnetograms: Quantitative Measures as Predictors

We derived two quantitative measures of an active region's global nonpotentiality from the region's vector magnetogram, 1) the net current (I(sub N)), and 2) the length of strong-shear, strong-field main neutral line (Lss), and used these two measures in a pilot study of the CME productivity of 4 active regions. We compared the global nonpotentiality measures to the active regions' CME productivity determined from GOES and Yohkoh/SXT observations. We found that two of the active regions were highly globally nonpotential and were CME productive, while the other two active regions had little global nonpotentiality and produced no CMEs. At the Fall 2000 AGU, we reported on an expanded study (12 active regions and 17 magnetograms) in which we evaluated four quantitative global measures of an active region's magnetic field and compared these measures with the CME productivity. The four global measures (all derived from MSFC vector magnetograms) included our two previous measures (I(sub N) and L(sub ss)) as well as two new ones, the total magnetic flux (PHI) (a measure of an active region's size), and the normalized twist (alpha (bar)= muIN/PHI). We found that the three quantitative measures of global nonpotentiality (I(sub N), L(sub ss), alpha (bar)) were all well correlated (greater than 99% confidence level) with an active region's CME productivity within plus or minus 2 days of the day of the magnetogram. We will now report on our findings of how good our quantitative measures are as predictors of active-region CME productivity, using only CMEs that occurred after the magnetogram. We report the preliminary skill test of these quantitative measures as predictors. We compare the CME prediction success of our quantitative measures to the CME prediction success based on an active region's past CME productivity. We examine the cases of the handful of false positive and false negatives to look for improvements to our predictors. This work is funded by NSF through the Space Weather Program and by NASA through the Solar Physics Supporting Research and Technology Program.

Falconer, D. A.↗

Organization, Management and Function of International Space Station (ISS) Multilateral Medical Operations

Long duration crews have inhabited the ISS since November of 2000. The favorable medical outcomes of its missions can be largely attributed to sustained collective efforts of all ISS Partners medical organizations. In-flight medical monitoring and support, although crucial, is just a component of the ISS system of Joint Medical Operations. The goal of this work is to review the principles, design, and function of the multilateral medical support of the ISS Program. The governing documents, which describe the relationships among all ISS partner medical organizations, were evaluated, followed by analysis of the roles, responsibilities, and decision-making processes of the ISS medical boards, panels, and working groups. The degree of integration of the medical support system was evaluated by reviewing the multiple levels of the status reviews and mission assurance activities carried out throughout the last six years. The Integrated Medical Group, consisting of physicians and other essential personnel in the mission control centers represents the front-line medical support of the ISS. Data from their day-to-day activities are presented weekly at the Space Medicine Operations Team (SMOT), where known or potential concerns are addressed by an international group of physicians. A broader status review is conducted monthly to project the state of crew health and medical support for the following month, and to determine measures to return to nominal state. Finally, a comprehensive readiness review is conducted during preparations for each ISS mission. The Multilateral Medical Policy Board (MMPB) issues medical policy decisions and oversees all health and medical matters. The Multilateral Space Medicine Board (MSMB) certifies crewmembers and visitors for training and space flight to the Station, and physicians to practice space medicine for the ISS. The Multilateral Medical Operations Panel (MMOP) develops medical requirements, defines and supervises implementation of operational countermeasures, environmental monitoring, medical care, and emergency medical services. MMOP assures the medical readiness of the Station for each subsequent mission or critical event. All boards and panels have functioned effectively and without interruptions even in various challenging circumstances. Based on the experience of the authors, consensus has prevailed as the primary nature of decisions made by all ISS medical groups, at all levels. The six first years of piloted operation have demonstrated the ability of the ISS medical authority groups and the medical infrastructure to implement medical policies and requirements, effectively interface with non-medical groups, and maintain the health and productivity of the crew in an integrated, multilaterally coordinated fashion. The medical support system appears to be mature and ready for further expansion of all Partners roles, and for the anticipated increase in the size of ISS crews.

Duncan, James M.↗

Toward an IMU-based Space Suit Motion Capture System

Spacesuits are complex engineering systems that sustain human health and enable performance outside of Earth-like environments. These systems must support human mobility and physical workload demands while minimizing injury risk during extravehicular activity (EVA). Future EVA on the lunar surface during the Artemis program is expected to be more frequent and require higher physical workloads than previous EVAs during the ISS, Shuttle, or Apollo programs. Hence it is important to optimize future as well as current spacesuits to be efficient and comfortable for the success of space and planetary missions. To enable this, an efficient method is needed to test these spacesuits on the ground.When testing spacesuits in ground environments, it is often necessary to understand the kinematics of the suit to validate the design against relevant requirements or characterize the physical workload necessary to operate the suit. This is a challenging task for traditional optical motion capture (OMC) approaches: suit-mounted OMC markers are easily occluded by the subject or environment and may become detached during testing. Controlling lighting and reflectivity of objects in the motion capture volume is also difficult. Fixed-position OMC cameras also constrain testing to a small and contrived laboratory environment, disallowing kinematics capture in field environments.One promising alternative is the use of suit-mounted inertial measurement units (IMUs). These sensors are small, unobtrusive, and portable, but come at the cost of increased sensor noise and complexity of the software and mathematics to analyze the collected data. To this end, engineers at NASA are developing the Augmented Suit Inverse Kinematics (ASIK) system, a complete motion capture methodand inverse kinematics solver which relies solely on a network of wireless IMUs attached to the major kinematic segments of the spacesuit. The ASIK modeling language allows for the simple inclusion of probabilistic priors such as suit size and shape or IMU positions and rotations. Furthermore, to increase accuracy and reduce operational overhead to use this motion capture approach, the developed inverse kinematics solver exploits so-called self-calibratingalgorithmic techniques, which reduce the need for precise alignment of the sensors on the segments or scripted functional calibration procedures. The ASIK system was tested in a 7-subject pilot study. Each subject donned NASA’s new prototype exploration spacesuit in the Active Response Gravity Offload System (ARGOS) facility at the NASA Johnson Space Center. The subjects were outfitted with a set of 14 APDM (Portland, OR, USA) Opal IMUs, 12 of which were used in the ASIK model to estimate lower body and trunk kinematics. The subjects were also outfitted with a set of reflective OMC markers and traditional OMC data was collected and processed. Presented results will include characterization of ASIK-derived suit joint angles accuracy against an optical motion capture datum. Discussion of these results, as well as discussion of system calibration and nuances of mathematical observability, will be included.If successful, IMU-based motion capture will enable testing and validation of spacesuits more frequently, with less overhead, in more extreme environments. Future work will apply these techniques to common spacesuit testing tasks, such as gait, mobility, and balance assessment, physical workload characterization, and ergonomics evaluations.

Timothy Mcgrath↗

X-31 Mishap: Lessons Learned

The experimental X-31 High Angle of Attack Research Aircraft crashed during a 1995 test mission flight conducted by NASA at Edwards Air Force Base, California. The pilot lost control of the airplane and was forced to eject, sustaining a permanent back injury that ended his flying career. Prior to this incident the airplane had a perfect record of several hundred non-eventful flights supported by an experienced team. During the subsequent investigation by a mishap committee it was discovered that a series of cascading events contributed to this accident. Some of the identified contributing factors that resulted in this mishap are common to aircraft design and to flight-test in general. The mistakes and the solutions are presented here so that the flight-test community may consider and learn from them. The primary cause of the crash was icing and, ultimately, a complete blockage of the pitot-static nose probe. The icing was caused by a freak weather phenomenon that was neither expected nor known to exist on the day of the mishap. The normal probe had been replaced with a special Kiel probe to allow total pressure measurements of up to 70 degrees angle of attack for flight-test purposes. The Kiel probe did not include a heater, because it was assumed that the airplane would not be flown in the clouds or in conditions conducive to icing. This assumption was later proven to be incorrect. The iced Kiel probe caused incorrect gain scheduling in the flight control system, resulting in an unstable aircraft. This failure was essentially undetected because of a faulty design in the flight control system architecture. There were, however, also a number of other issues that lead up to this situation that never should have happened. This presentation discusses what the issues were that contributed to the incident. After the incident was investigated, some of these issues were addressed and some changes were made. The second X-31 aircraft flew the remainder of the flight tests, and the program was successfully completed without incident. This presentation also shows a video of the mishap including lessons learned, and the changes that were made to resume the flight-test program are presented.

Larson, Richard R.↗

Flight Test of an Intelligent Flight-Control System

The F-15 Advanced Controls Technology for Integrated Vehicles (ACTIVE) airplane (see figure) was the test bed for a flight test of an intelligent flight control system (IFCS). This IFCS utilizes a neural network to determine critical stability and control derivatives for a control law, the real-time gains of which are computed by an algorithm that solves the Riccati equation. These derivatives are also used to identify the parameters of a dynamic model of the airplane. The model is used in a model-following portion of the control law, in order to provide specific vehicle handling characteristics. The flight test of the IFCS marks the initiation of the Intelligent Flight Control System Advanced Concept Program (IFCS ACP), which is a collaboration between NASA and Boeing Phantom Works. The goals of the IFCS ACP are to (1) develop the concept of a flight-control system that uses neural-network technology to identify aircraft characteristics to provide optimal aircraft performance, (2) develop a self-training neural network to update estimates of aircraft properties in flight, and (3) demonstrate the aforementioned concepts on the F-15 ACTIVE airplane in flight. The activities of the initial IFCS ACP were divided into three Phases, each devoted to the attainment of a different objective. The objective of Phase I was to develop a pre-trained neural network to store and recall the wind-tunnel-based stability and control derivatives of the vehicle. The objective of Phase II was to develop a neural network that can learn how to adjust the stability and control derivatives to account for failures or modeling deficiencies. The objective of Phase III was to develop a flight control system that uses the neural network outputs as a basis for controlling the aircraft. The flight test of the IFCS was performed in stages. In the first stage, the Phase I version of the pre-trained neural network was flown in a passive mode. The neural network software was running using flight data inputs with the outputs provided to instrumentation only. The IFCS was not used to control the airplane. In another stage of the flight test, the Phase I pre-trained neural network was integrated into a Phase III version of the flight control system. The Phase I pretrained neural network provided realtime stability and control derivatives to a Phase III controller that was based on a stochastic optimal feedforward and feedback technique (SOFFT). This combined Phase I/III system was operated together with the research flight-control system (RFCS) of the F-15 ACTIVE during the flight test. The RFCS enables the pilot to switch quickly from the experimental- research flight mode back to the safe conventional mode. These initial IFCS ACP flight tests were completed in April 1999. The Phase I/III flight test milestone was to demonstrate, across a range of subsonic and supersonic flight conditions, that the pre-trained neural network could be used to supply real-time aerodynamic stability and control derivatives to the closed-loop optimal SOFFT flight controller. Additional objectives attained in the flight test included (1) flight qualification of a neural-network-based control system; (2) the use of a combined neural-network/closed-loop optimal flight-control system to obtain level-one handling qualities; and (3) demonstration, through variation of control gains, that different handling qualities can be achieved by setting new target parameters. In addition, data for the Phase-II (on-line-learning) neural network were collected, during the use of stacked-frequency- sweep excitation, for post-flight analysis. Initial analysis of these data showed the potential for future flight tests that will incorporate the real-time identification and on-line learning aspects of the IFCS.

Davidson, Ron↗

Preliminary Results from the Joint Russian and US Field Test: Measurement of Sensorimotor and Cardiovascular Responses Immediately Following Landing of the Soyuz Spacecraft

Ongoing collaborative research efforts between NASA's Neuroscience and Cardiovascular Laboratories, and the Institute of Biomedical Problems' (IBMP) Sensory-Motor and Countermeasures Laboratories have been measuring functional sensorimotor, cardiovascular and strength responses following bed rest, dry immersion, short duration (Space Shuttle) and long duration (Mir and International Space Station) space flights. While the unloading paradigms associated with dry immersion and bed rest have do serve as acceptable flight analogs, testing of crew responses following the long duration flights does not begin until a minimum of 24 hours after landing. As a result it is not possible to estimate the nonlinear trend of the early (<24 hr) recovery process nor is it possible to accurately assess the full impact of the decrements associated with long duration flight. To overcome these limitations both the Russian and U.S. sides have implemented testing at the time of landing and before the flight crews have left the landing site. By joint agreement this research effort has been identified as the functional Field Test (FT). For practical reasons the FT has been divided into two phases: the full FT and a preliminary pilot version (PFT) of the FT that is reduced in both length and scope. The primary goal of this research is to determine functional abilities in long duration space flight crews beginning as soon after landing as possible (< 2 hr) with one to three immediate follow-up measurements on the day of landing. This goal has both sensorimotor and cardiovascular elements including an evaluation of NASA's new anti-orthostatic compression garment as compared with the Russian Kentavr garment. Functional sensorimotor measurements will include, but are not limited to, assessment of hand/eye coordination, ability to egress from a seated position, walk normally without falling, measurement of dynamic visual acuity, ability to discriminate different forces generated with both the hands and legs, recovery from a fall, a coordinated walk involving tandem heel-to-toe placement and determination of postural ataxia while standing. The cardiovascular portion of the investigation includes blood pressure and heart rate measurements during a timed stand test in conjunction with postural ataxia testing. In addition to the immediate post-landing collection of data for the full FT, postflight data will be acquired at a minimum of one to three more other times within the 24 hr following landing and continue until functional sensorimotor and cardiovascular responses have returned to preflight normative values. The PFT represents a single trial run comprised of jointly agreed tests from the full FT and relies heavily on IBMP's Sensory-Motor and Countermeasures Laboratories for content, and implementation. The PFT is currently scheduled for the September 2013 landing of the Soyuz spacecraft (34S). Testing will include: (1) a sit-to-stand test, (2) recovery from a fall where the crewmember begins in the prone position on the ground and then stands for 3 min while cardiovascular stability is determined and postural ataxia data are acquired, and (3) a tandem heel-to-toe walk to determine changes in the central locomotor program. Video, cardiovascular parameters (heart rate and blood pressure), data from body-worn inertial sensors and severity of postflight motion sickness will be available for analysis. It is our intent to present, at this celebratory symposium, a summary of these data obtained from two crewmembers. In summary, the level of functional deficit is expected to be most profound during the acquisition of gravity loads immediately after landing when the demands for crew intervention in response to emergency operations will be greatest. Clearly measureable performance parameters such as ability to perform a seat egress, recover from a fall or the ability to see clearly when walking, and related physiological data (orthostatic responses) are required to provide an evidence base for characterizing programmatic risks and the degree of variability among crewmembers. Overall, these early functional and related physiological measurements will allow estimation of nonlinear sensorimotor and cardiovascular recovery trends to an accuracy that has not been previously captured in over 50 years of space flight.

Reschke, M. F.↗

Preliminary Sensorimotor and Cardiovascular Results from the Joint Russian and U.S. Pilot Field Test with Planning for the Full Field Test Beginning with the Year Long Intenational Space Station

Ongoing collaborative research efforts between NASA's Neuroscience and Cardiovascular Laboratories, and the Institute of Biomedical Problems' (IBMP) Sensory-Motor and Countermeasures Laboratories have been measuring functional sensorimotor, cardiovascular and strength responses following bed rest, dry immersion, short duration (Space Shuttle) and long duration (Mir and International Space Station) space flights. While the unloading paradigms associated with dry immersion and bed rest does serve as acceptable flight analogs, testing of crew responses following the long duration flights previously has not been possible until a minimum of 24 hours after landing. As a result, it is not possible to estimate the nonlinear trend of the early (<24 hr) recovery process, nor is it possible to accurately assess the full impact of the decrements associated with long duration flight. To overcome these limitations, both the Russian and U.S. sides have implemented testing at landing site. By joint agreement, this research effort has been identified as the functional Field Test (FT). For practical reasons the FT has been divided into two phases: the full FT and a preliminary pilot version (PFT) of the FT that is reduced in both length and scope. The primary goal of this research is to determine functional abilities in long duration space flight crews beginning as soon after landing as possible (< 2 hr) with one to three immediate follow-up measurements on the day of landing. This goal has both sensorimotor and cardiovascular elements, including evaluations of NASA's new anti-orthostatic compression garment and the Russian Kentavr garment. Functional sensorimotor measurements will include, but are not limited to, assessment of hand/eye coordination, ability to egress from a seated position, walk normally without falling, measurement of dynamic visual acuity, ability to discriminate different forces generated with both the hands and legs, recovery from a fall, a coordinated walk involving tandem heel-to-toe placement, and determination of postural ataxia while standing. The cardiovascular portion of the investigation includes blood pressure and heart rate measurements during a timed stand test in conjunction with postural ataxia testing (quiet stance sway) as well as cardiovascular responses during other functional tasks. In addition to the immediate post-landing collection of data for the full FT, postflight data will be acquired at a minimum of one to three more other times within the 24 hr following landing and continue until functional sensorimotor and cardiovascular responses have returned to preflight normative values. The PFT represents a single trial run comprised of jointly agreed upon subset of tests from the full FT and relies heavily on IBMP's Sensory-Motor and Countermeasures Laboratories for content and implementation. The PFT was first conducted following the September 2013 landing of the Soyuz spacecraft (34S) and again following the landing of Soyuz 35S in November. Testing included: (1) a sit-tostand test, (2) recovery from a fall where the crewmember began in the prone position on the ground and then stood for 3 min while cardiovascular stability was determined and postural ataxia data were acquired, and (3) a tandem heel-to-toe walk test to determine changes in the central locomotor program. Video, cardiovascular parameters (heart rate and blood pressure), data from body-worn inertial sensors and severity of postflight motion sickness were collected for analysis. In summary, the level of functional deficit is expected to be most profound during the acquisition of gravity loads immediately after landing when the demands for crew intervention in response to emergency operations will be greatest. Clearly measureable performance parameters such as ability to perform a seat egress, recover from a fall or the ability to see clearly when walking, and related physiological data (orthostatic responses) are required to provide an evidence base for characterizing programmatic risks and the degree of variability among crewmembers for exploration missions where the crew will be unassisted after landing. Overall, these early functional and related physiological measurements will allow estimation of nonlinear sensorimotor and cardiovascular recovery trends to an accuracy that has not been previously captured in over 50 years of space flight.

Reschke, M. F.↗

Launch Complex 34, SWMU Cc054 2021 DNAPL Source Zone Operations, Maintenance, and Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ) and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 12 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. Site-wide biennial LTM sampling was not conducted during this reporting period and is scheduled to be conducted in December 2022. The timeframe for activities documented in this PMR extends from April 1, 2021 to March 31, 2022. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the DSZ and deep dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to re-characterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS to more adequately capture residual contaminant mass. The operational period for Year 12 of the HCS was from April 1, 2021 to March 31, 2022. Operational runtime for the system was 94 percent during Year 12, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2022, a total of 285,712,801 gallons of groundwater containing 84,933 pounds of VOCs have been removed by the HCS. Influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 12,000 µg/L (March 2022). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2021 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events in 2017, 2018, 2019, and 2020. Full vertical profile sampling was completed at each DPT from 8 to 98 ft bls, at 5 foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations at depths ranging from 8 to 98 ft bls. An overall increasing trend of TCE concentrations was observed in DPT samples during this reporting period, which may be due to several recovery wells that were turned off during the AS Pilot Study in the DSZ that operated from July 2021 to February 2022 (documented separately from this report). The maximum TCE concentration in 2021 was 15,400,000 µg/L in the 58 ft bls depth interval at DPT597 (previous maximum result in 2020 was 1,690,000 at 48 ft bls at DPT596). During the 2021 DPT event, the overall majority of TCE contamination was identified in the 58 ft bls interval (below Layer 4), where in the previous year the majority of mass was observed in Layer 4. This trend appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, monitoring well samples were collected from deep wells in the DSZ area (Layers 7 and 8) to verify vertical delineation. All monitoring well results were non-detect or below cleanup levels, with exception of one well (IW0162, screened 105 to 115 ft bls, which is below the existing recovery well capture zone) where TCE was identified above cleanup target levels. The HS 6 AS system remained operational during the reporting period covered under this report. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual prior to this operational period. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2021 show concentrations of contaminants of concern (cis-1,2-dichloroethene, trans-1,2- dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. Overall, the tasks associated with Year 12 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with the recommendations of the 2020 LC34 (Year 11) Operations, Maintenance, and Monitoring Report for DNAPL Source Zone, Site Wide LongTerm Monitoring, and Hot Spot 6 Air Sparging System PMR (NASA, 2021c). Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

trichloroethene↗

Is Structured Agile an Oxymoron? Tales from Implementing and Executing Agile in a US Government Environment

To paraphrase a famous quote, "No plan survives contact with the reality." Software (SW) development is often a classic example of this: whatever the plan was for a particular development, it often does not survive contact with technical realities, budget realities, program realities and schedule realities. Traditionally, SW development has followed a waterfall methodology with requirements being rigorously specified before the design, which was completed before the coding and unit testing started, which were in turn finished before validation and verification started. This model of SW engineering derives much from the HW engineering of large systems, and has been the standard methodology used in US government software acquisitions and systems for decades, with highly variable results. US Government SW requirements are built around Waterfall concepts, which assume that the plan will survive contact with reality, or at least that modifications to the plan are relatively small, and relatively few.Because of the inefficiencies and difficulties inherent in Waterfall, the commercial SW world started using a different SW development methodology called Agile more than 20 years ago. Agile believes that a plan should evolve and learn rapidly in response to the realities encountered. At its core, there are a few key elements of Agile:- A small team of people which is highly flexible and adaptive. The team collaborates and interoperates through sophisticated development architectures and release environments- An iterative, incremental development and release approach which is based upon the concept that knowledge comes from experience within the team, and that the team makes decisions based upon what it knows- A team culture which prizes transparency, inspection and adaptation. These values are necessary so that the team experience and decision making is transparent and responsive to the realities encountered during development and testingSo, how to use Agile in a US Government environment? GMSEC (Goddard Mission Services Evolution Center) develops satellite ground system software for NASA and other US Government agencies. The SW developed by the team contains a large code base of many applications used within satellite mission operations centers. It spans the full gamut of SW development types: from SW which is in a classic maintenance and sustainment mode, to new developments with a fairly well understood scope and approach, to new developments whose scope and approach are quite unclear and which require significant research and prototyping. Team members move between all of these different types of SW development. Waterfall was inadequate to the programmatic and technical needs of the team, as well as the various types of SW development being done. The software plan was not surviving contact with the technical and programmatic realities experienced by the team. To address this, the team started a small pilot project in 2016 to test the use of Agile within a small subset of the team for a new web services application. In early 2018, the use of Agile was expanded to the whole team and all the software, but we had to fulfill the NASA SW development requirements. And we needed to do this while still remaining true to the key Agile elements of transparency, inspection and adaption. In order to do this, the team worked very closely with the Software Process Improvement (SPI) team at NASA Goddard, as well as NASA engineering manageme

Beech, Theresa W.↗

Evaluating The Relationships Between Supine Propriorception Assessments with Upright Functional Mobility and Balance Tests

INTRODUCTION Upon return to Earth, spaceflight sensorimotor adaptations can result in impaired posture and locomotion [1], [2], and current exercise countermeasures in the International Space Station are not sufficient to maintain sensorimotor function. In-flight countermeasures and assessment tools for sensorimotor function are needed to mitigate risks associated with mission-critical task performance upon return to Earth or arrival to 0.38 G on Mars. One proposed countermeasure for proprioceptive deconditioning includes training on a tilt board device [3], which will be tested in an upcoming bed rest study. In preparation for the said study, the objective of this pilot study is to compare performance in supine proprioceptive assessments to performance in functional upright activities. The results are intended to guide the selection of supine assessment tools for the upcoming bedrest study and the development of future inflight proprioceptive training and assessment tools for exploration missions. METHODS Seventeen healthy participants (8 males and 9 females, 27.9 ± 8.5 years) provided informed consent as approved by the Institutional Review Board (IRB) at NASA. A horizontal air-bearing sled was used to provide a proprioceptive challenge in a supine body orientation, allowing for mediolateral motion with minimal friction during supine stance [4]. Participants were loaded axially (30 to 60% body weight) with their feet on a vertically oriented tilt board and instructed to perform supine assessment activities using custom software that displays a cursor controlled by tilting the tilt board. In a single-leg static activity on the tilt board (TB-St), performance was measured as the percent time spent on a center target during a 30-second trial. During a two-feet dynamic activity on the tilt board (TB-Dy), performance was measured as the number of targets captured in 30 seconds. These supine tasks were compared to performance during two upright activities used to represent upright performance: completion time for a functional mobility task (FMT) [2],[5] and a performance score from force plate sway data during 30-second single-leg upright standing (USL). RESULTS AND DISCUSSION A Spearman's rank-order correlation was run to assess the relationship between upright and supine assessments. There were statistically significant, strong correlations between scores for the FMT and each TB activity, including TB-St, rs(17) = 0.50, p<0.05, TB-Dy3, rs(17) = 0.73, p<0.001, and TB-Dy9, rs(15) = 0.53, p<0.05. There were no statistically significant correlations between USL and each TB activity. Despite a lack of correlation with upright single-leg balance, the ability of the TB to indicate upright performance in the FMT is promising, as this task is a standard post-flight measure designed to characterize locomotor dysfunction [2], [5]. CONCLUSION These efforts will inform the selection of an appropriate sensorimotor assessment method for the upcoming bed rest study and similar future studies. While current work uses a bed rest analog to develop these technologies, future work aims to prepare capabilities for future in-flight sensorimotor training and assessment to mitigate the risks of proprioception impairment after spaceflight. ACKNOWLEDGEMENTS This work was supported by the University Space Research Association Internship Program. REFERENCES [1] Mulavara A.P. et al (2018) Med Sci Sports Exerc, 50(9), 1961-1980. [2] Mulavara A.P. et al (2010) Exp Brain Res, 202(3), 649-659. [3] Macaulay T.R. et al (2021) Front. Syst. Neurosci., 15, 658-985. [4] Goel R. et al (2017) Front. Syst. Neurosci, 11. [5] Koppelmans V. et al (2013) BMC Neurology, 12.

R Bellisle↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗

Prospects for Future Human Space Flight Missions to Near-Earth Asteroids

The forthcoming Near-Earth Object (NEO) Surveyor space telescope is a foundational asset designed to complete NASA’s congressionally-mandated goal of cataloging ≥90% of NEOs ≥140 meters in size as soon as practical, and discover Earth impactors far in advance. NEO Surveyor is also critical to near-Earth asteroid (NEA) exploration because it will find suitable low-Δv NEAs for robotic and human missions, often on Earth-like orbits with long synodic periods. Such NEAs have usually not been detected until imminent Earth launch opportunities because they were not observable until close to Earth. Discovering them far enough in advance to deploy missions requires a deep-space infrared survey telescope such as NEO Surveyor. In addition to posing hazards and being scientifically important, NEAs contain resources, such as water (OH), that could be utilized off-Earth. They also offer unique opportunities for the most ambitious human voyages ever undertaken. The Apollo program forever changed humanity’s perspective by showing us Earthrise from our Moon through human eyes. Crewed missions to NEAs will forever change our perspective again by showing us Earth as a distant point of light in the heavens as seen from an asteroid by astronauts. Planetary defense endeavors to understand asteroid and comet impact risks and develop mitigation capabilities. NEA exploration is synergistic in multiple ways. NEO Surveyor will discover and help characterize Earth impactors and accessible NEAs. Heavy-lift launch is highly enabling for both human NEA missions and planetary defense. Reconnaissance missions for planetary defense can also characterize NEAs prior to crewed missions. In situ resource utilization (ISRU) systems may be applicable to deflecting or destroying hazardous NEAs. NEA characterization data critically inform planetary defense efforts and indicate NEA types suitable for human exploration or ISRU. In 2010, NASA performed the Near-Earth Object (NEO) Human Space Flight (HSF) Accessible Targets Study (NHATS), creating an automated online system monitoring mission accessibility of NEAs 2 . NHATS database NEAs meet criteria that require less total mission Δv and/or round-trip mission duration than the Martian surface or even Mars orbit. There are currently 4,658 NHATS NEAs, and many rival or exceed lunar orbit/surface accessibility. Thus, NHATS NEAs could be explored by humans prior to attempting a Mars mission. Human missions to NEAs would test human-rated spacecraft systems with less cost and risk than Mars missions. Thus, human missions to NEAs are compelling in their own right while also providing prudent preparation for more demanding Mars missions. Lunar missions can offer similar opportunities, but they differ from NEA missions in important ways. Lunar missions pose less demanding psychological challenges to crew and ground staff. Earth light-time delay for communications is significantly longer during NEA missions. NEA missions are available that require more propulsion system consumables than lunar missions but less than Mars missions. In this paper, we summarize NEA accessibility for human missions, discuss motivations for such missions, survey knowledge about NEAs that informs future human missions, present exemplar mission opportunities to the currently known NHATS NEAs, and describe future work towards enabling human NEA missions.

Near-Earth asteroids↗

A Countermeasure for Space Motion Sickness

Overall, the results obtained in both the U.S. and the Russian space programs indicate that most space crews will experience some symptoms of motion sickness (MS) causing significant impact on the operational objectives that must be accomplished to assure mission success. At this time the primary countermeasure for MS requires the administration of Promethazine. Promethazine is not a benign drug, and is most frequently administered just prior to the sleep cycle to prevent its side effects from further compromising mission objectives. Clearly other countermeasures for SMS must be developed. Currently the primary focus is on two different technologies: (1) developing new and different pharmacological compounds with less significant side effects, (2) preflight training. The primary problem with all of these methods for controlling MS is time. New drugs that may be beneficial are years from testing and development, and preflight training requires a significant investment of crew time during an already intensive pre-launch schedule. Granted, motion sickness symptoms can be minimized with either of the two methods detailed above, however, it may be possible to develop a countermeasure that does not require either extensive adaptation time or exposure to motion sickness. Approximately 25 years ago Professor Geoffrey Melvill Jones presented his work on adaptation of the vestibuloocular reflex (VOR) using optically reversed vision (left-right prisms) during head rotations in the horizontal plane. It was of no surprise that most subjects experienced motion sickness while wearing the optically reversing prisms. However, a serendipitous finding emerged during this research showing that the same subjects did not experience motion sickness symptoms when wearing the reversing prisms under stroboscopic illumination. The mechanism, by which this side-effect was believed to have occurred, is not clearly understood. However, the fact that no motion sickness was ever noted, suggests the possibility of producing functionally useful adaptation during space flight without the penalty of disabling motion sickness by controlling the rate of the adaptive process by means of an appropriate stroboscopically presented environment. After several recent meetings with Professor Melvill Jones, we were encouraged to repeat the motion sickness portions of his and Mandl's 1981 stroboscopic experiment. In conducting this experiment we used a randomized cross-over design where subjects were randomly assigned to either a stroboscopic flash or no strobe for their first exposure in the experimental design. Twenty subjects (19 subjects completed the study) read a short passage from Treasure Island mounted on the wall approximately 1 m from their eyes while wearing left-right reversing prisms. The strobe on time of 3 microseconds and flash frequency of 4 Hz was set to equal that used in the original study. Motion sickness was scored using a modified Miller and Graybiel scale that we constructed to include symptoms that may be elicited under conditions where reversing prisms are worn. On this scale a score of 5 represented Malaise IIa (mild motion sickness) and a score of 8 or above is approaching frank sickness. Symptoms were tracked and recorded every 5 min during the task. Testing was limited to 30 min unless the subject had reached the MIIa score, at which time the test was terminated. Performance under stroboscopic illumination was significantly better than when the subjects read under normal room illumination while wearing the left-right reversing prisms. Based on these results we developed a goggle system using LCD material that can be strobed. To evaluate the effectiveness of stroboscopic goggles we tested an additional 9 subjects in addition to retesting 10 used in the stroboscopic pilot study described above. These 19 subjects wore a pair of strobing LCD goggles that could be cycled at 4 Hz. These subjects wore the goggles while also wearing left-right reversg prisms. Results while wearing the goggles showed that none of the 19 subjects scored at the MIIa level on the motion sickness rating scale. When the goggles did not flash (no strobe), 11 of the 19 developed symptoms above the MIIa criteria. As a countermeasure the goggles seem to be effective, even with an on time of 10 msec (time the goggles are clear). We have also collected anecdotal data, from our personnel in the Neuroscience Laboratory at the Johnson Space Center, suggesting that the goggles may effective in preventing carsickness.

Reschke, M. F.↗

Overview of NASA ISRU Plans, Priorites, and Activities

Introduction:The National Aeronautics andSpace Administration (NASA) of the United States ofAmerica (US) has initiated the Artemis Moon to Marsprogram to send astronauts (the first woman andperson of color) back to the lunar surface, create asustainable human lunar exploration program, andlead the first human exploration mission to the Marssurface in the 2030’s [1]. A major objective of thisprogram is to characterize the resources that exist onthe Moon and Mars, and learn how to utilize them forsustained and affordable exploration. Commonlyknown as In Situ Resource Utilization (ISRU), thesearch for, acquisition, and processing of resources inspace has the potential to greatly reduce thedependency on transporting mission consumables andinfrastructure from Earth, thereby reducing missioncosts, risks, and dependency on Earth.ISRU is Enabling: Through the extraction andprocessing of resources into mission commoditiessuch as rocket propellants, life support consumables,and fuel cell reactants, ISRU enhances and evolvesthe cis-lunar, lander, and surface transportationsystems required for human exploration; expandingand enhancing HOW humans can explore and returnfrom the Moon. Through the extraction andprocessing of resources into metals, silicon, and othermanufacturing and construction feedstock, ISRUenhances and allows for the expansion of criticalinfrastructure using in situ manufacturing andconstruction capabilities that influence WHAT humanscan do on the Moon and in cis-lunar space. Becauseof this, ISRU supports and enables commercialinvolvement beyond NASA and governmentalagencies by both lowering the cost of sustainedtransportation to/from/on the Moon as well assupporting the market required for needing thesetransportation systems. Strategic Framework:To achieve this vision,NASA’s Space Technology Mission Directorate(STMD) ensures the coordinated development ofISRU and other critical space and surfaceinfrastructure elements such as propulsion, power,manufacturing, construction, and robotics through theStrategic Technology Architecture Roundtable(STAR) process. Through STAR, an integratedframework and process has been created allowing forcapabilities and technologies to be linked andassessed, gaps to be identified, specifications andmetrics to be established, and provide a means toprioritize and implement technology development andmissions. A critical part of the STAR effort has beenthe establishment of the Strategic Framework thatorganizes all work under four major Thrusts (Go,Land, Live, and Explore) and identifies the drivingOutcomes for each of these Thrusts. From the Thrustsand Outcomes, all work can be categorized and linkedbetween Capability Areas, and Technology Gaps canbe identified and addressed (Figure 1.)Figure 1. Strategic Framework and STAR FrameworkISRU Envisioned Future: To drive thedevelopment of technologies and capabilities, theSTAR process starts with establishing a ‘grand vision’of where each Outcome and Capability is aiming tobe considered complete. For ISRU, the EnvisionedFuture is “Scalable ISRU production/utilizationcapabilities including sustainable commodities on thelunar and Mars Surface”. This involves starting with10’s of metric tons of products, but evolves into 100’sto 1000’s of metric tons of water, oxygen, propellants,construction and manufacturing feedstock, andcommodities for habitat and food production andoperations. For ISRU, the ‘Prospect to Product’philosophy starts with Destination Reconnaissance &Resource Assessment, followed by ResourceAcquisition, Isolation, and Preparation, leading intoResource Processing (which is further subdivided intomission consumables and feedstocks for constructionand manufacturing). The ISRU Envisioned Futurealso considers what resources are available andattempts to address what and when these resourceswill be evaluated and harnessed, as well asconsidering which products/commodities can beobtained for early use and which ones require moretime and/or users of refined products.It Takes an Architecture: ISRU does not existon its own. By definition, it requires customers/users SHORT TITLE HERE: A. B. Author and C. D. Authorto use the products/commodities produced by ISRUsystems. Also, for an ISRU capability to exist, itmust obtain products and services from other systemsand infrastructure. An important aspect of the STARprocess and the ISRU Envisioned Futures Prioritiesstrategy is to identify and link all of these systems andcapabilities to achieve the desired end state (Figure2).Figure 2. ISRU as Part of a Larger ArchitectureISRU Capability Drivers: The guidingprinciples for NASA’s Space TechnologyDevelopment for Artemis are to develop criticaltechnologies and capabilities that enable (i) asustainable Lunar surface presence, (ii) the future goalof sending humans to Mars, and (iii) promotingcritical technologies to enable future science andcommercial missions. It is a major goal of theArtemis campaign to establish some sort of base campat the lunar South Pole by approximately the end ofthe decade. The ISRU Envisioned Futures Prioritiesstrategy is aligned with the Artemis campaign todevelop and demonstrate ISRU capabilities in thistimeframe that could lead to sustained surfaceoperations, infrastructure growth, and commercialoperations in the next decade (Figure 3).Figure 3. ISRU Dual Path to Full Implementation and CommercializationState of the Art and Gaps: To achieve theenvisioned future, an extensive effort was performedto understand the State of the Art (SOA) for ISRUgoing back decades, and to assess the SOA against thenear and long-term goals and objectives of the ISRUStrategic Outcome objectives. While the releasedISRU Envisioned Futures Priorities only includes atop-level definition of both the SOA and Gaps, furtherinformation on these for ISRU can be found in theISRU Gap Assessment Study performed for theInternational Space Exploration Coordination Group(ISECG) [2]. To provide further guidance to industryand academia, a top level assessment was performedand provide that divides critical areas of ISRUcapabilities and technologies into 3 categories:Significant Funding, Partially Covered/MoreRequired, and Limited/No Funded Activities.Envisioned Future Priorities- Next Steps forISRU: While a significant amount of work over abroad range of technology areas has been performedover the last several years for lunar ISRU, to reach theenvisioned future for ISRU, a lot more work isrequired at the technology level leading to bothsystems and technology demonstrations in the nearfuture. To guide investments within NASA, industry,and academia, 5 specific areas of high priority wereidentified. These are:1.Complete development of the Water and Oxygen Mining Paths and close technology gaps, with emphasis on oxygen extraction from Highland regolith and parallel paths for polar water mining.2.Expand development of metal extraction and feedstock for manufacturing and construction, with emphasis on aluminum and initial/easy to obtain/make construction feedstocks leading to more refined metals and other regolith resources. Also, evaluate biologically inspired/derived technologies in bio-mining, bio-plastic, and other feedstock commodities.3.Ensure the resource assessment needed for future ISRU commercial operations is coordinated with both near/long-term science objectives as well as Artemis mission locations of interest.4.Initiate NASA and industry-led system-level analyses, integration, and testing activities for ISRU capabilities. While significant work has been performed at the technology and subsystemlevel, it is now important to understand how these technology investments can be leveraged and utilized in actual systems and applications5.Initiate lunar ISRU technology flight demonstrations leading to initial ‘Pilot Plant’ end-to-end production capability demonstrations, led by industry

ISRU↗