At least 1,495 records · Page 83

Controlled Hydrogen Fleet and Infrastructure Demonstration Project

This program was undertaken in response to the US Department of Energy Solicitation DE-PS30-03GO93010, resulting in this Cooperative Agreement with the Ford Motor Company and BP to demonstrate and evaluate hydrogen fuel cell vehicles and required fueling infrastructure. Ford initially placed 18 hydrogen fuel cell vehicles (FCV) in three geographic regions of the US (Sacramento, CA; Orlando, FL; and southeast Michigan). Subsequently, 8 advanced technology vehicles were developed and evaluated by the Ford engineering team in Michigan. BP is Ford's principal partner and co-applicant on this project and provided the hydrogen infrastructure to support the fuel cell vehicles. BP ultimately provided three new fueling stations. The Ford-BP program consists of two overlapping phases. The deliverables of this project, combined with those of other industry consortia, are to be used to provide critical input to hydrogen economy commercialization decisions by 2015. The program's goal is to support industry efforts of the US President's Hydrogen Fuel Initiative in developing a path to a hydrogen economy. This program was designed to seek complete systems solutions to address hydrogen infrastructure and vehicle development, and possible synergies between hydrogen fuel electricity generation and transportation applications. This project, in support of that national goal, was designed to gain real world experience with Hydrogen powered Fuel Cell Vehicles (H2FCV) 'on the road' used in everyday activities, and further, to begin the development of the required supporting H2 infrastructure. Implementation of a new hydrogen vehicle technology is, as expected, complex because of the need for parallel introduction of a viable, available fuel delivery system and sufficient numbers of vehicles to buy fuel to justify expansion of the fueling infrastructure. Viability of the fuel structure means widespread, affordable hydrogen which can return a reasonable profit to the fuel provider, while viability of the vehicle requires an expected level of cost, comfort, safety and operation, especially driving range, that consumers require. This presents a classic 'chicken and egg' problem, which Ford believes can be solved with thoughtful implementation plans. The eighteen Ford Focus FCV vehicles that were operated for this demonstration project provided the desired real world experience. Some things worked better than expected. Most notable was the robustness and life of the fuel cell. This is thought to be the result of the full hybrid configuration of the drive system where the battery helps to overcome the performance reduction associated with time related fuel cell degradation. In addition, customer satisfaction surveys indicated that people like the cars and the concept and operated them with little hesitation. Although the demonstrated range of the cars was near 200 miles, operators felt constrained because of the lack of a number of conveniently located fueling stations. Overcoming this major concern requires overcoming a key roadblock, fuel storage, in a manner that permits sufficient quantity of fuel without sacrificing passenger or cargo capability. Fueling infrastructure, on the other hand, has been problematic. Only three of a planned seven stations were opened. The difficulty in obtaining public approval and local government support for hydrogen fuel, based largely on the fear of hydrogen that grew from past disasters and atomic weaponry, has inhibited progress and presents a major roadblock to implementation. In addition the cost of hydrogen production, in any of the methodologies used in this program, does not show a rapid reduction to commercially viable rates. On the positive side of this issue was the demonstrated safety of the fueling station, equipment and process. In the Ford program, there were no reported safety incidents.

08 HYDROGEN↗

Chemical Engineering in Space

The aerospace industry has long been perceived as the domain of both physicists and mechanical engineers. This perception has endured even though the primary method of providing the thrust necessary to launch a rocket into space is chemical in nature. The chemical engineering and chemistry personnel behind the systems that provide access to space have labored in the shadows of the physicists and mechanical engineers. As exploration into the cosmos moves farther away from Earth, there is a very distinct need for new chemical processes to help provide the means for advanced space exploration. The state of the art in launch systems uses chemical propulsion systems, primarily liquid hydrogen and liquid oxygen, to provide the energy necessary to achieve orbit. As we move away from Earth, there are additional options for propulsion. Unfortunately, few of these options can compare to the speed or ease of use provided by the chemical propulsion agents. It is with great care and significant cost that gaseous compounds such as hydrogen and oxygen are liquefied and become dense enough to use for rocket fuel. These low-temperature liquids fall within a specialty area known as cryogenics. Cryogenics, the science and art of producing cold operating conditions for use on Earth, in orbit, or on some other nonterrestrial body, has become increasingly important to our ability to travel within our solar system. The production of cryogenic fuels and the long-term storage of these fluids are necessary for travel. As our explorations move farther away from Earth, we need to address how to produce the necessary fuels to make a round-trip. The cost and the size of these expeditions are extreme at best. If we take everything necessary for our survival for the round-trip, we invalidate any chance of travel in the near future. As with the early explorers on Earth, we need to harvest much of our energy and our life support from the celestial bodies. The in situ production of these energy sources is paramount to success. We are currently working on several processes to produce the propellants that would allow us to visit and explore the surface of Mars. The capabilities currently at our disposal for launching and delivering equipment to another planet or satellite dictate that the size and scale of any hardware must be extremely small. The miniaturization of the processes needed to prepare the in situ propellants and life support commodities is a real challenge. Chemical engineers are faced with the prospect of reproducing an entire production facility in miniature so the complex can be lifted into space and delivered to our destination. Another area that does not normally concern chemical engineers is the extreme physical aspects payloads are subjected to with the launch of a spacecraft. Extreme accelerations followed by the sudden loss of nearly all gravitational forces are well outside normal equipment design conditions. If the equipment cannot survive the overall trip, then it obviously will not be able to yield the needed products upon arrival. These launch constraints must be taken into account. Finally, we must consider both the effectiveness and efficiencies of the processes. A facility located on the Moon or Mars will not have an unlimited supply of power or other ancillary utilities. For a Mars expedition, the available electric power is severely limited. The design of both the processes and the equipment must be considered. With these constraints in mind, only the most efficient designs will be viable. Cryogenics, in situ resource utilization, miniaturization, launchability, and power/process efficiencies are only a few of the areas that chemical engineers provide support and expertise for the exploration of space.

Lobmeyer, Dennis A.↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Retrospective on Recent DOE-Funded Studies Concerning the Extraction of Rare Earth Elements & Lithium from Geothermal Brines (Final Report)

Rare earth elements (REE) and lithium are non-toxic metals that are considered critical materials due to their use in electronics, magnets, batteries, and a wide variety of industrial processes important for the economy and military preparedness. Demand for REE and lithium is increasing and these critical materials are imported, so identifying and exploiting domestic sources of REE and lithium is a national priority. The U.S. Department of Energy (DOE) Geothermal Technologies Office (GTO) has been in the forefront of sponsoring research investigating the potential recovery of REE, lithium, and other critical minerals from geothermal brines. It has been proposed that the future of geothermal energy should include “hybrid systems” that combine electricity generation with other revenue-generating activities, such as recovery of valuable and critical minerals, including REE and lithium. Two recent GTO funding opportunities have focused on the recovery of REE and other valuable minerals from geothermal brines. The research supported by the GTO’s mineral recovery program is focused on three areas: resource characterization, technology for the extraction of REE, and technology for the extraction of lithium (Tables 1 and 2). This report is a retrospective study examining the outcome of GTO’s two recent mineral recovery programs (DE-FOA-0001016 in FY 2014 and DE-FOA-0001376 in FY 2016). In this report, the knowledge, technology, and techniques that were developed by researchers funded by GTO are summarized and discussed. Four projects were funded to assess the concentrations and amounts of REE found in geothermal brines and oil field produced waters. The GTO-funded studies compiled publically available data on REE concentrations from brines and produced water from all over the USA. In addition, new samples were collected and characterized from major geothermal and hydrocarbon basins in the Western USA. The studies examined the relationship between lithology and REE concentrations and developed models examining the influence of geology on REE concentrations in produced brines. It was determined that REE are frequently found at higher concentrations in oil field produced water than geothermal brines, but that some geothermal areas had significant REE resources. Significant reservoirs of REE were identified in the Western USA. In some cases, concentrations of REE were more than 1000 times the concentrations found in seawater. Collectively, these studies represent a comprehensive picture of REE resources associated with geothermal and hydrocarbon systems in the USA. The studies did not examine lithium resources, but in some cases, lithium concentration data was collected. Data from these studies are housed in the Geothermal Data Repository (GDR) and represent a significant information resource and it is recommended that these data be further analyzed in a future study. Eight projects were funded to develop new technology for REE extraction from geothermal fluids. These projects investigated sorption as an approach for removal and recovery of REE from geothermal brines. The projects investigated cutting-edge technology for selective sorption of ions from complex solutions, including the application of metal-organic frameworks and biosorbent proteins. The REE sorption studies tested different combinations of metal-binding ligands and solid supports. The most promising metal-binding ligands for REE included phosphonic acid, thiol, and carboxylic acid functional groups. Ligands were attached or incorporated into a wide variety of solid supports. In most cases, attachment was via covalent bonding to organic resins, polymers, or silica-based supports. Most of the REE projects were conducted at a low technology readiness level (TRL) and showed promise, but direct comparison between technologies was not possible based on the available information. It is recommended that testing and reporting be standardized to the extent possible to facilitate comparisons between technologies. Two projects were directed at novel lithium extraction technology. Both projects investigated the use of inorganic sorbents, including manganese oxides. One study also examined the use of metal- ion imprinted polymers as selective ion-exchange resins for the separation of lithium and manganese from brines. Both approaches showed promise for the selective extraction of lithium from brines, including potentially geothermal brines. Results from these GTO studies indicated that selective REE and lithium extraction is possible, but interference from co-occurring solutes, such as calcium, magnesium, or heavy metals, will interfere with process efficiency and negatively impact process economics. Techno-economic analysis conducted as part of the resource and technology studies suggest extraction of REE from geothermal brines is unlikely to be economically viable, especially since non-geothermal produced waters frequently have higher REE concentrations. It is recommended that benchmarks for techno-economic analysis be established to the extent possible for future studies, to facilitate direct comparison of various technologies. Based on the collective results of this program, it appears that hybrid geothermal power would benefit more from recovery of lithium and other metals, rather than REE. It is recommended that future studies be conducted at a higher- TRL and that sorbents be tested against actual geothermal fluid samples. Prior higher-TRL efforts to extract metals from geothermal brines should be further evaluated for lessons learned.

36 MATERIALS SCIENCE↗

Understanding the Origin of Negative Temperature Dependence and Activity of N-Coordinated Cobalt Sites During Ethylene Dimerization

The on-demand production of short-chain linear alpha olefins (LAOs; C4-C8) via C2H4 dimerization and oligomerization is industrially attractive, prompting extensive research on designing active, selective, and stable catalysts for industrial use. Cobalt supported on ammoniated carbon (Co(NH3)x/C) catalysts have shown remarkable activity and selectivity in this process. However, critical aspects such as the active phase, active site structure, the role of the catalyst support, cobalt loading effects, and the inverse correlation of the reaction rate with temperature remain inadequately understood. This study systematically explores these factors using a combination of steady-state differential catalytic tests, in situ molecular characterization including diffuse reflectance UV-Vis (DR-UV-Vis), Infrared, and Raman spectroscopies, and ex situ X-ray diffraction (XRD) and high annular aberration-corrected dark field transmission electron microscopy (HAADF-STEM). Various supports (SiO2, Al2O3, NH4-ZSM-5, g-C3N4, and C) and cobalt loadings (1.0-3.0 Co nm-2) were studied to determine the optimal catalyst composition and identify the active phase and sites. Carbon-supported catalysts uniquely produce C4-8 LAOs during C2H4 dimerization, with site-time-yield remaining constant (~10-3 s-1) for 1.0-4.0 Co nm-2 at prolonged reaction times (24-48?h time-on-stream). At higher loadings of 6.0 Co nm-2, the formation of crystalline CoO and Co3O4 phases reduces catalytic activity and LAO selectivity. Our findings show that active catalysts lack crystalline cobalt oxides and instead feature dispersed Co2+ sites, tetra-coordinated to a mix of N/NH3 and O/H2O ligands, which catalyze C2H4 dimerization via the Cossee-Arlman mechanism, exhibiting 1st order dependence on C2H4 concentration. The observed inverse rate-temperature correlation is attributed to compensation effects (i.e., presence of Cremer-Constable relationship) linked to changes in adsorption enthalpic and entropic factors.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Risk to ecological resources following remediation can be due mainly to increased resource value of successful restoration: A case study from the Department of Energy's Hanford Site

Several nations are faced with the need to remediate large contaminated sites following World War II, the Cold War, and abandoned industrial sites, and to return them to productive land uses. In the United States, the Department of Energy (DOE) has the largest cleanup challenge, and its Hanford Site in the state of Washington has the most extensive and most expensive cleanup task. Ideally, the risk to ecological resources on remediation sites is evaluated before, during, and after remediation, and the risk from, or damage to, ecological resources from contaminants should be lower following remediation. In this paper, we report the risk to ecological resources before, during, and as a consequence of remediation on contaminated units requiring cleanup, and then examine the causes for changes in risk by evaluating 56 cleanup evaluation units (EUs) at the Hanford Site. In this case, remediation includes a restoration phase. In general, the risk to ecological and eco-cultural resources is currently not discernible or low at most contaminated units, increases during remediation, and decreases thereafter. Remediation often causes physical disruption to ecosystems as it reduces the risk from exposure to contaminants. Most new remediation projects at the Hanford Site include ecological restoration. Ecological restoration results in the potential for the presence of higher quality resources after remediation than currently exists on these contaminated lands and facilities. Although counter-intuitive, our evaluation of the risk to ecological resources following remediation indicated that a significant percentage of units (61%) will be at increased risk in the post-remediation period. This increased risk is due to DOE's successful remediation and restoration that results in a higher percent of native vegetation and higher ecological value on the sites in the post-remediation period than before. These newly-created resources can then be at risk from post-remediation activities. Risks to these new higher quality resources include the potential for spread of invasive species and of noxious grasses used in previous cleanup actions, disruption of ecosystems (including those with state or federally listed species and unique ecosystems), compaction of soil, use of pesticides to control invasive species, and the eventual need for continued monitoring activities. Thus, by greatly improving the existing habitat and health of eco-receptors, and maintaining habitat corridors between high quality habitats, the ecological resources in the post-remediated units are at risk unless care is taken to protect them. Many of the negative effects of both remediation and future monitoring (or other future land uses) can be avoided by planning and management early in the remediation process. We suggest DOE and other agencies convene a panel of managers, remediation scientists, regulators, environmental and ecological scientists, Native Americans, economists, and the public to develop a generic list of performance metrics for the restoration phase of remediation, including evaluation of success, which could be applied across the DOE complex.

54 ENVIRONMENTAL SCIENCES↗

Toward High Fidelity LES Simulations of 5 x 5 PWR Fuel Bundle with Mixing Vane

The present work illustrates one example of a computational fluid dynamics (CFD) application in the nuclear engineering field. Since CFD is one of the most powerful tools available at the actual state of the art that could in principle help and assist the design process, a compromise should be established between the accuracy of the CFD numerical model (RANS - LES - DNS) and the computational cost of the simulations. In this spirit, this work will present the computational results from two different CFD model categories, Large Eddy Simulations (LES) and Reynolds-averaged Navier-Stokes (RANS) models. Both treat the flow turbulence issue in two separate ways, which differ mostly in the resolution of the turbulence statistics and the computational cost. The single-phase hydraulic problem presented involves the steady-state turbulent flow field modelling and resolution around a scaled PWR mixing vane grid, designed by Westinghouse and tested by Texas A and M University. The role of the mixing vane/spacer grid is to enhance the turbulent mixing and hence heat transfer of the core coolant around fuel bundles, thus increasing the departure of nucleate boiling-critical heat flux (DNB-CHF) point, as well as important structural functions for the rods bundles. The authors numerically studied the flow field characteristics at the region downstream of the spacer grids and validated their results to particle imagery velocimetry (PIV) measurements. Dominguez and Hassan performed two-dimensional time resolved PIV (TR-PIV) measurements within a 5 x 5 PWR rod bundle with spacer-grids that utilized a matching index of refraction (MIR) approach. Their averaged data showed a rather uniform direction velocity profile after the spacer grid while the downstream illustrated a no slip wall profile. The available PIV flow field experimental results from Texas A and M show complex structures of the flow field downstream the mixing vanes with the formation of secondary flows that tend to enhance the turbulent heat transfer, due to the mixing vanes geometry itself. Computational results will be validated with the available experimental data.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Corrosion evaluation of metal foams in eutectic molten salts for high temperature latent heat energy storage application

High-temperature Thermal Energy Storage (TES) has drawn great attention as a technology that can increase the role and profitability of micro nuclear reactors in the decentralized clean energy market. Various research needs have been proposed by Idaho National Laboratory (INL) in "the Integrated Energy Systems: 2020 Roadmap" with the goal of utilizing the high temperature of 550 degrees or more generated in the 4th generation reactor to industrial purposes from the standpoint of integrated energy systems [1]. With the recent development of the 4th generation nuclear power plant, including micro nuclear reactor, there is a great deal of interest in researching how to efficiently couple a heat source to an industrial process through thermal processing. Texas A&M University (TAMU) and INL are currently collaborating to develop a novel latent heat storage design called HITB (Heat pipe-Integrated Thermal Battery). As part of the small-scale experimental demonstration research for HITB, a study for storage medium selection was conducted at TAMU. Eutectic salts have attracted interest as high-temperature heat storage medium for HITB. Especially, chloride molten salts and fluoride molten salts are considered promising candidates due to their high melting temperature, thermal stability, and high latent heat of fusion. Since eutectic salts have poor thermal conductivity in general, it is critical to distribute materials with high thermal conductivity evenly to facilitate the charging and discharging of heat. In this study, metal foam was considered in the HITB system to overcome the poor heat transfer characteristics of eutectic salts. In order to improve heat transfer, it is necessary to study materials with high thermal conductivity, corrosion resistant to molten salts, such as fins, extended surfaces, particles, microcapsulation, or foam structure. Porous structure of copper or aluminum can increase heat transfer area, form a thermal transfer network, and increase the effective thermal conductivity of thermal storage medium [2]. Since the melting temperature is required to be at least 450? in the current HITB design, various eutectic salts are being considered. FLiNaK and FLiBe, which are famous for fluoride salts, are good candidates, but due to the sharp rise in the price of LiF recently, they are excluded for economic reasons to be applied to large-capacity thermal energy storage. On the other hand, chloride salts are very cheap and easy to obtain, have a high melting temperature, and have a high latent heat of fusion, so they are recently in the spotlight as a phase change material. However, because of the hygroscopic nature of chloride salts, HCl gas due to impurity is easy to be released and is particularly vulnerable to corrosion. Chloride eutectic salts have been tested and suggested for metal alloys that are particularly resistant to corrosion, such as SS304, SS316, Hastelloy, Inconel 625, Incoloy 800H, which has low thermal conductivity, and is very expensive [3-6]. Porous materials with high thermal conductivity such as copper and aluminum have been tested for stability in fluids such as paraffin or water as metal foam or metal fin structures, but high temperature corrosion tests were not performed on various eutectic salts yet. Therefore, this study investigated the high temperature corrosion characteristics of metal alloys, such as C10100 foam, C10100 plate, 6101 alloy foam, and SS316 plate, while immersed in the candidate eutectic salts. A total of 20 tests for SS316 coupons and 10 tests for C10100 coupons were performed to ensure the repeatability of the present measurements. Since it is difficult to completely remove the salt inside metal foam due to the complex inner structure of the metal foam, only the surface condition was observed with a microscopy and scanning electron microscopy (SEM) image, except for measuring the corrosion rate and average mass loss.

25 ENERGY STORAGE↗

Structural and Stratigraphic Controls on Methane Hydrate occurrence and distribution: Gulf of Mexico, Walker Ridge 313 and Green Canyon 955: Final Report

The goal of this project was to determine structural and stratigraphic controls on hydrate occurrence and distribution in Green Canyon (GC) 955 and Walker Ridge (WR) 313 blocks using seismic and well data. Gas hydrate was discovered in these blocks in coarse- and fine-grained sediments during the 2009 Joint Industrial project (JIP) Leg 11 drilling expedition. Although the immediate interest of the exploration community is exclusively hydrate which is present in coarse–grained sediments, factors that control hydrate and free gas distribution in the two blocks and whether coarse and fine-grained hydrate-bearing units are related in any manner, formed the core of this research. The project spanned from 10/01/2012 to 07/31/2016. In the project, in both the leased blocks, the interval spanning the gas hydrate stability zone (GHSZ) was characterized using a joint analysis of sparse Ocean Bottom Seismic (OBS) and dense, surface–towed multichannel seismic (MCS) data. The project team had the luxury of calibrating their results with two well logs. Advance processing methods such as depth migration and full-waveform inversion (FWI) were used for seismic data analysis. Hydrate quantification was achieved through interpretation of the FWI velocity field using appropriate rock physics models at both blocks. The seismic modeling/inversion methodology (common to both GC955 and WR313 blocks) was as follows. First, the MCS data were depth migrated using a P-wave velocity (VP) model constructed using inversion of reflection arrival times of a few (four in both cases) key horizons carefully picked in the OBS data to farthest possible offsets. Then, the resolution of the traveltime VP model was improved to wavelength scale by inverting OBS gathers up to the highest frequency possible (21.75 Hz for GC955 and 17.5 for WR313) using FWI. Finally, the hydrate saturation (or the volume fraction) was estimated at the well location assuming one of the other hydrate morphology (filling the primary or the secondary porosity) was extrapolated out from the wells using the FWI VP as a guide. General outcomes were as follows. First and foremost, an imaging methodology using sparse seismic data, which is easily replicable at other sites with similar datasets, has been demonstrated. The end product of this methodology at both the leased blocks is quantitative estimates of hydrate distribution. Second, at both locations there is strong evidence that the base of the GHSZ, which does not appear as a clear Bottom Simulating Reflection (BSR), manifests in the VP perturbations created by FWI, suggesting that FWI is sensitive to subtle compositional changes in shallow sediments and establishes it as a valuable tool for investigations of hydrate-bearing basins. Third, through joint interpretation of the depth migrated image and the FWI VP model, how structure and stratigraphy jointly determine hydrate and free gas distribution in both blocks could be clearly visualized. The joint interpretation also suggests that the coarse and fine grained hydrate-bearing sediments at both leased are connected. Site specific results, in addition to general results, are as follows. At GC955 the overlying fine-grained hydrate-bearing unit could have been sourced from the underlying hydrate coarse-grained channel-levee complex through a chimney feature. The channel-levee system at GC955 is compartmentalized by faults, of which only a few may be impermeable. Although compartmentalized, the channel-levee system in the GC955 as a whole might be in communication except selected zones. At WR313 the overlying fine-grained fracture-filled hydrate unit appears to be sourced from below the GHSZ. The reason that only a particular fine-grained unit has hydrate, despite having lower porosity that the bounding units, could be the presence of secondary porosity (such as those formed from clay dewatering under compaction). In conclusion, the project was a pioneering effort in in joint analysis of OBS and MCS datasets for advancing the knowledge about a hydrate and free–gas system dynamics using advanced processing methods such as FWI and depth migration. Results obtained in this project can greatly advance the tools and techniques used for delineating specific hydrate prospects. Results obtained in this project can also be seamlessly incorporated into other DOE funded project on modeling the potential productivity and commercial viability of hydrate from sand-dominated reservoirs. The OBS and MCS data in this project were acquired in 2012 (after the JIP II drilling) by the USGS and therefore the results are a posteriori. Nonetheless, the seismic inversion workflow established through this project can be used to generate various what-if quantification scenarios even in absence of logs and serve as a valuable tool for guiding drilling operations. Results from this project can augment other DOE sponsored projects on determining the commercial viability of methane production from the Gulf of Mexico.

03 NATURAL GAS↗

Proposed guidance for preparing and reviewing a molten salt non-power production or utilization facility application

Development of non-power molten salt reactors (MSRs) are under consideration to further establish an MSR experience base, support the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.43(e), and provide any additional analyses needed for development of a full-scale MSR. Guidance provided in this report is based on MSRs operating with liquid fuel (i.e., fuel dissolved within a molten salt). These reactors, unless owned by the DOE or DOD, will require licensing by the US Nuclear Regulatory Commission (NRC) staff. Standard review plan (SRP) guidance for large light water reactors (LWRs) is available in NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants; Light Water Reactor (LWR) Edition. However, NRC staff observed that NUREG-0800 is very cumbersome to apply to non-power reactors “because of the great differences in complexity and hazards between non-power reactors and nuclear power plants.” Therefore, a program to develop performance-based guidance applicable to non-power reactors was initiated. In 1996, NUREG-1537, Parts 1 and 2, Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors, was published. Part 1, the format and content guide, suggests a uniform format for presenting information in non-power reactor applications that is acceptable to the NRC staff, but conformance with the format and content is not required. Part 2, the SRP, ensures the quality and uniformity of the staff review of an application. Unfortunately, the application guidelines and SRP do not provide adequate guidance for all advanced non-LWR technologies and applications. This discrepancy eventually led to the 2012 development of interim staff guidance (ISG) for NUREG-1537, which includes criteria for describing and reviewing aqueous homogeneous reactors (AHRs). Specifically, NUREG-1537 ISG, 2012 expanded the original document to address three areas: 1. updated criteria for heterogeneous non-power reactors, 2. criteria for licensing AHRs, and 3. criteria for licensing a Part 50-licensed isotope production facility. In 2015, the US Department of Energy (DOE) opted to build on the AHR NUREG-1537 ISG experience by performing a gap analysis of the guidance that would be used to license a non-power MSR. MSRs represent one of the advanced non-LWR technologies selected by DOE for development through a multiyear cost share award with Southern Company Services. Under this Advanced Reactor Concepts 2015 (DOE Advanced Reactor Concepts [ARC] 15) award program, the DOE tasked Oak Ridge National Laboratory (ORNL) to evaluate the guidance changes that the NRC may need to consider when licensing an MSR non-power reactor. ORNL staff, with support from Boston Government Services, LLC, focused on five system-related chapters in NUREG-1537 that were considered most relevant to inform the effort that would be required for a non-power MSR applicant. ORNL documented this review in a technical report, ORNL/TM-2018/834, Proposed Guidance for Preparing and Reviewing Molten Salt Non-Power Reactor License Applications (NUREG-1537). The report was subsequently shared with industry and the NRC. The 2018 review was limited in scope, focusing on key system chapters based on the expected significance of each chapter relative to expected differences in addressing advanced non-LWR technologies, specifically non-power MSRs, compared with heterogeneously fueled non-power reactors. In the ORNL report, proposed generic adaptations were suggested for the following NUREG-1537 chapters: Chapter 4, “Reactor Description”; Chapter 5, “Reactor Coolant Systems”; Chapter 6, “Engineered Safety Features”; Chapter 9, “Auxiliary Systems”; Chapter 11, “Radiation Protection Program and Waste Management” The inclusion of Chapter 11 in the previous review effort was intended to provide guidance for categorizing the waste-handling process for an MSR operating with homogenous fuel. The introductions from Parts 1 and 2 of the 2012 NUREG-1537 ISG provide guidance for the application and review of production facilities. After a period of operation, non-power MSRs with homogenous fuel will include gaseous and soluble fission products. The gaseous fission products will be collected and held for decay in an off-gas system. There might also be an initiative to polish or filter the soluble fission products in the fuel salt by some mechanical or chemical means. The treatment and handling of fission products in the non-power MSR fuel salt and the description of this process in the safety analysis report (SAR) must be very precise to avoid the waste treatment facility being construed as a co-located special nuclear material (SNM) fuel cycle facility (see Section 2.3 of this report). Subsequent to the release of ORNL/TM-2018/834, NRC staff expressed a desire to continue the regulatory gap analysis that was begun in that report. This would provide additional clarity and information addressed in certain sections of the original report, while also providing new guidance on certain topics not addressed in the original report. This revision would benefit the NRC staff reviewing applications involving non-power MSR designs and would help developers understand how the NRC staff might approach the review of such applications. The focus of this report is to provide infrastructure support to the NRC staff for the regulatory review of non-power MSRs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Ground Processing Affordability for Space Vehicles

Launch vehicles and most of their payloads spend the majority of their time on the ground. The cost of ground operations is very high. So, why so often is so little attention given to ground processing during development? The current global space industry and economic environment are driving more need for efficiencies to save time and money. Affordability and sustainability are more important now than ever. We can not continue to treat space vehicles as mere science projects. More RLV's (Reusable Launch Vehicles) are being developed for the gains of reusability which are not available for ELV's (Expendable Launch Vehicles). More human-rated vehicles are being developed, with the retirement of the Space Shuttles, and for a new global space race, yet these cost more than the many unmanned vehicles of today. We can learn many lessons on affordability from RLV's. DFO (Design for Operations) considers ground operations during design, development, and manufacturing-before the first flight. This is often minimized for space vehicles, but is very important. Vehicles are designed for launch and mission operations. You will not be able to do it again if it is too slow or costly to get there. Many times, technology changes faster than space products such that what is launched includes outdated features, thus reducing competitiveness. Ground operations must be considered for the full product Lifecycle, from concept to retirement. Once manufactured, launch vehicles along with their payloads and launch systems require a long path of processing before launch. Initial assembly and testing always discover problems to address. A solid integration program is essential to minimize these impacts, as was seen in the Constellation Ares I-X test rocket. For RLV's, landing/recovery and post-flight turnaround activities are performed. Multi-use vehicles require reconfiguration. MRO (Maintenance, Repair, and Overhaul) must be well-planned--- even for the unplanned problems. Defect limits and standard repairs need to be in-place as well as easily added. Many routine inspections and maintenance can be like an aircraft overhaul. Modifications and technology upgrades should be expected. Another factor affecting ground operations efficiency is trending. It is essential for RLV's, and also useful for ELV's which fly the same or similar models again. Good data analysis of technical and processing performance will determine fixes and improvements needed for safety, design, and future processing. Collecting such data on new or low-frequency vehicles is a challenge. Lessons can be learned from the Space Shuttle, or even the Concorde aircraft. For all of the above topics, efficient business systems must be established for comprehensive program management and good throughput. Drawings, specifications, and manuals for an entire launch vehicle are often in different formats from multiple vendors, plus they have proprietary constraints. Nonetheless, the integration team must ensure that all data needed is compatible and visible to each appropriate team member. Ground processing systems for scheduling, tracking, problem resolution, etc. must be well laid-out. The balance between COTS (commercial off the shelf) and custom software is difficult. Multiple customers, vendors, launch sites, and landing sites add to the complexity of efficient IT (Information Technology) tools.

Ingalls, John↗

High power ring methods and accelerator driven subcritical reactor application

High power proton accelerators allow providing, by spallation reaction, the neutron fluxes necessary in the synthesis of fissile material, starting from Uranium 238 or Thorium 232. This is the basis of the concept of sub-critical operation of a reactor, for energy production or nuclear waste transmutation, with the objective of achieving cleaner, safer and more efficient process than today’s technologies allow. Designing, building and operating a proton accelerator in the 500-1000 MeV energy range, CW regime, MW power class still remains a challenge nowadays. There is a limited number of installations at present achieving beam characteristics in that class, e.g., PSI in Villigen, 590 MeV CW beam from a cyclotron, SNS in Oakland, 1 GeV pulsed beam from a linear accelerator, in addition to projects as the ESS in Europe, a 5 MW beam from a linear accelerator. Furthermore, coupling an accelerator to a sub-critical nuclear reactor is a challenging proposition: some of the key issues/requirements are the design of a spallation target to withstand high power densities as well as ensure the safety of the installation. These two domains are the grounds of the PhD work: the focus is on the high power ring methods in the frame of the KURRI FFAG collaboration in Japan: upgrade of the installation towards high intensity is crucial to demonstrate the high beam power capability of FFAG. Thus, modeling of the beam dynamics and benchmarking of different codes was undertaken to validate the simulation results. Experimental results revealed some major losses that need to be understood and eventually overcome. By developing analytical models that account for the field defects, one identified major sources of imperfection in the design of scaling FFAG that explain the important tune variations resulting in the crossing of several betatron resonances. A new formula is derived to compute the tunes and properties established that characterize the effect of the field imperfections on the transverse beam dynamics. The results obtained allow to develop a correction scheme to minimize the tune variations of the FFAG. This is the cornerstone of a new fixed tune non-scaling FFAG that represents a potential candidate for high power applications. As part of the developments towards high power at the KURRI FFAG, beam dynamics studies have to account for space charge effects. In that framework, models have been installed in the tracking code ZGOUBI to account for the self-interaction of the particles in the accelerator. Application to the FFAG studies is shown. Finally, one focused on the ADSR concept as a candidate to solve the problem of nuclear waste. In order to establish the accelerator requirements, one compared the performance of ADSR with other conventional critical reactors by means of the levelized cost of energy. A general comparison between the different accelerator technologies that can satisfy these requirements is finally presented. In summary, the main drawback of the ADSR technology is the high Levelized Cost Of Energy compared to other advanced reactor concepts that do not employ an accelerator. Nowadays, this is a show-stopper for any industrial application aiming at producing energy (without dealing with the waste problem). Besides, the reactor is not intrinsically safer than critical reactor concepts, given the complexity of managing the target interface between the accelerator and the reactor core.

43 PARTICLE ACCELERATORS↗

Examining Food Risk in the Large using a Complex, Networked System-of-sytems Approach

The food production infrastructure is a highly complex system of systems. Characterizing the risks of intentional contamination in multi-ingredient manufactured foods is extremely challenging because the risks depend on the vulnerabilities of food processing facilities and on the intricacies of the supply-distribution networks that link them. A pure engineering approach to modeling the system is impractical because of the overall system complexity and paucity of data. A methodology is needed to assess food contamination risk 'in the large', based on current, high-level information about manufacturing facilities, corrunodities and markets, that will indicate which food categories are most at risk of intentional contamination and warrant deeper analysis. The approach begins by decomposing the system for producing a multi-ingredient food into instances of two subsystem archetypes: (1) the relevant manufacturing and processing facilities, and (2) the networked corrunodity flows that link them to each other and consumers. Ingredient manufacturing subsystems are modeled as generic systems dynamics models with distributions of key parameters that span the configurations of real facilities. Networks representing the distribution systems are synthesized from general information about food corrunodities. This is done in a series of steps. First, probability networks representing the aggregated flows of food from manufacturers to wholesalers, retailers, other manufacturers, and direct consumers are inferred from high-level approximate information. This is followed by disaggregation of the general flows into flows connecting 'large' and 'small' categories of manufacturers, wholesalers, retailers, and consumers. Optimization methods are then used to determine the most likely network flows consistent with given data. Vulnerability can be assessed for a potential contamination point using a modified CARVER + Shock model. Once the facility and corrunodity flow models are instantiated, a risk consequence analysis can be performed by injecting contaminant at chosen points in the system and propagating the event through the overarching system to arrive at morbidity and mortality figures. A generic chocolate snack cake model, consisting of fluid milk, liquid eggs, and cocoa, is described as an intended proof of concept for multi-ingredient food systems. We aim for an eventual tool that can be used directly by policy makers and planners.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

North Dakota Integrated Carbon Storage Complex Feasibility Study. Final report

In spring 2017, the Energy & Environmental Research Center (EERC) initiated an effort to determine the feasibility of developing a commercial-scale CO 2 geologic storage complex able to store 50+ million tonnes (Mt) of CO 2 in central North Dakota safely, permanently, and economically. The objective was to fulfill the goals of the U.S. Department of Energy (DOE) Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative and address technical and nontechnical challenges specific to commercial-scale deployment of a CO2 storage project. The findings clearly show that the concept of capturing CO 2 from a lignite-fired electrical generation facility in central North Dakota and safely and permanently storing the CO 2 in the deep subsurface is indeed technically, economically, and socially feasible. This project evaluated two study areas and their respective geologic storage complexes located adjacent to separate coal-fired facilities in North Dakota: the Basin Electric Power Cooperative (BEPC)-owned Great Plains Synfuels Plant (GPSP) and the Minnkota Power Cooperative (Minnkota)-owned Milton R. Young Station (MRYS). These locations, one with CO 2 capture in place and an existing CO 2 pipeline, are bolstered by progressive North Dakota pore space ownership and long-term liability laws. These elements and a motivated team created an ideal synergistic scenario for ensuring success of the CarbonSAFE Initiative and promoting North Dakota’s statewide vision for carbon management. The project included drilling two new geologic characterization wells, integrating an existing 3-D seismic survey, creating a geologic model subsequently used for injection simulation, a risk assessment, public outreach, and generating a site development plan based on results. In addition, the performance of select National Risk Assessment Partnership tools was evaluated. The geologic characterization wells were drilled ~5600 feet deep to the Broom Creek Formation; ~350 feet of core was retrieved from each well. The core included the Broom Creek (targeted injection zone) and a portion of the overlying Opeche Shale (seal). The Flemmer-1 well, west of Beulah, North Dakota, yielded 169 feet of sandstone. The BNI-1 well located south of Center, North Dakota, yielded 124 feet of sandstone. In each case, laboratory analysis of the sandstone showed permeability in the 300–1000-mD range, with porosity of 20%–30%. The Flemmer-1 well was sited within the boundaries of an existing 3-D seismic survey. Colocating the well with the seismic survey maximized the relationship between new and legacy data and developed a first-of-its-kind interpretation of the geologic fabric of the Broom Creek. Geologic characterization data were integrated into a 5544-mi 2 geocellular model that encompassed both new wells and stratigraphy from the surface to the Amsden Formation (underlying the Broom Creek). The model was later expanded vertically to include the deeper Black Island–Deadwood interval to examine its potential viability as a storage target. The geocellular model provided the foundation for dynamic simulation of CO 2 into the Broom Creek. Results of the simulation suggest that the Broom Creek could accept the DOE target rate of 2 Mt/yr of CO 2 into as few as two wells. To bracket the expected capture from MRYS, simulations were also investigated for a 4-Mt/yr rate near MRYS. Although more wells are needed (two additional), the Broom Creek still has the storage resource to accept the CO 2 at the increased rate. A risk assessment exercise was conducted to identify and assess technical and nontechnical risks that could prevent potential candidate storage complexes within the study area from serving as commercial storage sites. The assessment identified and evaluated six technical risk categories: 1) CO 2 injectivity, 2) storage capacity, 3) lateral migration of CO 2 , 4) lateral pressure propagation, 5) vertical migration of CO 2 or formation brine, and 6) induced seismicity. Following two rounds of analysis and scoring, no risks were determined to preclude continued efforts to develop carbon capture, utilization, and storage (CCUS) in central North Dakota. The risk assessment results will be used to guide future site characterization, modeling and simulation, and monitoring activities. A specific nontechnical strategic risk based on challenges that may be realized in amalgamation of pore space resulted in vertically expanding the geologic model to incorporate the potential for stacked storage in multiple saline reservoirs. By including the Black Island–Deadwood interval (the basal sedimentary reservoir in this region), the amalgamated areal extent could be reduced by as much as 45%. Working with a smaller geographic area reduces risks and costs associated with monitoring and pore space leasing. An economic evaluation incorporating capture; transport (<5 mi); Class VI wells; permitting; and monitoring, verification, and accounting suggests implementing commercial-scale CCUS is economically attractive if the federal tax benefits of 45Q are included. This is validated by Minnkota’s continued pursuit of CO 2 capture and geologic storage at MRYS through its Project Tundra initiative, indicating that there is a business case for CCUS in central North Dakota. Currently, North Dakota is the only state with underground injection control (UIC) Class VI primacy. Built into the North Dakota Century Code is a series of regulatory requirements that guide the process to obtain a Class VI CO 2 storage facility permit. As part of this project, a site development plan was compiled to assure compliance with North Dakota’s requirements to permit a commercial-scale CO 2 storage operation and includes a prospective time line encompassing a general breakdown of activities. In total, an estimated 30 months would be needed to execute the necessary steps to attain a North Dakota CO 2 storage facility permit. Outreach was an integral part of the project and encompassed any project-related activity that had contact or exposure beyond the project team. The goals of outreach were to foster an environment from which stakeholders could make informed decisions about the project and gauge community receptiveness to a CCUS project. A consistent set of messages and outreach products were developed in conjunction with an outreach advisory board that integrated project partners and team members. To gauge public acceptability of geologically storing CO 2 , 5611 households in the project area were invited to participate in an online survey. The survey results indicate that the public attitude regarding CCUS is neutral to positive, with strong sentiment that CO 2 capture and storage may be an approach to maintain the economic vitality of the region. To achieve project objectives, critical support in the form of financial backing, engineering evaluations, site access, outreach collaboration, operations data, risk assessment/evaluation, and software access was provided by BEPC, the North Dakota Industrial Commission Lignite Research Council, ALLETE Clean Energy, BNI Energy, North American Coal Corporation, Minnkota, Prairie Public Broadcasting, Computer Modelling Group Ltd., and Schlumberger.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Determining Coal Ash Impacts on Radium and Thorium Background Levels in Soil Using Rare Earth Element Analyses - 18604

One challenge at large remediation sites contaminated with radiological materials is differentiating between low-level site-related contamination and NORM. This is because sites contaminated with radiological materials, such as thorium processing and mining and milling facilities, often generate wastes that contain contaminants that are similar to NORM deposits. For sites in urban areas, this issue is further compounded due to the presence of historic industrial fill (historic fill) containing materials such as fly ash, coal ash, and red brick, that exhibit elevated radioactivity levels. These materials often have activity levels near, or even well above, a site's cleanup goal. At a large Superfund Site in the eastern US (Site), many of the suspected Site-related fill areas are commingled with coal and fly ash. As the cleanup criteria for the radionuclides of concern (ROC), radium (Ra) and thorium (Th), is 5 pico-Curies per gram above background, a four-pronged approach was developed to determine if the coal and fly ash are impacting the background levels of the ROCs. This evaluation included a review of boring logs to visually confirm the presence of historic fill, as well as coal fragments and coal ash; a literature review to establish the typical concentrations of Ra and Th found in coal and fly ash from US sources; the use of rare earth analyses to establish chemical signatures for non-Site related historic fill containing coal ash versus Site-related fill; and a quantitative analysis of Site-related data to determine if the radioactivity levels in historic fill containing coal were elevated. Soil samples were collected from two locations at the Site; fill areas containing coal ash that were not suspected to be impacted by Site activities, as well as fill areas containing coal ash that were associated with the former processing facility. These samples were analyzed for rare earth elements (REE), as well as Ra-228 and Th-232 and the ratios of lanthanum, cerium, and neodymium to Ra-228 and Th-232 were established for each sample. Based on a comparison of these data, a strong correlation was established between the rare earth/thorium decay chain ratios and the classification of material as either Site or non-Site related. These data were used to develop a higher background activity for fill areas containing non-Site related NORM. While the cleanup level defined in the Record of Decision remained unchanged, the higher background derived from the fly ash/coal ash material, as identified by REE analyses, resulted in higher project screening levels, which ensured that excavation activities did not 'chase' material that was not Site-related. To date, use of the coal ash background level has saved millions of dollars in cleanup costs since non-Site related contamination is not being remediated. Use of this approach to determine the appropriate background level for a site is relatively straightforward since it relies on visual observation of the soil for coal and fly ash, along with REE analyses, which is an inexpensive, quick, and established analytical method for soil samples. As long as a good rare earth profile of both contaminated and natural (in this case fly ash and coal ash) material can be established, the results can be quite definitive, which could result in significant volume reduction by minimizing the amount of material excavated and disposed of. This will lead to cost and time savings for what could be an otherwise costly and potentially complex excavation. Anyone performing environmental remediation of NORM contaminated sites may benefit from this paper and presentation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Open Computing Infrastructure that Facilitates Integrated Product and Process Development from a Decision-Based Perspective

Computer applications for design have evolved rapidly over the past several decades, and significant payoffs are being achieved by organizations through reductions in design cycle times. These applications are overwhelmed by the requirements imposed during complex, open engineering systems design. Organizations are faced with a number of different methodologies, numerous legacy disciplinary tools, and a very large amount of data. Yet they are also faced with few interdisciplinary tools for design collaboration or methods for achieving the revolutionary product designs required to maintain a competitive advantage in the future. These organizations are looking for a software infrastructure that integrates current corporate design practices with newer simulation and solution techniques. Such an infrastructure must be robust to changes in both corporate needs and enabling technologies. In addition, this infrastructure must be user-friendly, modular and scalable. This need is the motivation for the research described in this dissertation. The research is focused on the development of an open computing infrastructure that facilitates product and process design. In addition, this research explicitly deals with human interactions during design through a model that focuses on the role of a designer as that of decision-maker. The research perspective here is taken from that of design as a discipline with a focus on Decision-Based Design, Theory of Languages, Information Science, and Integration Technology. Given this background, a Model of IPPD is developed and implemented along the lines of a traditional experimental procedure: with the steps of establishing context, formalizing a theory, building an apparatus, conducting an experiment, reviewing results, and providing recommendations. Based on this Model, Design Processes and Specification can be explored in a structured and implementable architecture. An architecture for exploring design called DREAMS (Developing Robust Engineering Analysis Models and Specifications) has been developed which supports the activities of both meta-design and actual design execution. This is accomplished through a systematic process which is comprised of the stages of Formulation, Translation, and Evaluation. During this process, elements from a Design Specification are integrated into Design Processes. In addition, a software infrastructure was developed and is called IMAGE (Intelligent Multidisciplinary Aircraft Generation Environment). This represents a virtual apparatus in the Design Experiment conducted in this research. IMAGE is an innovative architecture because it explicitly supports design-related activities. This is accomplished through a GUI driven and Agent-based implementation of DREAMS. A HSCT design has been adopted from the Framework for Interdisciplinary Design Optimization (FIDO) and is implemented in IMAGE. This problem shows how Design Processes and Specification interact in a design system. In addition, the problem utilizes two different solution models concurrently: optimal and satisfying. The satisfying model allows for more design flexibility and allows a designer to maintain design freedom. As a result of following this experimental procedure, this infrastructure is an open system that it is robust to changes in both corporate needs and computer technologies. The development of this infrastructure leads to a number of significant intellectual contributions: 1) A new approach to implementing IPPD with the aid of a computer; 2) A formal Design Experiment; 3) A combined Process and Specification architecture that is language-based; 4) An infrastructure for exploring design; 5) An integration strategy for implementing computer resources; and 6) A seamless modeling language. The need for these contributions is emphasized by the demand by industry and government agencies for the development of these technologies.

Hale, Mark A.↗

Recent advances in understanding secondary organic aerosol: Implications for global climate forcing: Advances in Secondary Organic Aerosol

Anthropogenic emissions and land use changes have modified atmospheric aerosol concentrations and size distributions over time. Understanding preindustrial conditions and changes in organic aerosol due to anthropogenic activities is important because these features (1) influence estimates of aerosol radiative forcing and (2) can confound estimates of the historical response of climate to increases in greenhouse gases. Secondary organic aerosol (SOA), formed in the atmosphere by oxidation of organic gases, represents a major fraction of global submicron-sized atmospheric organic aerosol. Over the past decade, significant advances in understanding SOA properties and formation mechanisms have occurred through measurements, yet current climate models typically do not comprehensively include all important processes. Our review summarizes some of the important developments during the past decade in understanding SOA formation. We also highlight the importance of some processes that influence the growth of SOA particles to sizes relevant for clouds and radiative forcing, including formation of extremely low volatility organics in the gas phase, acid-catalyzed multiphase chemistry of isoprene epoxydiols, particle-phase oligomerization, and physical properties such as volatility and viscosity. Several SOA processes highlighted in this review are complex and interdependent and have nonlinear effects on the properties, formation, and evolution of SOA. Current global models neglect this complexity and nonlinearity and thus are less likely to accurately predict the climate forcing of SOA and project future climate sensitivity to greenhouse gases. Efforts are also needed to rank the most influential processes and nonlinear process-related interactions, so that these processes can be accurately represented in atmospheric chemistry-climate models.

54 ENVIRONMENTAL SCIENCES↗

Atomic-Scale Surface Studies of Bulk Metallic Glasses. Final Report

Bulk metallic glasses (BMGs) are of both scientific and technological interest because the absence of periodic atomic arrangements provides them with unique physical, chemical, and mechanical properties. Their high strength, superior elasticity, and an ability to be easily formed into virtually unlimited shapes with feature sizes from centimeters to Angstroms by blow molding and thermoplastic forming makes them an attractive choice for more and more practical applications and products. Due to their complex internal structure, however, experiments that yield insight into their exact atomic arrangements have been scarce. As a result, glass physics is one of the last remaining unexplored fields of materials science despite the scientific and technological importance of glasses in our daily lives, and the question how to characterize and control matter away from equilibrium, as glasses are, was listed as one of five Grand Challenges in a recent DoE report. The main reason for the slow progress in glass physics is the lack of experimental tools that enable access to atomic-scale structural and behavioral information for disordered materials. Such atomic-scale knowledge is mandatory to establish structure-property relationships that ultimately could allow to custom-design alloys featuring specific desired characteristics. With no such relationships available, theory development in glass remains basic and the few that exist are often untested. The aim of this research was to enable progress in our understanding of BMGs by developing a new approach that will allow a meaningful application of local surface science methods to specially prepared BMG samples to obtain a wealth of quantitative information on their atomic arrangements. Key was the availability of specially prepared samples whose surfaces feature large atomically flat terraces despite being entirely amorphous, which we have produced from a Pt 57.5 Cu 14.7 Ni 5.3 P 22.5 alloy (‘Pt-BMG’) both under ambient conditions as well as in ultrahigh vacuum using a unique setup that has been specially developed within this grant. Our approach starts with the in-situ preparation of oxide crystals that are terminated by large terraces, from which exact mirror images out of BMG will be produced using thermoplastic forming (TPF); for the research within this grant, we have successfully used (001)-oriented SrTiO 3 single crystal surfaces as well as (100)-, (110)-, and (111)-oriented single crystals made from LaAlO 3 . Since the resulting BMG replicas display all features of the original crystal with sub-Angstrom fidelity, thereby mimicking the original crystal’s termination by atomically flat terraces without being crystalline themselves, they are ideally suited for further investigation. The following atomic-scale local studies were then carried within this proposal: (i) high-resolution surface imaging and local spectroscopy using scanning probe microscopy, which showed disordered atom-like features and revealed changes in the gradient of the local surface potential on a 1-2 nm length scale; (ii) characterization of atomic-scale plastic flow with affected volumes as low as 1000 atoms, which showed local hardness near or above the theoretically predicted maximum and, once plastic deformation was initiated, homogeneous flow of the atoms involved; (iii) characterization of surface relaxation processes and the onset of crystallization induced by annealing, which showed that upon heating over the material’s glass transition temperature, the surface rearranges and relaxes towards a more stable, denser packed glass, which increases on-terrace surface roughness, while surface tension smoothens step edges; and (iv) studies that investigate the dependence of the material’s mechanical properties and structure on processing parameters, revealing that relaxed glasses get denser, harder, and more elastic. In combination, this information allows to combine structural models with mechanical properties and preparation history, thereby facilitating the development of preparation-structure-property relationships for metallic glasses. With the availability of such information, bulk metallic glasses can be further optimized to be used in more and more applications in industry.