Search NASA⌕ Search

SEARCH · Search NASA

Results for “SHUTDOWN”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,495 records · Page 83

The Regulatory Challenges of Decommissioning Nuclear Power Plants in Korea - 13101

As of 2012, 23 units of nuclear power plants are in operation, but there is no experience of permanent shutdown and decommissioning of nuclear power plant in Korea. It is realized that, since late 1990's, improvement of the regulatory framework for decommissioning has been emphasized constantly from the point of view of International Atomic Energy Agency (IAEA)'s safety standards. And it is known that now IAEA prepare the safety requirement on decommissioning of facilities, its title is the Safe Decommissioning of Facilities, General Safety Requirement Part 6. According to the result of IAEA's Integrated Regulatory Review Service (IRRS) mission to Korea in 2011, it was recommended that the regulatory framework for decommissioning should require decommissioning plans for nuclear installations to be constructed and operated and these plans should be updated periodically. In addition, after the Fukushima nuclear disaster in Japan in March of 2011, preparedness for early decommissioning caused by an unexpected severe accident became also important issues and concerns. In this respect, it is acknowledged that the regulatory framework for decommissioning of nuclear facilities in Korea need to be improved. First of all, we identify the current status and relevant issues of regulatory framework for decommissioning of nuclear power plants compared to the IAEA's safety standards in order to achieve our goal. And then the plan is to be established for improvement of regulatory framework for decommissioning of nuclear power plants in Korea. After dealing with it, it is expected that the revised regulatory framework for decommissioning could enhance the safety regime on the decommissioning of nuclear power plants in Korea in light of international standards. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated Systems-Based Approach for Reaching Acceptable End Points for Groundwater - 13629

The sheer mass and nature of contaminated materials at DOE and DoD sites, makes it impractical to completely restore these sites to pre-disposal conditions. DOE faces long-term challenges, particularly with developing monitoring and end state approaches for clean-up that are protective of the environment, technically based and documented, sustainable, and most importantly cost effective. Integrated systems-based monitoring approaches (e.g., tools for characterization and monitoring, multi-component strategies, geophysical modeling) could provide novel approaches and a framework to (a) define risk-informed endpoints and/or conditions that constitute completion of cleanup and (b) provide the understanding for implementation of advanced scientific approaches to meet cleanup goals. Multi-component strategies which combine site conceptual models, biological, chemical, and physical remediation strategies, as well as iterative review and optimization have proven successful at several DOE sites. Novel tools such as enzyme probes and quantitative PCR for DNA and RNA, and innovative modeling approaches for complex subsurface environments, have been successful at facilitating the reduced operation or shutdown of pump and treat facilities and transition of clean-up activities into monitored natural attenuation remedies. Integrating novel tools with site conceptual models and other lines of evidence to characterize, optimize, and monitor long term remedial approaches for complex contaminant plumes are critical for transitioning active remediation into cost effective, yet technically defensible endpoint strategies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Present status and future plans for the restoration of Fukushima Daiichi NPS

There are many challenges at Fukushima-Daiichi Nuclear Power Station, even though the reactors have reached a condition equivalent to cold shutdown. Cooling of reactors is maintained using the circulating cooling system, which contains some temporary equipments and consists of long pipes reaching to about 4 km. The reliability of the cooling system is one of the keys to maintaining the stabilized condition. Therefore a variety of activities, such as the replacement of hoses with more durable pipes, is being conducted to improve the reliability of the cooling system. The first fuel bundle will be removed from the spent fuel pool (SFP) at Unit 4 in November, which is earlier than the original plan. In preparation for the fuel debris removal, investigations inside the primary containment vessel (PCVs) have been initiated. Visual images and other data, such as water level, radiation dose and temperature inside the PCVs, have been taken at Units 1 and 2. The issue of excessive contaminated water is the most urgent one. About 400 tons of ground water is intruding into the turbine and reactor buildings every day. This intruding water mixes with the core cooling water and becomes a large amount of contaminated water. It has to be stored on the site, despite the fact that some radioactive nuclides remain in it even after cesium is removed. The amount of water stored on the site has reached about 290,000 tons so far and is increasing. Counter measures for this issue, such as reduction of intruding water, cleaning up of the contaminated water and securing of water storage tanks, are under consideration and being conducted. However, certain recent events, such as the power loss of the SFP cooling systems and leakage of contaminated water from the underground tanks, have raised concerns about reliability. Vulnerabilities have been evaluated systematically and counter measures are being taken. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Overview of Remote Handling Equipment Used for the NPP A1 Decommissioning - 12141

The first Czechoslovak NPP A1 was in operation from 1972 to 1977 and it was finally shutdown due to an accident (level 4 according to the INES). The presence of radioactive, toxic or hazardous materials limits personnel access to facilities and therefore it is necessary to use remote handling technologies for some most difficult characterization, retrieval, decontamination and dismantling tasks. The history of remote handling technologies utilization started in nineties when the spent nuclear fuel, including those fuel assemblies damaged during the accident, was prepared for the transport to Russia. Subsequent significant development of remote handling equipment continued during implementation of the NPP A1 decommissioning project - Stage I and ongoing Stage II. Company VUJE, Inc. is the general contractor for both mentioned stages of the decommissioning project. Various remote handling manipulators and robotics arms were developed and used. It includes remotely controlled vehicle manipulator MT-15 used for characterisation tasks in hostile and radioactive environment, special robust manipulator DENAR-41 used for the decontamination of underground storage tanks and multi-purposes robotics arms MT-80 and MT-80A developed for variety of decontamination and dismantling tasks. The heavy water evaporator facility dismantling is the current task performed remotely by robotics arm MT-80. The heavy water evaporator is located inside the main production building in the room No. 220 where loose surface contamination varies from 10 Bq/cm{sup 2} to 1x10{sup 3} Bq/cm{sup 2}, dose rate is up to 1.5 mGy/h and the feeding pipeline contained liquid RAW with high tritium content. Presented manipulators have been designed for broad range of decommissioning tasks. They are used for recognition, sampling, waste retrieval from large underground tanks, decontamination and dismantling of technological equipments. Each of the mentioned fields claims specific requirements on design of manipulator, their operation and control systems as well as tools of manipulators. Precise planning of decontamination and dismantling tasks is necessary for its successful performance by remotely controlled manipulator. The example of the heavy water evaporator demonstrates typical procedure for decommissioning of contaminated technological equipment by remotely controlled manipulators - planning of decommissioning tasks, preparatory tasks, modification of applied tools and design of specific supporting constructions for manipulator and finally decontamination and dismantling themselves. Due to the particularly demanding conditions in highly contaminated A1 NPP, a team of experts with special know-how in the field of decommissioning has grown up, and unique technological equipment enabling effective and safe work in environment with a high radiation level has been developed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste-Incidental-to-Reprocessing Evaluation for the West Valley Demonstration Project Vitrification Melter - 12167

The Department of Energy (DOE) has determined that the vitrification melter used in the West Valley Demonstration Project can be disposed of as low-level waste (LLW) after completion of a waste-incidental-to-reprocessing evaluation performed in accordance with the evaluation process of DOE Manual 435.1-1, Radioactive Waste Management Manual. The vitrification melter - which consists of a ceramic lined, electrically heated box structure - was operated for more than 5 years melting and fusing high-level waste (HLW) slurry and glass formers and pouring the molten glass into 275 stainless steel canisters. Prior to shutdown, the melter was decontaminated by processing low-activity decontamination flush solutions and by extracting molten glass from the melter cavity. Because it could not be completely emptied, residual radioactivity conservatively estimated at approximately 170 TBq (4,600 Ci) remained in the vitrification melter. To establish whether the melter was incidental to reprocessing, DOE prepared an evaluation to demonstrate that the vitrification melter: (1) had been processed to remove key radionuclides to the maximum extent technically and economically practical; (2) would be managed to meet safety requirements comparable to the performance objectives for LLW established by the Nuclear Regulatory Commission (NRC); and (3) would be managed by DOE in accordance with DOE's requirements for LLW after it had been incorporated in a solid physical form with radionuclide concentrations that do not exceed the NRC concentration limits for Class C LLW. DOE consulted with the NRC on the draft evaluation and gave other stakeholders an opportunity to submit comments before the determination was made. The NRC submitted a request for additional information in connection with staff review of the draft evaluation; DOE provided the additional information and made improvements to the evaluation, which was issued in January 2012. DOE considered the NRC Technical Evaluation Report as well as comments received from other stakeholders prior to making its determination that the vitrification melter is not HLW, does not require permanent isolation in a geologic repository, and can be disposed of as LLW. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Testing Dual Rotary Filters - 12373

The Savannah River National Laboratory (SRNL) installed and tested two hydraulically connected SpinTek{sup R} Rotary Micro-filter units to determine the behavior of a multiple filter system and develop a multi-filter automated control scheme. Developing and testing the control of multiple filters was the next step in the development of the rotary filter for deployment. The test stand was assembled using as much of the hardware planned for use in the field including instrumentation and valving. The control scheme developed will serve as the basis for the scheme used in deployment. The multi filter setup was controlled via an Emerson DeltaV control system running version 10.3 software. Emerson model MD controllers were installed to run the control algorithms developed during this test. Savannah River Remediation (SRR) Process Control Engineering personnel developed the software used to operate the process test model. While a variety of control schemes were tested, two primary algorithms provided extremely stable control as well as significant resistance to process upsets that could lead to equipment interlock conditions. The control system was tuned to provide satisfactory response to changing conditions during the operation of the multi-filter system. Stability was maintained through the startup and shutdown of one of the filter units while the second was still in operation. The equipment selected for deployment, including the concentrate discharge control valve, the pressure transmitters, and flow meters, performed well. Automation of the valve control integrated well with the control scheme and when used in concert with the other control variables, allowed automated control of the dual rotary filter system. Experience acquired on a multi-filter system behavior and with the system layout during this test helped to identify areas where the current deployment rotary filter installation design could be improved. Completion of this testing provides the necessary information on the control and system behavior that will be used in deployment on actual waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Critical Drivers for Safety Culture: Examining Department of Energy and U.S. Army Operational Experiences - 12382

Evaluating operational incidents can provide a window into the drivers most critical to establishing and maintaining a strong safety culture, thereby minimizing the potential project risk associated with safety incidents. By examining U.S. Department of Energy (DOE) versus U.S. Army drivers in terms of regulatory and contract requirements, programs implemented to address the requirements, and example case studies of operational events, a view of the elements most critical to making a positive influence on safety culture is presented. Four case studies are used in this evaluation; two from DOE and two from U.S. Army experiences. Although the standards guiding operations at these facilities are different, there are many similarities in the level of hazards, as well as the causes and the potential consequences of the events presented. Two of the incidents examined, one from a DOE operation and the other from a U.S. Army facility, resulted in workers receiving chemical burns. The remaining two incidents are similar in that significant conduct of operations failures occurred resulting in high-level radioactive waste (in the case of the DOE facility) or chemical agent (in the case of the Army facility) being transferred outside of engineering controls. A review of the investigation reports for all four events indicates the primary causes to be failures in work planning leading to ineffective hazard evaluation and control, lack of procedure adherence, and most importantly, lack of management oversight to effectively reinforce expectations for safe work planning and execution. DOE and Army safety programs are similar, and although there are some differences in contractual requirements, the expectations for safe performance are essentially the same. This analysis concludes that instilling a positive safety culture comes down to management leadership and engagement to (1) cultivate an environment that values a questioning attitude and (2) continually reinforce expectations for the appropriate level of rigor in work planning and procedure adherence. A review of the root causes and key contributing causes to the events indicate: - Three of the four root cause analyses cite lack of management engagement (oversight, involvement, ability to recognize issues, etc.) as a root cause to the events. - Two of the four root cause analyses cite work planning failures as a root cause to the events and all cause analyses reflect work planning failures as contributing factors to the events. - All events with the exception of the Tuba City plant shutdown indicate procedure noncompliance as a key contributor; in the case of Tuba City the procedure issues were primarily related to a lack of procedures, or a lack of sufficiently detailed procedures. - All events included discussion or suggestion of a lack of a questioning attitude, either on the part of management/supervision, work planners, or workers. This analysis suggests that the most critical drivers to safety culture are: - Management engagement, - Effective work planning and procedures, and - Procedure adherence with a questioning attitude to ensure procedural problems are identified and fixed. In high-hazard operational environments the importance of robust work planning processes and procedure adherence cannot be overstated. However, having the processes by themselves is not enough. Management must actively engage in expectation setting and ensure work planning that meets expectations for hazard analysis and control, develop a culture that encourages incident reporting and a questioning attitude, and routinely observe work performance to reinforce expectations for adherence to procedures/work control documents. In conclusion, the most critical driver to achieving a workforce culture that supports safe and effective project performance can be summarized as follows: 'Management engagement to continually reinforce expectations for work planning processes and procedure adherence in an environment that cultivates a questioning attitude'. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fukushima Nuclear Crisis Recovery: A Modular Water Treatment System Deployed in Seven Weeks - 12489

On March 11, 2011, the magnitude 9.0 Great East Japan earthquake, Tohoku, hit off the Fukushima coast of Japan. This was one of the most powerful earthquakes in recorded history and the most powerful one known to have hit Japan. The ensuing tsunami devastated a huge area resulting in some 25,000 persons confirmed dead or missing. The perfect storm was complete when the tsunami then found the four reactor, Fukushima-Daiichi Nuclear Station directly in its destructive path. While recovery systems admirably survived the powerful earthquake, the seawater from the tsunami knocked the emergency cooling systems out and did extensive damage to the plant and site. Subsequent hydrogen generation caused explosions which extended this damage to a new level and further flooded the buildings with highly contaminated water. Some 2 million people were evacuated from a fifty mile radius of the area and evaluation and cleanup began. Teams were assembled in Tokyo the first week of April to lay out potential plans for the immediate treatment of some 63 million gallons (a number which later exceeded 110 million gallons) of highly contaminated water to avoid overflow from the buildings as well as supply the desperately needed clean cooling water for the reactors. A system had to be deployed with a very brief cold shake down and hot startup before the rainy season started in early June. Joined by team members Toshiba (oil removal system), AREVA (chemical precipitation system) and Hitachi-GE (RO system), Kurion (cesium removal system following the oil separator) proposed, designed, fabricated, delivered and started up a one of a kind treatment skid and over 100 metric tons of specially engineered and modified Ion Specific Media (ISM) customized for this very challenging seawater/oil application, all in seven weeks. After a very short cold shake down, the system went into operation on June 17, 2011 on actual waste waters far exceeding 1 million Bq/mL in cesium and many other isotopes. One must remember that, in addition to attempting to do isotope removal in the competition of seawater (as high as 18,000 ppm sodium due to concentration), some 350,000 gallons of turbine oil was dispersed into the flooded buildings as well. The proposed system consisted of a 4 guard vessel skid for the oil and debris, 4 skids containing 16 cesium towers in a lead-lag layout with removable vessels (sent to an interim storage facility), and a 4 polishing vessel skid for iodine removal and trace cesium levels. At a flow rate of at least 220 gallons per minute, the system has routinely removed over 99% of the cesium, the main component of the activity, since going on line. To date, some 50% of the original activity has been removed and stabilized and cold shutdown of the plant was announced on December 10, 2011. In March and April alone, 10 cubic feet of Engineered Herschelite was shipped to Seabrook Nuclear Power Plant, NPP, to support the April 1, 2011 outage cleanup; 400 cubic feet was shipped to Oak Ridge National Laboratory (ORNL) for strontium (Sr-90) ground water remediation; and 6000 cubic feet (100 metric tons, MT, or 220,400 pounds) was readied for the Fukushima Nuclear Power Station with an additional 100 MT on standby for replacement vessels. This experience and accelerated media production in the U.S. bore direct application to what was to soon be used in Fukushima. How such a sophisticated and totally unique system and huge amount of media could be deployable in such a challenging and changing matrix, and in only seven weeks, is outlined in this paper as well as the system and operation itself. As demonstrated herein, all ten major steps leading up to the readiness and acceptance of a modular emergency technology recovery system were met and in a very short period of time, thus utilizing three decades of experience to produce and deliver such a system literally in seven weeks: - EPRI - U.S. Testing and Experience Leading to Introduction to EPRI - Japan and Subsequently TEPCO Emergency Meetings - Three Mile Island (TMI) Media and Vitrification Experience by PNNL - Commercial Nuclear Power Plant Media Experience (including long term Cs removal) - DOE Low Active Waste (LAW) and High Level Waste (HLW) in High Salt and pH Conditions Media and Vitrification Experience - National Laboratory (e.g. Oak Ridge National Laboratory, ORNL) Ground Water Media Experience - Gulf Oil Spill Media Experience in Seawater - All Media Had to be Fully Tested at High Rad Levels in Seawater and Oil Before Arriving in Japan - Final Waste Form and Disposal Experience (e.g., vitrification) - 100 Metric Tons (6000 cubic feet or 220,400 pounds) of Media had to be Immediately Available with the same amount in production as replacement media. [To date, for 2011, 400 MT of media have been prepared for Japan alone.] - Remote Operation, Modular Water Treatment Equipment Design and Fabrication in both Commercial NPP and DOE Canyon Operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

US Spent (Used) Fuel Status, Management and Likely Directions- 12522

As of 2010, the US has accumulated 65,200 MTU (42,300 MTU of PWR's; 23,000 MTU of BWR's) of spent (irradiated or used) fuel from 104 operating commercial nuclear power plants situated at 65 sites in 31 States and from previously shutdown commercial nuclear power plants. Further, the Department of Energy (DOE) has responsibility for an additional 2458 MTU of DOE-owned defense and non defense spent fuel from naval nuclear power reactors, various non-commercial test reactors and reactor demonstrations. The US has no centralized large spent fuel storage facility for either commercial spent fuel or DOE-owned spent fuel. The 65,200 MTU of US spent fuel is being safely stored by US utilities at numerous reactor sites in (wet) pools or (dry) metal or concrete casks. As of November 2010, the US had 63 'independent spent fuel storage installations' (or ISFSI's) licensed by the US Nuclear Regulatory Commission located at 57 sites in 33 states. Over 1400 casks loaded with spent fuel for dry storage are at these licensed ISFSI's; 47 sites are located at commercial reactor sites and 10 are located 'away' from a reactor (AFR's) site. DOE's small fraction of a 2458 MTU spent fuel inventory, which is not commercial spent fuel, is with the exception of 2 MTU, being stored at 4 sites in 4 States. The decades old US policy of a 'once through' fuel cycle with no recycle of spent fuel was set into a state of 'mass confusion or disruption' when the new US President Obama's administration started in early 2010 stopping the only US geologic disposal repository at the Yucca Mountain site in the State of Nevada from being developed and licensed. The practical result is that US nuclear power plant operators will have to continue to be responsible for managing and storing their own spent fuel for an indefinite period of time at many different sites in order to continue to generate electricity because there is no current US government plan, schedule or policy for taking possession of accumulated spent fuel from the utilities. There are technical solutions for continuing the safe storage of spent fuel for 100 years or more and these solutions will be implemented by the US utilities that need to keep their nuclear power plants operating while the unknown political events are played out to establish future US policy decisions that can remain in place long enough regarding accumulated spent fuel inventories to implement any new US spent fuel centralized storage or disposition policy by the US government. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Remediation Activities in Japan Following the Fukushima Dai-ichi Reactor Incident - 12603

In March 2011, the Fukushima Dai-ichi reactor power plant was crippled by the Great Pacific earthquake and subsequent tsunami. Much of the focus in the news was on the reactor site itself as the utility company (TEPCO), the Japanese government, and experts from around the world worked to bring the damaged plants into a safe shutdown condition and stem the release of radioactivity to the environment. Most of the radioactivity released was carried out to sea with the prevailing winds. Still, as weather patterns changed and winds shifted, a significant plume of radioactive materials released from the plant deposited in the environment surrounding the plant, contaminating large land areas of the Fukushima Prefecture. The magnitude of the radiological impact to the surrounding environmental is so large that the Japanese government has had to reevaluate the meaning of 'acceptably clean'. In many respects, 'acceptably clean' cannot be a one-size-fits-all standard. The economics costs of such an approach would make impossible what is already an enormous and costly environmental response and remediation task. Thus, the Japanese government has embarked upon an approach that is both situation-specific and reasonably achievable. For example, the determination of acceptably clean for a nursery school or kindergarten play yard may be different from that for a parking lot. The acceptably clean level of residual radioactivity in the surface soil of a rice paddy is different from that in a forested area. The recognized exposure situation (scenario) thus plays a large role in the decision process. While sometimes complicated to grasp or implement, such an approach does prioritize national resources to address environment remediation based upon immediate and significant risks. In addition, the Japanese government is testing means and methods, including advanced or promising technologies, that could be proven to be effective in reducing the amount of radioactivity in the environment beyond a fixed, concentration based limit. Essentially, the definition of acceptably clean includes the concept of reasonably achievable, given the available technology, means and methods, and the cost to implement such. The Japanese government recently issued three technology demonstration contracts expressly designed to test and evaluate the available technologies, means, and methods, which, if implemented, might produce the greatest risk reduction from environmental contamination for the best value. One of the Japanese contract holders, Obayashi JV, has teamed with AMEC to demonstrate the applicability and capabilities of the Orion ScanPlot{sup SM} and ScanSort{sup SM} technologies in radiologically impacted towns both inside and immediately outside the 20 km restricted zone. This presentation provides some unique images and informative insight into the environmental radioactive impacts in and around the exclusion zone. It will provide a look at one element of the Japanese government?s efforts to achieve the greatest risk reduction that is reasonably achievable. The Orion ScanPlot{sup SM} and ScanSort{sup SM} are being used with success on the Japan Town Demonstration Project to assess pre-remedial action contamination levels, document the post-remedial action contamination levels and to precisely measure and segregate excavated soils based on their radioactive content and the prescribed segregation limits (DCS). Initial results suggest that these technologies could provide capabilities to the remedial action efforts that would result in considerable improvements in field data certainty and compliance with remedial objectives while reducing overall costs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and Construction of Large Size Micromegas Chambers for the ATLAS Upgrade of the Muon Spectrometer

Large area Micromegas detectors will be employed for the first time in high-energy physics experiments. A total surface of about 150 m{sup 2} of the forward regions of the Muon Spectrometer of the ATLAS detector at LHC will be equipped with 8-layer Micromegas modules. Each module extends over a surface from 2 to 3 m{sup 2} for a total active area of 1200 m{sup 2}. Together with the small strip Thin Gap Chambers they will compose the two New Small Wheels, which will replace the innermost stations of the ATLAS end-cap muon tracking system in the 2018/19 shutdown. In order to achieve a 15% transverse momentum resolution for 1 TeV muons, in addition to an excellent intrinsic resolution, the mechanical precision of each plane of the assembled module must be as good as 30 μm along the precision coordinate and 80 μm perpendicular to the chamber. In the prototyping towards the final configuration two similar quadruplets with dimensions 1.2 x 0.5 m{sup 2} have been built with the same structure as foreseen for the NSW upgrade. It represents the first example of a Micromegas quadruplet ever built, realized using the resistive-strip technology and decoupling the amplification mesh from the readout structure. All readout planes are segmented into strips with a pitch of 400 μm for a total of 4096 strips. In two of the four planes the strips are inclined by 1.5 deg. and provide a measurement of the second coordinate. The design and construction procedure of the Micromegas modules will be presented, as well as the design for the assembly of modules onto the New Small Wheel. Emphasis will be given on the methods developed to achieve the challenging mechanical precision. Measurements of deformation on chamber prototypes as a function of thermal gradients, gas over-pressure and internal stress (mesh tension and module fixation on supports) will be also shown in comparison to simulation. These tests were essential in the development of the final design in order to minimize the effects of deformations. During installation and operation all deformations and relative misalignments will be monitored through an optical alignment system and compensated in the tracking software. The optical alignment concept will also be outlined. 2 (authors)

43 PARTICLE ACCELERATORS↗

The Acoustic Emission signal acquired by the microphones placed in the CABRI test device along the fourteen last R.I.A. experiments: an example of reproducible research in nuclear science

The CABRI facility is an experimental nuclear reactor of the French Atomic Energy Commission. It is located at the Cadarache Research Centre in southern France and it is designed to act as a support to the French nuclear infrastructure. The purpose of the new testing programme termed, 'CABRI International Programme' (CIP) is to study the behaviour of PWR-type fuel rods at high burnup, equipped with an 'advanced' cladding, under Reactivity Initiated Accident (RIA) conditions (such as the scenario of a control rod ejection). Within the framework of this programme, piloted and funded by the French Institute of Nuclear Radioprotection and Safety (IRSN), ten tests are to be conducted with a frequency of two tests per year. The LPRE laboratory of the CEA which is in charge of the Preparation, realisation and breakdown of the test results studies the possibility to set up a new test analysis based on the processing of signals coming from sensors placed within the test equipment. During the experimental phase, the behaviour of the fuel element generates acoustic waves which can be detected by two microphones placed upstream and downstream of the test device. Studies showed the interest to realize temporal and spectral analyses on these signals by showing the existence of signatures which can be correlated with physical phenomena as the rod failure or the test shutdown (i.e. scram). The work presented in this article results from the will to consolidate these studies. Since the main phenomenon to be tracked is the fuel rod failure, the aim would be to highlight specific events which would have been precursors of the rod failure in order to use in the future these signals for further interpretation. Such an antecedent works resumption leads to a better understanding of the experimental needs and constitutes a good initial state to prepare the new very fast digital data acquisition systems. Although all the raw data are accessible in the form of text files, analyses and graphics representations were not straightforward to reproduce from the ancient studies since that, on one hand, people who were in charge of the original work left the laboratory and on the other hand because it is not easy when the time passes, even with our own work, to be able to remember the steps of data manipulations and the exact setup: - During the ancient experiments the use of analog data acquisition systems required to digitize tapes to be able to realize computer treatments. That had had for consequence to lose the initial dating. This one must be correctly edited to do temporal comparisons. - Analyses require functions for calculations whose parameters has to be well-known to reach the same results. We thus wished to manage our workflow in the idea that it can be easily reproducible on all the experiments. The object of the work presented in this article was to put in practice this strong bind between the data, treatments and generation of the document in order not to hesitate to do the iteration principle in action. We do not have to be afraid by the data driven analyses. According to the philosophy of the literate programming, the text of the technical document is woven with the computer code that produces all the printed output as tables, graphs for the study eliminating hence the unrealistic cut and paste. This difficulty is not specific to the nuclear domain. For many years, researchers have been worked out solutions to this mundane issue. And, presently, new technologies and high-level programming languages offer us actual answers. We will firstly present the tools applied in our laboratory to implement this workflow, then we will describe the global perception carried out to continue the study of the Acoustic Emission signals recorded by the two microphones during the fourteen last CABRI R.I.A. test.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The application of MAMMOTH for a detailed tightly coupled fuel pin simulation with a station blackout

The accurate calculation of desired quantities to predict fuel behavior in a nuclear reactor requires the solution of inter linked equations representing different physics phenomena. Traditional fuels performance codes often rely on internal empirical models for the pin power density and a simplified boundary condition on the cladding outer surface. These simplifications are performed because of the difficulty of coupling applications or codes on differing domains and mapping the required data. In this work the MAMMOTH application is employed in the demonstration of an approach that more consistent with first principles, in a simulation that couples the neutronics application Rattlesnake, the thermal fluids application RELAP-7 and the fuels performance application BISON. A single fuel pin was modeled based on the dimensions of a fuel rod from a Westinghouse 17*17 optimized PWR fuel assembly. The simulation consisted of a depletion period of 1343 days, representing three full operating cycles, followed by a station blackout (SBO) event. The fuel rod was depleted with a total pin power of 65.81 kW. After 1343 days the fission power was reduced to zero (simulating a reactor shutdown). Decay heat calculations provided the time-varying energy source after this time. For this problem, Rattlesnake, BISON, and RELAP-7 are coupled under MAMMOTH in a tightly coupled approach. Each system solves its physics on a separate mesh and, for RELAP-7 and BISON, on only a subset of the full problem domain. Rattlesnake solves the neutronics over the whole domain, which includes the fuel, cladding, gaps, water, and top and bottom rod holders. Here BISON is applied to the fuel and cladding with a 2-D axisymmetric domain, and RELAP-7 is applied to the flow of the circular outer water channel with a set of 1-D flow equations. For this work, the mesh on the Rattlesnake side is either be 3-D (for low order PN transport or diffusion) or 2-D axisymmetric (for diffusion). BISON has a matching ring structure mesh for the fuel so both the power density and local burnup are transferred accurately from Rattlesnake. At each depletion time step, Rattlesnake calculates a power density, fission density rate, burnup distribution and fast flux based on the current water density and fuel temperature. These are then mapped to the BISON mesh to perform a fuels performance solution. BISON calculates the fuel temperature and cladding surface temperature based upon the current power density and bulk fluid temperature. RELAP-7 then calculates the fluid temperature, water density fraction and water phase velocity based upon the cladding surface temperature. The fuel temperature and the fluid density are then passed back to Rattlesnake for another neutronics calculation. For this paper, sets of results from the detailed calculation are provided for both depletion and the SBO event. We demonstrate that a detailed simulation akin to first principles can be achieved using MAMMOTH and the various MOOSE application on differing domains. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

System Analysis Modeling and Intermodal Transportation for Commercial Spent Nuclear Fuel

The United States Department of Energy (DOE) Office of Nuclear Energy is applying knowledge and understanding in the areas of systems level engineering, analysis, and decision making to better inform the waste management pathways for U.S. spent nuclear fuel (SNF). Currently there are 93 operating and 23 shutdown commercial nuclear reactors in the United States. SNF at most of these locations is being stored in spent fuel pools, dry storage, or both [1, 2]. This paper initially goes over the basics of the agent-based simulation tool known as the Next Generation System Analysis Model (NGSAM) that has the capability to model interaction and movements of individual components or groups like casks, railcars etc. The next section covers some of the methods implemented in the Java Transportation Operations Model (JTOM) to facilitate the movement of assemblies, casks, railcars etc. and the various intermodal transfer options. This section also covers the current cask loading and intermodal transfer times implemented in NGSAM. The last section goes over the proposed values for intermodal transportation, and cask transfer/loading operations.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Assessment on Transport of Radioactive Species from Nuclear Facilities - 17079

It is generally recognized that radioactive nuclides are most hazardous fission products that could be released in the event of reactor accidents. The reactor coolant system of a pressurized water reactor (PWR) nuclear plant exhibits radioactivity from various sources. These radiation sources consist of the fission products from fuel element and activated products from corrosion products. The complex infrastructure of the processes does not allow detailed measurement of activity until after the reactor is shutdown. All of the components that require dismantling will be radioactive which was caused by neutron activation during operation, contamination by corrosion products, contamination by damaged by fuel rods and leaks by equipment. Due mainly to the various operation modes and their aging, there are the increasing needs to carry out repair works that are not sufficiently provided for by the original design. Many difficulties are involved in these tasks, namely, high radiation doses, cramped areas, hard to reach components, coupled with stringent quality conditions. The need to simulate the behavior of corrosion products in a nuclear power plant environment has attracted many researchers' attention. It has performed the in-depth reviews of the various theories and physics associated with the corrosion products transportation, the laboratory loop testing, and the field measurements in operating plants. Before we start the decommissioning of nuclear power plants, workers, the public and the environment shall be properly protected from radiation hazards. For this purpose, a safety assessment should be carried out relating to the potential hazards that may occur during the decommissioning. The radiological hazards involved in the decommissioning activities also should be identified, and be taken into account in the safety assessment. The radiation conditions of the primary circuit are determined by the activity of corrosion and fission products that have accumulated on the internal surfaces of the components. Therefore the estimation of contamination on the components is very important and, may be the first step in the reactor operation and decommissioning of components. The predominant radionuclide in the PWR primary coolant is Co-60, although Co-58 contributes significantly to radioactivity level at the early stage of a reactor operation. Since Co-60 is produced from the in-core Co-58, which is the source of cobalt in a reactor coolant system, many researchers have investigated its transmutation in the core, its transport around the system, and its subsequent deposition on surfaces. The major parameter influencing the behavior of radioactivity, such as Co-60 in the coolant, is the corrosion product oxides. The objective of this work is to analyze the corrosion product activity transported in the primary circuit by using a multi-region model. This model, which is incorporated with the mass and activity transport between the dissolved corrosion products in the coolant and the surface, describes the specific activity of corrosion products in coolant and on the surfaces according to the operation modes as well as decommissioning stage. In order to evaluate the analysis of the corrosion products in an integral type reactor, a multi-region mass balance model is applied. The specific activities of the various species on the surface of core and steam generator throughout the effective full power hours, 15,000 hours, are simulated for the various modes of operations. As a result, the specific activities of corrosion products from the surface of primary circuit were shown as very low compared to those of other commercial nuclear power plants. In this simulated reactor, a significant reduction of specific activities from the activated corrosion products is obtained due to the introduction of titanium alloy to the steam generator tube and the avoidance of boric acid induced corrosion. From this result we conclude that we are able to predict the level of radioactive nuclides generated by corrosion products in a primary circuit according to the various modes of operations by using multi-region model. In this point of view it is concluded that this multi-region model can be used as an engineering tool for analysis of the corrosion products within the primary coolant for the nuclear power plants. It is also considered that it is possible to extend to a calculation tool for estimating the radiological hazards involved in the decommissioning activities in terms of safety assessment. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Modeling and Analysis of Coupled Flow Through Packed Beds as a Diagnostic Tool for Packed Bed Reactor Health - 17172

The US Department of Energy, Office of River Protection, is building the Waste Treatment and Immobilization Plant (WTP) in Richland, Washington, to immobilize the hundreds of millions of liters of radioactive waste stored at the Hanford Site in Washington state. The offgas generated during vitrification of these wastes requires treatment to remove and/or destroy chemical and radioactive hazardous components before release to the atmosphere. In particular, volatile and semi-volatile hydrocarbon components are to be catalytically oxidized to carbon dioxide and water, whereas nitrogen oxides (NOx) are to be catalytically reduced to nitrogen and water. These tasks are accomplished in a series of packed bed reactors. Achieving the requisite Destruction/Removal Efficiency (DRE) for each of the tracked components is highly dependent on the flow characteristics of the offgas through the packed beds. The flow kinetics may be monitored and characterized during the initial warm-up of the system. The gases, initially at 76 deg. C (169 deg. F), (a) flow through one side of a countercurrent heat exchanger to recover heat from the exiting gases (which have already passed through the catalytic beds), (b) are then further heated electrically to approximately 400 deg. C (750 deg. F; the preferred operating temperature of the Thermo Catalytic Oxidizer (TCO)), (c) pass through the TCO where the reduced components of the offgas are oxidized over a supported Pt catalyst bed, (d) are partially cooled to approximately 315 deg. C (600 deg. F) by addition of approximately 25% (by weight) diluted ammonia/air mixture, (e) pass through the Selective Catalytic Reducer (SCR) where the NOx components are converted to N{sub 2} and H{sub 2}O over a supported V2O{sub 5}/TiO{sub 2} catalyst bed, and (f) exit through the hot side of the countercurrent heat exchanger. The electrical heater is not powerful enough to raise the temperature of the offgas to the desired 400 deg. C without the contribution of the heat recovered in the heat exchanger. Moreover, the thermal mass of the beds and housings of the TCO and SCR require a significant input of thermal energy to reach the desired operating temperatures; the better part of a day is required to bring the unit from ambient temperatures to operating temperatures. Therefore, the temperature of the stream during the initial warm-up of the system at each point in the system is dependent upon the thermal mass, flow dispersion, and permeability of the components, quantified as characteristic/representative volumes and residence times. By monitoring the temperature of the offgas as it enters and exits each portion of the system during this warm-up period one may model the system as a series of small Continuously Stirred Tank Reactors (CSTR)s (referred to as 'CSTRlets') to explain the flow kinetics through the catalyst beds. These component CSTRlets are adjustable in size and number, that one may model the flow profile of the gases through the catalyst beds. For example, a single large CSTR will present an effluent temperature profile with a simple exponential decay shape. Concatenating more CSTRlets generate more complex sigmoidal responses. Concatenating one CSTRlet significantly larger than the others in the train also alters the shape of the effluent temperature profile, in a fashion not replicable by a train of equal-sized CSTRlets. The ultimate goal is to accurately emulate the entire system as a representative CSTRlet train. Once accomplished, this characterization may be used in subsequent warm-ups (following shutdown for catalyst maintenance, for example) or by an intentional step change in inlet offgas temperature to detect/diagnose anomalies in flow through the beds (e.g., channeling or partial blockage.) This work presents development of this model through analytical, calculational, and empirical means. - The analytic model is accomplished by Laplace transform analysis of each component to recover component process transfer functions. - The calculational portion is performed via brute force finite element calculation. - Fitting empirical data from the warm-up of the TCO skid allows one to select the hypothetical CSTRlet trains which best fit the TCO and SCR beds for the analytical and finite element calculations. The first portion of this paper presents the development of the analytical (Laplace space) model of the coupled system. Estimated values for the initial temperature, mass, specific heat, electrical heat, and relative quantities of the offgas, catalyst beds, stainless steel housings, and ammonia dilution stream are used to generate expected temperature profiles at several selected junctures of the system. The number and size of the component hypothetical CSTRlets are calculated from the analytical model and are used to predict temperature profiles at the exit of the system and at intermediate junctions between system components (where thermocouples are present in the actual unit.) The finite element calculations employ a series of CSTRlet volumes to produce a similar suite of temperature profiles, for comparison with the analytical model results. Finally, empirical data from the Factory Acceptance Test system warm-up are used to select and compare the results from each modeling strategy to select the CSTRlet train(s) which best model the behavior of the actual system. This work presents a novel method of system component characterization, of value to the WTP plant and similar vitrification facilities as well as chemical process industries unrelated to waste management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovative Solutions To Solve Complex Radioactive Waste Management Problems In The U.S. - 2017 Richard S. Hodes, M.D. Honor Lecture Award - 17609

Ever since Wilhelm Roentgen, Henri Becquerel, and Marie Curie discovered x-rays, radioactivity, and radium, respectively, at the turn of the nineteenth century, nuclear technologies have continued to evolve and significantly enrich the quality of life for mankind. The evolution of such technologies has enabled our society to diagnose medical illnesses without the need for invasive surgeries, treat cancers, conduct research, develop new kinds of pharmaceuticals, preserve our food supply, and generate over 20% of our nation's electricity from commercial nuclear power plants. While these life-changing technologies have significantly enriched our quality of life and advanced our understanding of the sciences, they also generate radioactive waste that must be managed responsibly in a manner that protects public health. Over the past several decades, decision makers have developed a patchwork of policies to safely manage radioactive wastes-policies that are not necessarily based on the risk posed to public health, but more often on the origins of the waste and the manner in which they are defined in federal legislation. However, in the past several years, much progress has been made to better risk-inform the practices of managing Low-Level Radioactive Waste (LLW) in the United States. In 2012, the nation's first regional commercial facility for disposing of Class A, B, and C LLW since the U.S. Congress enacted the Low-Level Radioactive Waste Policy Act of 1980, as amended in 1985, was opened in Andrews County, Texas. Since then, other innovative LLW management solutions have emerged, ranging from cost-effective disposal options for wastes with very low levels of radioactivity to depleted uranium, and perhaps ultimately, for waste exceeding the concentration-based limits for Class C LLW (i.e., Greater Than Class C LLW) as specified in Title 10 of the Code of Federal Regulations (CFR), chap. 61.55. Most recently, a license application for a consolidated interim storage facility for Spent Nuclear Fuel (SNF) is currently under review by the U.S. Nuclear Regulatory Commission (NRC). Should the NRC approve the license application, SNF currently located at 12 shutdown and decommissioned nuclear reactors could be placed into interim storage in Texas. Approval of this license application would facilitate the complete decommissioning of nuclear power plants, returning them to green-fields, and allowing the local communities to re-purpose the lands for further economic development. Over the next decade, many of these waste management challenges that once seemed insurmountable may soon be transformed into a reality. As will be discussed at the award lecture, achieving such possibilities clearly aligns with the vision of creating innovative radioactive waste management solutions for our nation that were championed by the late physician and statesman, Dr. Richard S. Hodes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Selection and Validation of Alternate Slag Sources for Saltstone Production - 16145

To stabilize low activity salt solution produced at the Savannah River Site (SRS) the salt waste is mixed with a combination of fly ash (FA), ground granulated blast furnace slag (GGBFS), and ordinary Portland cement (OPC) to form a grout termed saltstone. Upon curing, the low activity waste is encapsulated within the hardened cementitious matrix. While the sources of the dry feed components have remained unchanged for several years, SRS was recently notified that its domestic source of GGBFS would no longer be available due to the shutdown of the steel making plant that produced the ferrous slag as a by-product. This shut-down follows a trend in the reduction of domestic ferrous slag sources. Alternate GGBFS vendors were sought and a program developed to validate the alternate sources for use in saltstone. GGBFS is primarily utilized in the construction industry as a replacement for OPC and the requirements of a GGBFS source, based on an American Society for Testing and Materials (ASTM) standard, are predominantly limited to demonstrating that the GGBFS replacement will provide equivalent strength in comparison to the baseline OPC-based concrete. This affords the construction industry significant flexibility with respect to the GGBFS source that can be used. In contrast, GGBFS has a role of significantly more importance when utilized in saltstone. In particular, the reducing blast furnace environment under which GGBFS is produced yields reducing species, such as sulfide (S{sup 2-}) and ferrous iron (Fe{sup 2+}), which are believed to facilitate the long-term immobilization of redox sensitive contaminants (e.g. technetium-99 ({sup 99}Tc)). In addition, a change in GGBFS source has the potential to impact the rheological properties and the reactive heat generation of the grout, which may adversely affect the ability to pump the grout to a Saltstone Disposal Unit (SDU) and the temperatures attained within an SDU, respectively. As such, alternate GGBFS sources for the processing of saltstone require significantly more scrutiny than is prescribed by the ASTM standard. Four alternate GGBFS sources were evaluated. All four sources met the ASTM requirements, only one source was considered viable for use in saltstone based on preliminary evaluation. The other three sources will require a more intensive assessment to determine their potential applicability. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗