Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operating Systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,477 records · Page 82

Impact of distributed power electronics on the lifetime and reliability of PV systems: Impact of distributed power electronics

Here, this paper quantifies the impact of distributed power electronics in photovoltaic (PV) systems in terms of end-of-life energy-capture performance and reliability. The analysis is based on simulations of PV installations over system lifetime at various degradation rates. It is shown how module-level or submodule-level power converters can mitigate variations in cell degradation over time, effectively increasing the system lifespan by 5-10 years compared with the nominal 25-year lifetime. An important aspect typically overlooked when characterizing such improvements is the reliability of distributed power electronics, as power converter failures may not only diminish energy yield improvements but also adversely affect the overall system operation. Failure models are developed, and power electronics reliability is taken into account in this work, in order to provide a more comprehensive view of the opportunities and limitations offered by distributed power electronics in PV systems. Lastly, it is shown how a differential power-processing approach achieves the best mismatch mitigation performance and the least susceptibility to converter faults.

14 SOLAR ENERGY↗

Coordinated distribution network control of tap changer transformers, capacitors and PV inverters

A power distribution system operates most efficiently with voltage deviations along a feeder kept to a minimum and must ensure all voltages remain within specified limits. Recently with the increased integration of photovoltaics, the variable power output has led to increased voltage fluctuations and violation of operating limits. This study proposes an optimization model based on a recently developed heuristic search method, grey wolf optimization, to coordinate the various distribution controllers. Several different case studies on IEEE 33 and 69 bus test systems modified by including tap changing transformers, capacitors and photovoltaic solar panels are performed. Simulation results are compared to two other heuristic-based optimization methods: harmony search and differential evolution. Finally, the simulation results show the effectiveness of the method and indicate the usage of reactive power outputs of PVs facilitates better voltage magnitude profile.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distributed Energy Resource-Cognizant Upgrade Paths to the Traditional Restoration Strategy of Utilities for Improved Load Restoration

Climate change has resulted in increasingly impactful and more frequent occurrences of extreme weather events. This trend poses a significant challenge for distribution utilities and system operators to ensure that there is uninterrupted power supply to critical loads in their networks under fault scenarios; however, currently, utilities deploying the automated fault location, isolation and restoration (FLISR) function in their advanced distribution management system (ADMS) do not take into account the available generation and load-modification capabilities of distributed energy resources present in the disconnected network due to an upstream isolated fault. This results in the network reconfiguration and restoration to result in sub-optimal load restoration. Therefore, this paper presents two approaches that can upgrade the existing FLISR capabilities of distribution utilities to significantly increase the restoration of critical loads. The performance of the proposed approaches is evaluated on a numerical model of a real distribution feeder in Georgia, USA.

DER↗

Optimal PMU Restoration for Power System Observability Recovery After Massive Attacks

Cyber-physically resilient power system operation requires rapid recovery of situational awareness after disastrous scenarios such as massive cyber attacks. In this article, the concept of optimal sequential restoration of Phasor Measurement Units is introduced, aiming at rapid recovery of power system observability in post-attack scenarios. Additionally, the observability recovery problem is formulated as a Mixed Integer Linear Programming problem to maximize the cumulative observability level gained over time during the restoration process. Three alternative objective functions-maximizing the number of observable buses, the number of observable branches, and the total amount of observable power flow-are considered. The effectiveness of the proposed optimal strategy is verified by comparing it with heuristic approaches on the IEEE 57-bus system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Wintap

Wintap is an extensible, general purpose agent framework for the Windows operating system. It provides an easy-to-use plugin architecture, an integrated streaming analytics engine, and real-time event subscriptions for host-based data. Wintap can support a wide variety of applications across production operations, cyber security operations, and cyber security research.

Frye, DavidJ↗

Synchrophasor Applications for Wind Power Generation

The U.S. power industry is undertaking several initiatives that will improve the operations of the electric power grid. One of those is the implementation of wide-area measurements using phasor measurement units to dynamically monitor the operations and status of the network and provide advanced situational awareness and stability assessment. The overviews of synchrophasors and stability analyses in this report are intended to present the potential future applications of synchrophasors for power system operations under high penetrations of wind and other renewable energy sources.

17 WIND ENERGY↗

High resolution and fast scanning squid based non-destructive inspection system of niobium sheets for SRF cavities

Applications in high energy physics accelerators and other fields require the use of thousands of superconducting RF (SRF) cavities that are made of high purity Nb material and the purity of niobium is critical for these cavities to reach the highest accelerating fields. Tantalum is the most prolific of metal inclusions, which can cause thermal breakdown and prevent the cavities from reaching their theoretical performance limits of 45-50 MV/m, and DOE Labs are searching for a technology that could detect small impurities in superconducting Nb sheets reaching the highest possible accelerating fields. The proposed innovative SQUID-based Nondestructive system can scan Niobium sheets used in the manufacturing of SRF cavities with both high speed and high resolution. A highly sensitive SQUID system with a gradiometer probe, non-magnetic dewar, data acquisition system, and a scanning system will be developed for fast detection of impurities in planar Nb sheets. In phase I, we will modify our existing SQUID-based eddy current system to detect 100 micron size Ta defects and a great effort will focus on achieving fast scanning of a large number of niobium sheets in a shorter time and with reasonable resolution. An older system operated by moving the sample 1 mm, stopping and waiting for 1-2 seconds, then activating a measurement by the SQUID after the short settle time is modified. A preliminary designed and implemented a SQUID scanning system that is fast and is capable of scanning a 30 cm x 30 cm Nb sheet in 15 minutes by continuously moving the table at speeds up to 10 mm/s while activating the SQUID at 1mm interval is modified and reached the Phase I goal of 100mm resolution. We have successfully demonstrated the feasibility that a fast speed SQUID scanner without sacrificing the resolution of detection can be done, and a data acquisition and analysis system is also preliminary developed. The SQUID based scanner will help reach the highest accelerating field in SRF cavities that will provide a considerable cost reduction for new accelerators and for upgrades of existing accelerators. This will be realized either by reducing the length required for the SRF cavities or by the installation of higher gradient cavities for energy upgrades in the same space. The SQUID based scanner will also be used for the detection of defects on the surface, inside the bulk or at the back side of metallic sheets in other industries.

43 PARTICLE ACCELERATORS↗

Smart container UWB sensor system for situational awareness of intrusion alarms

An in-container monitoring sensor system is based on an UWB radar intrusion detector positioned in a container and having a range gate set to the farthest wall of the container from the detector. Multipath reflections within the container make every point on or in the container appear to be at the range gate, allowing intrusion detection anywhere in the container. The system also includes other sensors to provide false alarm discrimination, and may include other sensors to monitor other parameters, e.g. radiation. The sensor system also includes a control subsystem for controlling system operation. Communications and information extraction capability may also be included. A method of detecting intrusion into a container uses UWB radar, and may also include false alarm discrimination. A secure container has an UWB based monitoring system

47 OTHER INSTRUMENTATION↗

Distributed Energy Resource-Cognizant Upgrade Paths to the Traditional Restoration Strategy of Utilities for Improved Load Restoration: Preprint

Climate change has resulted in increasingly impactful and more frequent occurrences of extreme weather events. This trend poses a significant challenge for distribution utilities and system operators to ensure that there is uninterrupted power supply to critical loads in their networks under fault scenarios; however, currently, utilities deploying the automated fault location, isolation and restoration (FLISR) function in their advanced distribution management system (ADMS) do not take into account the available generation and load-modification capabilities of distributed energy resources present in the disconnected network due to an upstream isolated fault. This results in the network reconfiguration and restoration to result in sub-optimal load restoration. Therefore, this paper presents two approaches that can upgrade the existing FLISR capabilities of distribution utilities to significantly increase the restoration of critical loads. The performance of the proposed approaches is evaluated on a numerical model of a real distribution feeder in Georgia, USA.

DER↗

Assessing the Impact of Variable Air Volume Box Damper Stuck Faults Using a Building Automation System and Building Energy Simulation Model

The study examines the impact of variable air volume (VAV) damper stuck faults on the system operation, building indoor conditions, and reheating energy consumption. This study includes both experimental and simulation studies for five test scenarios, including a fault-free scenario. We implemented VAV damper stuck fault through the building automation system (BAS). Results show that a damper stuck in a high opening position (60% damper opening) results in supplying an excessive amount of cold air from the rooftop unit (RTU) to the conditioned zone, increasing reheating energy consumption. The results of this research can serve as a foundational resource for developing fault detection algorithms.

Jung, Sungkyun↗

Insights Into On-Demand Transit: A Case Study of Houston METRO's curb2curb Transit Services: Preprint

As modern on-demand transit (ODT) deployments increase, the insights gained from studying real-world systems prove more useful. In this study, a shared ODT system called "METRO curb2curb" in the suburbs of Houston, Texas was studied, with a particular focus on the Missouri City zone, which has the highest ridership out of the four total zones in which the system operates. The Missouri City zone spans 18 square miles with an average daily ridership of nearly 400 as of November 2024. In order to gain a passenger perspective, data collection was performed through using the ODT system first-hand, completing 50 rides in March and April of 2023. These rides included a mix of three different types of on-demand travel accommodations - 1.) advance bookings (30 min - 2 hours ahead), 2.) as-soon-as-possible / real-time dispatch bookings, and 3.) no-reservation trips at two designated "anchor points." Wait and travel time were collected for each ride. Anecdotal findings related to ease of locating the driver/vehicle, the process of booking a ride, and popular trip purposes were also documented. This study provides an overview of the METRO curb2curb system, including its history, service provider, service area, ridership, booking options, wait time, and travel time. Intricacies related to different definitions of wait time are included. Finally, relevant considerations for automating the on-demand transit system and discussed.

33 ADVANCED PROPULSION SYSTEMS↗

Renewable Electricity Futures: Operational Analysis of the Western Interconnection at Very High Renewable Penetrations

The goal of this work was to perform a detailed, sub-hourly analysis of very high penetration scenarios for a single interconnection (the Western Interconnection). The scenarios analyzed for this study included a variety of generation infrastructure buildouts and power system operational assumptions, with three different portfolios of renewable generators. The primary conclusion of this study is that sub-hourly operation of the grid is possible with renewable generation levels between 80% and 90%. Dynamic studies will need to be done to understand any impacts on reliability during contingencies and transient events.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Stochastic Cooling

Stochastic Cooling was invented by Simon van der Meer and was demonstrated at the CERN ISR and ICE (Initial Cooling Experiment). Operational systems were developed at Fermilab and CERN. A complete theory of cooling of unbunched beams was developed, and was applied at CERN and Fermilab. Several new and existing rings employ coasting beam cooling. Bunched beam cooling was demonstrated in ICE and has been observed in several rings designed for coasting beam cooling. High energy bunched beams have proven more difficult. Signal suppression was achieved in the Tevatron, though operational cooling was not pursued at Fermilab. Longitudinal cooling was achieved in the RHIC collider. More recently a vertical cooling system in RHIC cooled both transverse dimensions via betatron coupling.

43 PARTICLE ACCELERATORS↗

Sizing ramping reserve using probabilistic solar forecasts: A data-driven method

Ramping products have been introduced or proposed in several U.S. power markets to mitigate the impact of load and renewable uncertainties on market efficiency and reliability. Current methods often rely on historical data to estimate the requirements of ramping products and fail to take into account the effects of the latest weather conditions and their uncertainties, which could lead to overly conservative or insufficient requirements. This study proposes a k-nearest-neighbor-based method to give weather-informed estimates of ramping needs based on short-term probabilistic solar irradiance forecasts. Forecasts from multiple sites are employed in conjunction with principal component analysis to derive numerical classifiers to characterize system-level weather conditions. In addition, we develop a data-driven method to optimize the model parameters in a rolling-forward manner. By using real-world data from the California Independent System Operator, we design two metrics to evaluate method performance: 1) frequency of shortage and 2) oversupply of ramping product. Our proposed method presents advantages in comparison with the baseline and a set of benchmark methods: without compromising system reliability, it reduces system ramping requirements by up to 25%, therefore improving both system reliability and economics.

14 SOLAR ENERGY↗

Stability Assessment of a System Comprising a Single Machine and Inverter with Scalable Ratings

Synchronous machines have traditionally acted as the foundation of large-scale electrical infrastructures and their physical properties have formed the cornerstone of system operations. However, with the increased integration of distributed renewable resources and energy-storage technologies, there is a need to systematically acknowledge the dynamics of power-electronics inverters - the primary energy-conversion interface in such systems - in all aspects of modeling, analysis, and control of the bulk power network. In this paper, we assess the properties of coupled machine-inverter systems by studying an elementary system comprised of a synchronous generator, three-phase inverter, and a load. The inverter model is formulated such that its power rating can be scaled continuously across power levels while preserving its closed-loop response. Accordingly, the properties of the machine-inverter system can be assessed for varying ratios of machine-to-inverter power ratings. After linearizing the model and assessing its eigenvalues, we show that system stability is highly dependent on the inverter current controller and machine exciter, thus uncovering a key concern with mixed machine-inverter systems and motivating the need for next-generation grid-stabilizing inverter controls.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Collaborative Decision Approach for Electricity Pricing-demand Response Stackelberg Game

Demand response programs are considered as a valuable resource in smart grids that provide several advantages of load shifting, peak load reduction, mediating intermittency of renewable energy integration, etc. Flexible price-based incentives have been recognized as a critical strategy in motivating and compensating consumers' load adjustment actions for successful implementation of demand response. Game theoretical approaches, especially Stackelberg games are popularly adopted to model the relationship between electricity price and customers' demand response and solved by the classical centralized backward induction (BI) method. However, the BI method generally requires convexity of the follower's model for necessary optimality conditions, and the computational time of any centralized approach increases sharply with larger problem instances. In this paper, the Stackelberg game of electricity pricing-demand response between a distribution system operator (DSO) and load aggregators (LAs) is decomposed based on a collaborative optimization (CO) framework, where each LA is treated as a discipline with its own domain constraints (e.g. building temperature control), while the DSO at the system level tries to reduce the solution discrepancy and guide the searching towards optimality. Several groups of comparison experiments have demonstrated the effectiveness of the proposed collaborative decision approach in solving the demand response game.

Chen, Yang↗

A system for EPID-based real-time treatment delivery verification during dynamic IMRT treatment

Purpose: To design and develop a real-time electronic portal imaging device (EPID)-based delivery verification system for dynamic intensity modulated radiation therapy (IMRT) which enables detection of gross treatment delivery errors before delivery of substantial radiation to the patient.Methods: The system utilizes a comprehensive physics-based model to generate a series of predicted transit EPID image frames as a reference dataset and compares these to measured EPID frames acquired during treatment. The two datasets are using MLC aperture comparison and cumulative signal checking techniques. The system operation in real-time was simulated offline using previously acquired images for 19 IMRT patient deliveries with both frame-by-frame comparison and cumulative frame comparison. Simulated error case studies were used to demonstrate the system sensitivity and performance.Results: The accuracy of the synchronization method was shown to agree within two control points which corresponds to approximately ∼1% of the total MU to be delivered for dynamic IMRT. The system achieved mean real-time gamma results for frame-by-frame analysis of 86.6% and 89.0% for 3%, 3 mm and 4%, 4 mm criteria, respectively, and 97.9% and 98.6% for cumulative gamma analysis. The system can detect a 10% MU error using 3%, 3 mm criteria within approximately 10 s. The EPID-based real-time delivery verification system successfully detected simulated gross errors introduced into patient plan deliveries in near real-time (within 0.1 s).Conclusions: A real-time radiation delivery verification system for dynamic IMRT has been demonstrated that is designed to prevent major mistreatments in modern radiation therapy.

61 RADIATION PROTECTION AND DOSIMETRY↗

Vitrification of Sellafield Wastes with High Metallic Magnesium Alloy Content - 17495

The Sellafield nuclear complex, located in northwest England, is the largest such site in the United Kingdom. Sellafield Limited, which is the operating contractor for the Nuclear Decommissioning Authority, is evaluating thermal treatment technologies for a potential future facility to process a variety of Intermediate Level Waste sludges and slurries accumulated from historical site operations. In support of that effort, Atkins and the Vitreous State Laboratory (VSL) of The Catholic University of America conducted studies to evaluate the feasibility and implications of installing a joule-heated ceramic melter (JHCM) vitrification system to process a variety of sludge and slurry radioactive wastes at the Sellafield site. These sludges have the potential to contain a significant proportion of reactive metals in localized regions. The metallic fraction derives from unreacted Magnox spent fuel cladding. Thus, an important objective of this work was to investigate the performance of JHCM technology for the treatment of streams with localized regions of high reactive metal contents. The present work was focused on Site Ion Exchange Effluent Plant (SIXEP) Magnox sludges, investigated previously. Suitable waste simulants were developed for the SIXEP Magnox sludge waste stream, which included surrogates for all important radionuclides. High waste-loading, fully compliant glass formulations were designed using a combination of previous experience, extensive waste glass data bases, and small-scale crucible melts. Glasses from the test melts were characterized for properties that are important for processability and product quality. The most viable compositions were then selected for small-scale melter trials to collect information on processing rates and behavior, off-gas and secondary waste compositions, and overall system mass balance. These data were used to support the technology evaluation, which considered such factors as minimization of inactive additions, waste volume reduction, retention of radionuclides, minimization of secondary wastes, and overall process efficiency and effectiveness. The data were also used to develop sizing estimates for the full-scale facility and to estimate treatment durations under various treatment scenarios. A series of tests was then performed with partial replacement of the magnesium hydroxide with a metallic magnesium alloy that is close in composition to Magnox alloy. A commercially available magnesium alloy, Elecktron AZ31B, which has a nominal magnesium content of 95.7%, was used for this purpose. The testing was performed on a DuraMelter 10 (DM10) JHCM system to characterize the melter off-gas, glass product, and the effects of magnesium alloy particle size on feed processing. Data on processing rate and any processing issues, product glass composition, off-gas composition including hydrogen, and system operating parameters, including flows, temperatures, pressures, etc., were collected and analyzed to evaluate the effects of magnesium alloy on the vitrification process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗