Search NASA⌕ Search

SEARCH · Search NASA

Results for “Program Flow”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,495 records · Page 83

Century: Zap Energy’s 100-kW-Scale Repetitive Sheared-Flow-Stabilized Z -Pinch System with Liquid Metal Cooling

Zap Energy is developing the sheared-flow-stabilized (SFS) Z-pinch concept for commercial applications. The SFS Z pinch relies on plasma self-organization, in the sense that plasma dynamics play a critical role in confinement. Using plasma axial current for confinement and compression eliminates the need for external confinement or heating technologies. This compact magnetic confinement technology could, in turn, provide the basis for a cost-effective deuterium-tritium fusion power plant. In addition to a robust experimental program pushing plasma performance towards breakeven conditions, Zap Energy has parallel programs developing power handling systems suitable for future power plants. Technologies under development include high average-power repetitive pulsed power, high duty-cycle cathodes, and liquid metal wall systems. Century is the name of Zap Energy’s first effort to integrate these three components into an operational system capable of firing non-reacting hydrogen SFS Z-pinch plasmas into a liquid-metal-lined container at sustained repetition rates on the order of 0.1 Hz. Here, the pulsed power driver and liquid metal heat exchanger are both designed to sustain input powers of 100 kW. Construction and initial operations with an interim ~10 kW liquid metal heat exchanger are described.

Century↗

National Bio-fuel Energy Laboratory

The National Biofuel Energy Laboratory or NBEL was a consortia consisting of non-profits, universities, industry, and OEM’s. NextEnergy Center (NEC) in Detroit, Michigan was the prime with Wayne State University as the primary subcontractor. Other partners included: Art Van Furniture; Biodiesel Industries Inc. (BDI); Bosch; Clean Emission Fluids (CEF); Delphi; Oakland University; U.S. TARDEC (The Army); and later Cummins Bridgeway. The program was awarded to NextEnergy by U.S. DOE-NREL on July 1, 2005. The period of performance was about five (5) years, ending June 30, 2010. This program was executed in two phases: 1.Phase I focused on bench-scale R&D and performance-property-relationships. 2.Phase II expanded those efforts into further engine testing, emissions testing, and on-road fleet testing of biodiesel using additional types of feedstock (i.e., corn, and choice white grease based). NextEnergy – a non-profit 501(c)(3) organization based in Detroit was originally awarded a $1.9 million grant from the U.S. Dept. of Energy for Phase I of the NBEL program. A few years later, NextEnergy and its partners received an additional $1.9MM in DOE funding to complete Phase II. The NBEL funding was completely exhausted by the program end date of June 30, 2010 and the cost share commitment of 20% minimum has been exceeded nearly two times over. As a result of the work performed by the NBEL consortia, the following successes were realized: 1.Over one hundred publications and presentations have been delivered by the NBEL consortia, including but not limited to: R&D efforts on algae-based biodiesel, novel heterogeneous catalysis, biodiesel properties from a vast array of feedstock blends, cold flow properties, engine testing results (several Society of Automotive Engineers [SAE] papers have been published on this research), emissions testing results, and market quality survey results. 2.One new spinoff company (NextCAT) was formed by two WSU Chemical Engineering professors and another co-founder, based on a novel heterogeneous catalyst that may be retrofitted into idled biodiesel manufacturing facilities to restart production at a greatly reduced cost. 3.Three patents have been filed by WSU and granted based on the NextCAT focus. 4.The next-generation advanced biodiesel dispensing unit (CEF F.A.S.T. unit version 2) was developed by Clean Emission Fluids (CEF). 5.NBEL aided in the preparing a sound technical basis for setting an ASTM B20 standard: ASTM Standard D7467-08 was passed in June of 2008 and officially published on October of 2008. 6.NBEL has helped to understand composition-property-performance relationships, from not only a laboratory and field testing scale, for biodiesel blends from a spectrum of feedstocks. 7.NBEL helped propel the development of biodiesel with improved performance, cetane numbers, cold flow properties, and oxidative stability. 8.Data for over 30,000 miles has been logged for the fleet testing that select members of the consortia participated in. There were five vehicles that participated in the fleet testing. Art Van provided two vehicles, one that remained idle for most of the time and one that was used often for commercial furniture deliveries, Oakland University provided one vehicle, NEC provided one vehicle, and The Night Move provided one vehicle. These vehicles were light to medium duty (2.0 to 6.6 L displacement), used B5 or B20 blends from multiple sources of feedstock (corn-, choice white grease-, and soybean-based blends) and sources (NextDiesel, BDI, or Wacker Oil), experienced a broad range in ambient temperatures (from -9 °F in Michigan winters to 93 °F in the summertime), and both city and highway driving conditions.

09 BIOMASS FUELS↗

Advanced High-Temperature Reactor Dynamic System Model Development: April 2012 Status

The Advanced High-Temperature Reactor (AHTR) is a large-output fluoride-salt-cooled high-temperature reactor (FHR). An early-phase preconceptual design of a 1500 MW(e) power plant was developed in 2011 [Refs. 1 and 2]. An updated version of this plant is shown as Fig. 1. FHRs feature low-pressure liquid fluoride salt cooling, coated-particle fuel, a high-temperature power cycle, and fully passive decay heat rejection. The AHTR is designed to be a “walk away” reactor that requires no action to prevent large off-site releases following even severe reactor accidents. This report describes the development of dynamic system models used to further the AHTR design toward that goal. These models predict system response during warmup, startup, normal operation, and limited off-normal operating conditions. Severe accidents that include a loss-of-fluid inventory are not currently modeled. The scope of the models is limited to the plant power system, including the reactor, the primary and intermediate heat transport systems, the power conversion system, and safety-related or auxiliary heat removal systems. The primary coolant system, the intermediate heat transport system and the reactor building structure surrounding them are shown in Fig. 2. These systems are modeled in the most detail because the passive interaction of the primary system with the surrounding structure and heat removal systems, and ultimately the environment, protects the reactor fuel and the vessel from damage during severe reactor transients. The reactor silo also plays an important role during system warmup. The dynamic system modeling tools predict system performance and response. The goal is to accurately predict temperatures and pressures within the primary, intermediate, and power conversion systems and to study the impacts of design changes on those responses. The models are design tools and are not intended to be used in reactor qualification. The important details to capture in the primary system relate to flows within the reactor vessel during severe events and the resulting temperature profiles (temperature and duration) for major components. Critical components include the fuel, reactor vessel, primary piping, and the primary-to-intermediate heat exchangers (P-IHXs). The major AHTR power system loops are shown in Fig. 3. The intermediate heat transfer system is a group of three pumped salt loops that transports the energy produced in the primary system to the power conversion system. Two dynamic system models are used to analyze the AHTR. A Matlab/Simulink-based model initiated in 2011 has been updated to reflect the evolving design parameters related to the heat flows associated with the reactor vessel. The Matlab model utilizes simplified flow assumptions within the vessel and incorporates an empirical representation of the Direct Reactor Auxiliary Cooling System (DRACS). A Dymola/Modelica model incorporates a more sophisticated representation of primary coolant flow and a physics-based representation of the three-loop DRACS thermal hydraulics. This model is not currently operating in a fully integrated mode. The Matlab model serves as a prototype and provides verification for the Dymola model, and its use will be phased out as the Dymola model nears completion. The heat exchangers in the system are sized using spreadsheet-based, steady-state calculations. The detail features of the heat exchangers are programmed into the dynamic models, and the overall dimensions are used to generate realistic plant designs. For the modeling cases where the emphasis is on understanding responses within the intermediate and primary systems, the power conversion system may be modeled as a simple boundary condition at the intermediate-to-power conversion system heat exchangers.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Special Report on The Department of Energy's Acquisition Workforce and its Impact on Implementation of the American Recovery and Reinvestment Act of 2009

Signed by the President on February 17, 2009, the American Recovery and Reinvestment Act of 2009 (Recovery Act) seeks to strengthen the U.S. economy through the creation of new jobs, aiding State and local governments with budget shortfalls, and investing in the long-term health of the Nation's economic prosperity. Under the Recovery Act, the Department of Energy will receive approximately $40 billion for various energy, environmental, and science programs and initiatives. To have an immediate stimulative impact on the U.S. economy, the Department's stated goal is to ensure that these funds are spent as expeditiously as possible, without risking transparency and accountability. Given the Department's almost total reliance on the acquisition process (contracts, grants, cooperative agreements, etc.) to carry out its mission, enhanced focus on contract administration and, specifically, the work performed by Federal acquisition officials is of vital importance as the unprecedented flow of funds begins under the Recovery Act.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

In vivo evaluation of an adaptive resuscitation controller using whole blood and crystalloid infusates for hemorrhagic shock

Introduction Hemorrhage remains the leading cause of preventable death on the battlefield. The most effective means to increase survivability is early hemorrhage control and fluid resuscitation. Unfortunately, fluid resuscitation requires constant adjustments to ensure casualty is properly managed, which is often not feasible in the pre-hospital setting. In this study, we showed how an adaptive closed-loop controller for hemorrhage resuscitation can be used to automate hemodynamic management using a swine hemorrhagic shock injury model. Methods The adaptive resuscitation controller (ARC) was previously developed to track pressure–volume responsiveness in real time and adjust its infusion rate to reach the target mean arterial pressure (MAP). Swine while maintained under a surgical plane of anesthesia and analgesia underwent a splenectomy, followed by two hemorrhage and resuscitation events. For the first resuscitation event, hemorrhage was induced to reduce the MAP to 35 mmHg until arterial lactate reached 4 mmol/L. The ARC system then infused whole blood (WB) to reach the target MAP and maintained the subject using crystalloids for 120 min. For the second resuscitation event, the subjects were hemorrhaged again but resuscitated using only crystalloid infusion to reach the target MAP and 120-min maintenance. Results The ARC was effective at WB resuscitation, reaching the target MAP in 2.0 ± 1.0 min. The median performance error was 1.1% ± 4.6%, and target overshoot was 14.4% ± 7.0% of the target MAP. The ARC maintained all animals throughout the 120 min maintenance period. For the second crystalloid-based resuscitation, ARC required a longer time to reach the target MAP, at an average rise time of 4.3 ± 4.0 min. However, target overshoot was reduced to 8.4% ± 7.3% of the target MAP. Much higher flow rates were required to maintain the target MAP during the second resuscitation event than during the first resuscitation event. Discussion The ARC was able to rapidly reach and maintain the target MAP effectively. However, this sometimes required large volumes of fluid as the ARC’s only goal was to reach the target MAP. Further clinical insight is needed regarding the preferred aggression level to achieve the target MAP. In conclusion, the ARC was successful in its programmed objective of reaching and maintaining the target MAP for extended periods of time in vivo , a critical next step toward improving hemorrhage treatment in the pre-hospital environment.

Snider, Eric J.↗

Pressure core analysis of geomechanical and fluid flow properties of seals associated with gas hydrate-bearing reservoirs in the Krishna-Godavari Basin, offshore India

Physical properties of the sediment directly overlying a gas hydrate reservoir provide important controls on the effectiveness of depressurizing that reservoir to extract methane from gas hydrate as an energy resource. The permeability of overlying sediment determines if a gas hydrate reservoir’s upper contact will provide an effective seal that enables efficient reservoir depressurization. Compressibility, stiffness and strength indicate how overlying sediment will deform as the in situ stress changes during production, providing engineering data for well designs. Assessing these properties requires minimally-disturbed sediment. India’s National Gas Hydrates Program Expedition 2 (NGHP-02) provided an opportunity to study these seal sediment properties, reducing disturbance from gas exsolution and bubble growth by collecting a pressure core from the seal sediment just above the primary gas hydrate reservoir at Site NGHP-02-08 in Area C of the Krishna-Godavari Basin. The effective stress chamber (ESC) and the direct shear chamber (DSC) devices in the suite of Pressure Core Characterization Tools (PCCTs) were used to measure permeability, compressibility, stiffness and shear strength at the in situ vertical stress. Geotechnical properties of the predominantly fine-grained seal layer at in situ vertical stress are in typical clay sediment ranges, with low measured permeability (0.02 mD), high compressibility (C c = 0.26 – 0.33) and low shear strength (404 kPa). Though pressure and temperature were maintained throughout the collection and measurement process to stabilize gas hydrate, the lack of effective stress in the pressure core storage chamber and the chamber pressurization with methane-free water caused core expansion and gas hydrate in a thin coarser-grained layer to dissolve. The PCCTs can reapply in situ stress with incremental loading steps during a consolidation test to account for sediment compaction. Lastly, gas hydrate dissolution can be limited by storing cores just above freezing temperatures, and by using solid spacers to reduce the storage chamber’s free volume.

09 BIOMASS FUELS↗

Proceedings of RIKEN BNL Research Center Workshop: Predictions for sPHENIX [Slides]

To complete the RHIC mission, sPHENIX was specifically designed to measure jet and heavy-flavor observables with a level of precision not previously achievable at RHIC. This will enhance our understanding of the quark-gluon plasma (QGP) properties and their temperature dependence beyond what is possible with existing and planned data from the LHC and other RHIC experiments. A major goal of the sPHENIX program is to address the question of the approach to thermalization of the quark-gluon plasma and its transport properties using hard probes such as jets and heavy flavor. The current three-year run plan includes Au+Au, p+Au and p+p collisions at 200 GeV. The Au+Au dataset provides a large QGP system to study the QGP properties. The p+Au dataset will allow for additional studies of the intriguing behavior observed in flow measurements from other RHIC experiments as well as transport properties of cold QCD matter and proton/nuclear structure. The p+p collisions provide a necessary reference for Au+Au and p+Au collisions and also allow for additional studies of proton structure. Anticipated measurements include but are not limited to, jet substructure observables, photon and heavy flavor tagged jets as well as comparisons of the production of the different upsilon states in all three collision systems. To maximize the rich physics sPHENIX is capable of accessing, this workshop will enhance the discussions between the experimentalists making the measurements and the theorists whose models will be tested and constrained by the new data. Since sPHENIX will start taking data in early 2023, this workshop is timely for theorists wishing to make final predictions of anticipated observables before data collection commences. In addition, it will provide an opportunity for theorists and experimentalists to propose and discuss new observables.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Energy to Communities Program Short Introduction: Evaluation of Enhanced Geothermal System for Cornell District Heating [Slides]

Through the U.S. Department of Energy's Energy to Communities (E2C) program, NLR, other national laboratory experts, and select organizations provide Expert Match - free, short-term technical assistance to address near-term energy challenges and questions. Expert Match is for community stakeholders who have decision-making power or influence in their community but need access to additional energy expertise to inform key upcoming decisions. This Expert Match request supported Cornell University (Itaca, NY) community efforts in developing Enhanced Geothermal System (EGS) reservoir performance, by simulating fracture flow to estimate pressure drop, flow distribution, and heat extraction efficiency in fractured rock. Thermal drawdown modeling was used to assess long-term resource sustainability, while system optimization studies refined key parameters such as well configuration and flow rate to improve overall reservoir efficiency.

15 GEOTHERMAL ENERGY↗

Final Report for Subcontract B541028, Pore-Scale Modeling to Support "Pore Connectivity" Research Work

This report covers modeling aspects of a combined experimental and modeling task in support of the DOE Science and Technology Program (formerly OSTI) within the Office of Civilian Radioactive Waste Management (OCRWM). Research Objectives The research for this project dealt with diffusive retardation: solute moving through a fracture diffuses into and out of the rock matrix. This diffusive exchange retards overall solute movement, and retardation both dilutes waste being released, and allows additional decay. Diffusive retardation involves not only fracture conductivity and matrix diffusion, but also other issues and processes: contaminants may sorb to the rock matrix, fracture flow may be episodic, a given fracture may or may not flow depending on the volume of flow and the fracture's connection to the overall fracture network, the matrix imbibes water during flow episodes and dries between episodes, and so on. The objective of the project was to improve understanding of diffusive retardation of radionuclides due to fracture / matrix interactions. Results from combined experimental/modeling work were to (1) determine whether the current understanding and model representation of matrix diffusion is valid, (2) provide insights into the upscaling of laboratory-scale diffusion experiments, and (3) help in evaluating the impact on diffusive retardation of episodic fracture flow and pore connectivity in Yucca Mountain tuffs. Questions explored included the following: (1) What is the relationship between the diffusion coefficient measured at one scale, to that measured or observed at a different scale? In classical materials this relationship is trivial; in low-connectivity materials it is not. (2) Is the measured diffusivity insensitive to the shape of the sample? Again, in classical materials there should be no sample shape effect. (3) Does sorption affect diffusive exchange in low-connectivity media differently than in classical media? (4) What is the effect of matrix saturation on the effective diffusivity? Is it different for low-connectivity media than for classical media? (5) In addition to changing the matrix saturation (and thereby the diffusion coefficient), the wetting/drying cycles drive water into, and then out of, the matrix. How do these mass flow cycles affect the long-term exchange of solutes between the fracture and the matrix? Can it be treated as a simple increase in effective diffusivity? Is it a local or a global effect? Is the effect different in low-connectivity media? The modeling portion of this project primarily focused on how diffusion varies with pore connectivity, and it also connected the experimental work to theory.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

MODELING OF FLOW AND TRANSPORT INDUCED BY PRODUCTION OF HYDROFRACTURE-STIMULATED GAS WELLS NEAR THE RULISON NUCLEAR TEST

The Piceance Basin in western Colorado contains significant reserves of natural gas in poorly connected, low-permeability (tight) sandstone lenses of the Mesaverde Group. The ability to enhance the production of natural gas in this area has long been a goal of the oil and gas industry. The U.S. Atomic Energy Commission, a predecessor agency to the U.S. Department of Energy (DOE) and the U.S. Nuclear Regulatory Commission, participated in three tests using nuclear detonations to fracture tight formations in an effort to enhance gas production. The tests were conducted under Project Plowshare, a program designed to identify peaceful, beneficial uses for nuclear devices. The first, Project Gasbuggy, was conducted in 1967 in the San Juan Basin of New Mexico. The two subsequent tests, Project Rulison in 1969 and Project Rio Blanco in 1973, were in the Piceance Basin. The ability to enhance natural gas production from tight sands has become practical through advances in hydraulic fracturing technology (hydrofracturing). This technology has led to an increase in drilling activity near the Rulison site, raising concerns that contamination currently contained in the subsurface could be released through a gas well drilled too close to the site. As wells are drilled nearer the site, the DOE Office of Legacy Management has taken the approach outlined in the June 2010 Rulison Path Forward document (DOE 2010), which recommends a conservative, staged approach to gas development. Drillers are encouraged to drill wells in areas with a low likelihood of encountering contamination (both distance and direction from the detonation zone are factors) and to collect data from these wells prior to drilling nearer the site’s 40 acre institutional control boundary (Lot 11). Previous modeling results indicate that contamination has been contained within Lot 11 (Figure 1). The Path Forward document couples the model predictions with the monitoring of gas and produced water from the gas wells and the monitoring of shallow groundwater near the site.

tritium, nuclear fracturing, hydraulic fracturing,↗

Real-Time Corrective Switching in Response to Simultaneous Contingencies

The standard optimal power flow (OPF) problem is an economic dispatch (ED) problem combined with transmission constraints, which are based on a static topology. Prior research has demonstrated that cooptimization of generation dispatch and transmission topology results in cost savings. However, the computational complexity associated with topology control (TC) has been a major deterrent to its implementation. The proposed work investigates the application of a heuristic, a greedy algorithm, to improve the computational time for the TC problem while still maintaining the ability to find quality solutions. An expression is derived, which indicates the impact on the objective for a marginal change in the state of a transmission line. This expression is used to generate a priority list with potential candidate lines for switching, which may provide huge improvements to the system. The advantage of this method is that it is a fast heuristic as compared to using mixed integer programming (MIP) to find a solution. The heuristic is tested on real-time applications such as N-1 events, N - m events (m simultaneous contingencies), and cascading events. The proposed algorithm specifically targets cases that lead to load shedding in the system and provides a quick and efficient method to restore the loads by improving the deliverability of reserves via TC. Simulation results on the IEEE 73 bus test system and the IEEE 118 bus test system suggest a significant improvement in the amount of load served to the system with TC as opposed to without TC with minimal time and computation.

Electric power systems↗

Development of LWR Fuels with Enhanced Accident Tolerance ATF Feasibility Analysis Report Deliverable for the Westinghouse Accident Tolerant Fuel Program

The Westinghouse Electric Company LLC (Westinghouse) accident tolerant fuel (ATF) program utilizes chromium (Cr) coated zirconium alloy cladding with uranium silicide (U 3 Si 2 ) high density/high thermal conductivity fuel for its lead test rod (LTR) program with irradiation beginning in 2019. The lead test assembly (LTA) program will use both SiC/SiC composites and Cr coated zirconium alloy claddings with the high density/high thermal conductivity U 3 Si 2 pellet which will begin in 2022. Over the past several years, Westinghouse has tested the Cr coated zirconium (Zr) and silicon carbide (SiC) claddings in autoclaves and in the Massachusetts Institute of Technology (MIT) reactor and the U 3 Si 2 pellets have been tested in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL). High temperature tests at the state-of-the-art Westinghouse facilities in Churchill, PA have been carried out to determine the time and temperature limits for the SiC and Cr coated zirconium claddings. Fuel rod and assembly design in preparation for the LTR and LTA programs is underway as well as licensing efforts with the Nuclear Regulatory Commission (NRC). Finally, accident analyses coupled with economic evaluations for both operating savings as well as fuel savings have been initiated. Cr coated zirconium alloy claddings showed low corrosion rates in both autoclave and in-reactor tests and will be fabricated using commercial processes for the first LTRs for insertion in 2019. Current autoclave results for SiC composite claddings indicate that a corrosion rate of fewer than 2 micrometers per year which meets corrosion requirements may be achieved under normal operating conditions. Modular Accident Analysis Program 5 (MAAP5) calculations indicate that solid fission products can be contained within SiC cladding for up to two hours longer than current Zr based cladding in a station blackout scenario. This additional time is due to the much higher temperature capability of SiC (~2000°C). These two hours can be used to implement additional response options instituted through the FLEX program by reactor operators. While the Cr coated Zr alloy option offers more modest ATF gains (~200°C higher than bare Zr) in similar situations, the coatings do delay the runaway oxidation encountered by uncoated zirconium cladding. Both ATF cladding options also reduce hydrogen production which dramatically reduces primary system and containment pressure and the risk of fission product release beyond containment in the unlikely event of an accident. The lower pressure in the system allows more time to feed cooling water to the core, resulting in the avoidance of fuel melting. The coping time is extended indefinitely as long as the water flow continues. SiC exhibits the highest accident tolerance of any cladding and significant advances in understanding the design, manufacture and accident behavior of SiC cladding have been made. Department of Energy support is needed to continue the on-going experimental work addressing the interaction between U 3 Si 2 and SiC at temperatures >1200°C, the effect of SiC manufacturing methods and manufacturing variability on physical properties, and the ability to predict the mechanical properties of SiC composites based on the composite design. Additionally, experimental work on methods to rapidly fabricate SiC composite structures with high density and reduce the fabrication price of SiC fibers while maintaining a high level of performance is needed. Minimal (<1%) swelling of U 3 Si 2 and subsequent fission gas release has been demonstrated up to 20 MWd/kgU. Irradiation experiments with U 3 Si 2 fuel in ATR to determine these properties at 40 to 50 MWd/kgU are underway. These experiments will provide the data needed to license fuel rod design codes. Research is continuing on production methods for making U 3 Si 2 from UF 6 without going through the U metal step. Oxidation tests of fuel pellets and powder in steam and synthetic air indicate that U 3 Si 2 has a lower oxidation reaction initiation temperature than UO 2 . Options to reduce the U 3 Si 2 oxidation rate are being explored. A hybrid fuel design using pellets with the weight ratio of 30%/70% U 3 Si 2 /UN is currently undergoing testing in the ATR. This approach is being explored to further increase the positive economics of the U 3 Si 2 fuel. In addition to the work supported by the USDOE, research and testing activities are being carried on in a world-wide effort funded by many countries such as Sweden, United Kingdom, Belgium, Netherlands, Spain, Germany, Japan and France. This work is being facilitated through the Westinghouse led Collaboration for Advanced Research on Accident Tolerant Fuel (CARAT) program. Annual meetings are organized by Westinghouse as a venue for presentation of this work and to provide for the cross-fertilization of ideas among the many outstanding researchers in the ATF area. Since SiC, coated cladding and high density fuel options are not currently used in the nuclear industry, support from the government and industry members is needed to further the significant effort of setting new standards. The same is true for the Nuclear Regulatory Commission (NRC) which must review and approve the commercial use of these new fuels since all current regulations are oriented toward Zr/ UO 2 fuel. There are no showstoppers for accident tolerant fuel technologies when considering supply chain, fabrication, enrichment suppliers, production, and licensing. Due to the cost savings from higher density fuel and the accident tolerance of coated claddings, Exelon has identified potential commercial plants to host the LTRs and LTAs. Planning is underway to implement this schedule.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Comparison of Quinone-Based Catholytes for Aqueous Redox Flow Batteries and Demonstration of Long-Term Stability with Tetrasubstituted Quinones

Quinones are appealing targets as organic electrolytes for aqueous redox flow batteries (RFBs), but their utility continues to be constrained by limited stability under operating conditions. The present study evaluates the stability of a series water-soluble quinones, with redox potentials ranging from 605–885 mV vs. NHE, under acidic aqueous conditions (1 M H2SO4). Four of the quinones are examined as cathodic electrolytes in an aqueous RFB, paired with anthraquinone-2,7-disulfonate (AQDS) as the anodic electrolyte. The RFB data complement the solution stability measures and show that the most stable electrolyte is a tetrasubstituted quinone containing four sulfonated thioether substituents. The results highlight the importance of substituting all C–H positions of the quinone in order to maximize the quinone stability and set the stage for design of improve organic electrolytes for aqueous RFBs. The authors thank Joseph Fourie for assisting in the synthesis of compound 8. Financial support for this work was provided by the Center for Molecular Electrocatalysis, an Energy Frontier Research Center funded by the U.S. Department of Energy, Office of Science, Office of Basic Energy Sciences (SSS, TWR, JBG, CWA, YP), with supplemental contributions by the Wisconsin Alumni Research Foundation (WARF) through the WARF Accelerator Program (YQ and partial support for JBG, CWA, YP). NMR spectroscopy facilities were partially supported by the NSF (CHE-0342998 and CHE-1048642), a UW Madison Instructional Laboratory Modernization Award, and a gift from Paul J. and Margaret M. Bender.

aqueous flow batteries, quinones, organic, redox m↗

Estimate of radiation release from MIT reactor with un-finned LEU core during Maximum Hypothetical Accident

The Massachusetts Institute of Technology Reactor (MITR-II) is a research reactor in Cambridge, Massachusetts designed primarily for experiments using neutron beam and in-core irradiation facilities. At 6 MW, it delivers neutron flux and energy spectrum comparable to light water reactor (LWR) power reactors in a compact core using highly enriched uranium (HEU) fuel. In the framework of nonproliferation policy, the international community aims to minimize the use of HEU in civilian facilities. Within this context, research and test reactors have started a program to convert HEU fuel to low enriched uranium (LEU) fuel. A new type of LEU fuel based on a high density alloy of uranium and molybdenum (U-10Mo) is expected to allow the conversion of U.S. domestic high performance reactors like MITR. The current study focuses on the impacts of MITR Maximum Hypothetical Accident (MHA), which is also the Design Basis Accident (DBA), with LEU fuel. The MHA for the MITR is postulated to be a coolant flow blockage in the fuel element that contains the hottest fuel plate. It is assumed that the entire active portion of five fuel plates melts. The analysis shows that, within a 2-h period and by considering all the possible radiation sources and dose pathways, the overall off-site dose is 302.1 mrem (1 rem ¼ 0.01 Sv) Total Effective Dose Equivalent (TEDE) at 8 m exclusion area boundary (EAB) and a higher dose of 392.8 mrem TEDE is found at 21 m EAB. In all cases the dose remains below the 500 mrem total TEDE limit goal based on NUREG-1537 guidelines.

Sun, Kaichao (ORCID:0000000285871918)↗

An Assessment of Energy Potential at Non-Powered Dams in the United States

The United States has produced clean, renewable electricity from hydropower for more than 100 years, but hydropower-producing facilities represent only a fraction of the infrastructure development that has taken place on the nation’s waterways. In contrast to the roughly 2,500 dams that provide 78 gigawatts (GW) 1 of conventional and 22 GW of pumped-storage hydropower, the United States has more than 80,000 non-powered dams (NPDs)—dams that do not produce electricity—providing a variety of services ranging from water supply to inland navigation. Importantly, many of the monetary costs and environmental impacts of dam construction have already been incurred at NPDs, so adding power to the existing dam structure can often be achieved at lower cost, with less risk, and in a shorter timeframe than development requiring new dam construction. The abundance, cost, and environmental favorability of NPDs, combined with the reliability and predictability of hydropower, make these dams a highly attractive source for expanding the nation’s renewable energy supply. To better characterize this unique national resource, the U.S. Department of Energy (DOE) Wind and Water Power Program has undertaken a national-scale analysis of U.S. dams to determine the ability of NPDs to provide hydroelectric power. DOE’s Oak Ridge National Laboratory (ORNL), with input from DOE’s Idaho National Laboratory, quantified the potential capacity and generation available from adding power production capability to U.S. NPDs. Of the more than 80,000 NPDs throughout the U.S., 54,391 dams were analyzed, with remaining dams eliminated from consideration due to erroneous geographic information, or erroneous flow or drainage area attributes that could not be resolved and corrected through independent investigation of maps and records. Anecdotal information suggests that these dams with missing or erroneous information are likely to be relatively small or have low potential to produce hydroelectric energy. Dams with a reported height of less than five feet were also excluded from analysis. A thorough quality control and review process ensured that the 54,391 remaining NPDs were analyzed and characterized as accurately as possible. Figure ES-1 demonstrates the spatial and capacity potential distribution of the nation’s NPDs. Electric generating capacities included in the report were calculated using the assumption that all water passing a facility would be available for conversion into electrical energy and that hydraulic head at the facility would remain constant. The analysis did not consider the economic feasibility of developing each unpowered facility. The assessment provides preliminary information for stakeholders (such as developers, municipal planners, and policymakers), who can further evaluate the potential to increase hydropower production at NPD sites. Developers could use the information provided in this assessment to focus on more detailed analysis of sites that demonstrate a reasonable potential for being developed. Adding power to U.S. NPDs has the potential to add up to 12 GW (12,000 megawatts or MW) of new renewable capacity—a potential equivalent to increasing the size of the existing conventional hydropower fleet by 15%. A majority of this potential is concentrated in just 100 NPDs, which could contribute approximately 8 GW of clean, reliable hydropower; the top 10 facilities alone could add up to 3 GW of new hydropower. Eighty-one of the 100 top NPDs are U.S. Army Corps of Engineers (USACE) facilities, many of which, including all of the top 10, are navigation locks on the Ohio River, Mississippi River, Alabama River, and Arkansas River, as well as their major tributaries. This study also shows that dams owned by the U.S. Bureau of Reclamation hold the potential to add approximately 260 MW of capacity; the Bureau has also engaged in an effort to conduct a more detailed evaluation of its own facilities.

13 HYDRO ENERGY↗

Idaho National Laboratory Integrated Multisite SSHAC Level 3: Probabilistic Volcanic Hazards Assessment

The Idaho National Laboratory (INL) resides on the eastern Snake River Plain (ESRP), part of the Snake River Plain (SRP) with a complex origin and geologic history of volcanism. Much of the Quaternary (last 2.58 million years) volcanism within 400 km of INL is genetically associated with a major thermal anomaly referred to as the Yellowstone hotspot, which is currently located more than 180 km northeast of INL. Near INL, local volcanic sources include silicic domes near its southern border, and numerous dike-fed basaltic vents of the ESRP, some of which are near or within the INL boundaries. Quantitative probabilistic assessments of screened-in volcanic hazardous phenomena for nine different facility complexes at the INL are presented for a Senior Seismic Hazard Analysis Committee (SSHAC) Level 3 (SL3) study. The comprehensive, integrated multisite SSHAC study consists of a single regional Probabilistic Volcanic Hazards Assessment (PVHA) that pertains to all nine INL facility complexes, with site-specific information developed at each respective area of interest (AOI), referred to as the "INL facility AOI" (Figure ES-1). Hazard products are generated for specified INL facility AOIs for use by multiple stakeholders from different agencies in risk-informed decision-making regarding site selection, operations, and design of nuclear facilities at INL, consistent with U.S. Department of Energy (DOE) and U.S. Nuclear Regulatory Commission (NRC) regulatory guidance. The study also serves as the basis for future periodic safety assessments required for existing DOE facilities, such as 10-year evaluations of natural-phenomena hazards. Elements of the INL PVHA including initial characterization, screening, quantitative assessments of eruption and hazard potential, and consideration of facility needs are conducted using the three phases of the SSHAC process: evaluation, integration, and documentation. As per regulatory guidance, the SSHAC framework provided the necessary processes and procedures for the PVHA Technical Integration (TI) team, at three workshops, five formal working meetings and many TI team remote meetings, to conduct initial characterization, screen the volcanic hazards, create PVHA model inputs, exercise those models in the PVHA, consider facility-specific volcanic hazard needs, and perform final hazard calculations. The Participatory Peer Review Panel (PPRP) provided independent oversight and performed process and technical reviews of the PVHA throughout its duration. The study included an extensive New Data Collection and Analyses (NDCA) program developed by the PVHA TI team to reduce uncertainties in hazard-significant elements in the PVHA model. NDCA activities generated 20 reports providing important contributory datasets and results to the project database for characterizing the ESRP. For example, a report compiling the dimensions of ESRP shield volcanoes and lava fields was used to construct volcanic footprints (areas of impact), was compared with data from INL subsurface cores, and was used to validate the results of lava-flow inundation modeling on the contemporary terrain. Another example is the acquisition of aeromagnetic data over INL and its surrounding area, with maps of buried magmatic features (e.g., subsurface volcanoes and swarms of feeder dikes) that informed the PVHA conceptual model of volcanism. The SSHAC evaluation process was used to conduct all elements of the PVHA including initial characterization and screening. Existing data and NDCA activities provided the foundation to develop the tectonomagmatic conceptual model of volcanism for the region of geographical interest in the SRP and Yellowstone hotspot volcanic system, and for considering volcanoes in the western US. Considering Quaternary volcanic sources active during this period, the screening approach identified and evaluated magma compositions, types of eruptive and intrusive phenomena, types of hazardous phenomena, and proximity of sources to INL. The PVHA TI team evaluated 18 types of magmatic sources in terms of 20 potentially hazardous phenomena, resulting in 360 screening decisions. The screening process resulted in 140 screened-in hazardous volcanic phenomena for Quaternary volcanic sources 1) proximal to INL facility complexes in the ESRP (64 basaltic and 54 silicic), 2) regional sources associated with the Yellowstone caldera system and Blackfoot Reservoir volcanic field (7), and 3) more distal sources from thirteen Cascade volcanoes and two volcanoes at Long Valley caldera (CA).

58 GEOSCIENCES↗

HydroMINE: Simple, Modular and Scalable (Final Scientific/Technical Report)

Hydromine is a novel extremely versatile solution to hydrokinetics energy generation, where the external water flow facing energy sweeping area (&structure) is completely passive. One or multiple Hydromine units can easily deploy from a multitude of floating or stationary marine structures, opening a multitude of application and use cases. Proposing Hydromine, it was initially found that the concept could easily scale into all of the four areas of ARPA-E SHARKS cases, as well as other applications, this is illustrated in Figure 1. Also, the relatively aggressive cost of energy targets of the program could be met in the conceptual phase.

13 HYDRO ENERGY↗

Coal Ash Corrosion Resistant Materials Testing

In April 1999, three identical superheater test sections were installed into the Niles Unit No.1 for the purpose of testing and ranking the coal ash corrosion resistance of candidate superheater alloys. The Niles boiler burns high sulfur coal (3% to 3.5%) that has a moderate alkali content (0.2% sodium equivalents), thus the constituents necessary for coal ash corrosion are present in the ash. The test sections were controlled to operate with an average surface metal temperature from approximately 1060 F to 1210 F which was within the temperature range over which coal ash corrosion occurs. Thus, this combination of aggressive environment and high temperature was appropriate for testing the performance of candidate corrosion-resistant tube materials. Analyses of the deposit and scale confirmed that aggressive alkali sulfate constituents were present at the metal surface and active in tube metal wastage. The test sections were constructed so that the response of twelve different candidate tube and/or coating materials could be studied. The plan was to remove and evaluate one of the three test sections at time intervals of 1 year, 3 years, and 5 years. This would permit an assessment of performance of the candidate materials as a function of time. Test Section A was removed in November 2001 after about 24 months of service at the desired steam temperature set point, with about 15.5 months of exposure at full temperature. A progress report, issued in October 2002, was written to document the performance of the candidate alloys in that test section. The evaluation described the condition of each tube sample after exposure. It involved a determination of the rate of wall thickness loss for these samples. In cases where there was more than one sample of a candidate material in the test section, an assessment was made of the performance of the alloy as a function of temperature. Test Sections B and C were examined during the November 2001 outage, and it was decided that, due to excessive wastage, certain tube samples needed to be removed and replaced in order to ensure that Test Sections B and C would have a chance of remaining in the boiler for their intended exposure period. These suspect tube samples were replaced and the two remaining test sections were put back into service. The tube samples that were removed from Test Sections B and C were set aside for later analysis at the end of the planned exposure period. Test Sections B and C were again examined approximately six months later. At that time, measured wall thickness losses raised concerns about additional tube samples. These suspect samples were also removed, set aside for later analysis, and replaced. The test sections then went back into service until the end of the second exposure period, which was concluded in May 2003 when, due to evidence of excessive wastage, the valves were opened increasing cooling steam flow and thereby effectively stopping corrosion. In August 2003, Test Sections B and C were removed for closer examination. Section C had experienced about 42 months of service at the desired team temperature set point with 28.5 months at temperature at full temperature. Additional suspect samples were removed from Test Section B, then, it was re-installed into the boiler (at the location originally occupied by Section C), where it remained in service until the end of the program. Due to this removal history, the samples from Test Section B had a total service duration that varied from a minimum of 15.5 months (for samples that performed poorly) to 37 months for samples the survived for the full intended service exposure for Section B. The figure below shows a schematic of Test Section B and indicates the length of service exposure for different locations. This report provides the results of the evaluation of Test Section B, including the samples that remained in the Test Section for the full exposure period as well as those that were removed early. This report also is intended to compare and summarize the results for all three test sections. The analysis of Test Section B followed much the same protocol that was employed in the assessment of the other two test sections. The focus was on determining and documenting the relative corrosion rates of the candidate materials; however, additional investigations were undertaken to better understand the wastage mechanism, and to characterize how selected candidate materials performed either well, or poorly, in the severe coal ash corrosion environment in the convection pass of Niles Unit No.1. The detailed results of the investigation are included in this report as a series of twelve appendices. Each appendix is devoted to the performance of one of the candidate alloys. The table below summarizes metal loss rate for the worst case sample of each of the candidate materials in all three test sections. The body of this report compares these for all of the samples in the test section.

01 COAL, LIGNITE, AND PEAT↗