Search NASA⌕ Search

SEARCH · Search NASA

Results for “Load Monitoring”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,477 records · Page 82

Damage Detection of CFRP Plates by Full-Spectral Analysis of a Fibre Bragg Grating Sensor Signal

This paper describes the measurement of average strain, strain distribution and vibration of cantilever beam made of Carbon Fiber Reinforced Plastics (CFRP), using a single Fibre Bragg Grating (FBG) sensor mounted on the beam surface. Average strain is determined from the displacement of the peak wavelength of reflected light from the FBG sensor. Unstrained reference FBG sensors were used to compensate for temperature drift and the photoelastic coefficient (P{sub e}), which was used to calculate the gauge factor. Measured strains agree with those measured by a resistance foil strain gauge attached to the sample. Stress distributions are measured by monitoring the variation in the full width half maximum (FWHM) values of the reflected spectrum, using a proposed optical analytical model, described in the paper. FWHM values were measured for both the cantilever test beam and a for a reference beam, loaded using a four-point bending rig. The trend of the stress distribution for the test beam matches with our analytical model, however with a relatively large noise present in the experimentally determined data. The vibration of cantilever beam was measured by temporal analysis of the peak reflection wavelength. This technique is very stable as measurements are not affected by variations in the signal amplitude. Finally an application of FBG sensors for damage detection of CFRP plates is demonstrated, by measuring the average strain and natural frequency. With small defects of different sizes applied to the CFRP plate, average strains were seen to increase with damage size and the natural frequency decreased with damage size.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Marine Corps Base Camp Lejeune AEM-1 Hydrosphere Deployment Metadata

Critical military training and testing on lands along the nation’s coastal and estuarine shorelines are increasingly placed at risk because of encroachment pressures in surrounding areas, impairments due to other anthropogenic disturbances, and changes in climate and sea level. The U.S. Department of Defense (DoD) intends to enhance and sustain its training and testing assets and also optimize its stewardship of natural resources through the development and application of an ecosystem-based management approach on DoD installations. To accomplish this goal, particularly for installations in estuarine/coastal environments, the Strategic Environmental Research and Development Program (SERDP) launched the Defense Coastal/Estuarine Research Program (DCERP) as a 10-year effort at Marine Corps Base Camp Lejeune (MCBCL) in North Carolina. The results of the second 5 years of the program (DCERP2) are presented in the DCERP2 Final Report.There were four overarching objectives of DCERP2. The first objective was to understand the effects of climate change impacts, including warming temperatures, variability in the hydrological cycle, storm events, and sea level rise on the coastal ecosystems at MCBCL from observations and measurements made over the 10-year program. The second objective was to understand the carbon cycle of the coastal and terrestrial ecosystems at MCBCL through a highly integrated sampling program. The third objective was to develop models, tools, and indicators to evaluate current and projected future ecosystem state changes and translate scientific findings into actionable information for installation managers. The last objective was to recommend adaptive management strategies to sustain ecosystem natural resources within the context of an active military installation.Data were collected to characterize the travel time of water and solutes through the tidal freshwater reach of the New River. Travel time of particles and solutes is fundamental for estimating their exposure to reaction sites where biogeochemical processes occur. Travel time provides the time scale for all subsequent calculations of biogeochemical process rates that alter constituent loads through this reach. This metric provides a convenient control volume across which to extrapolate process rates of denitrification and photomineralization of DOC. Analysis of this dataset is provided in Appendix D of Chapter 4 (AEM-4) in the DCERP2 Final Monitoring Report.

54 ENVIRONMENTAL SCIENCES↗

Acoustic emission during unloading of elastically stressed magnesium alloy

A magnesium alloy was quasi-statically cycled elastically between zero load and tension. Both loading and unloading stress delays were found, and the unloading stress delay was further studied. An analytical expression was written for the unloading stress delay which is an elastic constitutive parameter. The potential use of these results for the acoustic emission monitoring of elastic stress states is discussed.

Lee, S. S.↗

Advanced Earth-to-orbit propulsion technology program overview: Impact of civil space technology initiative

The NASA Earth-to-Orbit (ETO) Propulsion Technology Program is dedicated to advancing rocket engine technologies for the development of fully reusable engine systems that will enable space transportation systems to achieve low cost, routine access to space. The program addresses technology advancements in the areas of engine life extension/prediction, performance enhancements, reduced ground operations costs, and in-flight fault tolerant engine operations. The primary objective is to acquire increased knowledge and understanding of rocket engine chemical and physical processes in order to evolve more realistic analytical simulations of engine internal environments, to derive more accurate predictions of steady and unsteady loads, and using improved structural analyses, to more accurately predict component life and performance, and finally to identify and verify more durable advanced design concepts. In addition, efforts were focused on engine diagnostic needs and advances that would allow integrated health monitoring systems to be developed for enhanced maintainability, automated servicing, inspection, and checkout, and ultimately, in-flight fault tolerant engine operations.

Stephenson, Frank W., Jr.↗

Failure mechanisms of 3-D woven SiC/SiC composites under tensile and flexural loading at room and elevated temperatures

Nicalon silicon carbide 3D yarn with silicon carbide matrix composites made through a chemical vapor infiltration (CVI) process were investigated under tensile and flexural loading at 23, 1200 and 1550 C in air. The effectiveness of a chemical vapor deposition (CVD) SiC surface coating was also evaluated in severe oxidizing environment. Acoustic emission sensors and in situ optical microscopy were used at room temperature to monitor the failure mechanisms. It is shown that the level of tensile stress at which nonlinear behavior begins is not drastically reduced at 1200 and 1550 C when composites were protected by a SiC surface coating. Extensive fiber pull-out was observed only in the 1550 C specimen. Similar behaviors were also found in flexural specimens.

Chulya, Abhisak↗

Status of Electrical Actuator Applications

An ever increasing number of actuation functions historically performed by hydraulics or pneumatics are being accomplished by electric actuation. If 'end to end' systems are considered, electric actuators (EA's) are potentially lighter and more efficient. In general, system redundancies may be more easily implemented and operationally monitored. Typically, electrical components exhibit longer mean times to failure and projected lifetime costs of EA's are potentially much lower than those of other options. EA's have certain characteristics which must be considered in their application. The actual mechanical loadings must be established, for the more easily controlled EA may be operated much closer to its full capabilities. At higher rates of motion, EA's are operating as constant power devices. Therefore, it may be possible to start a movement that can not be stopped. The incorporation of high power electronics into remote locations introduces new concerns of EMI and thermal control. It is the management of these and other characteristics that forms the engineering design challenges. Work is currently in progress on EA's for aircraft and expendable launch vehicles. These applications span from ten to 40+ horsepower. The systematics and status of these actuators will be reported along with current technical trends in this area.

Roth, Mary Ellen↗

Design of a Parachute Canopy Instrumentation Platform

This paper discusses the current technology available to design and develop a reliable and compact instrumentation platform for parachute system data collection and command actuation. Wireless communication with a parachute canopy will be an advancement to the state of the art of parachute design, development, and testing. Embedded instrumentation of the parachute canopy will provide reefing line tension, skirt position data, parachute health monitoring, and other telemetry, further validating computer models and giving engineering insight into parachute dynamics for both Earth and Mars entry that is currently unavailable. This will allow for more robust designs which are more optimally designed in terms of structural loading, less susceptible to adverse dynamics, and may eventually pave the way to currently unattainable advanced concepts of operations. The development of this technology has dual use potential for a variety of other applications including inflatable habitats, aerodynamic decelerators, heat shields, and other high stress environments.

Alshahin, Wahab M.↗

Technology Solutions Case Study: Hygrothermal Performance of a Double-Stud Cellulose Wall

Moisture problems within the building shell can be caused by a number of factors including excess interior moisture that is transported into the wall through air leakage and vapor drive, bulk water intrusion from leaks and wind-driven rain, capillary action from concrete to wood connections, and through wetted building materials such as siding wetted from rain splash back. With the increasing thickness of walls, moisture issues could increase. Several builders have successfully used “double-wall” systems to more practically achieve higher R-values in thicker framed walls. A double wall typically consists of a load-bearing external frame wall constructed with 2 × 4 framing at 16 in. on center using conventional methods. After the building is enclosed, an additional frame wall is constructed several inches inside the load-bearing wall. Several researchers have used moisture modeling software to conduct extensive analysis of these assemblies; however, little field research has been conducted to validate the results. In this project, the Building America research team Consortium for Advanced Residential Buildings monitored a double-stud assembly in climate zone 5A to determine the accu¬racy of moisture modeling and make recommendations to ensure durable and efficient assemblies.

Building America↗

Occupancy-Driven Stochastic Decision Framework for Ranking Commercial Building Loads

For effective integration of building operations into the evolving demand response programs of the power grid, real-time decisions concerning the use of building appliances for grid services must excel on multiple criteria, ranging from the added value to occupants' comfort to the quality of the grid services. In this paper, we present a data-driven stochastic decision-support framework to dynamically rank load control alternatives in a commercial building, addressing the needs of multiple decision criteria (e.g. occupant comfort, grid service quality) under uncertainties in occupancy patterns. We adopt a stochastic multi-criteria decision algorithm recently applied to prioritize residential on/off loads, and extend it to i) consider complex load control decisions (e.g. dimming of lights, changing zone temperature set-points) in a commercial building; and ii) systematically integrate zonal occupancy patterns to better identify short-term (and time-varying) opportunities for grid service participation. We evaluate the performance of the proposed framework for curtailment of air-conditioning, lighting, and plug-loads in a multi-zone commercial office building for a range of design choices. With the help of a prototype system that integrates an interactive \textit{Data Analytics and Visualization} frontend we demonstrate a way for the building operators to monitor and change in real-time the available flexibility in energy consumption and to develop trust in the decision recommendations by interpreting the rationale behind the ranking.

Jain, Milan↗

Modeling Assessment of Residential Air-to-Water Heat Pumps Coupled with Cooling Thermal Storage

This study explored the performance and operating cost viability of air-to-water heat pumps (AWHPs) coupled with thermal energy storage (TES) in efficient new residential construction. AWHPs are an emerging technology in this country, but offer promise in terms of high efficiency, fully contained and factory charged outdoor refrigeration system, and hydronic delivery capabilities, which facilitates zoning, ducts in conditioned space, and TES integration for summer load-shifting. Although this AWHP+TES strategy is not yet mainstream, the authors feel that in ten years as decarbonization efforts proceed and TOU rates become more common, strategies such as this will be more accessible. Validated EnergyPlus simulation models were developed based on detailed monitoring data collected over several years at Pacific Gas and Electric's CVRH laboratory test homes located in Stockton, California. One of the CVRH test homes (1,962 ft 2 two-story) had been testing various AWHP systems and configurations over the past six years. The validated model was then updated with high efficiency IECC ZERH envelope and component requirements for climate zones 1-5, including ducts in conditioned space thermal distribution. Simulations were completed for the 1,962 ft 2 home in each climate zone for a minimum efficiency ASHP, an AWHP coupled with a fan coil, and an AWHP coupled with TES sized to eliminate summer on-peak compressor operation. To maintain consistency in reporting energy use estimates, all cases were run with a similar indoor thermostat control strategy to pre-cool the house below the nominal 76 degrees Fahrenheit set point prior to the on-peak period and float slightly above the set point during the peak period. The AWHP+TES configuration was controlled to alternately condition the indoor space or to charge the TES tanks prior to the beginning of the on-peak. Three composite TOU rates were developed based on existing TOU rates across the U.S. to provide differing economic scenarios to evaluate customer bill impacts throughout the summer. Two of the TOU rates had short three-hour peak periods, while the third rate had a longer seven-hour duration peak period. AWHP modeling projections were based on the observed field performance of the Chiltrix CX34 variable speed unit. Other products on the market or entering the market in the near term would likely perform differently.

25 ENERGY STORAGE↗

Assessing mechanical response of CO 2 storage into a depleted carbonate reef using a site-scale geomechanical model calibrated with field tests and InSAR monitoring data

Geomechanical risks of injection have raised concerns regarding secure CO 2 storage. In this work, a combined monitoring and modeling approach is used to assess the stress changes and surface uplift associated with CO 2 injection into a depleted carbonate reef of the Michigan basin. A site-scale geomechanical model is built by assigning mechanical properties of formations using well-log and experimental data. Gravity load is applied to the model to estimate the vertical component of stress as well as different lateral boundary displacement scenarios to estimate horizontal stresses. We used a poroelastic pressure-dependent model (instead of a linear elastic mechanical earth model) to calibrate initial stresses using hydraulic fracture test data measured at depleted reservoir status. Multi-phase fluid flow-geomechanical simulations are performed to estimate the poroelastic response during (1) primary depletion (2) field-scale CO 2 injection phase (3) a hypothetical forecast scenario in which well bottom hole pressure (BHP) reach 45000 KPa. The predicted surface uplift is less than 1 mm at the end of the field-scale CO 2 injection phase which is in good agreement with Interferometric Synthetic Aperture Radar (InSAR) uplift measurement. Although the InSAR data shows an insignificant uplift, hydromechanical modeling of injection shows that CO 2 injection still causes reservoir deformation emphasizing the role of carbonate overburden and reservoir formation mechanical properties and limited size of reef on diminishing the surface deformation. Modeling indicates poroelastic response of caprock matters to estimate uplift. The lower permeability of the top two layers provides additional barrier to large uplift. Also, history of subsidence due to production should be accounted to predict uplift due to a follow up injection correctly. This report shows the significance of combining a calibrated geomechanical model with field measured stresses and monitoring data to be used as a tool to ensure the safety of CO 2 storage.

42 ENGINEERING↗

Strategy Guideline: Proper Water Heater Selection

This Strategy Guideline on proper water heater selection has been developed to provide step-by-step procedures for evaluating preferred cost-effective options for energy efficient water heater alternatives based on local utility rates, climate, and anticipated loads. These procedures, developed both for individual water heater applications (both single and multi-family) and multifamily central systems, provide users with projections on operating cost savings over a 10- year time horizon for retrofit applications and on a cash flow basis for new construction. The savings information, combined with installation cost estimates, allows one to determine which alternatives make sense for a particular application. The information presented in this guideline is based on latest monitoring results from residential field assessments of advanced gas water heater systems and heat pump water heater (HPWH) systems. The methodology presented here can be further refined as more data becomes available on emerging water heating technologies. The tool is targeted at both single and multifamily new and retrofit applications. The intended audience includes: • Builders and Building Owners • Plumbers • General Contractors • Homeowners. This guideline fills an important need because it moves beyond a simplified approach of comparing alternative water heating systems based on a single performance metric. By recognizing the load variations on equipment performance, climate differences, and retail fuel rates, one can develop a more customized performance assessment of competing technologies. This guideline represents the first step in the process of developing a comprehensive system-based evaluation of optimal water heater system design, which will hopefully be developed in the near future. Other Building America-sponsored activities will lead to measure guidelines that focus on technology-specific implementation details related to installation issues in new and existing homes. These guidelines will address issues related to combustion air, venting requirements, space conditioning impacts, safety issues, and other implementation details. The CARB team has developed such a guideline on HPWHs, entitled “Heat Pump Water Heaters in New and Existing Homes”, and IBACOS is in the process of finalizing a tankless water heater guideline.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Guest Editorial Introduction to the Special Issue on 'Advanced Signal Processing Techniques and Telecommunications Network Infrastructures for Smart Grid Analysis, Monitoring, and Management'

Electrical power systems are undergoing a radical change in structure, components, and operational paradigms, and are progressively approaching the new concept of smart grids (SGs). Future power distribution systems will be characterized by the simultaneous presence of various distributed resources, such as renewable energy systems (i.e., photovoltaic power plant and wind farms), storage systems, and controllable/non-controllable loads. Control and optimization architectures will enable network-wide coordination of these grid components in order to improve system efficiency and reliability and to limit greenhouse gas emissions. In this context, the energy flows will be bidirectional from large power plants to end users and vice versa; producers and consumers will continuously interact at different voltage levels to determine in advance the requests of loads and to adapt the production and demand for electricity flexibly and efficiently also taking into account the presence of storage systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Resilience of the Electric Grid Through Trustable IoT-Coordinated Assets

The electricity grid has evolved from a physical system to a cyberphysical system with digital devices that perform measurement, control, communication, computation, and actuation. The increased penetration of distributed energy resources (DERs) including renewable generation, flexible loads, and storage provides extraordinary opportunities for improvements in efficiency and sustainability. However, they can introduce new vulnerabilities in the form of cyberattacks, which can cause significant challenges in ensuring grid resilience. We propose a framework in this paper for achieving grid resilience through suitably coordinated assets including a network of Internet of Things devices. A local electricity market is proposed to identify trustable assets and carry out this coordination. Situational Awareness (SA) of locally available DERs with the ability to inject power or reduce consumption is enabled by the market, together with a monitoring procedure for their trustability and commitment. With this SA, we show that a variety of cyberattacks can be mitigated using local trustable resources without stressing the bulk grid. Multiple demonstrations are carried out using a high-fidelity cosimulation platform, real-time hardware-in-the-loop validation, and a utility-friendly simulator.

distributed energy resources↗

Solid-State Fault Current Limiter Development: Design and Testing Update of a 15kV SSCL Power Stack

The Solid-State Fault Current Limiter (SSCL) is a promising technology that can be applied to utility power delivery systems to address the problem of increasing fault currents associated with load growth. As demand continues to grow, more power is added to utility system either by increasing generator capacity or by adding distributed generators, resulting in higher available fault currents, often beyond the capabilities of the present infrastructure. The SSCL is power-electronics based equipment designed to work with the present utility system to address this problem. The SSCL monitors the line current and dynamically inserts additional impedance into the line in the event of a fault being detected. The SSCL is based on a modular design and can be configured for 5kV through 69kV systems at nominal current ratings of 1000A to 4000A. Results and Findings This report provides the final test results on the development of 15kV class SSCL single phase power stack. The scope of work included the design of the modular standard building block sub-assemblies, the design and manufacture of the power stack and the testing of the power stack for the key functional tests of continuous current capability and fault current limiting action. Challenges and Objectives Solid-State Current Limiter technology impacts a wide spectrum of utility engineering and operating personnel. It addresses the problems associated with load growth both at Transmission and Distribution class networks. The design concept is pioneering in terms of developing the most efficient and compact power electronics equipment for utility use. The initial test results of the standard building blocks are promising. The independent laboratory tests of the power stack are promising. However the complete 3 phase system needs rigorous testing for performance and reliability. Applications, Values, and Use The SSCL is an intelligent power-electronics device which is modular in design and can provide current limiting or current interrupting capabilities. It can be applied to variety of applications from distribution class to transmission class power delivery grids and networks. It can also be applied to single major commercial and industrial loads and distributed generator supplies. The active switching of devices can be further utilized for protection of substation transformers. The stress on the system can be reduced substantially improving the life of the power system. It minimizes the voltage sag by speedy elimination of heavy fault currents and promises to be an important element of the utility power system. DOE Perspective This development effort is now focused on a 15kV system. This project will help mitigate the challenges of increasing available fault current. DOE has made a major contribution in providing a cost effective SSCL designed to integrate seamlessly into the Transmission and Distribution networks of today and the future. Approach SSCL development program for a 69kV SSCL was initiated which included the use of the Super GTO advanced semiconductor device which won the 2007 R&D100 Award. In the beginning, steps were identified to accomplish the economically viable design of a 69kV class Solid State Current Limiter that is extremely reliable, cost effective, and compact enough to be applied in urban transmission. The prime thrust in design and development was to encompass the 1000A and the 3000A ratings and provide a modular design to cover the wide range of applications. The focus of the project was then shifted to a 15kV class SSCL. The specifications for the 15kV power stack are reviewed. The design changes integrated into the 15kV power stack are discussed. In this Technical Update the complete project is summarized followed by a detailed test report. The power stack independent high voltage laboratory test requirements and results are presented. Keywords Solid State Current Limiter, SSCL, Fault Current Limiter, Fault Current Controller, Power electronics controller, Intelligent power-electronics Device, IED

24 POWER TRANSMISSION AND DISTRIBUTION↗

Mitigating Data Center Impact on Grid Stability: A Coordinated Control Strategy Using Verrus StabiliGrid Architecture

Large data centers, which now represent a significant and growing share of the total U.S. grid load, can inadvertently destabilize the electrical grid when they disconnect simultaneously during brief voltage disturbances. The July 10, 2024, Eastern Interconnection incident, in which a sub-100-millisecond transmission fault triggered the cascading loss of approximately 1,500 MW of data center load, illustrates this vulnerability. While commercial battery energy storage systems (BESS) deployed in data centers provide device-level fault ride-through per IEEE 1547, they lack coordination with facility protection logic and uninterruptible power supplies (UPS), limiting their effectiveness as grid-stabilizing assets. This report presents the Verrus StabiliGrid architecture, a coordinated control framework that integrates BESS, UPS, and point-of-interconnection (POI) protection settings to enable data centers to ride through both undervoltage and overvoltage grid contingencies without disconnecting. The four-step strategy encompasses: (1) high-resolution power quality monitoring to detect the grid state during events such as undervoltage, overvoltage, underfrequency, and overfrequency; (2) POI protection settings that allow for extended ride-through and grid-connected operation during grid contingencies; (3) grid state-driven autonomous dispatch of assets to improve grid resilience by reducing power draw during undervoltage or absorbing more power during overvoltage events; and (4) coordinated post-recovery dispatch of data center assets to restore firm load to pre-contingency levels. Validated through controller-hardware-in-the-loop (C-HIL) simulations at the National Laboratory of the Rockies, results show grid import restoration to pre-fault levels within 100 milliseconds of voltage recovery. This work advances the ability of data centers to transition from passive, disturbance-sensitive loads to active participants in grid stability, a capability increasingly required by emerging NERC and ERCOT regulatory frameworks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Feasibility of an Accelerometer-Based Structural Health Monitoring System for the LANL Blast Tube

A modeling- and simulation-based study was conducted on the feasibility of implementing an accelerometer-based SHM system on the Los Alamos National Laboratory blast tube. A blast tube experiment was modeled using the Abaqus explicit finite element solver. A custom user subroutine was written to apply test-like pressure loading to the inside surface of the blast tube. The subroutine applies analytically defined pressure loads derived from tracer output taken from a Compressible Flow Computational Fluid Dynamics Solver model of the blast tube. Five unique versions of the model were created: an undamaged reference model at 65°F was used as the baseline and compared to equivalent models at 10°F and 100°F. These three models were compared to models with small damage at the reference temperature. The two types of damage considered were a radial (circumferential) crack in the main tube body and a longitudinal crack in the supports. Acceleration outputs were extracted from accelerometer bodies included in the model and were post processed using a variety of standard SHM techniques. Different potential features signaling failure were extracted and compared using statistical methods in the time and frequency domains. A method was identified that clearly shows that differences in structural response resulting from the modeled damage can be differentiated from the structural response resulting from changing environmental conditions. However, the amount of damage applied to create observable differences in the accelerometer data was so large that simpler methods of damage detection would be more cost effective in locating damage.

42 ENGINEERING↗

A study of elevated temperature testing techniques for the fatigue behavior of PMCS: Application to T650-35/AMB21

An experimental study was conducted to investigate the mechanical behavior of a T650-35/AMB21 eight-harness satin weave polymer composite system. Emphasis was placed on the development and refinement of techniques used in elevated temperature uniaxial PMC testing. Issues such as specimen design, gripping, strain measurement, and temperature control and measurement were addressed. Quasi-static tensile and fatigue properties (R(sub sigma) = 0.1) were examined at room and elevated temperatures. Stiffness degradation and strain accumulation during fatigue cycling were recorded to monitor damage progression and provide insight for future analytical modeling efforts. Accomplishments included an untabbed dog-bone specimen design which consistently failed in the gage section, accurate temperature control and assessment, and continuous in-situ strain measurement capability during fatigue loading at elevated temperatures. Finally, strain accumulation and stiffness degradation during fatigue cycling appeared to be good indicators of damage progression.

Gyekenyesi, Andrew L.↗