Search NASA⌕ Search

SEARCH · Search NASA

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,477 records · Page 82

MIDAS-DC-AC Tool: Fully Automating the Acquisition of AC Power Flow Solution (MIDAS-DC2AC)

MIDAS DC2AC is an automated tool for achieving a converged AC power flow solution from any dispatch, e.g., determined using DC power flow model based optimal power flow. The entire process is free of human interference. It is usually encountered in practice that, even with a DC power flow solution, acquiring the solved AC power flow solution, if exists, sometimes could be a challenging task, especially during the planning stage. It is also difficult to distinguish the unsolvable cases from diverging iterations. Manual adjustments to approach the desired power flow condition has been largely relied on in the past using lots of engineering heuristics. This tool provides a systematic way to first achieve a solvable AC power flow case by modifying the power flow condition, and then try to track the AC power flow solution while gradually removing the adopted changes. If all adopted changes can be completely removed, then the original AC power flow solution is obtained. Otherwise, insights for actionable controls are derived to help operation and planning. Currently, this tool has been implemented in Python using SIEMENS PTI PSS/E as power flow solver, where only adjusting generator terminal voltage set point is considered as an available means to try to turn an unsolved power flow to a solved one. In future, more means should be considered, including the operation of tap-changing transformers, switched shunts and redispatch of active power.

Tan, Jin↗

High Quality, Low Cost Bulk Gallium Nitride Substrates Grown by the Electrochemical Solution Growth Method

The objective of this project was to develop the Electrochemical Solution Growth (ESG) method conceived / patented at Sandia National Laboratory into a commercially viable bulk gallium nitride (GaN) growth process that can be scaled to low cost, high quality, and large area GaN wafer substrate manufacturing. The goal was to advance the ESG growth technology by demonstrating rotating seed growth at the lab scale and then transitioning process to prototype commercial system, while validating the GaN material and electronic / optical device quality. The desired outcome of the project is a prototype commercial process for US-based manufacturing of high quality, large area, and lower cost GaN substrates that can drive widespread deployment of energy efficient GaN-based power electronic and optical devices. In year 1 of the project (Sept 2012 – Dec 2013) the overall objective was to demonstrate crystalline GaN growth > 100um on a GaN seed crystal. The development plan included tasks to demonstrate and implement a method for purifying reagent grade salts, develop the reactor 1 process for rotating seed Electrochemical Solution Growth (ESG) of GaN, grow and characterize ESG GaN films, develop a fluid flow and reaction chemistry model for GaN film growth, and design / build an improved growth reactor capable of scaling to 50mm seed diameter. The first year’s project objectives were met in some task areas including salt purification, film characterization, modeling, and reactor 2 design / fabrication. However, the key project objective of the growth of a crystalline GaN film on the seed template was not achieved. Amorphous film growth on the order of a few tenths of a micron has been detected with a film composition including Ga and N, plus several other impurities originating from the process solution and hardware. The presence of these impurities, particularly the oxygen, has inhibited the demonstration of crystalline GaN film growth on the seed template. However, the presence of both Ga and N at the growth surface indicates that the reactor hardware physics is all functioning properly; achieving film growth is a matter of controlling the chemistry at the interface. The impurities originating from the hardware are expected to be straightforward to eliminate. Activities were defined for an extension of budget period 1 to eliminate the undesired impurities originating from the reactor hardware and interfering with crystalline GaN film growth. The budget period 1 extension was negotiated during the 1st half of 2014. The budget period 1 extension spanned approximately from August 2014 to August 2015. The project objective for this extension period was to demonstrate at least 0.5um crystalline GaN film on a GaN seed in the lab scale reactor. The focus of the budget 1 extension period from August 2014 to August 2015 was to eliminate oxygen contamination interference with GaN film growth. The team procured the highest purity lowest oxygen salt for testing. Low oxygen crucible materials such as silicon carbide were installed and evaluated in the laboratory reactor. Growth experiments were performed with high purity salt, high purity hardware, and optimized oxide removal from the seed surface. Experiments were characterized with methods including UV inspection, profilometry, x-ray diffraction (XRD) to determine crystalline structure, optical and scanning electron microscopy, photoluminescence, x-ray photon spectroscopy (XPS), transmission electron microscopy (TEM), and secondary ion mass spectroscopy (SIMS). Despite successfully integrating the low oxygen materials in the laboratory reactor, the goal of depositing 0.5um of crystalline GaN on the MOCVD GaN seed was not met. Very thin (ca. 10nm) cubic phase GaN deposition was observed on the hexagonal MOCVD GaN seeds. But there was a competing etching reaction which was also observed and thought to be related to the presence of metallic lithium, a byproduct of the LiCl-KCl salt used as the process medium. The etching reaction could potentially be addressed by alternate salts not containing lithium, but would necessitate starting all over on the reactor and process design. Further, controlling the reaction of Ga and N in the bulk salt to favor deposition on the seed has proved to be very difficult and unlikely to be solved within the scope of this project in a manner consistent with the original objective for wafer or crystal scale thickness for GaN deposition on a GaN seed. Upon completion of the budget 1 extension period in August 2015 the project partners and DOE agreed to stop work on the project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Nebraska Integrated Carbon Capture and Storage Pre-Feasibility Study

In collaboration with the Nebraska Public Power District (NPPD), the Energy & Environmental Research Center (EERC) has conducted a pre-feasibility study for a commercial-scale carbon dioxide (CO 2 ) geologic storage complex in western Nebraska integrated with potential CO 2 capture at Gerald Gentleman Station (GGS). GGS is the largest coal-fired electricity-generating station in Nebraska, emitting 8.5 million metric tons (Mt) of CO 2 annually, and is located near the town of Sutherland. This pre-feasibility (Phase 1) project has been executed as part of the U.S. Department of Energy (DOE) CarbonSAFE program, a multiphase initiative to support the deployment of large-scale carbon capture and storage (CCS) projects. Each CarbonSAFE project is required to demonstrate the potential to capture and store at least 50 million tonnes (Mt) of CO 2 over a 25-year operational period. The EERC and NPPD established a coordination team to identify challenges to a potential Nebraska CCS project, comprising local stakeholder organizations, which met twice in Lincoln and via several Webinars, providing feedback and guidance throughout the pre-feasibility study. The EERC also secured the technical support of Schlumberger Carbon Services and Computer Modelling Group Ltd. (CMG). The project comprised four technical themes, all using published information sources. Regional and stakeholder analysis, including identification of sensitive environmental areas, potential resource conflicts, and strategies for public outreach. A review of geographic and socioeconomic characteristics, in combination with geologic characterization in the subbasinal analysis described below, identified an area to the southwest and within a 75-mile radius of GGS as the most prospective for development of a storage site. This area largely avoided lands with protected status such as wetlands. A public outreach plan has also been developed for implementation in any further phases of CCS assessment in western Nebraska, for example a CarbonSAFE Phase 2 feasibility study. Scenario analysis, addressing economic and regulatory factors. GGS is the only single major source of CO 2 emissions capable of satisfying the CarbonSAFE 50-Mt scale requirement within the study region. Chemical absorption using amines was identified as the most viable technology for postcombustion CO 2 capture at GGS. The total cost of a CCS project at GGS was estimated to be between $67/tonne CO 2 for capture and auxiliary boiler to minimize parasitic load and $70/tonne CO 2 avoided cost, using the Carnegie-Mellon University Integrated Environmental Control Model (IECM). The total avoided cost included the capture facility and parasitic load, a flue gas desulfurization plant required for the use of amine solvent technology, transport via pipeline, and dedicated storage infrastructure. Nebraska has no legislation in place to address typical CCS-specific issues, for example pore space ownership for storage. Long-term liability, therefore, falls under the U.S. Environmental Protection Agency Underground Injection Control (UIC) Class 6 program regulations. Subbasinal analysis, addressing the potential for a dedicated subsurface “container” to store the required 50-Mt quantity of CO 2 . Modeling and simulation studies identified an area to the southwest of GGS with the potential for storage of 50 Mt CO 2 in the Cloverly Formation, comprising sandstones with interbedded and intermingled shales. The area of review (AOR) that would be required for monitoring under a Class VI operating permit was estimated to be as high as 400–700 square miles, due to uncertain pressure effects. The viability of this storage option is subject to significant uncertainty due to the relatively limited amount of existing characterization data available to the pre-feasibility study; for example, dynamic simulation indicated that the proposed storage rate might require as little as two or as many as 14 injection wells. A key uncertainty is the relative proportion and distribution of sandstone and shale within the Cloverly Formation. A preliminary, semiquantitative risk assessment also suggested uncertainty over storage capacity and injectivity constitute the most significant project risks at this pre-feasibility stage. No assessed risks were considered to rule out the possibility of a project moving to deployment. National Risk Assessment Partnership (NRAP) validation, using software tools developed by the National Energy Technology Laboratory (NETL) to assess risks associated with the potential 50-Mt CO 2 storage complex. NRAP tools were used to assess hypothetical leakage scenarios. Results broadly supported the conclusion of the semiquantitative risk analysis – for example, even worst-case analysis of theoretical leakage scenarios found limited migration rates and impacts. In summary, the work undertaken in this Phase 1 pre-feasibility study has shown that western Nebraska has potential to host a commercial-scale CCS project, including a dedicated storage “container” for 50 Mt of CO 2 . However, the following key challenges would need to be overcome: The business case for deploying CCS projects is uncertain; recently announced federal tax credits and sales of CO 2 for enhanced oil recovery may not cover the full costs of a CCS project at GGS, as estimated by this pre-feasibility study. The potential 50-Mt CO 2 dedicated storage container defined in this pre-feasibility study should be regarded as having a relatively low level of readiness to support a CCS project. Public outreach would be a vital element in western Nebraska, where sensitivities around such environmental issues as water resource protection and pipeline construction would need to be carefully addressed.

54 ENVIRONMENTAL SCIENCES↗

Cyber Science Capability Strategy

This document outlines LANL’s cyber science capability strategy, working in tandem with the IS&T strategy, to focus internal investments utilizing our unique skill sets, capabilities and facilities supporting national scientific priorities to address emerging challenges to national security. This strategy identifies LANL’s strengths as they relate to cyber science and is intended to guide internal investments to increase the strength, focus, and impact of LANL’s cyber capability building innovative scientific leadership. Subsequent documents (human capital development, implementation, capabilities, infrastructure, etc.) will develop plans targeting specific program areas including weapons, energy, and strategic partnership programs.

97 MATHEMATICS AND COMPUTING↗

Chicago Area Waterway System Microbiome Research

This report summarizes the research conducted by Argonne National Laboratory (Argonne) for the Metropolitan Water Reclamation District of Greater Chicago (MWRD) for the first five years (2013-2017) of a seven-year study with emphasis on the impact of disinfection (2016-2017) on the microbial community of the Chicago Area Waterway System (CAWS). The study examines microbial communities following disinfection of secondary treated effluents at the T.J. O’Brien (UV) and Calumet (chlorine and dechlorination) Water Reclamation Plants (WRPs) and the phased implementation of the Tunnel and Reservoir Plan (TARP). The Thornton Composite Reservoir (TCR) was completed in 2015. It provides 7.9 billion gallons of storage and since its completion has captured more than 11.0 billion gallons of combined stormwater and sewage from Calumet WRP that would otherwise overflow into CAWS in rainy weather. In addition to the effects of TARP and disinfection, we present an analysis of potential sources of the microbes found in the CAWS and the results of 16S rRNA amplicon gene sequencing which was used to characterize microbial community variability as a function of location, season, and environmental conditions. A total of 2,077 samples were collected from 2013 to 2017 from WRPs and CAWS and analyzed using high-throughput sequencing. The whole microbial community composition using all the genetic material in the environmental sample was characterized using 16S rRNA gene-based analysis, while functional subsystem attributes of these microbial communities were characterized using shotgun metagenomics. We used a Bayesian statistical tool, SourceTracker 2.0 to determine the likely sources of microbes found in CAWS by sampling location and sampling period.

54 ENVIRONMENTAL SCIENCES↗

Los Alamos National Laboratory Fall Avian Migration Monitoring Report 2010-2018

During the fall of 2018, biologists at Los Alamos National Laboratory completed the ninth year of monitoring fall migration passerines (songbirds). Songbirds were captured at a mist-netting station located in a wetland/riparian complex in Technical Area 36 on the north side of Pajarito Road in Los Alamos County. Captured birds were identified, measured, and banded with a United States Fish and Wildlife Service (USFWS) migratory bird band. Banding operations took place between August and October, with the completion of a total of 10 mist-netting sessions annually. This project was conducted as part of the implementation of the Biological Resources Management Plan and is in compliance with the 2013 Memorandum of Understanding between the USFWS and the United States Department of Energy/National Nuclear Security Administration and Executive Order 13186. Between 2010 and 2018 the overall number of birds and species captured was variable. We saw significant differences in the bird community composition when we compared earlier years to later years. Although environmental variables including a drought severity index, were not shown to influence the community composition, insectivorous birds and the percentage of hatch year birds were influenced by drought severity. Additionally, Audubon’s Warbler and Virginia’s Warbler numbers decreased from 2010 and showed declining trends in their abundances. The variability in bird populations is likely driven by regional climatic factors, but more data are needed for robust assessments.

54 ENVIRONMENTAL SCIENCES↗

National Hurricane Program Metrics Framework

The need for metrics for planning and response measures was identified as key gap to be addressed in the National Hurricane Program's (NHP) Technology Modernization effort. This document proposes a framework for defining a set of metrics for planning and response that will be implemented in the NHP products of hurricane evacuation studies (HES) and post-storm assessments (PSA). To determine the feasibility of this framework, a survey of current HES and PSAs was carried out followed by and then used to determine if the proposed metrics are currently captured. While there is a wide variety in data availability and detail, the implementation of these metrics is not only feasible but presents an opportunity to improve on current practices. The final implementation of this framework shall require the ongoing feedback from local, state, tribal, and federal stakeholders.

54 ENVIRONMENTAL SCIENCES↗

Enhanced Recovery Opportunities in the Appalachian Basin

The Midwest Regional Carbon Sequestration Partnership (MRCSP) has incorporated the work of geologic research teams (Geoteams) in its regional characterization, project planning and carbon dioxide (CO2) injection implementation work since the partnership was established by the U.S. Department of Energy (DOE) in 2003. Over this 16-year period, the cohort of Geoteams has grown from five to ten states and has contributed to the characterization of geologic sequestration opportunities, refinement of reservoir and seal data, and supported injection efforts through both predictive and post-injection assessments. The regional characterization work conducted by the Geoteams during the MRCSP Phase III project period (2010 – 2019) focused on the following tasks: (1) refinement of geologic seals/reservoir systems; (2) assessment of Atlantic Coastal Plain and offshore opportunities; (3) expanded assessments of oil and gas fields, particularly as they relate to enhanced recovery opportunities; (4) regional support for implementation of carbon capture utilization and storage (CCUS) in the partnership area; and (5) communication and data sharing. The findings of this work are summarized in the final report entitled Final Report of Geologic Carbon Capture Utilization and Storage Opportunities in the form of a state-by-state presentation for the MRCSP Region. In addition to the capstone deliverable mentioned above, the Geoteams have also prepared a series of topical reports to elaborate on specific geologic intervals and/or geographic areas of study completed during the Phase III project period. Specifically, these topical reports address: (1) the Atlantic Coastal Plain and adjacent offshore; (2) Cambro-Ordovician reservoirs/seals in the region; (3) enhanced oil and gas recovery opportunities in the Appalachian Basin; and (4) enhanced oil recovery (EOR) in the Michigan Basin. The remainder of this topical report presents our findings relative to enhanced recovery opportunities in the Appalachian Basin.

54 ENVIRONMENTAL SCIENCES↗

Enhanced Recovery Opportunities in the Appalachian Basin

The Midwest Regional Carbon Sequestration Partnership (MRCSP) has incorporated the work of geologic research teams (Geoteams) in its regional characterization, project planning and carbon dioxide (CO2) injection implementation work since the partnership was established by the U.S. Department of Energy (DOE) in 2003. Over this 16-year period, the cohort of Geoteams has grown from five to ten states and has contributed to the characterization of geologic sequestration opportunities, refinement of reservoir and seal data, and supported injection efforts through both predictive and post-injection assessments. The Appalachian Basin Geoteam consists of geologists from the state geological surveys of Kentucky, Maryland, New York, Ohio, Pennsylvania, and West Virginia. Pennsylvania and West Virginia led the research related to enhanced recovery opportunities in oil and gas fields, while Kentucky led the work associated with enhanced gas recovery (EGR) opportunities in organic-rich shales. The Appalachian Basin Geoteam evaluated reservoirs amenable to CO2-EOR and EGR using a combination of data sources and technical approaches. The Geoteam characterized the subsurface geology of the area in stepwise fashion, starting with existing geologic maps and fields/pools data generated as part of previous MRCSP regional characterization research. With this data, the Geoteam correlated stratigraphy and generated cross sections to delineate the extent, depths and thicknesses of those formations that may serve as reservoirs for either miscible or immiscible enhanced recovery projects. In addition, the team prepared structure and isopach maps for prospective formations, as well as assessments of gross and net porosity of these units. Once prospective localities were identified, the Geoteam selected a short list of oil fields in each of the three states for assessment for case study preparation.

01 COAL, LIGNITE, AND PEAT↗

DC-AC Tool: Fully Automating the Acquisition of AC Power Flow Solution

DC2AC is an automated tool for achieving a converged AC power flow solution from any dispatch, e.g., determined using DC power flow model based optimal power flow. The entire process is free of human interference. It is usually encountered in practice that, even with a DC power flow solution, acquiring the solved AC power flow solution, if exists, sometimes could be a challenging task, especially during the planning stage. It is also difficult to distinguish the unsolvable cases from diverging iterations. Manual adjustments to approach the desired power flow condition has been largely relied on in the past using lots of engineering heuristics. This tool provides a systematic way to first achieve a solvable AC power flow case by modifying the power flow condition, and then try to track the AC power flow solution while gradually removing the adopted changes. If all adopted changes can be completely removed, then the original AC power flow solution is obtained. Otherwise, insights for actionable controls are derived to help operation and planning. Currently, this tool has been implemented in Python using SIEMENS PTI PSS/E as power flow solver, where only adjusting generator terminal voltage set point is considered as an available means to try to turn an unsolved power flow to a solved one. In future, more means should be considered, including the operation of tap-changing transformers, switched shunts and redispatch of active power.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of a Portable In Situ Phosphorous Sensor

While phosphorus is a critical nutrient for all forms of life, runoff leads to phosphorus accumulation in surface water where it can cause a variety of health, environmental, and economic problems. The Department of Energy is interested in conducting long-term field experiments to monitor the impact of phosphorus in terrestrial and aquatic environments, and to better understand a cost vs. benefit analysis of reducing phosphorus pollution. Performing such long-term experiments requires affordable sensors capable of monitoring low-level phosphorus concentrations under challenging environmental conditions. However, such sensors are currently not available. The goal of this proposed project is to develop and demonstrate a low-cost portable phosphorus sensor suitable for in situ measurements. We will determine the technical requirements for a Raman-based sensor system, design and build a signal amplifier, integrate it with a Raman-based sensor, and demonstrate a proof-of-concept level sensor system. The expected accomplishments for Phase I include the identification of the technical requirements of a combined Raman laser/spectrometer and cavity enhancement system, building a proof-of-concept level sensor system capable of detecting orthophosphate compounds at the desired level of 0.25 mg P/L and organic P compounds, and verification of the sensor performance under laboratory and field conditions. In addition, we will identify initial hardening requirements that will need to be implemented during Phase II. While we plan to develop an integrated sensor system for monitoring phosphorus, the cavity-based enhancement system can also be used in combination with other (non-phosphorus) Raman sensors that we plan to develop or that are already commercially available. A recent market report highlights the increasing demand for such environmental monitoring applications, with the market for chemical detection anticipated to grow at a compound annual growth rate of 6.5% (2020-2025). Wide-spread monitoring of phosphorus could reduce the damage from eutrophication in freshwater, which is estimated to be $2.2 billion annually, thereby increasing biodiversity, reducing costs required for drinking water treatment, and decreasing economic losses related to recreation and angling and lake property values.

54 ENVIRONMENTAL SCIENCES↗

Social Aspects and Considerations for Agrivoltaics Implementation

Integrated PV technologies - such as agrivoltaics - have potential to address challenges associated with siting and land use for solar. This presentation provides an overview of agrivoltaic R&D activities in the United States and focuses on the non-technical aspects of implementation, specifically social considerations around collaboration, planning, and acceptance.

14 SOLAR ENERGY↗

Collaborative Enhancements to Unlock Interregional Transmission

Multiple recent studies highlight significant benefits associated with expansion of interregional transfer capabilities for efficiently adapting to these changes. Despite these proposed benefits, few, if any, interregional transmission projects have been built in recent memory . The objective of this report is to confront the barriers to interregional transmission that exist today and address them with potential reforms and collaborative solutions. This report identifies solutions with the potential for immediate beneficial impact on interregional transmission with the ultimate goal of allowing more effective identification and advancement of interregional transmission projects that create the most positive net value to the participating systems . It distinguishes between states, federal government, and planning regions as key actors in implementing solutions designed to be flexible to accommodate regional differences.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Information Management System for the California State Water Resources Control Board (SWRCB)

A study was made to establish the requirements for an integrated state-wide information management system for water quality control and water quality rights for the State of California. The data sources and end requirements were analyzed for the data collected and used by the numerous agencies, both State and Federal, as well as the nine Regional Boards under the jurisdiction of the State Board. The report details the data interfaces and outlines the system design. A program plan and statement of work for implementation of the project is included.

Heald, T. C.↗

Apollo experience report: Guidance and control systems. Engineering simulation program

The Apollo Program experience from early 1962 to July 1969 with respect to the engineering-simulation support and the problems encountered is summarized in this report. Engineering simulation in support of the Apollo guidance and control system is discussed in terms of design analysis and verification, certification of hardware in closed-loop operation, verification of hardware/software compatibility, and verification of both software and procedures for each mission. The magnitude, time, and cost of the engineering simulations are described with respect to hardware availability, NASA and contractor facilities (for verification of the command module, the lunar module, and the primary guidance, navigation, and control system), and scheduling and planning considerations. Recommendations are made regarding implementation of similar, large-scale simulations for future programs.

Gilbert, D. W.↗

STS/Spacelab payload utilization planning study: Executive summary

The planning process recommended to meet the orbital flight requirements for the Space Transportation System and payload development, procurement, operations, and support leading to authorization and funding of STS and payload project activities is described. The rationale and rp primary products of STS utilization planning are summarized along with the implementation of the system. Major recommendations of the study are included.

Source record↗

Solar Power Satellites

A satellite based energy concept is described, including the advantages of the basic concept, system characteristics, cost, and environmental considerations. An outline of a plan for the further evaluation and implementation of the system is given. It is concluded that the satellite concept is competitive with other advanced power generation systems when a variety of factors are considered, including technical feasibility, cost, safety, natural resources, environment, baseload capability, location flexibility, land use, and existing industrial base for implementation.

Kraft, C. C., Jr.↗

Satellite services system analysis study. Volume 2, part 2: Study results

The development of an effective satellite services system was investigated. Satek Satellite user market, design reference missions, satellite service functions, service equipment, and cost estimates are discussed. Extensive program plans for a satellite service system implementation are included.

Source record↗