Search NASA⌕ Search

SEARCH · Search NASA

Results for “Generation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,495 records · Page 83

Demand Response-Driven Production and Maintenance Decision-Making for Cost-Effective Manufacturing

Manufacturers consume about 27% of the total electricity in the U.S. and are among the main contributors in the rising electricity demand. End-user electricity demand response is an effective demand side management tool that can help energy suppliers reduce electricity generation expenditures while providing opportunities for manufacturers to decrease operating costs. Several studies on demand response for manufacturers have been conducted. However, there lacks a unified production model that balances production capability degradation, maintenance requirements, and time-of-use (TOU) electricity prices simultaneously such that the interaction between production, maintenance, and electricity costs is considered. In this paper, a cost-effective production and maintenance scheduling model considering TOU electricity demand response is presented. Additionally, an aggregate cost model is formulated, which considers production, maintenance, and demand response parameters in the same function. The proposed models provide manufacturers with tools for implementing feasible and cost-effective demand response while meeting production targets and efficiently allocating maintenance resources. A case study is performed and illustrates that 19% in cost savings can be achieved when using the proposed model compared to solely minimizing the electricity billing cost. In addition, 14% in cost savings can be achieved when using the proposed model compared to a strategy where only the maintenance cost is minimized. Finally, the benefits of demand response driven production and maintenance scheduling under different cost and parameter settings are investigated; where the rated power, production rate, and initial machine production capability show to have the largest impact on the cost effectiveness of implementing demand response.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Updated NGNP Fuel Acquisition Strategy

A Next Generation Nuclear Plant (NGNP) fuel acquisition strategy was first established in 2007. In that report, a detailed technical assessment of potential fuel vendors for the first core of NGNP was conducted by an independent group of international experts based on input from the three major reactor vendor teams. Part of the assessment included an evaluation of the credibility of each option, along with a cost and schedule to implement each strategy compared with the schedule and throughput needs of the NGNP project. While credible options were identified based on the conditions in place at the time, many changes in the assumptions underlying the strategy and in externalities that have occurred in the interim requiring that the options be re-evaluated. This document presents an update to that strategy based on current capabilities for fuel fabrication as well as fuel performance and qualification testing worldwide. In light of the recent Pebble Bed Modular Reactor (PBMR) project closure, the Advanced Gas Reactor (AGR) fuel development and qualification program needs to support both pebble and prismatic options under the NGNP project. A number of assumptions were established that formed a context for the evaluation. Of these, the most important are: • Based on logistics associated with the on-going engineering design activities, vendor teams would start preliminary design in October 2012 and complete in May 2014. A decision on reactor type will be made following preliminary design, with the decision process assumed to be completed in January 2015. Thus, no fuel decision (pebble or prismatic) will be made in the near term. • Activities necessary for both pebble and prismatic fuel qualification will be conducted in parallel until a fuel form selection is made. As such, process development, fuel fabrication, irradiation, and testing for pebble and prismatic options should not negatively influence each other during the period prior to a decision on reactor type. • Additional funding will be made available beginning in fiscal year (FY) 2012 to support pebble bed fuel fabrication process development and fuel testing while maintaining the prismatic fuel schedule. Options for fuel fabrication for prismatic and pebble bed were evaluated based on the credibility of each option, along with a cost and schedule to implement each strategy. The sole prismatic option is Babcock and Wilcox (B&W) producing uranium oxycarbide (UCO) tristructural-isotropic (TRISO) fuel particles in compacts. This option finishes in the middle of 2022 . Options for the pebble bed are Nuclear Fuel Industries (NFI) in Japan producing uranium dioxide (UO2) TRISO fuel particles, and/or B&W producing UCO or UO2 TRISO fuel particles. All pebble options finish in mid to late 2022.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Virtualized Network Control (VNC)

The focus of this project was on the development of a "Network Service Plane" as an abstraction model for the control and provisioning of multi-layer networks. The primary motivation for this work were the requirements of next generation networked applications which will need to access advanced networking as a first class resource at the same level as compute and storage resources. A new class of "Intelligent Network Services" were defined in order to facilitate the integration of advanced network services into application specific workflows. This new class of network services are intended to enable real-time interaction between the application co-scheduling algorithms and the network for the purposes of workflow planning, real-time resource availability identification, scheduling, and provisioning actions.

97 MATHEMATICS AND COMPUTING↗

Aerospace Safety Advisory Panel

This annual report is based on the activities of the Aerospace Safety Advisory Panel in calendar year 2000. During this year, the construction of the International Space Station (ISS) moved into high gear. The launch of the Russian Service Module was followed by three Space Shuttle construction and logistics flights and the deployment of the Expedition One crew. Continuous habitation of the ISS has begun. To date, both the ISS and Space Shuttle programs have met or exceeded most of their flight objectives. In spite of the intensity of these efforts, it is clear that safety was always placed ahead of cost and schedule. This safety consciousness permitted the Panel to devote more of its efforts to examining the long-term picture. With ISS construction accelerating, demands on the Space Shuttle will increase. While Russian Soyuz and Progress spacecraft will make some flights, the Space Shuttle remains the primary vehicle to sustain the ISS and all other U.S. activities that require humans in space. Development of a next generation, human-rated vehicle has slowed due to a variety of technological problems and the absence of an approach that can accomplish the task significantly better than the Space Shuttle. Moreover, even if a viable design were currently available, the realities of funding and development cycles suggest that it would take many years to bring it to fruition. Thus, it is inescapable that for the foreseeable future the Space Shuttle will be the only human-rated vehicle available to the U.S. space program for support of the ISS and other missions requiring humans. Use of the Space Shuttle will extend well beyond current planning, and is likely to continue for the life of the ISS.

Source record↗

Alternating Between Software Models and Real Hardware in the System Integration Lab for theIncremental Development of the Space Launch System Program Avionics

The MSFC System Integration Lab (SIL) supports avionics development of NASA’s Space Launch System—a new U.S. heavy-lift launch vehicle for NASA’s next generation of human space exploration beyond low-Earth orbit. The SIL facility allows for the incremental development of system components by either hosting real hardware in the loop and/or software models of those components. Through this functionality test teams are able to evaluate overall system performance as components are designed, built and modified. Early hardware/software integration and testing reduces risks and saves overall cost and schedule throughout a program/project life cycle. By performing early hardware/software integration, potential architecture and interface-related problems can be identified, and thus reduce associated risk as early in the design cycle as possible when problems are the least expensive to resolve while also improving the design and requirements. This presentation will illustrate the power of employing a hardware in the loop simulation system for the development of novel spacecraft avionics.

Space Launch System↗

The Mass Change Designated Observable Study: Overview and Results

The 2017–2027 United States National Academy of Sciences Decadal Survey (DS) for Earth Science and Applications from Space identified Mass Change (MC) as one of five Designated Observables (DOs) having the highest priority in terms of Earth observations required to advance Earth system science over the next decade. In response to this designation, NASA initiated several multi-center studies, with the goal of recommending observing system architectures for each DO for implementation within this decade. This paper provides an overview of the Mass Change Designated Observable (MCDO) Study along with key findings. The study process included: (a) generation of a Science and Applications Traceability Matrix (SATM) that maps required measurement parameters to the DS Science and Applications Objectives; (b) identification of three architecture classes relevant for measuring mass change: Precise Orbit Determination (POD), Satellite-Satellite-Tracking (SST) and Gravity Gradiometry (GG), along with variants within each architecture class; and (c) creation of a Value Framework process that considers science value, cost, risk, schedule, and partnership opportunities, to identify and recommend high value observing systems for further in-depth study. The study team recommended the implementation of an SST architecture, and identified variants that simultaneously (a) satisfy the baseline measurement parameters of the SATM; (b) maximize the probability of providing overlap with the Gravity Recovery and Climate Experiment Follow-On (GRACE-FO) mission currently in operation, accelerating science return from both missions; and (c) provide a pathway towards substantial improvements in resolution and accuracy of mass change data products relative to the program of record.

D N Wiese↗

Performance Modeling of Urban Air Mobility Vehicles to Support Air Traffic Management Research

The recent emergence of Urban Air Mobility (UAM) vehicles has resulted in a need for flight performance models that enable comprehensive simulation-based research on air traffic management topics such as route structure, scheduling, and separation standards. Successful performance modeling methods exist for a wide range of traditional aircraft designs. However, comparable modeling methods appropriate for UAM vehicles that combine fixed-wing and rotorcraft performance have not yet been established. One challenge to progress has been the lack of available data capturing the performance characteristics and unique flight profiles of these aircraft. This paper describes methods used to generate the required performance data and the development of performance models for UAM vehicles. Included is a review of the energy and power equations often used in developing performance models for traditional aircraft as well as a discussion of their applicability to UAM vehicles. The challenge of generating realistic performance data in over-actuated vehicles transitioning from hover to cruise flight is also addressed through an approach based on objective function optimization. A table-based performance model format adapted to UAM configurations is described, as well as parametric models intended to accompany the performance table to allow detailed modeling of power and fuel consumption during accelerated flight, turning flight, or flight at an arbitrary climb or descent rate. A discussion of future work is also provided, including the need for refinement of UAM performance modeling methods and formats, especially in conjunction with improvements to aerodynamic modeling of vehicles with complex designs where strong interaction effects may dominate important regions of the flight envelope.

Performance Modeling↗

Performance Modeling of Urban Air Mobility Vehicles to Support Air Traffic Management Research

The recent emergence of Urban Air Mobility (UAM) vehicles has resulted in a need for flight performance models that enable comprehensive simulation-based research on air traffic management topics such as route structure, scheduling, and separation standards. Successful performance modeling methods exist for a wide range of traditional aircraft designs. However, comparable modeling methods appropriate for UAM vehicles that combine fixed-wing and rotorcraft performance have not yet been established. One challenge to progress has been the lack of available data capturing the performance characteristics and unique flight profiles of these aircraft. This paper describes methods used to generate the required performance data and the development of performance models for UAM vehicles. Included is a review of the energy and power equations often used in developing performance models for traditional aircraft as well as a discussion of their applicability to UAM vehicles. The challenge of generating realistic performance data in over-actuated vehicles transitioning from hover to cruise flight is also addressed through an approach based on objective function optimization. A table-based performance model format adapted to UAM configurations is described, as well as parametric models intended to accompany the performance table to allow detailed modeling of power and fuel consumption during accelerated flight, turning flight, or flight at an arbitrary climb or descent rate. A discussion of future work is also provided, including the need for refinement of UAM performance modeling methods and formats, especially in conjunction with improvements to aerodynamic modeling of vehicles with complex designs where strong interaction effects may dominate important regions of the flight envelope.

Performance Modeling↗

Progress on the decommissioning of Zion nuclear generating station

The decommissioning of the twin 1040 MWe PWRs at Zion, near Chicago USA is a ground breaking programme. The original owner, Exelon Nuclear Corporation, transferred the full responsibility for reactor dismantling and site license termination to a subsidiary of EnergySolutions. The target end state of the Zion site for return to Exelon will be a green field with the exception of the dry fuel storage pad. In return, ZionSolutions has access to the full value of the decommissioning trust fund. There are two potential attractions of this model: lower overall cost and significant schedule acceleration. The Zion programme which commenced in September 2010 is designed to return the cleared site with an Independent Spent Fuel Storage Installation (ISFSI) pad in 2020, 12 years earlier than planned by Exelon. The overall cost, at $500 M per full size power reactor is significantly below the long run trend of $750 M+ per PWR. Implementation of the accelerated programme has been underway for nearly three years and is making good progress. The programme is characterised by numerous projects proceeding in parallel. The critical path is defined by the inspection and removal of fuel from the pond and transfer into dry fuel storage casks on the ISFSI pad and completion of RPV segmentation. Fuel loading is expected to commence in mid- 2013 with completion in late 2014. In parallel, ZionSolutions is proceeding with the segmentation of the Reactor Vessel (RV) and internals in both Units. Removal of large components from Unit 1 is underway. Numerous other projects are underway or have been completed to date. They include access openings into both containments, installation of heavy lift crane capacity, rail upgrades to support waste removal from the site, radiological characterization of facilities and equipment and numerous related tasks. As at February 2013, the programme is just ahead of schedule and within the latest budget. The paper will provide a fuller update. The first two years of the Zion programme offer some interesting learning opportunities. The critical importance of leadership and project control systems will be emphasised in the paper. Strong supplier relationships and good community cooperation are essential. A learning and adaptable team, incentivised to meet schedule and budget, drives affordability of the whole programme. Our key lessons so far concern organisation and people as much as engineering and technology. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Solving the Issue of Restenosis After Stenting of Intracranial Stenoses: Experience with Two Thin-Strut Drug-Eluting Stents (DES)—Taxus Element™ and Resolute Integrity™

PurposeThin-strut, flexible DES are suitable for intracranial stenting and may improve long-term vessel patency. The purpose of this study was to report our experience with two new-generation DES for the treatment of intracranial atherosclerotic disease.Patients and MethodsWe retrospectively reviewed all patients treated with Taxus Element™ or Resolute Integrity™ stent for an intracranial atherosclerotic stenosis between March 2011 and August 2013. Technical success was defined as the ability to deploy the device at the desired location and reduce the degree of stenosis below 50 %. All procedure-related strokes were recorded. Control angiography was scheduled after 6 weeks, 3, 6, and 12 months and yearly thereafter. A luminal narrowing ≥50 % was regarded as a restenosis. Stroke recurrence in the territory of the treated artery was reported.ResultsIn the defined period we treated 101 patients harboring 117 intracranial stenoses. The procedure was successful in 100 (85.5 %) lesions. Procedure-related strokes occurred in 10 (9.9 %) patients with a permanent morbidity in 3 (3.0 %). Follow-up angiography was available for 83 of 100 (83.0 %) successfully treated lesions with an average of 355 days (IQR 153–482 days). Three (3.6 %) asymptomatic restenoses were detected. All occurred after treatment with Resolute Integrity™, none after Taxus Element™ (p = 0.059). New strokes in the territory of the treated artery were encountered in 2 (2.6 %) occasions.ConclusionThin-strut DES improve long-term patency and reduce the risk of subsequent stroke. Differences between devices may exist. Feasibility is comparable to bare-metal balloon-mounted stents and procedure-related strokes occurred within the expected range.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Replication-Dependent Radiosensitization of Human Glioma Cells by Inhibition of Poly(ADP-Ribose) Polymerase: Mechanisms and Therapeutic Potential

Purpose: Current treatments for glioblastoma multiforme are inadequate and limited by the radiation sensitivity of normal brain. Because glioblastoma multiforme are rapidly proliferating tumors within nondividing normal tissue, the therapeutic ratio might be enhanced by combining radiotherapy with a replication-specific radiosensitizer. KU-0059436 (AZD2281) is a potent and nontoxic inhibitor of poly(ADP-ribose) polymerase-1 (PARP-1) undergoing a Phase II clinical trial as a single agent. Methods and Materials: Based on previous observations that the radiosensitizing effects of PARP inhibition are more pronounced in dividing cells, we investigated the mechanisms underlying radiosensitization of human glioma cells by KU-0059436, evaluating the replication dependence of this effect and its therapeutic potential. Results: KU-0059436 increased the radiosensitivity of four human glioma cell lines (T98G, U373-MG, UVW, and U87-MG). Radiosensitization was enhanced in populations synchronized in S phase and abrogated by concomitant exposure to aphidicolin. Sensitization was further enhanced when the inhibitor was combined with a fractionated radiation schedule. KU-0059436 delayed repair of radiation-induced DNA breaks and was associated with a replication-dependent increase in {gamma}H2AX and Rad51 foci. Conclusion: The results of our study have shown that KU-0059436 increases radiosensitivity in a replication-dependent manner that is enhanced by fractionation. A mechanism is proposed whereby PARP inhibition increases the incidence of collapsed replication forks after ionizing radiation, generating persistent DNA double-strand breaks. These observations indicate that KU-0059436 is likely to enhance the therapeutic ratio achieved by radiotherapy in the treatment of glioblastoma multiforme. A Phase I clinical trial is in development.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Randomized Clinical Trial of Weekly vs. Triweekly Cisplatin-Based Chemotherapy Concurrent With Radiotherapy in the Treatment of Locally Advanced Cervical Cancer

Purpose: To compare compliance, toxicity, and outcome of weekly and triweekly cisplatin administration concurrent with radiotherapy in locally advanced cervical cancer. Methods and Materials: In this open-label, randomized trial, 104 patients with histologically proven Stage IIB-IVA cervical cancer were randomly assigned by a computer-generated procedure to weekly (weekly cisplatin 40 mg/m{sup 2}, six cycles) and triweekly (cisplatin 75 mg/m{sup 2} every 3 weeks, three cycles) chemotherapy arms during concurrent radiotherapy. The difference of compliance and the toxicity profiles between the two arms were investigated, and the overall survival rate was analyzed after 5 years. Results: All patients tolerated both treatments very well, with a high completion rate of scheduled chemotherapy cycles. There was no statistically significant difference in compliance between the two arms (86.3% in the weekly arm, 92.5% in the triweekly arm, p > 0.05). Grade 3-4 neutropenia was more frequent in the weekly arm (39.2%) than in the triweekly arm (22.6%) (p = 0.03). The overall 5-year survival rate was significantly higher in the triweekly arm (88.7%) than in the weekly arm (66.5%) (hazard ratio 0.375; 95% confidence interval 0.154-0.914; p = 0.03). Conclusions: Triweekly cisplatin 75-mg/m{sup 2} chemotherapy concurrent with radiotherapy is more effective and feasible than the conventional weekly cisplatin 40-mg/m{sup 2} regimen and may be a strong candidate for the optimal cisplatin dose and dosing schedule in the treatment of locally advanced cervical cancer.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Fibre optic extensometer for high radiation and high temperature nuclear applications

In the framework of the Joint Instrumentation Laboratory (LCI), gathering resources from SCK-CEN (Belgium) and CEA (France), we are developing an optical sensor in order to accurately measure radiation-induced elongation of material placed in the core of a Material Testing Reactor (MTR). This extensometer displays common advantages of Fibre Optic (FO) sensors: high resolution, easy remote sensing and multiplexing, and also compact size which is of particular interest for in pile experiments with little room available. In addition, light weight reduces gamma heating hence limiting the thermal effect. In accordance with the specifications, the sensor has preferably two fixing points defining a gauge length of 10 to 15 mm (as a minimum). The diameter is less than 2 mm. Intense gamma and neutron irradiation as well as high temperatures are the most difficult environment conditions to withstand. Reactor radiation produces huge losses in common optical fibre. The losses can be limited by selecting the fibres (mainly with high purity silica core), the wavelength range (800-1200 nm), and a measurement based on interferometry (largely insensitive to losses in the fibre thanks to the wavelength encoding of the useful signal). Heavy neutron - mainly - and gamma flux such as in MTR, also produce compaction of silica, resulting in a significant drift and preventing the use of commercial FO sensors in such environment. Knowing this issue we revised the basic scheme of Extrinsic Fabry Perot Interferometer (EFPI) in order to limit the effects of compaction. A first sensor prototype fixed on a stainless steel support was tested in the Smirnof test facility in the BR2 MTR in Mol (Belgium). The support was subject to a constant mechanical and thermal stress, and his dimensions were not supposed to vary. This test showed a very low drift of the revisited EPFI design under high irradiation field in comparison with a commercial EFPI. This result has to be confirmed with second generation sensors with an increased robustness. The other difficulty to face is high temperature. Fibre optics with metal coating allows safe operation under temperatures up to 400 deg.C and even higher. But differential dilatation between silica and typical metallic material produces differential elongation in the range of 0.5 10{sup -2} i.e 5000{mu}{epsilon} for an increase in temperature of 300-400 deg. C. Such large elongation has to be considered carefully in the sensor design and its fixing on the sample. Laboratory tests with a second generation of adapted sensors demonstrated their good accuracy: less than 1% error over a displacement of 100{mu}m (< 1 {mu}m error), at room temperature. The displacement measured can reach 250{mu}m (20000{mu}{epsilon} with a gauge length of 12.5 mm) or more. We are currently implementing metal-coated fibre and we are preparing the next in pile irradiation on the BR2 reactor scheduled for mid-2011. Other applications of the sensor can be considered. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

SU-F-T-282: Quality Assurance for IMRT/VMAT QA Devices: Issues Affecting the Timing for ArcCHECK Recalibration

Purpose: To discuss several factors surrounding the decision on when to recalibrate the ArcCHECK device as well as present a simple and efficient monthly check to evaluate ArcCHECK calibrations. Methods: ArcCheck (Sun Nuclear) calibrations were evaluated monthly by measuring a 25×25cm{sup 2} field with 100 MU. Since ArcCHECK measurements are run on an almost nightly basis, such additional square field measurements are obtained with minimal additional effort. An in-house MATLAB script compares two radial (y-direction) profiles from the top/center of the new measurement relative to a baseline measurement acquired at the last device calibration. The program automatically generates PDF profile and percent difference comparisons for inspection. Recalibration is based on inspection of measurement profile shapes and percent differences from the baseline measurement. Results: The method presented here shows the utility of a simple monthly check for evaluating ArcCHECK calibrations, and in addition shows the importance of recalibrating after Linac beam steering. Our device required recalibration approximately every 8–10 months. However, for ease of scheduling, we propose a bi-annual recalibration interval. Clinics with a lighter/heavier IMRT/VMAT QA case load may require different recalibration intervals, which are easily determined using the single-field method presented. Analysis of additional square fields is also easily incorporated, if desired. We further illustrate the importance of array recalibration given that diode irradiation is not uniform over the entire device, with central diodes receiving more than 900 Gy over the course of 10 months and peripheral diodes receiving as little as 50 Gy (in our experience). Finally, we show that timely device recalibration decreases spread in clinical IMRT/VMAT QA gamma passing rates. Conclusion: Quality assurance for ArcCHECK array calibrations is important to ensure quality IMRT/VMAT QA comparisons. For many clinics, calibrations should be performed at least annually, if not more frequently, based on use of the proposed monthly check.

60 APPLIED LIFE SCIENCES↗

Development of Cable Aging Acceptance Criteria for Nuclear Facilities

The aging of nuclear power plant electrical cables has been the subject of substantial research and development (R&D) projects in the nuclear industry, national and international laboratories, universities, and vendor organizations for several years. More specifically, these R&D efforts were conducted to develop equipment and techniques for assessing age-related degradation of in-service cables in nuclear facilities including power plants, research reactors, waste facilities and fuel fabrication plants. In recent years, cable R&D efforts in the nuclear arena have also included work to develop new cables for the next generation of reactors. Over time, exposure to harsh environmental conditions such as elevated temperatures, radiation, and humidity in nuclear installations can result in age-related degradation and failure of cables. In the current fleet of nuclear reactors, there are thousands of miles of cabling installed in each plant and many of these cables are exposed to these harsh environmental conditions. For these cables, the jacket and insulation polymers harden and become brittle over time, making them more susceptible to crack formation and growth, moisture intrusion, and other mechanisms that can lead to cable failure. Moreover, the existing U.S. fleet of 98 nuclear reactors has an average operating age of 38 years. Many of these nuclear power plants have applied for and almost all have been granted regulatory approval for license renewals to operate for 60 years, 20 years beyond their original 40-year life. Further, subsequent license renewals (SLRs) are underway with a few commercial nuclear power sites already approved to operate up to 80 years. As these reactors pursue operating life extensions, utilities must find a way to address issues associated with age-related degradation of cables. Designers of small modular reactors are also in need of technologies to evaluate the performance of cables that will be installed in harsher environments (e.g. higher temperatures, radiation doses, dose rates, etc.) than those present in current-generation reactors. Today, a variety of cable condition monitoring (CM) techniques have been developed and successfully used in nuclear facilities. These techniques are used to identify age-related degradation and assess the condition of cables to determine if their performance characteristics have changed with age. However, objective criteria must be developed for these CM tests to help quantify cable condition and thereby develop repair and replacement schedules. With operating life extending to 80 years and more SLRs on the horizon, both nuclear facilities and regulators need an objective means to determine the aged condition of cables.

36 MATERIALS SCIENCE↗

Development of Cable Aging Acceptance Criteria for Nuclear Facilities

The aging of nuclear power plant electrical cables has been the subject of substantial research and development (R&D) projects in the nuclear industry, national and international laboratories, universities, and vendor organizations for several years. More specifically, these R&D efforts were conducted to develop equipment and techniques for assessing age-related degradation of in-service cables in nuclear facilities including power plants, research reactors, waste facilities and fuel fabrication plants. In recent years, cable R&D efforts in the nuclear arena have also included work to develop new cables for the next generation of reactors. Over time, exposure to harsh environmental conditions such as elevated temperatures, radiation, and humidity in nuclear installations can result in age-related degradation and failure of cables. In the current fleet of nuclear reactors, there are thousands of miles of cabling installed in each plant and many of these cables are exposed to these harsh environmental conditions. For these cables, the jacket and insulation polymers harden and become brittle over time, making them more susceptible to crack formation and growth, moisture intrusion, and other mechanisms that can lead to cable failure. Moreover, the existing U.S. fleet of 98 nuclear reactors has an average operating age of 38 years. Many of these nuclear power plants have applied for and almost all have been granted regulatory approval for license renewals to operate for 60 years, 20 years beyond their original 40-year life. Further, subsequent license renewals (SLRs) are underway with a few commercial nuclear power sites already approved to operate up to 80 years. As these reactors pursue operating life extensions, utilities must find a way to address issues associated with age-related degradation of cables. Designers of small modular reactors are also in need of technologies to evaluate the performance of cables that will be installed in harsher environments (e.g. higher temperatures, radiation doses, dose rates, etc.) than those present in current-generation reactors. Today, a variety of cable condition monitoring (CM) techniques have been developed and successfully used in nuclear facilities. These techniques are used to identify age-related degradation and assess the condition of cables to determine if their performance characteristics have changed with age. However, objective criteria must be developed for these CM tests to help quantify cable condition and thereby develop repair and replacement schedules. With operating life extending to 80 years and more SLRs on the horizon, both nuclear facilities and regulators need an objective means to determine the aged condition of cables.

36 MATERIALS SCIENCE↗

Asteroid Crewed Segment Mission Lean Development

The next generation of human spaceflight missions presents numerous challenges to designers that must be addressed to produce a feasible concept. The specific challenges of designing an exploration mission utilizing the Space Launch System and the Orion spacecraft to carry astronauts beyond earth orbit to explore an asteroid stored in a distant retrograde orbit around the moon will be addressed. Mission designers must carefully balance competing constraints including cost, schedule, risk, and numerous spacecraft performance metrics including launch mass, nominal landed mass, abort landed mass, mission duration, consumable limits and many others. The Asteroid Redirect Crewed Mission will be described along with results from the concurrent mission design trades that led to its formulation. While the trades presented are specific to this mission, the integrated process is applicable to any potential future mission. The following trades were critical in the mission formulation and will be described in detail: 1) crew size, 2) mission duration, 3) trajectory design, 4) docking vs grapple, 5) extravehicular activity tasks, 6) launch mass and integrated vehicle performance, 7) contingency performance, 8) crew consumables including food, clothing, oxygen, nitrogen and water, and 9) mission risk. The additional Orion functionality required to perform the Asteroid Redirect Crewed Mission and how it is incorporated while minimizing cost, schedule and mass impacts will be identified. Existing investments in the NASA technology portfolio were leveraged to provide the added functionality that will be beneficial to future exploration missions. Mission kits are utilized to augment Orion with the necessary functionality without introducing costly new requirements to the mature Orion spacecraft design effort. The Asteroid Redirect Crewed Mission provides an exciting early mission for the Orion and SLS while providing a stepping stone to even more ambitious missions in the future.

Gard, Joe↗

Integrated Control Design for A Partially Turboelectric Aircraft Propulsion System

Electrified Aircraft Propulsion (EAP) holds great potential for reducing aviation emissions and fuel burn. A variety of EAP architectures have been proposed including partially-turboelectric configurations that combine turbofan engines with motor-driven propulsors. Such architectures exhibit coupling between subsystems and thus require an integrated control solution. To address this need, this paper presents an integrated control design strategy for a commercial single-aisle partially-turboelectric aircraft concept consisting of two wing-mounted turbofan engines and an electric motor driven tailfan propulsor. Within this architecture the turbofans serve the dual purpose of generating thrust and supplying mechanical offtake power used to generate electricity for the tailfan motor. The propulsion control system is tasked with coordinating turbofan and tailfan operation under both steady-state and transient scenarios. The paper introduces a linear state-space representation of the architecture reflecting the coupling between the turbofan and tailfan subsystems along with loop transfer functions reflecting open- and closed-loop system dynamics. Also discussed is an applied strategy for scheduling the tailfan setpoint command based on the average sensed fan speed of the two turbofans. This approach ensures synchronized operation of the turbofan and tailfan subsystems while also allowing the turbofan fuel control design to be simplified. Performance of the integrated control design is assessed through a real-time hardware-in-the-loop test conducted at the NASA Electric Aircraft Testbed. During this test a scaled version of the electrical system and turbomachinery shaft dynamics were implemented in electrical machine hardware and evaluated under closed-loop control. Results from this facility test are presented to illustrate the efficacy of the applied integrated control design approach under steady-state and transient scenarios including a full-flight mission profile.

Electrified Aircraft Propulsion↗