Search NASA⌕ Search

SEARCH · Search NASA

Results for “OUTAGES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,471 records · Page 82

The AP1000{sup R} nuclear power plant innovative features for extended station blackout mitigation

Station Blackout (SBO) is defined as 'a condition wherein a nuclear power plant sustains a loss of all offsite electric power system concurrent with turbine trip and unavailability of all onsite emergency alternating current (AC) power system. Station blackout does not include the loss of available AC power to buses fed by station batteries through inverters or by alternate AC sources as defined in this section, nor does it assume a concurrent single failure or design basis accident...' in accordance with Reference 1. In this paper, the innovative features of the AP1000 plant design are described with their operation in the scenario of an extended station blackout event. General operation of the passive safety systems are described as well as the unique features which allow the AP1000 plant to cope for at least 7 days during station blackout. Points of emphasis will include: - Passive safety system operation during SBO - 'Fail-safe' nature of key passive safety system valves; automatically places the valve in a conservatively safe alignment even in case of multiple failures in all power supply systems, including normal AC and battery backup - Passive Spent Fuel Pool cooling and makeup water supply during SBO - Robustness of AP1000 plant due to the location of key systems, structures and components required for Safe Shutdown - Diverse means of supplying makeup water to the Passive Containment Cooling System (PCS) and the Spent Fuel Pool (SFP) through use of an engineered, safety-related piping interface and portable equipment, as well as with permanently installed onsite ancillary equipment. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

AP1000{sup R} nuclear power plant safety overview for spent fuel cooling

The AP1000{sup R} plant is an 1100-MWe class pressurized water reactor with passive safety features and extensive plant simplifications that enhance construction, operation, maintenance, safety and costs. The AP1000 design uses passive features to mitigate design basis accidents. The passive safety systems are designed to function without safety-grade support systems such as AC power, component cooling water, service water or HVAC. Furthermore, these passive features 'fail safe' during a non-LOCA event such that DC power and instrumentation are not required. The AP1000 also has simple, active, defense-in-depth systems to support normal plant operations. These active systems provide the first level of defense against more probable events and they provide investment protection, reduce the demands on the passive features and support the probabilistic risk assessment. The AP1000 passive safety approach allows the plant to achieve and maintain safe shutdown in case of an accident for 72 hours without operator action, meeting the expectations provided in the U.S. Utility Requirement Document and the European Utility Requirements for passive plants. Limited operator actions are required to maintain safe conditions in the spent fuel pool via passive means. In line with the AP1000 approach to safety described above, the AP1000 plant design features multiple, diverse lines of defense to ensure spent fuel cooling can be maintained for design-basis events and beyond design-basis accidents. During normal and abnormal conditions, defense-in-depth and other systems provide highly reliable spent fuel pool cooling. They rely on off-site AC power or the on-site standby diesel generators. For unlikely design basis events with an extended loss of AC power (i.e., station blackout) or loss of heat sink or both, spent fuel cooling can still be provided indefinitely: - Passive systems, requiring minimal or no operator actions, are sufficient for at least 72 hours under all possible pool heat load conditions. - After 3 days, several different means are provided to continue spent fuel cooling using installed plant equipment as well as off-site equipment with built-in connections. Even for beyond design basis accidents with postulated pool damage and multiple failures in the passive safety-related systems and in the defense-in-depth active systems, the AP1000 multiple spent fuel pool spray and fill systems provide additional lines of defense to prevent spent fuel damage. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Evaluation of earthquake and tsunami on JSFR

Evaluation of earthquake and tsunami on JSFR has been analyzed. For seismic design, safety components are confirmed to maintain their functions even against recent strong earthquakes. As for Tsunami, some parts of reactor building might be submerged including component cooling water system whose final heat sink is sea water. However, in the JSFR design, safety grade components are independent from component cooling water system (CCWS). The JSFR emergency power supply adopts a gas turbine system with air cooling, since JSFR does not basically require quick start-up of the emergency power supply thanks to the natural convection DHRS. Even in case of long station blackout, the DHRS could be activated by emergency batteries or manually and be operated continuously by natural convection. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Westinghouse Small Modular Reactor passive safety system response to postulated events

The Westinghouse Small Modular Reactor (SMR) is an 800 MWt (>225 MWe) integral pressurized water reactor. This paper is part of a series of four describing the design and safety features of the Westinghouse SMR. This paper focuses in particular upon the passive safety features and the safety system response of the Westinghouse SMR. The Westinghouse SMR design incorporates many features to minimize the effects of, and in some cases eliminates the possibility of postulated accidents. The small size of the reactor and the low power density limits the potential consequences of an accident relative to a large plant. The integral design eliminates large loop piping, which significantly reduces the flow area of postulated loss of coolant accidents (LOCAs). The Westinghouse SMR containment is a high-pressure, compact design that normally operates at a partial vacuum. This facilitates heat removal from the containment during LOCA events. The containment is submerged in water which also aides the heat removal and provides an additional radionuclide filter. The Westinghouse SMR safety system design is passive, is based largely on the passive safety systems used in the AP1000{sup R} reactor, and provides mitigation of all design basis accidents without the need for AC electrical power for a period of seven days. Frequent faults, such as reactivity insertion events and loss of power events, are protected by first shutting down the nuclear reaction by inserting control rods, then providing cold, borated water through a passive, buoyancy-driven flow. Decay heat removal is provided using a layered approach that includes the passive removal of heat by the steam drum and independent passive heat removal system that transfers heat from the primary system to the environment. Less frequent faults such as loss of coolant accidents are mitigated by passive injection of a large quantity of water that is readily available inside containment. An automatic depressurization system is used to reduce the reactor pressure in a controlled manner to facilitate the passive injection. Long-term decay heat removal is accomplished using the passive heat removal systems augmented by heat transfer through the containment vessel to the environment. The passive injection systems are designed so that the fuel remains covered and effectively cooled throughout the event. Like during the frequent faults, the passive systems provide effective cooling without the need for ac power for seven days following the accident. Connections are available to add additional water to indefinitely cool the plant. The response of the safety systems of the Westinghouse SMR to various initiating faults has been examined. Among them, two accidents; an extended station blackout event, and a LOCA event have been evaluated to demonstrate how the plant will remain safe in the unlikely event that either should occur. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

AP1000{sup R} severe accident features and post-Fukushima considerations

The AP1000{sup R} passive nuclear power plant is uniquely equipped to withstand an extended station blackout scenario such as the events following the earthquake and tsunami at Fukushima without compromising core and containment integrity. The AP1000 plant shuts down the reactor, cools the core, containment and spent fuel pool for more than 3 days using passive systems that do not require AC or DC power or operator actions. Following this passive coping period, minimal operator actions are needed to extend the operation of the passive features to 7 days using installed equipment. To provide defense-in-depth for design extension conditions, the AP1000 plant has engineered features that mitigate the effects of core damage. Engineered features retain damaged core debris within the reactor vessel as a key feature. Other aspects of the design protect containment integrity during severe accidents, including unique features of the AP1000 design relative to passive containment cooling with water and air, and hydrogen management. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Storm-DEPART (Damage Estimate Prediction and Recovery Tool)

Storm-DEPART (Damage Estimate Prediction and Restoration Tool): Each year hurricanes and tropical storms in the United States damage critical infrastructure assets, disrupt the services they provide, and cause millions to billions of dollars in economic impacts due to extended recovery times. The Storm-DEPART tool and analytical output enable more impactful data-driven decision-making capabilities and strengthen national-level disaster preparedness, response, and recovery. Storm-DEPART, built through multi-month collaboration between Entergy and INL, combines Entergy’s critical infrastructure inventory data with weather forecasts to predict damages to Electric utility’s assets due to natural disasters and the estimated recovery support needed, including time, materials, and resource allocation. In the event of an approaching hurricane, this innovative solution can assess potential damage to power generation capacity, transmission grids, distribution networks, and communications assets from wind bands, storm surge, and flooding. With more effective predictions, Entergy can more efficiently allocate resources to mitigate impacts and optimize recovery for customers. Storm-DEPART also allows Electric utilities the ability to apply a planning scenario and model expected damage to better inform infrastructure restoration needs leading to enhance system resiliency. The technology is fully transferrable to other electric utilities with the same damage estimating challenges. The INL team is working on the evolution of Storm-DEPART to include ice event damage prediction framework.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of Standardized Probabilistic Risk Assessment Models for Shutdown Operations Integrated in SPAR Level 1 Model

Nuclear plant operating experience and several studies show that the risk from shutdown operation during Modes 4, 5, and 6 at pressurized water reactors and Modes 4 and 5 at boiling water reactors can be significant. This paper describes using the U.S. Nuclear Regulatory Commission’s full-power Standardized Plant Analysis Risk (SPAR) model as the starting point for development of risk evaluation models for commercial nuclear power plants. The shutdown models are integrated with their respective internal event at-power SPAR model. This is accomplished by combining the modified system fault trees from the SPAR full-power model with shutdown event tree logic. Preliminary human reliability analysis results indicate that risk is dominated by the operator’s ability to correctly diagnose events and initiate systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Flooding Experiments and Modeling for Improved Reactor Safety

Countercurrent two-phase flow and “flooding” phenomena in light water reactor systems are being investigated experimentally and analytically to improve reactor safety of current and future reactors. The aspects that will be better clarified are the effects of condensation and tube inclination on flooding in large diameter tubes. The current project aims to improve the level of understanding of flooding mechanisms and to develop an analysis model for more accurate evaluations of flooding in the pressurizer surge line of a Pressurized Water Reactor (PWR). Interest in flooding has recently increased because Countercurrent Flow Limitation (CCFL) in the AP600 pressurizer surge line can affect the vessel refill rate following a small break LOCA and because analysis of hypothetical severe accidents with the current flooding models in reactor safety codes shows that these models represent the largest uncertainty in analysis of steam generator tube creep rupture. During a hypothetical station blackout without auxiliary feedwater recovery, should the hot leg become voided, the pressurizer liquid will drain to the hot leg and flooding may occur in the surge line. The flooding model heavily influences the pressurizer emptying rate and the potential for surge line structural failure due to overheating and creep rupture. The air-water test results in vertical tubes are presented in this paper along with a semi-empirical correlation for the onset of flooding. The unique aspects of the study include careful experimentation on large-diameter tubes and an integrated program in which air-water testing provides benchmark knowledge and visualization data from which to conduct steam-water testing.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Instrumentation, Controls, and Human-Machine Interface Technology Development Roadmap in Support of Grid Appropriate Reactors

Grid Appropriate Reactors (GARs) are a component of the U.S. Department of Energy s (DOE s) Global Nuclear Energy Partnership (GNEP) program. GARs have smaller output power (<~600 MWe), than those intended for deployment on large, tightly coupled grids. This smaller size is important in avoiding grid destabilization, which can result from having a large fraction of a grid s electrical generation supplied by a single source. GARs are envisioned to be deployed worldwide often in locations without extensive nuclear power experience. DOE recently sponsored the creation of an Instrumentation, Controls, and Human-Machine Interface (ICHMI) technology development roadmap emphasizing the specific characteristics of GARs [1]. This roadmapping effort builds upon and focuses the recently developed, more general nuclear energy ICHMI technology development roadmap [2]. The combination of the smaller plant size, smaller grids, and deployment in locations without extensive prior nuclear power experience presents particular infrastructure, regulation, design, operational, and safeguards challenges for effective GAR deployment. ICHMI technologies are central to efficient GAR operation and as such are a dimension of each of these challenges. Further, while the particular ICHMI technologies to be developed would be useful at larger power plants, they are not high-priority development items at the larger plants. For example, grid transient resilience would be a useful feature for any reactor/grid combination and indeed would have limited some recent blackout events. However, most large reactors have limited passive cooling features. Large plants with active safety response features will likely preserve trip preferential grid transient response. This contrasts sharply with GARs featuring passive shutdown cooling, which can safely support grid stability during large grid transients. ICHMI technologies ranging from alternative control algorithms to simplified human-interface system designs are key to enabling GARs to respond properly and thereby stabilize the grid during transients.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Impact of PMU Technology in State Estimation

Recent blackouts and the need to manage larger and larger power systems closer to their stability limits are driving electricity utilities to deploy synchronized phasor measurements (PMU) for wide area monitoring and control. At the same time, modern TSOs need accurate, fast and reliable estimation of their networks' real-time conditions. State Estimator (SE), a fundamental function in dispatching control centers, is expected to perform reliably around the clock since it provides the foundation for subsequent critical security analyses, market revenue calculations, etc. PMU technology provides accurate, satellite-synchronized measurements of both magnitude and angle, which naturally fit in the SE algorithm and enhance its robustness and the quality of the results. This paper presents current results of ongoing experiences with electric utilities on the usage of PMU data in state estimation. It focuses on practical implementation aspects, such as data communication and interfacing to the control center EMS, metrics for evaluation of State Estimator results and improvements in state estimation behavior and results thanks to PMU data.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Proposed SPAR Modeling Method for Quantifying Time Dependent Station Blackout Cut Sets

Abstract: The U.S. Nuclear Regulatory Commission’s (USNRC’s) Standardized Plant Analysis Risk (SPAR) models and industry risk models take similar approaches to analyzing the risk associated with loss of offsite power and station blackout (LOOP/SBO) events at nuclear reactor plants. In both SPAR models and industry models, core damage risk resulting from a LOOP/SBO event is analyzed using a combination of event trees and fault trees that produce cut sets that are, in turn, quantified to obtain a numerical estimate of the resulting core damage risk. A proposed SPAR method for quantifying the time-dependent cut sets is sometimes referred to as a convolution method. The SPAR method reflects assumptions about the timing of emergency diesel failures, the timing of subsequent attempts at emergency diesel repair, and the timing of core damage that may be different than those often used in industry models. This paper describes the proposed SPAR method.

99 GENERAL AND MISCELLANEOUS↗

Impact of Uncertainty on Calculations for Recovery from Loss of Offsite Power

Uncertainty, both aleatory and epistemic, can have a significant impact on estimated probabilities of recovering from loss of offsite power within a specified time window, and such probabilities are an input to risk-informed decisions as to the significance of inspection findings in the U.S. Nuclear Regulatory Commission’s Reactor Oversight Process. In particular, the choice of aleatory model for offsite power recovery time can have a significant impact on the estimated nonrecovery probability, especially if epistemic uncertainty regarding parameters in the aleatory model is accounted for properly. In past and current analyses, such uncertainty has largely been ignored. This paper examines the impact of both aleatory and epistemic uncertainty on the results, using modern open-source Bayesian inference software, which implements Markov chain Monte Carlo sampling. It includes examples of time-dependent convolution calculations to show the impact that uncertainty can have on this increasingly frequent type of calculation, also. The results show that the “point estimate” result, which is an input to risk-informed decisions, can easily be uncertain by a factor of 10 if both aleatory and epistemic uncertainties are considered. The paper also illustrates the use of Bayesian model selection criteria to aid in the choice of aleatory model.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗