Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,477 records · Page 82

Deployment Effects of Marine Renewable Energy Technologies: Wave Energy Scenarios

Given proper care in siting, design, deployment, operation and maintenance, wave energy conversion could become one of the more environmentally benign sources of electricity generation. In order to accelerate the adoption of these emerging hydrokinetic and marine energy technologies, navigational and environmental concerns must be identified and addressed. All developing hydrokinetic projects involve a wide variety of stakeholders. One of the key issues that site developers face as they engage with this range of stakeholders is that, due to a lack of technical certainty, many of the possible conflicts (e.g., shipping and fishing) and environmental issues are not well-understood,. In September 2008, re vision consulting, LLC was selected by the Department of Energy (DoE) to apply a scenario-based assessment to the emerging hydrokinetic technology sector in order to evaluate the potential impact of these technologies on the marine environment and navigation constraints. The project’s scope of work includes the establishment of baseline scenarios for wave and tidal power conversion at potential future deployment sites. The scenarios capture variations in technical approaches and deployment scales to properly identify and characterize environmental effects and navigational effects. The goal of the project is to provide all stakeholders with an improved understanding of the potential range of technical attributes and potential effects of these emerging technologies and focus all stakeholders on the critical issues that need to be addressed. By identifying and addressing navigational and environmental concerns in the early stages of the industry’s development, serious mistakes that could potentially derail industry-wide development can be avoided. This groundwork will also help in streamlining siting and associated permitting processes, which are considered key hurdles for the industry’s development in the U.S. today. Re vision is coordinating its efforts with two other project teams funded by DoE which are focused on regulatory issues (Pacific Energy Ventures) and navigational issues (PCCI). The results of this study are structured into three reports: (1) Wave power scenario description (2) Tidal power scenario description (3) Framework for Identifying Key Environmental Concerns This is the first report in the sequence and describes the results of conceptual feasibility studies of wave power plants deployed in Humboldt County, California and Oahu, Hawaii. These two sites contain many of the same competing stakeholder interactions identified at other wave power sites in the U.S. and serve as representative case studies. Wave power remains at an early stage of development. As such, a wide range of different technologies are being pursued by different manufacturers. In order to properly characterize potential effects, it is useful to characterize the range of technologies that could be deployed at the site of interest. An industry survey informed the process of selecting representative wave power devices. The selection criteria requires that devices are at an advanced stage of development to reduce technical uncertainties, and that enough data are available from the manufacturers to inform the conceptual design process of this study. Further, an attempt is made to cover the range of different technologies under development to capture variations in potential environmental effects. Table 1 summarizes the selected wave power technologies. A number of other developers are also at an advanced stage of development, but are not directly mentioned here. Many environmental effects will largely scale with the size of the wave power plant. In many cases, the effects of a single device may not be measurable, while larger scale device arrays may have cumulative impacts that differ significantly from smaller scale deployments. In order to characterize these effects, scenarios are established at three deployment scales which nominally represent (1) a small pilot deployment, (2) a small commercial deployment, and (3) a large commercial scale plant. It is important to understand that the purpose of this study was to establish baseline scenarios based on basic device data that was provided to use by the manufacturer for illustrative purposes only.

16 TIDAL AND WAVE POWER↗

Advanced Sensors and Instrumentation Issue 10

The Advanced Sensors and Instrumentation (ASI) program, on its seventh fiscal year, continues to address key technology gaps for future nuclear energy systems. ASI’s goal is to enable the advanced instrumentation and control (I&C) technologies essential to the Office of Nuclear Energy’s research and development (R&D) efforts needed to realize its mission goals. Information on our projects can be found in our ASI annual awards summaries, annual review webinars, and newsletters posted in the Office of Nuclear Energy website (energy.gov/ne). This year, we have initiated three newly awarded projects in the area of data analytics. We also initiated a project to develop and demonstrate a prototype passive wireless sensor network. This sensor will use advanced manufacturing and printing, and be tested and demonstrated at a U.S. nuclear power plant facility. In addition, we are developing a sensor database to capture advanced sensor and instrumentation technology that is applicable to nuclear power plants. Under the In-Pile Instrumentation program, we continue to develop unique in-pile sensors and instrumentation to provide real-time, accurate, and spatially resolved information regarding the performance of fuels and materials. Due to the closure of the Halden reactor, we are focusing our near-term research in providing equivalent capability for the instrumentation of irradiation experiments in the U.S. that are needed by the nuclear industry. As the ASI program continues to award projects through competitive solicitations, we encourage the I&C community to visit our website for current funding opportunity announcements, especially for the industry-focused solicitation entitled, “U.S. Industry Opportunities for Advanced Nuclear Technology Development.”

99 GENERAL AND MISCELLANEOUS↗

Solar Resource and Infrastructure Assessment for the Town of Westhampton

This report is a solar resource and infrastructure assessment for the town of Westhampton, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Westhampton. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, both distribution lines providing electricity to Westhampton are oversaturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. Future upgrades could potentially free up additional capacity for new, large projects. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in locations preferred by the community. Future scenarios may also include the addition energy storage and other "non-wires alternatives."

14 SOLAR ENERGY↗

Solar Resource and Infrastructure Assessment for the Town of Blandford

This report is a solar resource and infrastructure assessment for the town of Blandford, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Blandford. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, most distribution lines providing electricity to Blandford are over-saturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. We can expect significant upgrades to these circuits, if any of the in-process projects are to proceed, which might then free up additional capacity for new projects. There is one circuit which serves a section of North Blandford Road that is not over-saturated; for the immediate future, this is the most cost-effective location for new large-scale projects to be sited. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in preferred locations. Future scenarios may also include the addition energy storage and other "non-wires alternatives."

14 SOLAR ENERGY↗

Solar Resource and Infrastructure Assessment for the Town of Wendell

This report is a solar resource and infrastructure assessment for the town of Wendell, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Wendell. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, both distribution lines providing electricity to Wendell are over-saturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. It appears that National Grid is planning an upgrade to the Wendell Depot substation, which might then allow in-process projects are to proceed, and potentially free up additional capacity for new, large projects. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in locations preferred by the community. Future scenarios may also include the addition energy storage and other "non-wires alternatives."

14 SOLAR ENERGY↗

Electric Power Generation from Low to Intermediate Temperature Resources

This project was designed to test the concept on the Eland-Lodgepole Field near Dickinson, North Dakota in the Williston Basin. The field is in secondary-recovery water-flood and consists of 12 producing oil wells, 5 water injection wells and one disposal well. Water production at the site averages approximately 320 gallons per minute (20.2 l s-1) and the temperature is 100 ⁰C. Engineers at Ormat estimated power production potential with the existing resource to be approximately 350 kWh. Unfortunately, ownership of the field was transferred from Encore, Inc., to Denbury, Inc., within the first week of the project. After two years of discussion and planning, Denbury decided not to pursue this project due to complications with the site location and its proximity to Patterson Lake. Attempts to find other partners operating in the Williston Basin were unsuccessful. Consequently, we were unable to pursue the primary objective of the project. However, during negations with Denbury and subsequent time spent contacting other potential partners, we focused on objectives 2 and 3 and developed a clear understanding of the potential for co-produced production in the Williston Basin and the best practices for developing similar projects. At least nine water bearing formations with temperatures greater than 90 ⁰C extend over areas of several 10s of km2. The total energy contained in the rock volume of those geothermal aquifers is 283.6 EJ (1 EJ = 1018 J). The total energy contained in the water volume, determined from porosities which range from 2 percent to 8 percent, is 6.8 EJ. The aquifers grouped by 10 ⁰C temperature bins (Table 1) include one or more formations due to the bowl-shape structure of the basin. Table 1. Summary of energy available in geothermal aquifers in the Williston Basin Analysis of overall fluid production from active wells, units, fields and formations in North Dakota showed that few sites co-produce sufficient fluid for significant power production with ORC technology. Average co-produced water for 10,480 wells is 3.2 gallons per minute (gpm). Even excluding the tight formations, Bakken and Three Forks, average co-produced water for the remaining 3,337 is only 5 gpm. The output of the highest producing well is 184 gpm and the average of the top 100 wells is 52 gpm. Due to the depth of the oil producing formations in the Williston Basin, typically 3 km or greater, pumps are operated slowly to prevent watering out thus total fluid production is purposefully maintained at low volumes. There remain potential possibilities for development of geothermal fluids in the Williston Basin. Unitized fields in which water production from several tens of wells is collected at a single site are good possibilities for development. Water production in the unitized fields is greater than 1000 gpm is several areas. A similar possibility occurs where infill-drilling between Bakken and Three Forks horizontal wells has created areas where large volumes of geothermal fluids are available on multi-well pads and in unitized fields. Although the Bakken produces small amounts of water, the water/oil ration is typically less than 1, the oil and water mix produced at the well head can be sent through the heat exchanger on an ORC. It is estimated that several tens of MWh of power could be generated by a distributed system of ORC engines in the areas of high-density drilling in the Bakken Formation. Finally, horizontal drilling in water bearing formations is the other possibility. Several secondary recovery water-flood projects in the basin are producing water above 100 ⁰C at rates of 300 gpm to 850 gpm. Those systems also could produce several tens of MWh of power with ORC technology. Objective 3 of the project was highly successful. The program has produced 5 PhDs, 7 MS, and 3 BS students with theses in geothermal energy. The team has involved 7 faculty in 4 different engineering and science disciplines, ChE, EE, GE, and Geol. The team has produced 26 peer-reviewed papers and 62 presentations at professional meetings. Faculty involved in the program developed five graduate level courses covering different elements in heat flow and geothermal energy that are now offered in the Harold Hamm School of Geology and Geological Engineering. Lessons learned – Keys to developing a successful project;1. Determine target formations; a. Data from oil and gas operators, state oil and gas regulatory agencies, and state geological surveys help to identify producing formations and their properties; 2. Determine the quantity of energy available in the target formations; a. A complete thermal analysis of the basin or region yields the most useful information; b. Critical data include: BHT, heat flow, stratigraphy, lithology, lithological properties, and thermal conductivity, subsurface structure; 3. Determine fluid production potential; a. State oil and gas regulatory agencies, and state geological surveys have data on oil, gas and water production. State Water Commission/Agencies have data on water quality, aquifers, and regulations; b. Consider single horizontal wells, multiple conventional wells, and unitized fields; 4. Calculate energy production capacity of each formation based on different well combination and power plant scenarios. This is a broad overview rather than a site specific analysis; 5. Research and understand the local electrical power industry. Obtain the PPA before committing to the project; 6. Work with the high-level personnel in the oil company partner. Obtain an MOU that addresses all issues in the project including what to expect if the company goes out of business, is bought out, changes management, etc; and 7. Be prepared for project delays.

15 GEOTHERMAL ENERGY↗

Rare Earth Production in the United States: A Concise Review of Resource Development and Commercial Processes

This review article presents a concise review of estimated resources, processing methods and challenges involved in domestic rare earth mining projects in the United States (US). It also highlights the current status of major mining projects, anticipated rare earth production in the near future, and commercial projects utilizing non-traditional feedstocks for rare earth production and recycling. Based on the current industry outlook, opportunities for R&D have also been highlighted. Perspective on domestic rare earth production capability is essential because global rare earth production is currently dominated by China. Given potential export controls by China, this imbalance has created supply chain risk. The US and other countries have limited rare earth production capacity and relatively little expertise in rare earth processing. However, in the last decade, efforts have been made by several nations, including the US, to reduce their reliance on China for rare earth and other critical minerals. The US is currently investing in projects to develop domestic rare earth separation and refining capacity. These projects are discussed here. When backed by R&D and government support, these projects have potential to make significant progress towards establishment of domestic rare earth separation capabilities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

First demonstration of 3D optical readout of a TPC using a single photon sensitive Timepix3 based camera

The ARIADNE project is developing innovative optical readout technologies for two-phase liquid Argon time projection chambers (LArTPCs). Optical readout presents an exciting alternative to the current paradigm of charge readout. Optical readout is simple, scalable and cost effective. This paper presents first demonstration of 3D optical readout of TPC, using CF 4 gas as a proof of principle. Both cosmic rays and an Americium-241 alpha source have been imaged in 100 mbar CF 4 . A single-photon sensitive camera was developed by combining a Timepix3 (TPX3) based camera with an image intensifier. When a pixel of TPX3 is hit, a packet containing all information about the hit is produced. This packet contains the x , y coordinates of the pixel, time of arrival (ToA) and time over threshold (ToT) information. Here, the z position of the hit in the TPC is determined by combining drift velocity with ToA information. 3D event reconstruction is performed by combining the pixels x , y location with this calculated z position. Calorimetry is performed using time over threshold, a measure of the intensity of the hit.

3D↗

Integration of Solar Training into Allied Professional Development Platforms - Final Technical Report

The Interstate Renewable Energy Council (IREC) designed the “Integration of Solar Training into Allied Professional Development Platforms” project to surmount barriers to the expansion of solar technology caused by gaps in knowledge impacting on-the-job performance of allied professionals. At project start, questionnaires deployed nationally indicated that only 9% of firefighters felt certain they could shut down a PV system to the extent possible, and only a third of code officials thought they could even discern the difference between a PV and solar thermal system. Therefore, the project objective was to measurably and significantly increase the number of code officials and fire service professionals with solar knowledge directly applicable to their job function. IREC identified specific gaps in current knowledge, and integrated research-proven adult learning principles and technology solutions to enable a cost-effect but impactful reach. The project design ensured that solar training is a continuing component of the targeted sector professional development toolkit. To this end, the key partners recruited and cultivated were existing, trusted training partners in the targeted sectors: International Code Council Solar Rating and Certification Corporation (ICC-SRCC), International Association of Electrical Inspectors (IAEI), International Association of Fire Fighters (IAFF) and National Association of State Fire Marshals (NASFM). During the project, IREC held 79 courses in 25 states that trained 4,156 people, offered a PV in the 2017 National Electric Code webinar attended by 787 people, developed on-line training for code officials with 2,298 on-line learners, and developed an on-line training for firefighters with 4,930 on-line learners. In addition, the project participated in 28 conferences and reached over 537,000 professionals with solar information.

14 SOLAR ENERGY↗

Developing a Massively Parallel Forward Projection Radiography Model for Large-Scale Industrial Applications

This project utilizes Graphics Processing Units (GPUs) to compute radiograph simulations for arbitrary objects. The generation of radiographs, also known as the forward projection imaging model, is computationally intensive and not widely utilized. The goal of this research is to develop a massively parallel algorithm that can compute forward projections for objects with a trillion voxels (3D pixels). To achieve this end, the data are divided into blocks that can each t into GPU memory. The forward projected image is also divided into segments to allow for future parallelization and to avoid needless computations.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

A Multiphysics Multiscale Simulation Platform for Damage, Environmental Degradation, and Life Prediction of CMCs in Extreme Environments

This project successfully developed a multiphysics, multiscale computational framework to enhance the design and development of CMCs, with a focus on modeling highly nonlinear, time-dependent damage mechanisms and material degradation under extreme conditions, such as those experienced in turbine service environments. The project made significant advances in improving our understanding of progressive damage, oxidative degradation, and time-dependent inelastic deformation in CMCs, with particular attention to the role of uncertainties in predictions. Key outcomes include the integration of advanced material characterization, uncertainty quantification, and multiphysics constitutive models to predict the behavior of CMCs over their service life. A novel multiscale methodology was employed, which integrated microscale constituent behaviors with structural-scale responses, enabling the manufacturing defects in the microstructure that are prone to damage nucleation. Through the development of DL algorithms, the project advanced the prediction of damage initiation and crack propagation, taking into account the defect morphology and statistical variations across multiple scales. The framework was rigorously validated using thermomechanical experiments, which tested CMCs under various mechanical loadings at elevated temperatures, further enhancing the model's predictive capability. Overall, the research outcomes have provided a more accurate, reliable method for predicting CMC component life, significantly advancing material design, and improving component reliability in extreme environments. This work has strong implications for the optimization of turbine components and other high-performance applications where CMCs are used.

03 NATURAL GAS↗

MATERIALS AND COMPONENT DEVELOPMENT FOR ADVANCED TURBINE SYSTEMS PROJECT SUMMARY

Future hydrogen-fired or oxy-fuel turbines will likely experience an enormous level of thermal and mechanical loading, as turbine inlet temperatures (TIT) approach 1425-1760C (2600-3200F) with pressures of 300-625 psig, respectively. Maintaining the structural integrity of future turbine components under these extreme conditions will require (1) durable thermal barrier coatings (TBCs), (2) high temperature creep resistant metal substrates, and (3) effective cooling techniques. While advances in substrate materials have been limited for the past decades, thermal protection of turbine airfoils in future hydrogen-fired and oxy-fuel turbines will rely primarily on collective advances in the TBCs and aerothermal cooling. To support the advanced turbine technology development, the Office of Research and Development (ORD) at National Energy Technology Laboratory (NETL) has continued its collaborative research efforts with the University of Pittsburgh and West Virginia University, while working in conjunction with commercial material and coating suppliers. This paper presents the technical accomplishments that were made during FY09 in the initial areas of advanced materials, aerothermal heat transfer and non-destructive evaluation techniques for use in advanced land-based turbine applications in the Materials and Component Development for Advanced Turbine Systems project, and introduces three new technology areas high temperature overlayer coating development, diffusion barrier coating development, and oxide dispersion strengthened (ODS) alloy development that are being conducted in this effort.

36 MATERIALS SCIENCE↗

Plutonium Finishing Plant (PFP) 241-Z Liquid Waste Treatment Facility Deactivation and Demolition

Fluor Hanford, Inc. (FH) is proud to submit the Plutonium Finishing Plant (PFP) 241-Z liquid Waste Treatment Facility Deactivation and Demolition (D&D) Project for consideration by the Project Management Institute as Project of the Year for 2008. The decommissioning of the 241-Z Facility presented numerous challenges, many of which were unique within the Department of Energy (DOE) Complex. The majority of the project budget and schedule was allocated for cleaning out five below-grade tank vaults. These highly contaminated, confined spaces also presented significant industrial safety hazards that presented some of the most hazardous work environments on the Hanford Site. The 241-Z D&D Project encompassed diverse tasks: cleaning out and stabilizing five below-grade tank vaults (also called cells), manually size-reducing and removing over three tons of process piping from the vaults, permanently isolating service utilities, removing a large contaminated chemical supply tank, stabilizing and removing plutonium-contaminated ventilation ducts, demolishing three structures to grade, and installing an environmental barrier on the demolition site. All of this work was performed safely, on schedule, and under budget. During the deactivation phase of the project between November 2005 and February 2007, workers entered the highly contaminated confined-space tank vaults 428 times. Each entry (or 'dive') involved an average of three workers, thus equaling approximately 1,300 individuals confined -space entries. Over the course of the entire deactivation and demolition period, there were no recordable injuries and only one minor reportable skin contamination. The 241-Z D&D Project was decommissioned under the provisions of the 'Hanford Federal Facility Agreement and Consent Order' (the Tri-Party Agreement or TPA), the 'Resource Conservation and Recovery Act of 1976' (RCRA), and the 'Comprehensive Environmental Response, Compensation, and Liability Act of 1980' (CERCLA). The project completed TPA Milestone M-083-032 to 'Complete those activities required by the 241-Z Treatment and Storage Unit's RCRA Closure Plan' four years and seven months ahead of this legally enforceable milestone. In addition, the project completed TPA Milestone M-083-042 to 'Complete transition and dismantlement of the 241-2 Waste Treatment Facility' four years and four months ahead of schedule. The project used an innovative approach in developing the project-specific RCRA closure plan to assure clear integration between the 241-Z RCRA closure activities and ongoing and future CERCLA actions at PFP. This approach provided a regulatory mechanism within the RCRA closure plan to place segments of the closure that were not practical to address at this time into future actions under CERCLA. Lessons learned from th is approach can be applied to other closure projects within the DOE Complex to control scope creep and mitigate risk. A paper on this topic, entitled 'Integration of the 241-Z Building D and D Under CERCLA with RCRA Closure at the PFP', was presented at the 2007 Waste Management Conference in Tucson, Arizona. In addition, techniques developed by the 241-Z D&D Project to control airborne contamination, clean the interior of the waste tanks, don and doff protective equipment, size-reduce plutonium-contaminated process piping, and mitigate thermal stress for the workers can be applied to other cleanup activities. The project-management team developed a strategy utilizing early characterization, targeted cleanup, and close coordination with PFP Criticality Engineering to significantly streamline the waste- handling costs associated with the project . The project schedule was structured to support an early transition to a criticality 'incredible' status for the 241-Z Facility. The cleanup work was sequenced and coordinated with project-specific criticality analysis to allow the fissile material waste being generated to be managed in a bulk fashion, instead of individual waste packages. This approach negated the need for real-time assay of individual waste packages, greatly improving the efficiency of the cleanup operation. The cleanup and stabilization of the 241-2 Liquid Effluent Treatment Facility reduced radiological risks to the environment and Hanford site workers. It was recognized as a success by regulatory agencies, the media, the DOE-client, and stakeholders. The 241-Z D&D Project demonstrated management excellence in adapting to significant changes in project direction, fostered a safety culture that amassed impressive results on this high-hazard job, maintained excellent communications with the client and stakeholders, and developed and implemented unique cleanup techniques.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigating the Impacts of Outdoor Lighting (Final Report)

This report documents the research associated with the Depart of Energy supported project “Investigating the Health Impact of Outdoor Lighting.” This project was developed to consider how alternative solid state lighting options, particularly the spectral power distribution, effected the hormone melatonin which ultimately could lead to potential health issues. The project also provides an opportunity to gather other secondary data with respect to visual performance in a controlled environment. These tasks were developed to consider how alternative solid state lighting applications impacted performance. This report is a complete documentation of the tasks undertaken as part of this project. The report includes a literature review and consideration of the background data which are part of this field of study as well as a documentation of the methods developed as part of the project. The melatonin results, the primary dependent variable are included in the attached peer-review paper that has been recent published (Gibbons et al., 2022). Our discussion of these results are included in that publication. Other results from this project will be documented in one or more future publications.

59 BASIC BIOLOGICAL SCIENCES↗

Development of a Source of Quasi-Monochromatic MeV Energy Photons

We report current progress on a project to develop an all-optically-driven x-ray photon source. A laser pulse with 40-50 TW of peak power is focused on a supersonic helium nozzle to drive a relativistic plasma wave. Electron beams with energies of 320 MeV (+/-28 MeV) are accelerated by means of laser wakefield acceleration. Remarkably, the acceleration region is only 3 mm in length. This accelerator is currently being employed to demonstrate the generation of MeV-energy x-ray by means of all-optical Thomson scattering. By this mechanism, a lower power, laser pulse (from the same laser system) is focused onto the above laser-driven electron beam, 1-eV energy photons are Doppler-shifted in energy to >1 MeV.

43 PARTICLE ACCELERATORS↗

Development of Next Generation Heating System for Scale Free Steel Reheating

The work carried out under this project includes development and design of components, controls, and economic modeling tools that would enable the steel industry to reduce energy intensity through reduction of scale formation during the steel reheating process. Application of scale free reheating offers savings in energy used for production of steel that is lost as scale, and increase in product yield for the global steel industry. The technology can be applied to a new furnace application as well as retrofit design for conversion of existing steel reheating furnaces. The development work has resulted in the knowledge base that will enable the steel industry and steel forging industry us to reheat steel with 75% to 95% reduction in scale formation and associated energy savings during the reheating process. Scale reduction also results in additional energy savings associated with higher yield from reheat furnaces. Energy used for steel production ranges from 9 MM Btu/ton to 16.6 MM Btu/ton or the industry average of approximately 13 MM Btu/ton. Hence, reduction in scale at reheating stage would represent a substantial energy reduction for the steel industry. Potential energy savings for the US steel industry could be in excess of 25 Trillion Btu/year when the technology is applied to all reheating processes. The development work has resulted in new design of reheating process and the required burners and control systems that would allow use of this technology for steel reheating in steel as well as steel forging industries.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of fundamental power coupler for high-current superconducting RF cavity

Brookhaven National Laboratory took a project of developing a 704 MHz five-cell superconducting RF cavity for high-current linacs, including Energy Recovery Linac (ERL) for planned electron-hadron collider eRHIC. The cavity will be fed by a high-power RF amplifier using a coaxial Fundamental Power Coupler (FPC), which delivers 20 kW of CW RF power to the cavity. The design of FPC is one of the important aspects as one has to take into account the heat losses dissipated on the surface of the conductor by RF fields along with that of the static heat load. Using a simple simulation model we show the temperature profile and the heat load dissipated along the coupler length. To minimize the heat load on FPC near the cavity end, a thermal intercept is required at an appropriate location on FPC. A 10 K intercept was chosen and its location optimized with our simulation code. The requirement on the helium gas flow rate for the effective heat removal from the thermal intercept is also discussed.

43 PARTICLE ACCELERATORS↗