Path to Ignition at the National Ignition Facility: The Role of the Automated Alignment System
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Following the decision to withdraw the Yucca Mountain license application, the Department of Energy created a Blue Ribbon Commission (BRC) on America's Nuclear Future, tasked with recommending a national strategy to manage the back end of the nuclear fuel cycle. The BRC issued its final report in January 2012, with recommendations covering transportation, storage and disposal of spent nuclear fuel (SNF); potential reprocessing; and supporting institutional measures. The BRC recommendations on disposal of SNF and high-level waste (HLW) are relevant to the U.S. Environmental Protection Agency (EPA), which shares regulatory responsibility with the Nuclear Regulatory Commission (NRC): EPA issues 'generally applicable' performance standards for disposal repositories, which are then implemented in licensing. For disposal, the BRC endorses developing one or more geological repositories, with siting based on an approach that is adaptive, staged and consent-based. The BRC recommends that EPA and NRC work cooperatively to issue generic disposal standards-applying equally to all sites-early in any siting process. EPA previously issued generic disposal standards that apply to all sites other than Yucca Mountain. However, the BRC concluded that the existing regulations should be revisited and revised. The BRC proposes a number of general principles to guide the development of future regulations. EPA continues to review the BRC report and to assess the implications for Agency action, including potential regulatory issues and considerations if EPA develops new or revised generic disposal standards. This review also involves preparatory activities to define potential process and public engagement approaches. (authors)
The road-map to obtaining closure of the Middlesex Sampling Plant FUSRAP site in Middlesex, New Jersey (NJ) has required a multi-faceted approach, following the CERCLA Process. Since 1998, the US ACE, ECC, and other contractors have completed much of the work required for regulatory acceptance of site closure with unrestricted use. To date, three buildings have been decontaminated, demolished, and disposed of. Two interim storage piles have been removed and disposed of, followed by the additional removal and disposal of over 87,000 tons of radiologically and chemically-impacted subsurface soils by the summer of 2008. The US ACE received a determination from the EPA for the soils Operable Unit, (OU)-1, in September 2010 that the remedial excavations were acceptable, and meet the criteria for unrestricted use as required by the 2004 Record of Decision (ROD) for OU-1. Following the completion of OU-1, the project delivery team performed additional field investigation of the final Operable Unit for Middlesex, OU-2, Groundwater. As of December 2012, the project delivery team has completed a Supplemental Remedial Investigation, which will be followed with a streamlined Feasibility Study, Proposed Plan, and ROD. Several years of historical groundwater data was available from previous investigations and the FUSRAP Environmental Surveillance Program. Historical data indicated sporadic detections of Volatile Organic Compounds (VOCs), primarily trichloroethylene (TCE), carbon tetrachloride (CT), and methyl tert-butyl ether (MTBE), with no apparent trend or pattern indicating extent or source of the VOC impact. In 2008, the project delivery team initiated efforts to re-assess the Conceptual Site Model (CSM) for groundwater. The bedrock was re-evaluated as a leaky multi-unit aquifer, and a plan was developed for additional investigations for adequate bedrock characterization and delineation of groundwater contaminated primarily by CT, TCE, and tetrachloroethene (PCE). The investigation was designed to accumulate multiple lines of evidence to determine the source and to delineate the extent of contamination, as required to complete the CERCLA Process and gain regulatory acceptance. Investigative techniques included in-well vertical flow tracing, borehole geophysics and packer testing of temporary test holes to characterize contamination in the bedrock fractures beneath the site, and to delineate likely source areas. (authors)
Empty HLW handling and storage tanks at SRS and INL contain residual radioactivity; these tanks are being stabilized with cementitious grout during closure operations. The US NRC directed the Center for Nuclear Waste Regulatory Analyses (CNWRA{sup R}) to develop physical analogs of cementitious grout monoliths to investigate their potential to form fast flow pathways such as macro-cracks, separations between grout lifts, and annuli around pipes, supports, and along tank walls. CNWRA developed and tested 15 55-gal-drum-scale specimens and 2 larger specimens of tank-filling cementitious grout, and 9 specimens of pipe-filling grout. These experiments demonstrated that the size of fast flow pathways that develop and the peak temperatures attained during hydration are proportional to the scale of the specimen, and that annular apertures and bulk grout permeability generally increased with time post-placement. Cracks developed overnight following placement of each grout lift in the largest specimen, but developed more slowly in smaller specimens, perhaps due to a ∼20 deg. C difference in peak temperatures, which influence the thermal gradients that can induce cracking. Plastic and drying shrinkage commonly led to poor grout-to-metal and grout-to-grout bonding. Cracks, annular gaps, and grout flow lobe seams transmitted fluids during injection testing. Macro-scale flow pathways such as these are not readily observed in bench-scale specimens of cementitious tank grout. (authors)
Explore the source record for details and available documents.
Operating a water treatment facility at the Fernald Preserve in Cincinnati, Ohio-to support groundwater remediation and other wastewater treatment needs-has become increasingly unnecessary. The Fernald Preserve became a U.S. Department of Energy Office of Legacy Management (LM) site in November 2006, once most of the Comprehensive Environmental Response, Compensation, and Liability Act environmental remediation and site restoration had been completed. Groundwater remediation is anticipated to continue beyond 2020. A portion of the wastewater treatment facility that operated during the CERCLA cleanup continued to operate after the site was transferred to LM, to support the remaining groundwater remediation effort. The treatment facility handles the site's remaining water treatment needs (for groundwater, storm water, and wastewater) as necessary, to ensure that uranium discharge limits specified in the Operable Unit 5 Record of Decision are met. As anticipated, the need to treat groundwater to meet uranium discharge limits has greatly diminished over the last several years. Data indicate that the groundwater treatment facility is no longer needed to support the ongoing aquifer remediation effort. (authors)
Sandia National Laboratories/New Mexico (SNL/NM), designated as a small quantity site (SQS) by the National TRU Program (NTP), generated contact-handled (CH) and remote-handled (RH) transuranic (TRU) waste primarily from the decontamination and clean-out of glove boxes at the Hot Cell Facility (HCF) at Technical Area (TA) V. All of the waste required repackaging, with the CH TRU waste being repackaged from late 2007 through 2011. Three shipments of CH were completed in October 2011, which de-inventoried SNL/NM's legacy TRU waste. In FY11, RH TRU waste was repackaged at the Auxiliary Hot Cell Facility (AHCF) located in TAV with the support of the Central Characterization Project (CCP). The waste was originally packaged in SNL/NM fabricated casks, cement or lead-lined 55-gallon drums, or 30-gallon drums. The AHCF is a small hot cell, with access only through a roof port which presented challenges for inserting and removing waste from the hot cell. The CCP provided visual examination operators (VEOs) to observe and document each waste item repackaged, removal of prohibited items, and radiological sampling. Dose-to-Curie measurements were calculated by CCP after a radiological report was prepared using scaling factors determined by the analysis of swipe samples. Finally, headspace gas samples were taken and sent to the Advanced Mixed Waste Treatment Project (AMWTP) for analysis. Despite the challenges, the RH waste is on track to be shipped to WIPP in early FY12. The processes used and procedures developed to conduct the repackaging operations, the issues identified and mitigated were challenging but the cooperation between SNL/NM and the Central Characterization Program (CCP) enabled SNL/NM to complete the repackaging and support the characterization and shipment. An inventory list, identification of the campaigns, discussion of the challenges and mitigations, and the final loading of the RH 72-B casks at TA-V for direct shipment to the Waste Isolation Pilot Plant (WIPP) will be discussed. Lessons learned from the RH campaigns are: - Some containers that were originally identified as HC-3 have been re-evaluated and became < HC-3 due to the conservative estimates made by the original generators - Operators at the AHCF were not accustomed to the detail required by the VE operators. However, they worked well together and the repackaging was completed ahead of schedule. - The AK was not always accurate as was demonstrated by the solid waste found in the drum during the first visit by EPA. That waste has since been determined to be low-level. - Two drums originally thought to be RH turned out to be CH and arrangement for RTR had to be made quickly. - Six of the original RH repacked drums became low level. - Lessons learned from the CH campaigns were helpful in avoiding many issues. The RH repackaging effort has been a success due to the expertise of the AHCF operators, supervisor, and manager, the conscientious attention to detail of the CCP VE operators, the experience of the CCP DTC and headspace gas sampling staff, and the guidance and support from CCP and CBFO. Sometimes schedules had to be adjusted, processes updated, and issues discussed, but the communication between CCP and SNL/NM was good. SNL/NM hopes to have the legacy RH TRU waste shipped off-site by early 2012. (authors)
The U.S. Department of Energy, Office of Nuclear Energy (DOE/NE) has sponsored a program since Fiscal Year (FY) 09 to develop the technical basis for extended dry storage of used fuel. This program is also working to develop the transportation technical basis for the transport of used fuel after the extended storage period. As this program has progressed, data gaps associated with dry storage systems (e.g., fuel, cask internals, canister, closure, overpack, and pad) have been identified that need to be addressed to develop the technical bases for extended storage and transportation. There has also been an initiation of experimental testing and analyses based on the identified data gaps. The technical aspects of the NE program are being conducted by a multi-lab team made up of the DOE laboratories. As part of this program, a mission objective is to also collaborate closely with industry and the international sector to ensure that all the technical issues are addressed and those programs outside the DOE program can be leveraged, where possible, to maximize the global effort in storage and transportation research. The DOE/NE program is actively pursuing the development of the technical basis to demonstrate the feasibility of storing UNF for extended periods of time with subsequent transportation of the UNF to its final disposition. This program is fully integrated with industry, the U.S. regulator, and the international community to assure that programmatic goals and objectives are consistent with a broad perspective of technical and regulatory opinion. As the work evolves, assessments will be made to ensure that the work continues to focus on the overall goals and objectives of the program. (authors)
Incorporation of a standardized canister system into the commercial waste management system represents an opportunity to develop an integrated approach to storage, transportation, and disposal issues. However, regardless of timing and method, deployment of such a system would have the potential to cause significant system-wide impacts. The current inventory of commercial spent nuclear fuel dry storage systems is diverse and increasing. In addition, the currently loaded systems are large-capacity systems (up to 37 pressurized water reactor assemblies or 89 boiling water reactor assemblies) that are now able to accommodate large (greater than 45 kilowatts) amounts of heat during storage, with the potential to accommodate fairly high heat loads (∼32 kilowatts) for transportation as well. A standardized canister system designed with disposition in mind would likely be significantly smaller than the current systems and have dramatically lower heat limit maximums. Over the past few years, the Department of Energy (DOE) Office of Nuclear Energy Fuel Cycle Technologies Nuclear Fuels Storage and Transportation Planning Project (NFST) has performed a number of system analyses using logistic simulations to evaluate the impacts of incorporating these smaller canisters into the commercial waste management system. These simulations predict the amount of resources (e.g., staff, canisters/casks, rail-cars, facilities), the size of facilities, and the timing of operations, as well as provide rough order-of-magnitude cost estimates. In addition to system analyses, DOE funded efforts by EnergySolutions to develop a generic design of a small-capacity standardized canister system and investigate innovative operational approaches to minimize the at-reactor operational impacts of loading such smaller canisters. A result of EnergySolutions' work was the development of a 'canister-in-carrier' concept that would allow for loading, storing, transporting, and potentially disposing of groups of small canisters at the same time. With the inclusion of this new concept, the most recent system analyses show that incorporating standardized canister systems into the commercial waste management system has the potential for some system-wide cost reductions in addition to the flexibility that smaller canisters would provide to the system. Based on these analyses, the authors of this paper recommend that DOE fund (1) a demonstration of the ability to weld up to four small canisters at the same time to confirm the feasibility and practicality of the canister-in-carrier concept and (2) the development of a more detailed conceptual design for future applications for Certificates of Compliance, if standardized canisters were incorporated into the commercial waste management system. This paper documents both the results of the latest assessment of standardized canister concepts including the canister-in-carrier concept and the authors' recommendations. (authors)
The development of the USA's only candidate (since 1987) HLW-repository at the Yucca Mountain (YM) site, Nevada, was halted by the Obama administration in 2009. Four years later, the Obama administration proposed a new strategy for the back end of the nuclear fuel cycle that would open a consent-based HLW repository 'by 2048'. At the end of 2014, both the YM HLW repository and the new HLW-disposition (storage and disposal) strategy remain on hold due to lack of enabling legislation. With this as background, and based upon our active involvement in, monitoring of, and reporting on HLW management programs in the USA and abroad since 1973, we submit that: 1. Politics, political will, and legal actions and outcomes will continue to govern progress. 2. Public acceptance and sustained support (PASS) may influence politics and political will. 3. PASS is time-dependent and governed by: a. Ideologies; b. Perceived benefits and risks; c. Level and equity of radiation protection provided by applicable regulations; d. Perceived robustness/safety of the proposed disposition concept; and e. Perceived credibility and competency vested in the involved organizations and their respective leaders (= TRUST). We therefore recommend that the USA concurrently pursues at least two, 'centralized' HLW-storage and -disposal solutions based upon best-available relevant knowledge and majority-PASS at facility-host locations. Furthermore, safe(r) and more secure disposal of defense/government-generated HLW could probably commence at least 15 years earlier than 'by 2048' in/at: 1. The YM repository/site. 2. The WIPP repository/site. 3. 'Local' deep boreholes. (authors)
The Central Nevada Test Area, Nevada, was the site of an underground nuclear test in 1968, which resulted in residual contamination at and near the detonation depth of 975 meters (3200 feet). The environmental corrective action strategy for the site was conducted in accordance with the Federal Facility Agreement and Consent Order and all applicable Nevada Division of Environmental Protection (NDEP) policies and regulations. The corrective action strategy initiated in 1999 included developing a conceptual site model, preparing a numerical flow and transport model, calculating contaminant boundaries, negotiating compliance boundaries with NDEP, performing model validation, and monitoring groundwater. This strategy was executed through the Corrective Action Decision Document/Corrective Action Plan phase, when it was determined that the flow and transport model could not be validated because it failed to adequately predict groundwater elevations in the monitoring/validation (MV) wells (MV-1, MV-2, and MV-3) drilled subsequent to the modeling effort. This led to a change in the corrective action strategy that is now designed to validate the compliance boundary through monitoring and institutional controls, rather than relying predominantly on a numerical flow and transport model. This new approach included enhancements to the monitoring well network and additional monitoring to confirm that data were sufficient to proceed to closure. The corrective action activities were completed in 2015, and the Closure Report, which established the long-term postclosure monitoring program, was approved in 2016. The postclosure monitoring program is designed to (1) assess the effectiveness of the compliance boundary by monitoring for the radionuclides of interest and (2) evaluate the effectiveness of monitoring locations within the groundwater flow system by monitoring water elevations to ensure that monitoring wells are located along the potential migration pathways. (authors)
In the development of I and C systems for nuclear plants it is critical to validate a defense in depth strategy through a thorough and complete reliability analysis program. An emerging issue is how to define and use a quantitative estimation of CCF in a system analysis. Industry standards provide insight but not necessarily a comprehensive approach. One solution is to leverage existing modeling techniques with a unique insertion of CCF probabilities. A relatively simple approach will be provided using reliability block diagrams. Three specific areas that will be explored include: 1. Definition of hardware CCF; 2. Quantitative estimation in a simple system; 3. Quantitative estimation in a complex system. (authors)
Multi-Positron Emission Particle Tracking (MPEPT) is able to reconstruct the position of point-sources in a PET scanner to a high degree of accuracy. Experimental and simulated trajectories of activated point-sources are compared herein to validate the GATE model of our PET scanner, and test MPEPT performance. The trajectory followed by one point-source of activity 370000 Bq is simulated in GATE, and experimentally measured for velocities 0.18, 0.22. and 0.45 cm/s moving along the major axis of the detector bore. The average difference between the prescribed and predicted point-source positions is found to be approximately 0.3 mm. However, the number of Lines of Response (LOR) reported by GATE for the 370000 Bq source is larger than the number of LOR measured in the experiments. Additional testing of the accuracy of MPEPT is provided by the simulation of 20 point-sources of 20 Bq each placed around the surface of a sphere of radius 40 mm and moving radially inward to a radius of 20 mm at a constant velocity of 1 E-6 m/s. Point-source trajectories for the GATE simulation are compared to trajectories reconstructed from the GATE generated LOR using MPEPT. The average difference between prescribed and predicted point-source position is found to be approximately 0.72 mm. (authors)
Explore the source record for details and available documents.
Colorado is the first state to receive DOE approval to implement rooftop solar in WAP. This case study discusses Colorado's solar programs in WAP and LIHEAP, as well as key takeaways.
Explore the source record for details and available documents.
Municipal electricity utilities and communities with public power are increasingly interested in the opportunities afforded by locally-sited solar projects. Understanding the allocation of costs and benefits of a solar project across affected entities and stakeholders such as customer types can be critical for community buy-in. This case study looked specifically at an analysis done for the City of Frankfort and how plans to meet 100% of city government electricity loads with renewable energy by 2023 could affect an all requirements contract the city's municipal utility has with a regional electricity provider. While the results are specific to Frankfort and the electricity contracts in place at the time of the study, it is an example of how the question of cross-subsidization can be addressed using a quantitative study, with the goal of increasing transparency and buy-in across multiple stakeholders.
Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100) provided a comprehensive analysis of pathways for Puerto Rico to achieve its goal of 100% renewable energy by 2050, based on extensive stakeholder input. The study illuminates immediate and longer-term investments needed to achieve reliability while pursuing Puerto Rico's energy goals and addressing critical energy needs. Expected benefits of these investments include improvements in safety, security, health, and economic opportunity.