At least 1,477 records · Page 82

Integrated Human Test Facilities at NASA and the Role of Human Engineering

Integrated human test facilities are a key component of NASA's Advanced Life Support Program (ALSP). Over the past several years, the ALSP has been developing such facilities to serve as a large-scale advanced life support and habitability test bed capable of supporting long-duration evaluations of integrated bioregenerative life support systems with human test crews. These facilities-targeted for evaluation of hypogravity compatible life support and habitability systems to be developed for use on planetary surfaces-are currently in the development stage at the Johnson Space Center. These major test facilities are comprised of a set of interconnected chambers with a sealed internal environment, which will be outfitted with systems capable of supporting test crews of four individuals for periods exceeding one year. The advanced technology systems to be tested will consist of both biological and physicochemical components and will perform all required crew life support and habitability functions. This presentation provides a description of the proposed test "missions" to be supported by these integrated human test facilities, the overall system architecture of the facilities, the current development status of the facilities, and the role that human design has played in the development of the facilities.

Tri, Terry O.↗

SynchroPhasor Measurements: System Architecture and Performance Evaluation in Supporting Wide-Area Applications

The infrastructure of phasor measurements have evolved over the last two decades from isolated measurement units to networked measurement systems with footprints beyond individual utility companies. This is, to a great extent, a bottom-up self-evolving process except some local systems built by design. Given the number of phasor measurement units (PMUs) in the system is small (currently 70 each in western and eastern interconnections), current phasor network architecture works just fine. However, the architecture will become a bottleneck when large number of PMUs are installed (e.g. >1000~10000). The need for phasor architecture design has yet to be addressed. This paper reviews the current phasor networks and investigates future architectures, as related to the efforts undertaken by the North America SynchroPhasor Initiative (NASPI). Then it continues to present staged system tests to evaluate the performance of phasor networks, which is a common practice in the Western Electricity Coordinating Council (WECC) system. This is followed by field measurement evaluation and the implication of phasor quality issues on phasor applications.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Applying Contamination Modelling to Spacecraft Propulsion Systems Designs and Operations

Molecular and particulate contaminants generated from the operations of a propulsion system may impinge on spacecraft critical surfaces. Plume depositions or clouds may hinder the spacecraft and instruments from performing normal operations. Firing thrusters will generate both molecular and particulate contaminants. How to minimize the contamination impact from the plume becomes very critical for a successful mission. The resulting effect from either molecular or particulate contamination of the thruster firing is very distinct. This paper will discuss the interconnection between the functions of spacecraft contamination modeling and propulsion system implementation. The paper will address an innovative contamination engineering approach implemented from the spacecraft concept design, manufacturing, integration and test (I&T), launch, to on- orbit operations. This paper will also summarize the implementation on several successful missions. Despite other contamination sources, only molecular contamination will be considered here.

Chen, Philip T.↗

Integrating Indigenous Traditional, Local and Scientific Knowledge for Improved Management, Policy and Decision-Making in Reindeer Husbandry in the Russian Arctic

As scientists and policy-makers from both indigenous and non-indigenous communities begin to build closer partnerships to address common sustainability issues such as the health impacts of climate change and anthropogenic activities, it becomes increasingly important to create shared information management systems which integrate all relevant factors for optimal information sharing and decision-making. This paper describes a new GIs-based system being designed to bring local and indigenous traditional knowledge together with scientific data and information, remote sensing, and information technologies to address health-related environment, weather, climate, pollution and land use change issues for improved decision/policy-making for reindeer husbandry. The system is building an easily-accessible archive of relevant current and historical, traditional, local and remotely-sensed and other data and observations for shared analysis, measuring, and monitoring parameters of interest. Protection of indigenous culturally sensitive information will be respected through appropriate data protocols. A mechanism which enables easy information sharing among all participants, which is real time and geo-referenced and which allows interconnectivity with remote sites is also being designed into the system for maximum communication among partners. A preliminary version of our system will be described for a Russian reindeer test site, which will include a combination of indigenous knowledge about local conditions and issues, remote sensing and ground-based data on such parameters as the vegetation state and distribution, snow cover, temperature, ice condition, and infrastructure.

Maynard, Nancy G.↗

Generative Vulnerability Assessment for Cyber-Physical Systems

Cyber-physical systems (CPS) are highly susceptible to malicious attacks due to their complex dynamics and interconnectivity. A comprehensive understanding of their vulnerabilities is essential for designing effective resilience measures. This paper presents a data-driven attack generative system for evaluating the vulnerability of CPS. The proposed approach formulates the vulnerability assessment problem as determining the feasibility of a specific attack set based on two boundary functions that represent the effectiveness and stealthiness of attacks. The attack generative model is trained using a custom loss function, with two universal approximators designed to learn the effectiveness and stealthiness functions simultaneously. Theoretical results for successful generation and asymptotic convergence of the resulting training algorithm are given. As a result, the proposed approach is evaluated via numerical simulation of an IEEE 14-bus system and gas pipeline systems, demonstrating its viability in learning how to attack nonlinear CPS and identify potential vulnerabilities.

Computer systems organization↗

Estimation, Minimization, and Validation of Commutation Loop Inductance for a 135-kW SiC EV Traction Inverter

With growing interests in low inductance SiC based power module packaging, it is vital to focus on system level design aspects to facilitate easy integration of the modules and reap system level benefits. To effectively utilize the low inductance modules, busbar and interconnects should also be designed with low stray inductances. A wholistic investigation of the flux path and flux cancellations in the module-busbar assembly which as differentially coupled series inductors is thus mandatory for a system level design. This work presents a busbar design which can be adopted to effectively integrate the CREE’s low inductance 1.2 kV/1.7 kV SiC power modules. The paper also proposes a novel measurement technique to measure the inductance of the modulebusbar assembly as a whole rather than deducing it from individual components. The inductance of the overall commutation loop of the inverter which encompasses the SiC power module, interconnects and PCB busbar have been estimated using finite element analysis (FEA). Furthermore, insights gained from FEA provided the guidelines to decide on the placement of the decoupling capacitors in the busbar to minimize the overall commutation loop inductance from 12.8 nH to 7.4 nH which resulted in significant reduction in the device voltage overshoot. The simulation results have been validated through measurements using an impedance analyzer with less than 5% difference between extracted loop inductance from FEA and measurements. The bus bar design study and the measurement technique discussed in this paper, can be easily extended to other power module packages. Finally, the 135 kW inverter has been compared to a similar highpower inverter utilizing a laminated busbar to highlight the performance of the former.

42 ENGINEERING↗

Transient Stability of the US Western Interconnection with High Wind and Solar Generation

The addition of large amounts of wind and solar generation to bulk power systems that are traditionally subject to operating constraints set by transient limitations is the subject of considerable concern in the industry. The US Western Interconnection (WI) is expected to experience substantial additional growth in both wind and solar generation. These plants will, to some extent, displace large central station thermal generation, both coal and gas-fired, which have traditionally helped maintain stability. This paper reports the results of a study that investigated the transient stability of the WI with high penetrations of wind and solar generation. The main goals of this work were to (1) create a realistic, baseline model of the WI, (2) test selected transient stability events, (3) investigate the impact of large amounts of wind and solar generation, and (4) examine means to improve performance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid-Forming and Grid-Following Inverter Comparison of Droop Response

With the increase in penetration of inverter-based resources (IBRs) in the electrical power system, the ability of these devices to provide grid support to the system has become a necessity. With standards previously developed for the interconnection requirements of grid-following inverters (GFLI) (most commonly photovoltaic inverters), it has been well documented how these inverters “should” respond to changes in voltage and frequency. However, with other IBRs such as grid-forming inverters (GFMIs) (used for energy storage systems, standalone systems, and as uninterruptable power supplies) these requirements are either: not yet documented, or require a more in deep analysis. With the increased interest in microgrids, GFMIs that can be paralleled onto a distribution system have become desired. With the proper control schemes, a GFMI can help maintain grid stability through fast response compared to rotating machines. This paper will present an experimental comparison of commercially available GFMI and GFLI ' responses to voltage and frequency deviation, as well as the GFMI operating as a standalone system and subjected to various changes in loads.

Grid Support, Inverter, Droop Control, Volt-VAR, F↗

Launching applications on compute and service processors running under different operating systems in scalable network of processor boards with routers

A multiple processor computing apparatus includes a physical interconnect structure that is flexibly configurable to support selective segregation of classified and unclassified users. The physical interconnect structure also permits easy physical scalability of the computing apparatus. The computing apparatus can include an emulator which permits applications from the same job to be launched on processors that use different operating systems.

97 MATHEMATICS AND COMPUTING↗

BioEarth: Envisioning and developing a new regional earth system model to inform natural and agricultural resource management

As managers of agricultural and natural resources are confronted with uncertainties in global change impacts, the complexities associated with the interconnected cycling of nitrogen, carbon, and water present daunting management challenges. Existing models provide detailed information on specific sub-systems (land, air, water, economics, etc). An increasing awareness of the unintended consequences of management decisions resulting from interconnectedness of these sub-systems, however, necessitates coupled regional earth system models (EaSMs). Decision makers’ needs and priorities can be integrated into the model design and development processes to enhance decision-making relevance and "usability" of EaSMs. BioEarth is a current research initiative with a focus on the U.S. Pacific Northwest region that explores the coupling of multiple stand-alone EaSMs to generate usable information for resource decision-making. Direct engagement between model developers and non-academic stakeholders involved in resource and environmental management decisions throughout the model development process is a critical component of this effort. BioEarth utilizes a "bottom-up" approach, upscaling a catchment-scale model to basin and regional scales, as opposed to the "top-down" approach of downscaling global models utilized by most other EaSM efforts. This paper describes the BioEarth initiative and highlights opportunities and challenges associated with coupling multiple stand-alone models to generate usable information for agricultural and natural resource decision-making.

agricultural↗

FEW questions, many answers: using machine learning to assess how students connect food–energy–water (FEW) concepts

There is growing support and interest in postsecondary interdisciplinary environmental education which integrate concepts and disciplines in addition to providing varied perspectives. There is a need to assess student learning in these programs as well as rigorous evaluation of educational practices, especially of complex synthesis concepts. This work tests a text classification machine learning model as a tool to assess student systems thinking capabilities using two questions anchored by the Food-Energy-Water (FEW) Nexus phenomena by answering two questions (1) Can machine learning models be used to identify instructor-determined important concepts in student responses? (2) What do college students know about the interconnections between food, energy and water, and how have students assimilated systems thinking into their constructed responses about FEW? Reported here are a broad range of model performances across 26 text classification models associated with two different assessment items, with model accuracy ranging from 0.755 to 0.992. Expert-like responses were infrequent in our dataset compared to responses providing simpler, incomplete explanations of the systems presented in the question. For those students moving from describing individual effects to multiple effects, their reasoning about the mechanism behind the system indicates advanced systems thinking ability. Specifically, students exhibit higher expertise for explaining changing water usage than discussing tradeoffs for such changing usage. This research represents one of the first attempts to assess the links between foundational, discipline-specific concepts and systems thinking ability. These text classification approaches to scoring student FEW Nexus Constructed Responses (CR) indicate how these approaches can be used, in addition to several future research priorities for interdisciplinary, practice-based education research. Development of further complex question items using machine learning would allow evaluation of the relationship between foundational concept understanding and integration of those concepts as well as more nuanced understanding of student comprehension of complex interdisciplinary concepts.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Small Hydropower Interconnections: State Interconnection Processes

Small hydropower projects with rated power output between 0 to 20 MW have been the predominant source of hydropower growth over the past decade in the United States (DOE 2016; Johnson et al. 2018). However, interconnection to electricity distribution and transmission grids is a persistent barrier. Interconnection of an electricity generating unit is overseen by the distribution or transmission owner, who use interconnection standards and requirements that vary by state. The differences between standards in standards may affect the final cost, timeline, and success of a small hydropower project. Small hydropower project developers across the United States have found interconnection procedures to be fraught with cost surprises and schedule overruns. System operators have struggled to understand impacts to overburdened or rapidly evolving transmission and distribution grids. The results of these shortcomings have been stranded costs and unrealized small hydropower potential. Though regulatory actions and policy recommendations at the state level have increased the situational awareness of interconnection challenges, the remote locations of small hydropower resources and the relatively small revenues associated with energy production through small hydropower facilities continue to make interconnection processes and requirements confusing and costly. Noting these challenges, the U.S. Department of Energy Water Power Technologies Office enlisted Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) to investigate the small hydropower interconnection landscape across the United States. The second in a series, this paper investigates the interconnection process in each state in the U.S. to compare their attributes. Subsequent papers in the series will analyze these interconnection processes (“Small Hydropower Interconnections: Analysis of Interconnection Processes”) and present best practices (“Small Hydropower Interconnections: Best Practices”) that will help overcome barriers to future small hydropower development. The first paper in the series examined the state of small hydropower projects in the United States (“Small Hydropower Interconnections: Small Hydropower in the United States”) to understand the industry characteristics.

13 HYDRO ENERGY↗

Integrated Energy-Water Planning in the Western and Texas Interconnections

While long-term regional electricity transmission planning has traditionally focused on cost, infrastructure utilization, and reliability, issues concerning the availability of water represent an emerging issue. Thermoelectric expansion must be considered in the context of competing demands from other water use sectors balanced with fresh and non-fresh water supplies subject to climate variability. An integrated Energy-Water Decision Support System (DSS) is being developed that will enable planners in the Western and Texas Interconnections to analyze the potential implications of water availability and cost for long-range transmission planning. The project brings together electric transmission planners (Western Electricity Coordinating Council and Electric Reliability Council of Texas) with western water planners (Western Governors’ Association and the Western States Water Council). This paper lays out the basic framework for this integrated Energy-Water DSS.

electricity↗

Static shape control for flexible structures

An integrated methodology is described for defining static shape control laws for large flexible structures. The techniques include modeling, identifying and estimating the control laws of distributed systems characterized in terms of infinite dimensional state and parameter spaces. The models are expressed as interconnected elliptic partial differential equations governing a range of static loads, with the capability of analyzing electromagnetic fields around antenna systems. A second-order analysis is carried out for statistical errors, and model parameters are determined by maximizing an appropriate defined likelihood functional which adjusts the model to observational data. The parameter estimates are derived from the conditional mean of the observational data, resulting in a least squares superposition of shape functions obtained from the structural model.

Rodriguez, G.↗

Repowering: The Other Side of the Reliability Coin

Extreme weather, cracked backsheets, severe PID, poorly built modules, and installation flaws - all can compromise a solar plant's health and force repowering long before end of life. With more than 70% of U.S. PV capacity less than seven years old, the fleet is young, but its rapid expansion has introduced new materials and system designs that are still being tested under real-world conditions. As a result, reliability - not economics - is what most often drives repowering decisions. Repowering is frequently assumed to be an economically motivated choice, but our work shows that reliability concerns are the real trigger. Drawing from industry interviews, case studies, and modeling, we highlight the physical, electrical, and policy barriers owners face when deciding whether to repair, repower, or decommission. At the same time, repowering can create opportunities: renewed interconnection periods, improved energy yields, and strategic upgrades to extend system value. We present a quantitative framework using NLR's System Advisor Model (SAM) and PV in Circular Economy (PV ICE) tool to evaluate trade-offs across financial, material, and energy impacts. These findings provide practical guidance for navigating the realities of repowering today and underscore the critical role of reliability in shaping the future performance and sustainability of the PV fleet.

14 SOLAR ENERGY↗

Ultra-heavy vertical lift system: The Heli-Stat

A hybrid VTOL airship which is combined with helicopters is evaluated. The static lift of the airship supports approximately the full empty weight of the entire assembly. The helicopter rotors furnish the lift to support the payload as well as the propulsion and control about all axes. Thus existing helicopters, with no new technology required, can be made to lift payloads of ten times the capacity of each one alone, and considerably more than that of any airship built so far. A vehicle is described which has a 75-ton payload, based on four existing CH-53D helicopters and an airship of 3,600,000 cu. ft. The method of interconnection is described along with discussion of control, instrumentation, drive system and critical design conditions. The vertical lift and positioning capabilities of this vehicle far exceed any other means available today, yet can be built with a minimum of risk, development cost and time.

Piasecki, F. N.↗

System-Level Integration of Mass Memory

A report discusses integrating multiple memory modules on the high-speed serial interconnect (IEEE 1393) that is used by a spacecraft?s inter-module communications in order to ease data congestion and provide for a scalable, strong, flexible system that can meet new system-level mass memory requirements.

Cox, Brian↗

Evaluating the Impact of Residential Solar Contract Cancellations in the United States

The residential solar photovoltaic (PV) market in the United States is growing, despite frequent customer cancellations. Contract cancellations result in lost time and costs that must be borne by installers, often in the form of higher "soft costs" (i.e., non-equipment costs). These costs are often passed on to customers who successfully install PV systems. To date, few studies have attempted to estimate national cancellation rates or model the impacts on installed system costs. In this report, we utilize an installer-provided dataset of 199,665 residential PV-only projects representing about 10% of U.S. installs each year from 2017-2019. With this data, we evaluate cancellation rates and trends from contract signing to install. Next, by leveraging NREL's soft cost model for residential solar, we estimate installer spending through each phase of the pre-install process. Applying our findings on cancellation timelines and rates, we then estimate the potential cost impacts to successful installs from contract cancellations. Our work suggests that the rates and impacts of contract cancellations have been previously underestimated. Namely, we find that cancellations/unsuccessful project are; more common than previous estimates suggest; occur earlier in project timelines, though a significant number happen even after permit/ATB approvals; and contribute significantly to customer acquisition and other soft costs. We also find that cancellation do not appear to be driven by review delays in permitting and interconnection applications.