Effect of energy interlock on possible beam losses in the Booster to Storage Ring transfer line
Under normal operational conditions in NSLS-II the energy of the beam extracted from the Booster and transferred to and injected into the Storage Ring (SR) is 3 GeV. It was determined that for the commissioning purposes energy range of the beam reaching the SR is allowed to be 2 GeV - 3.15 GeV. While the upper limit of the beam energy is defined by the maximum possible settings of Booster dipoles at the top of the ramp, the lower energy limit has to be provided by magnet interlocks. Dynamic interlocks of the Booster dipoles would be an ideal solution, yet the constraints of time and resources do not allow providing such interlocks for commissioning stage of NSLS-II. Therefore, the static interlock of two bends in the Booster to SR transfer line (BSR) will be used - the bends B1 and B2 will be interlocked within 5% of their nominal values. The possible energy of the beam reaching each BSR magnet strongly depends on the details of interlock scheme. Thus, the possible beam losses in the BSR transfer line have to be calculated taking into account the particular energy interlock. The purpose of this exercise is to determine the potential beam loss locations, for further identification of the radiation risks they impose outside the existing bulk shielding, and specification of the supplemental shielding design necessary to mitigate those risks. We will present the beam systems description along with their planned operating ranges, which forms the basis of our analysis. Next, we will find the range of beam energy that can possibly be experienced by each BSR magnet. Finally, we will describe the method used to determine potential beam loss locations and we will present the results of our studies in a form of convenient to use table which includes all the information necessary for analysis of radiation risks induced by the determined beam losses. In the following analysis we assume, unless the opposite is indicated in the clearest possible terms, that the accelerator is configured in any feasible way that its design allows.