Search NASA⌕ Search

SEARCH · Search NASA

Results for “Task complexity”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,477 records · Page 82

Robot hands and extravehicular activity

Extravehicular activity (EVA) is crucial to the success of both current and future space operations. As space operations have evolved in complexity so has the demand placed on the EVA crewman. In addition, some NASA requirements for human capabilities at remote or hazardous sites were identified. One of the keys to performing useful EVA tasks is the ability to manipulate objects accurately, quickly and without early or excessive fatigue. The current suit employs a glove which enables the crewman to perform grasping tasks, use tools, turn switches, and perform other tasks for short periods of time. However, the glove's bulk and resistance to motion ultimately causes fatigue. Due to this limitation it may not be possible to meet the productivity requirements that will be placed on the EVA crewman of the future with the current or developmental Extravehicular Mobility Unit (EMU) hardware. In addition, this hardware will not meet the requirements for remote or hazardous operations. In an effort to develop ways for improving crew productivity, a contract was awarded to develop a prototype anthromorphic robotic hand (ARH) for use with an extravehicular space suit. The first step in this program was to perform a a design study which investigated the basic technology required for the development of an ARH to enhance crew performance and productivity. The design study phase of the contract and some additional development work is summarized.

Marcus, Beth↗

Operations management system

The objective of an operations management system is to provide an orderly and efficient method to operate and maintain aerospace vehicles. Concepts are described for an operations management system and the key technologies are highlighted which will be required if this capability is brought to fruition. Without this automation and decision aiding capability, the growing complexity of avionics will result in an unmanageable workload for the operator, ultimately threatening mission success or survivability of the aircraft or space system. The key technologies include expert system application to operational tasks such as replanning, equipment diagnostics and checkout, global system management, and advanced man machine interfaces. The economical development of operations management systems, which are largely software, will require advancements in other technological areas such as software engineering and computer hardware.

Brandli, A. E.↗

Report of the Cost Assessment and Validation Task Force on the International Space Station

The Cost Assessment and Validation (CAV) Task Force was established for independent review and assessment of cost, schedule and partnership performance on the International Space Station (ISS) Program. The CAV Task Force has made the following key findings: The International Space Station Program has made notable and reasonable progress over the past four years in defining and executing a very challenging and technically complex effort. The Program size, complexity, and ambitious schedule goals were beyond that which could be reasonably achieved within the $2.1 billion annual cap or $17.4 billion total cap. A number of critical risk elements are likely to have an adverse impact on the International Space Station cost and schedule. The schedule uncertainty associated with Russian implementation of joint Partnership agreements is the major threat to the ISS Program. The Fiscal Year (FY) 1999 budget submission to Congress is not adequate to execute the baseline ISS Program, cover normal program growth, and address the known critical risks. Additional annual funding of between $130 million and $250 million will be required. Completion of ISS assembly is likely to be delayed from one to three years beyond December 2003.

Source record↗

Operational Methodology for the International Space Station (ISS) High Rate Communications Outage Recorder (HCOR)

The HCOR will be used onboard the ISS to record digital data during Ku-band Loss of Signal (LOS) periods. This recorded data will be played back to the ground during Ku-band Acquisition of Signal (AOS) periods. The Data Management (DM) Team at the Payload Operations and Integration Center is the primary operator of this complex recorder. The record and playback capabilities - along with the memory management functions - are presented in this paper. To illustrate how the DM Team plans to manage the record, playback and memory management tasks of operating the HCOR, an operational scenario for a ninety-minute orbit is presented.

Mixson, C. David↗

Cost Assessment and Validation Task Force on the International Space Station

The Cost Assessment and Validation (CAV) Task Force was established for independent review and assessment of cost, schedule and partnership performance on the International Space Station (ISS) Program. The CAV Task Force has made the following key findings: The International Space Station Program has made notable and reasonable progress over the past four years in defining and executing a very challenging and technically complex effort; The Program, size, complexity, and ambitious schedule goals were beyond that which could be reasonably achieved within the $2.1 billion annual cap or $17.4 billion total cap; A number of critical risk elements are likely to have an adverse impact on the International Space Station cost and schedule; The schedule uncertainty associated with Russian implementation of joint Partnership agreements is the major threat to the ISS Program; The Fiscal Year (FY) 1999 budget submission to Congress is not adequate to execute the baseline ISS Program, cover normal program, growth, and address the known critical risks. Additional annual funding of between $130 million and $250 million will be required; and Completion of ISS assembly is likely to be delayed from, one to three years beyond December 2003.

Source record↗

Solving Problems With SINDA/FLUINT

SINDA/FLUINT, the NASA standard software system for thermohydraulic analysis, provides computational simulation of interacting thermal and fluid effects in designs modeled as heat transfer and fluid flow networks. The product saves time and money by making the user's design process faster and easier, and allowing the user to gain a better understanding of complex systems. The code is completely extensible, allowing the user to choose the features, accuracy and approximation levels, and outputs. Users can also add their own customizations as needed to handle unique design tasks or to automate repetitive tasks. Applications for SINDA/FLUINT include the pharmaceutical, petrochemical, biomedical, electronics, and energy industries. The system has been used to simulate nuclear reactors, windshield wipers, and human windpipes. In the automotive industry, it simulates the transient liquid/vapor flows within air conditioning systems.

Source record↗

From Apollo to Cognac

Shell Oil Company started oil and gas production from a new offshore platform called Cognac located in the Gulf of Mexico. It is the world's tallest oil platform, slightly taller than the Empire State Building. The highly complex job of installing Cognac's support "jacket" under water more than a thousand feet deep was directed from a barge-based control center. To enable crews to practice in advance difficult tasks never before accomplished, Honeywell, adapting NASA's Apollo technology, developed a system for simulating the various underwater operations. In training sessions, displays and controls reacted exactly as they would in real operation.

Source record↗

An Enabling Technology for New Planning and Scheduling Paradigms

The Night Projects Directorate at NASA's Marshall Space Flight Center is developing a new planning and scheduling environment and a new scheduling algorithm to enable a paradigm shift in planning and scheduling concepts. Over the past 33 years Marshall has developed and evolved a paradigm for generating payload timelines for Skylab, Spacelab, various other Shuttle payloads, and the International Space Station. The current paradigm starts by collecting the requirements, called ?ask models," from the scientists and technologists for the tasks that are to be scheduled. Because of shortcomings in the current modeling schema, some requirements are entered as notes. Next, a cadre with knowledge of vehicle and hardware modifies these models to encompass and be compatible with the hardware model; again, notes are added when the modeling schema does not provide a better way to represent the requirements. Finally, the models are modified to be compatible with the scheduling engine. Then the models are submitted to the scheduling engine for automatic scheduling or, when requirements are expressed in notes, the timeline is built manually. A future paradigm would provide a scheduling engine that accepts separate science models and hardware models. The modeling schema would have the capability to represent all the requirements without resorting to notes. Furthermore, the scheduling engine would not require that the models be modified to account for the capabilities (limitations) of the scheduling engine. The enabling technology under development at Marshall has three major components: (1) A new modeling schema allows expressing all the requirements of the tasks without resorting to notes or awkward contrivances. The chosen modeling schema is both maximally expressive and easy to use. It utilizes graphical methods to show hierarchies of task constraints and networks of temporal relationships. (2) A new scheduling algorithm automatically schedules the models without the intervention of a scheduling expert. The algorithm is tuned for the constraint hierarchies and the complex temporal relationships provided by the modeling schema. It has an extensive search algorithm that can exploit timing flexibilities and constraint and relationship options. (3) An innovative architecture allows multiple remote users to simultaneously model science and technology requirements and other users to model vehicle and hardware characteristics. The architecture allows the remote users to submit scheduling requests directly to the scheduling engine and immediately see the results. These three components are integrated so that science and technology experts with no knowledge of the vehicle or hardware subsystems and no knowledge of the internal workings of the scheduling engine have the ability to build and submit scheduling requests and see the results. The immediate feedback will hone the users' modeling skills and ultimately enable them to produce the desired timeline. This paper summarizes the three components of the enabling technology and describes how this technology would make a new paradigm possible.

Jaap, John↗

Enabling a New Planning and Scheduling Paradigm

The Flight Projects Directorate at NASA's Marshall Space Flight Center is developing a new planning and scheduling environment and a new scheduling algorithm to enable a paradigm shift in planning and scheduling concepts. Over the past 33 years Marshall has developed and evolved a paradigm for generating payload timelines for Skylab, Spacelab, various other Shuttle payloads, and the International Space Station. The current paradigm starts by collecting the requirements, called "tasks models," from the scientists and technologists for the tasks that they want to be done. Because of shortcomings in the current modeling schema, some requirements are entered as notes. Next a cadre with knowledge of vehicle and hardware modifies these models to encompass and be compatible with the hardware model; again, notes are added when the modeling schema does not provide a better way to represent the requirements. Finally, another cadre further modifies the models to be compatible with the scheduling engine. This last cadre also submits the models to the scheduling engine or builds the timeline manually to accommodate requirements that are expressed in notes. A future paradigm would provide a scheduling engine that accepts separate science models and hardware models. The modeling schema would have the capability to represent all the requirements without resorting to notes. Furthermore, the scheduling engine would not require that the models be modified to account for the capabilities (limitations) of the scheduling engine. The enabling technology under development at Marshall has three major components. (1) A new modeling schema allows expressing all the requirements of the tasks without resorting to notes or awkward contrivances. The chosen modeling schema is both maximally expressive and easy to use. It utilizes graphics methods to show hierarchies of task constraints and networks of temporal relationships. (2) A new scheduling algorithm automatically schedules the models without the intervention of a scheduling expert. The algorithm is tuned for the constraint hierarchies and the complex temporal relationships provided by the modeling schema. It has an extensive search algorithm which can exploit timing flexibilities and constraint and relationship options. (3) A web-based architecture allows multiple remote users to simultaneously model science and technology requirements and other users to model vehicle and hardware characteristics. The architecture allows the users to submit scheduling requests directly to the scheduling engine and immediately see the results. These three components are integrated so that science and technology experts with no knowledge of the vehicle or hardware subsystems and no knowledge of the internal workings of the scheduling engine have the ability to build and submit scheduling requests and see the results. The immediate feedback will hone the users' modeling skills and ultimately enable them to produce the desired timeline. This paper summarizes the three components of the enabling technology and describes how this technology would make a new paradigm possible.

Jaap, John↗

Hybrid quantum-classical approach for coupled-cluster Green's function theory

The three key elements of a quantum simulation are state preparation, time evolution, and measurement. While the complexity scaling of time evolution and measurements are well known, many state preparation methods are strongly system-dependent and require prior knowledge of the system's eigenvalue spectrum. Here, we report on a quantum-classical implementation of the coupled-cluster Green's function (CCGF) method, which replaces explicit ground state preparation with the task of applying unitary operators to a simple product state. While our approach is broadly applicable to many models, we demonstrate it here for the Anderson impurity model (AIM). The method requires a number of T gates that grows as O ( N 5 ) per time step to calculate the impurity Green's function in the time domain, where N is the total number of energy levels in the AIM. Since the number of T gates is analogous to the computational time complexity of a classical simulation, we achieve an order of magnitude improvement over a classical CCGF calculation of the same order, which requires O ( N 6 ) computational resources per time step.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

CO2 injection with fracturing in geomechanically protected caprock: Task 6 of LLNL's Research Activities to Support DOE's Carbon Storage Program (FWP-FEW0191) (Final Technical Report)

Conventional principles of the design and operation of geologic carbon storage (GCS) require injecting CO 2 below the caprock fracturing pressure to ensure the integrity of the storage complex. In non-ideal storage reservoirs with relatively low permeability, modest injection rates can lead to pressure buildup and hydraulic fracturing of the reservoir and caprock. While the GCS community has generally viewed hydraulic fractures as a key risk to storage integrity, the actual behavior of a caprock hydraulic fracture, particularly from a geomechanical perspective, has not been thoroughly studied. The prevailing method of treating a hydraulic fracture as a high-permeability wing of the storage reservoir might have resulted in erroneous understanding of caprock hydraulic fracture behavior. Comprehensive analyses of monitoring data from the In Salah project suggested that one or more hydraulic fractures may have been created in the reservoir and lower caprock system during injection operations, but did not cause detectable leakage of CO 2 out of the storage complex. This observation coincides with a well-known phenomenon in the oil and gas industry: sedimentary rock formations have many inherent features that naturally protect the formations from unbounded vertical growth of hydraulic fractures.

58 GEOSCIENCES↗

The persistence of a visual dominance effect in a telemanipulator task: A comparison between visual and electrotactile feedback

The possibility to use an electrotactile stimulation in teleoperation and to observe the interpretation of such information as a feedback to the operator was investigated. It is proposed that visual feedback is more informative than an electrotactile one; and that complex electrotactile feedback slows down both the motor decision and motor response processes, is processed as an all or nothing signal, and bypasses the receptive structure and accesses directly in a working memory where information is sequentially processed and where memory is limited in treatment capacity. The electrotactile stimulation is used as an alerting signal. It is suggested that the visual dominance effect is the result of the advantage of both a transfer function and a sensory memory register where information is pretreated and memorized for a short time. It is found that dividing attention has an effect on the acquisition of the information but not on the subsequent decision processes.

Gaillard, J. P.↗

Computing in AEC Education: Hindsight, Insight, and Foresight

In the architecture, engineering, and construction (AEC) fields, computing and information technologies play an increasingly prevalent and complex role in day-to-day work. Consequently, educators must adjust and, in many cases, reimagine curricula and teaching methodologies to adapt to the changing landscape. Past research efforts led by the ASCE Computing Division Education Committee, formerly called the Task Committee on Computing Education of the Technical Council on Computing and Information Technology (TCCIT), have regularly surveyed AEC educators to understand computing trends in AEC curricula, with the latest survey taking place nearly a decade ago. This work presents the results of an updated survey that used this prior work as a springboard, providing timely insights into the computing skills and curricular barriers faced by AEC educators today. The results showed that the technical skills used by students have evolved, but the barriers faced in incorporating new skills into curricula have remained largely the same. In addition to comparisons with prior surveys, this work presents the results of an expanded, open-ended portion of the survey that explores educator perspectives on the future of the AEC workforce in a broader lens than used in previous surveys. Thematic analysis of these open-ended responses revealed themes that were common among responses and provided organization to the findings. For example, educators provided their vision of what competencies the future AEC workforce would need, which were thematically organized into a continuum based on the level of interaction between humans and technology. These results suggest an increasingly complex and evolving relationship between the AEC workforce and emerging technology, highlighting the need for educators to encourage the development of technological adaptability and agility. Overall, this work provides a systematic comparison of current educational practices in AEC computing with a decade ago to illustrate educational shifts and adds a prediction of AEC trends from experts in AEC education, providing crucial discussion of curricular transformations that will better position students for success in the workforce.

42 ENGINEERING↗

Reduced-order modeling through machine learning and graph-theoretic approaches for brittle fracture applications

Typically, thousands of computationally expensive micro-scale simulations of brittle crack propagation are needed to upscale lower length scale phenomena to the macro-continuum scale. Running such a large number of crack propagation simulations presents a significant computational challenge, making reduced-order models (ROMs) attractive for this task. Here, the ultimate goal of this research is to develop ROMs that have sufficient accuracy and low computational cost so that these upscaling simulations can be readily performed. However, constructing ROMs for these complex simulations presents its own challenge. Here, we present and compare four different approaches for reduced-order modeling of brittle crack propagation in geomaterials. These methods rely on machine learning (ML) and graph-theoretic algorithms to approximate key aspects of the brittle crack problem. These methods also incorporate different physics-based assumptions in order to reduce the training requirements while maintaining accurate physics as much as possible. Results from the ROMs are directly compared against a high-fidelity model of brittle crack propagation. Further, the strengths and weaknesses of the ROMs are discussed, and we conclude that combining smart physics-informed feature engineering with highly trainable ML models provides the best performance. The ROMs considered here have computational costs that are orders-of-magnitude less than the cost associated with high-fidelity physical models while maintaining good accuracy.

36 MATERIALS SCIENCE↗

Numerical simulation of coupled THM behaviour of full-scale EBS in backfilled experimental gallery in the Horonobe URL

Bentonite-based engineered barrier system (EBS) is a key component of many repository designs for the geological disposal of high-level radioactive waste. Given the complexity and interaction of the phenomena affecting the barrier system, coupled thermo-hydro-mechanical (THM) numerical analyses are a potentially useful tool for a better understanding of their behaviour. In this context, a Task (the Horonobe EBS experiment) was undertaken to study, using numerical analyses, the thermo-hydro-mechanical (and thermo-hydro) interactions in bentonite based engineered barriers within the international cooperative project DECOVALEX 2023. One full-scale in-situ experiment and four laboratory experiments, largely complementary, were selected for modelling. The Horonobe EBS experiment is a temperature-controlled non-isothermal experiment combined with artificial groundwater injection. The Horonobe EBS experiment consists of the heating and cooling phases. Six research teams performed the THM or TH (depended on research team approach) numerical analyses using a variety of computer codes, formulations and constitutive laws. Finally, for each experiment, the basic features of the analyses are described and the comparison between calculations and laboratory experiments and field observations are presented and discussed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Distributed quantum approximate optimization algorithm on a quantum-centric supercomputing architecture

Quantum approximate optimization algorithm (QAOA) has shown promise in solving combinatorial optimization problems by providing quantum speedup on near-term gate-based quantum computing systems. However, QAOA faces challenges for high-dimensional problems due to the large number of qubits required and the complexity of deep circuits, limiting its scalability for real-world applications. In this study, we present a distributed QAOA (DQAOA), which leverages distributed computing strategies to decompose a large computational workload into smaller tasks that require fewer qubits and shallower circuits than are necessary to solve the original problem. These sub-problems are processed using a combination of high-performance and quantum computing resources. The global solution is iteratively updated by aggregating sub-solutions, allowing convergence toward the optimal solution. We demonstrate that DQAOA can handle considerably large-scale optimization problems (e.g., 1000-bit problem), achieving a high solution quality and short time-to-solution, outperforming existing strategies. Furthermore, we realize DQAOA on a quantum-centric supercomputing architecture, paving the way for practical applications of gate-based quantum computers in real-world optimization tasks. To extend DQAOA’s applicability to materials science, we further develop an active learning algorithm integrated with our DQAOA (AL-DQAOA), which involves machine learning, DQAOA, and active data production in an iterative loop. We successfully optimize photonic structures using AL-DQAOA, indicating that solving real-world optimization problems using gate-based quantum computing is feasible. We expect the proposed DQAOA to be applicable to a wide range of optimization problems and AL-DQAOA to find broader applications in material design.

Kim, Seongmin [ORNL] (ORCID:0000000159063004)↗

TAZeR: Hiding the Cost of Remote I/O in Distributed Scientific Workflows

A perennial bottleneck in distributed workflow analytics is long access latencies for remote data. We ask the question: assuming that data must be accessed remotely, can latencies be hidden? We present TAZeR, a framework that reduces data access latency while increasing data reuse. TAZeR transparently converts POSIX I/O into operations that interleave application work with data transfer, i.e. read, prefetching, and write stage-out. TAZeR ensures read data moves directly to application memory without synchronous intervention (soft zero-copy). TAZeR uses distributed bandwidth-aware staging to exploit reuse across application tasks and to manage the capacity constraints of fast hierarchical storage. We evaluate TAZeR on a High Energy Physics workflow that requests remote data at 48 Gb/s (over two 1 Gb/s WAN links) using complex access patterns. TAZeR is 12× and 22× faster than XRootD (state-of-the-art) and file copies (current approach), respectively; and within 7% of optimal. We discuss conditions when TAZeR can hide I/O accesses; and evaluate performance as effective staging sizes change.

Tazer, remote I/O, data staging↗

A Length Adaptive Algorithm-Hardware Co-design of Transformer on FPGA Through Sparse Attention and Dynamic Pipelining

Transformers are considered one of the most important deep learning models since 2018, in part because it establishes state-of-the-art (SOTA) records and could potentially replace existing Deep Neural Networks (DNNs). Despite the remarkable triumphs, the prolonged turnaround time of Transformer models is a widely recognized roadblock. The variety of sequence lengths imposes additional computing overhead where inputs need to be zero-padded to the maximum sentence length in the batch to accommodate the parallel computing platforms. This paper targets the field-programmable gate array (FPGA) and proposes a coherent sequence length adaptive algorithm–hardware co-design for Transformer acceleration. Particularly, we develop a hardware-friendly sparse attention operator and a length-aware hardware resource scheduling algorithm. The proposed sparse attention operator brings the complexity of attention-based models down to linear complexity and alleviates the off-chip memory traffic. The proposed length-aware resource hardware scheduling algorithm dynamically allocates the hardware resources to fill up the pipeline slots and eliminates bubbles for NLP tasks. Experiments show that our design has very small accuracy loss and has 80.2 × and 2.6 × speedup compared to CPU and GPU implementation, and 4 × higher energy efficiency than state-of-the-art GPU accelerator optimized via CUBLAS GEMM.

Peng, Hongwu↗