At least 1,495 records · Page 83

An islanding detection methodology combining decision trees and Sandia frequency shift for inverter-based distributed generations

Distributed generations (DGs) for grid-connected applications require an accurate and reliable islanding detection methodology (IDM) for secure system operation. This paper presents an IDM for grid-connected inverter-based DGs. The proposed method is a combination of passive and active islanding detection techniques for aggregation of their advantages and elimination/minimisation of the drawbacks. In the proposed IDM, the passive method utilises critical system attributes extracted from local voltage measurements at target DG locations as well as employs decision tree-based classifiers for characterisation and detection of islanding events. The active method is based on Sandia frequency shift technique and is initiated only when the passive method is unable to differentiate islanding events from other system events. Thus, the power quality degradation introduced into the system by active islanding detection techniques can be minimised. Furthermore, a combination of active and passive techniques allows detection of islanding events under low power mismatch scenarios eliminating the disadvantage associated with the use of passive techniques alone. Finally, detailed case study results demonstrate the effectiveness of the proposed method in detection of islanding events under various power mismatch scenarios, load quality factors and in the presence of single or multiple grid-connected inverter-based DG units.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Quantum-Inspired Power System Reliability Assessment

To enable an in-depth study of power system operation and planning, the assessment of standard reliability indices is inevitable. The Monte Carlo Simulation (MCS) approach is a broadly used method in replacing the analytical methods in reliability indices assessment. The accuracy of MCS, however, highly depends on the sampling size, and hence, a complicated system with large number of components requires a large sampling size and daunting computational effort. To address this shortcoming, we, in this paper attempt to take advantage of potentials of the quantum computing (QC) for power system reliability assessment by realizing the following contributions: 1) an innovative quantum model designed for reliability assessment; 2) a quantum circuit that achieves the quadratic speed up compared to the classical MCS method; 3) an efficient quantum amplitude estimation (QAE) algorithm to accurately evaluate the reliability indices. The accuracy and efficacy of the quantum reliability method are extensively verified and demonstrated on both radial and mesh distribution systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Drivers of the Resource Adequacy Contribution of Solar and Storage for Florida Municipal Utilities

Solar’s variable generation limits its contribution to reliably meeting peak demand, or its resource adequacy contribution. Energy storage is a leading option to increase solar’s resource adequacy contribution, yet the contribution from different configurations of solar and storage is not widely understood. We develop methods for exploring the primary drivers of an estimate of the resource adequacy contribution of solar and storage, and we apply the methods to a case study in Florida, where demand peaks in winter and summer. We find that the portion of solar nameplate capacity that contributes to resource adequacy—its capacity credit—is less than 50% and that it declines with increasing solar penetration. The capacity credit of storage, even though it is fully controllable by the system operator, strongly depends on the duration of storage. The capacity credit of 1 hour of storage can be less than the capacity credit of solar. Achieving a 90% capacity credit requires at least 4–5 hours of storage when storage capacity is small relative to the system peak. As storage deployment increases to 20% of the peak demand, 9 hours—and sometimes more than 10 hours—of storage are needed to achieve a 90% capacity credit. Increased solar deployment at the system level can increase storage’s capacity credit. Directly pairing solar and storage can also impact the capacity credit. Storage with a power rating similar to the solar inverter rating loses capacity credit when coupled with solar if its duration is more than 1–2 hours, because storage competes with solar for use of the inverter. On the other hand, there is no reduction in capacity credit when the storage is small relative to the solar inverter. The approach and tools developed here for exploratory analysis can be useful for many other utilities and regions grappling with similar preliminary questions, prior to evaluation of specific cases using more detailed and resource-intensive modeling.

14 SOLAR ENERGY↗

Interconnection Cost Analysis in the PJM Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the PJM Territory, representing nearly 86% of all new unique generators requesting interconnection from 2000 to 2022. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Generator Interconnection Cost Analysis in the Southwest Power Pool (SPP) Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 845 projects from interconnection studies for the Southwest Power Pool (SPP) Territory. The studies were performed between 2002 and 2023 and include all of the most refined cost estimates available. Project-level cost summary data are available for download on this page. We find: -Project-specific interconnection costs can differ widely. -Average interconnection costs are stable for projects that complete all interconnection studies but have escalated for those that withdraw. -Broader network upgrade costs are the primary driver of recent cost increases, especially for withdrawn projects. -Potential interconnection costs of all solar and wind requests have been greater than those of storage and natural gas projects. -Economies of scale exist for completed wind and solar projects but not for other fuel types or withdrawn projects. -Interconnection costs vary by location. Berkeley Lab publishes a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interconnection Cost Analysis in ISO-New England

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 194 projects in New England from interconnection studies performed between 2010 and 2021. Project-level cost summary data are available for download on this page. We find: -Interconnection costs have grown over time, especially for projects that withdraw. -Interconnection costs are highest for onshore wind, followed by solar and storage. Natural gas and offshore wind projects tend to cost less to interconnect, in comparison. -Economies of scale exist for solar and possibly storage projects, but not for other resource types. -Wind and solar projects requesting capacity network resource interconnection service have higher interconnection costs, despite being evaluated using the same interconnection standard in the analyzed studies. -Low and high interconnection costs can be found throughout the ISO-NE footprint. -Costs are split fairly evenly between investments at the point of interconnection and within the broader network for active and withdrawn projects, while complete projects incur most costs at the point of interconnection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Bias Correcting NOAA's High-Resolution Rapid Refresh (HRRR) Wind Resource Data for Grid Integration Applications [Slides]

Many weather years of high-quality wind data are widely accepted in the grid integration community to be important for studying wind energy technical potential, energy system operations, and grid resilience. NREL makes high-quality wind and solar resource data available. NREL's Grid-Atmosphere workshop (March 2024) identified NREL National Solar Radiation Database as widely used in grid integration modeling, but there is less agreement on commonly used wind datasets. One important factor identified by ESIG's 2023 report 'Weather Dataset Needs for Planning and Analyzing Modern Power Systems' for gold standard wind data is regular updates. To address the need for regular updates, NREL's team can now process all currently available and regularly updated High-Resolution Rapid Refresh (HRRR) outputs. HRRR is an hourly-updated operational forecast product produced by the National Oceanic and Atmospheric Administration (NOAA) (Dowell et al., 2022). One barrier to NREL using HRRR is systematic bias and consistency with NREL's existing wind datasets (e.g. WIND Toolkit, 'WTK') across weather years. To address this barrier, we show that the HRRR can be interpolated and bias-corrected to be consistent with NRE's existing datasets. We call the new dataset BC-HRRR (bias-corrected HRRR). As with historical datasets like the WTK, BC-HRRR is intended for use in grid integration modeling (e.g., capacity expansion, production cost, and resource adequacy modeling). BC-HRRR's (2015-present) consistency with WTK (2007-2013) allows NREL to extend internal grid integration tooling with 15+ weather years of wind data with low-overhead extensibility to future years as they are made available by NOAA. The rest of this slide deck documents the BC-HRRR processing methods, validation, and its implications for intended use.

17 WIND ENERGY↗

Micromobility Integrated Transit and Infrastructure for Efficiency (MITIE)

Nearly omnipresent in many cities of all sizes across the United States, micromobility vehicles-e-scooters, manual bicycles, e-bicycles, and larger seated electric scooters-are notably missing from SMART Mobility research. This project aims to expand the spectrum of modes currently being researched within SMART Mobility by exploring micromobility as an important tool toward meeting energy-efficient mobility goals. It expands on findings from SMART Mobility 1.0 that revealed preferences to reduce transportation-related expenses through use of a network of mobility-as-a-service (MaaS) and other shared mobility options, and builds on findings from a 2019 Vehicle Technology Analysis Program (VTAP) funded micromobility project conducted by our team. We will explore multiple facets of micromobility, including behavior and decision-making, the integration of micromobility within transportation infrastructure, energy estimates, and operations. Guiding research questions include: (1) What are the potential energy savings from low, medium, and high market penetration of micromobility (in passenger, multimodal, and freight domains)? (2) Which scenarios for micromobility use and related enablement of increased public transit use should be modeled/considered in the SMART 2.0 Workflow? (3) To what degree can micromobility supplement/complement transit system operations? (4) What are people's preferences towards micromobility? How do preferences vary across various sociodemographic segments? How can this knowledge inform operations? (5) What are optimal strategies to attain high user adoption and shift users toward more energy-efficient mode choices in terms of micromobility operation? How do these strategies affect energy savings, person-miles traveled, lifecycle energy use, and adoption rates? These questions will be addressed through applied research in five project emphasis areas: (1) Energy estimates of micromobility for Workflow scenarios: Expand and refine previous micromobility work to augment the Workflow approaches to modeling urban travel. (2) Multimodal connection with transit: Utilizing Mobility-Energy Productivity (MEP) tools to evaluate multimodal travel patterns enabled by micromobility, including assessing how to reduce barriers of inequity of access to mobility options and destinations. (3) Mode choice, induced demand, and infrastructure: Understanding the mode shift induced through micromobility to inform energy impact analysis. (4) Energy optimization of micromobility operations: Identification of micromobility operations parameters and development of operations scenarios to better understand present-day micromobility operations for integration into the Workflow, in partnership with BEAM and POLARIS modeling teams. (5) Micro-freight: Characterize the current state of micro-freight activities, including energy effects and geospatial analyses, to inform Workflow.

ADVANCED PROPULSION SYSTEMS,POWER TRANSMISSION AND↗

Big Data Analytic for Cascading Failure Analysis

With the challenges of increased grid dynamics and more variability of power generation from renewable energy sources, rapidly increasing complexity in the grid model, and abundant data from measurements and simulations, the requirements for computational analysis have also increased dramatically. Power system operators and engineers need to analyze more scenarios, extract meaningful information from a larger set of data, and respond more quickly when faced with these new challenges for large-scale applications, such as contingency analysis. This paper proposes a novel big data analysis approach for power system cascading analysis, prevention, and remediation. The developed techniques will be capable of cascading analysis, better assessment of the system’s vulnerability level, as well as proposing potential remediation. Case studies using IEEE 118-bus system and a 500-bus system, with a comparison against a commercial tool, validate the advantages of the developed big data approach: accurate prediction, and more importantly, faster and effective correction actions.The developed techniques could be further used for other power system applications.

big data, cascading analysis, corrective action, m↗

Transient recovery problem in acoustics: A multichannel model-based deconvolution approach

Critical acoustical systems operating in complex environments contaminated with disturbances and noise offer an extreme challenge when excited by out-of-the-ordinary, impulsive, transient events that can be undetected and seriously affect their overall performance. Transient impulse excitations must be detected, extracted, and evaluated to determine any potential system damage that could have been imposed; therefore, the problem of recovering the excitation in an uncertain measurement environment becomes one of multichannel deconvolution. Recovering a transient and its initial energy has not been solved satisfactorily, especially when the measurement has been truncated and only a small segment of response data is available. The development of multichannel deconvolution techniques for both complete and incomplete excitation data is discussed, employing a model-based approach based on the state-space representation of an identified acoustical system coupled to a forward modeling solution and a Kalman-type processor for enhancement and extraction. In conclusion, synthesized data are utilized to assess the feasibility of the various approaches, demonstrating that reasonable performance can be achieved even in noisy environments.

42 ENGINEERING↗

Subtask 2.6 – Optimization of Aerosol Mitigation Technology for Postcombustion CO 2 Capture

Growing concerns over the impact of CO 2 emissions from combustion sources on global climate change have prompted numerous research and development projects aimed at developing cost-effective technologies for CO 2 capture. One family of technologies being demonstrated at pilot and full scale globally is postcombustion CO 2 capture (PCCC) systems that employ amine-based solvents. The captured CO 2 can be compressed and permanently stored underground or used for enhanced oil recovery (EOR). The proximity of North Dakota’s lignite-fired fleet of power plants to potential CO 2 storage options creates a unique atmosphere for PCCC within the state. However, the aerosols present in lignite flue gas present a challenge for large-scale PCCC at North Dakota power plants. Aerosols can negatively impact the long-term performance of amine-based solvents for CO 2 capture. Amine-based solvents are volatile, and aerosols provide nucleation sites where amine vapors can condense. Because aerosols cannot be easily captured at the column outlet using conventional technologies, the amine-laden aerosols escape the system and lead to accelerated solvent losses. Moreover, aerosol components can chemically react with amines to form degradation products that can permanently deactivate the amine, cause fouling, and lead to hazardous emissions. Many of the elements that have been shown to catalyze solvent degradation are present in lignite coals and can exacerbate solvent replacement economics. Understanding this issue is critical to the implementation of solvent-based CO 2 capture systems as applied to lignite-fired generation systems. The Energy & Environmental Research Center (EERC) designed and carried out this project to optimize aerosol mitigation technology for PCCC at a lignite-fired power plant. To meet the goal of this project, the following objectives were identified: Determine the effectiveness of a wet electrostatic precipitator (WESP) on collection of aerosols at a low-rank coal-fired power station. Determine the impact of aerosols on the efficiency and degradation products of amine-based carbon capture systems fired with low-rank fuels. Work was conducted at Minnkota Power Cooperative’s (MPC’s) Milton R. Young (MRY) Station Unit 2 using a slipstream of flue gas from the outlet of the plant’s flue gas desulfurization (FGD) unit. To gather initial data for sizing and specifying a WESP for this system, a temporary pilot-scale WESP was rented and installed on-site. Several different conditions were tested to examine the impact of flow rate, voltage, and current on WESP performance. The WESP was effective at removing large particulate (>200 nm) but caused an increase in fine particulate (<75 nm). Fine particulate material at the inlet and outlet of the WESP was collected, analyzed, and showed that crystalline sulfates carried over from the plant’s FGD unit were being converted to fine aerosols and SO 2 was being converted to SO 3 through the WESP. Additionally, the high moisture content of the flue gas stream at this sample location also contributed to an overall increase in aerosol mass under some of the test conditions. Using the results from the rented WESP, the project team installed a smaller-scale WESP upstream of the EERC’s slipstream CO 2 capture system. Flue gas was routed through a pilot-scale FGD unit to remove SO 2 to very low levels (~1 ppm) and then through a direct contact cooler (DCC) to further cool the gas and to remove moisture. The gas exiting the DCC was then routed through the new WESP before passing to the CO 2 absorber columns. Fluor’s amine-based solvent was used to scrub CO 2 from the slipstream through a set of two absorber columns. The rich solvent was regenerated in a stripper column by heating to drive off captured CO 2 . The system operated using a catch-and-release method where the CO 2 was separated to provide data on the process, but the captured CO 2 was released back into the host site stack. Aerosols and sulfur species were measured at multiple locations throughout the pilot-scale system. The inlet FGD and DCC removed much of the particulate matter and gaseous sulfur upstream of the WESP. With this configuration, the WESP achieved >95% particulate capture. The new WESP did not show any of the increases in SO 3 or other aerosol species that had been consistently observed with the larger-scale WESP installed immediately downstream of the plant’s full-scale FGD unit. Particulate samples captured and analyzed from the WESP inlet did not show any presence of crystalline sulfate materials, indicating that the pilot-scale FGD and DCC were efficient at reducing carryover from the plant’s full-scale FGD unit. A set of parametric tests were conducted on the new WESP to assess the impacts of flow rate, voltage, number of online WESP fields, and gas-phase sulfur content on aerosol and sulfur transformations. The results showed that the WESP performed similarly well at all sets of conditions. Sulfur and particulate matter exiting the WESP were further reduced through the absorber column as the amine-based solvent captured some of the residual contaminants. Solvent analysis showed that these species were slowly concentrating in the solvent over the duration of the test. When the WESP was taken offline and the sulfur slip through the FGD allowed to rise, the sulfate content in the solvent rose sharply, showing that the extra FGD and WESP were effective at reducing sulfate and cation uptake. This would be expected to extend amine-based solvent life by slowing the formation of heat-stable salts and other degradation products. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission and MPC.

01 COAL, LIGNITE, AND PEAT↗

Distribution Grid Incentive Design with Unknown Agent Behavior

Motivation: During extreme events, traditional grid regulation methods (e.g., energy prices, net power injection limits) may be insufficient. While system operators typically lack control over end-user grid interactions, (e.g., energy demand), incentives can influence behavior - for example, a user that receives a grid-driven incentive may adjust their consumption or expose relevant control variables in response. Problem: Optimize for the best incentive subject to system stability constraints. However, user behavior is unknown to the SO - i.e., for a given incentive, the amount of curtailed load or control variables exposed is unknown.

feedback based control↗

Large-Scale Simulation of Regional Demand Flexibility Implementation and Customer Economic Impact

The Distribution System Operator with Transactive (DSO+T) study conducted a large-scale simulation of over 60,000 customers in a region the size of Texas to demonstrate the effective coordination of distributed energy resources (DERs) in commercial and residential buildings. The integrated simulation included both the bulk (wholesale generation and transmission) and distribution systems. The DERs (including batteries, electric vehicles, air conditioning, and water heaters) participated in a transactive energy retail market that was integrated into an existing competitive wholesale market. The engineering and economic performance of the resulting demand flexibility was evaluated over annual simulations for both moderate and high renewable generation scenarios. A detailed parametric cost model was developed to enable detailed economic analysis of key stakeholders. In addition, fixed and dynamic customer tariffs were designed and applied to the customer population. This allowed the impact on annual customer bills to be analyzed for various building types (residential versus commercial; single- versus multi-family). This paper presents results showing the relative flexibility of batteries, electric vehicles, and building loads throughout the year and under different renewable scenarios. This feeds a detailed breakdown of the impact this flexibility has on the operating costs of the grid and the resulting net economic benefit. Finally, the study showed that practically all customer classes (including non-participating customers) save money under the proposed demand flexibility scheme. The study found overall net annual economic savings of $3.3-5.0B for a region the size of Texas equating to average customer bill savings of 10-16%.

Reeve, Hayden M.↗

Investigating the effects of cooperative transmission expansion planning on grid performance during heat waves with varying spatial scales

There is growing recognition of the advantages of interregional transmission capacity to decarbonize electricity grids. A less explored benefit is potential performance improvements during extreme weather events. This study examines the impacts of cooperative transmission expansion planning using an advanced modeling chain to simulate power grid operations of the United States Western Interconnection in 2019 and 2059 under different levels of collaboration between transmission planning regions. Two historical heat waves in 2019 with varying geographical coverage are replayed under future climate change in 2059 to assess the transmission cooperation benefits during grid stress. The results show that cooperative transmission planning yields the best outcomes in terms of reducing wholesale electricity prices and minimizing energy outages both for the whole interconnection and individual transmission planning regions. Compared to individual planning, cooperative planning reduces wholesale electricity prices by 64.3 % and interconnection-wide total costs (transmission investments + grid operations) by 34.6 % in 2059. It also helps decrease greenhouse gas emissions by increasing renewable energy utilization. However, the benefits of cooperation diminish during the widespread heat wave when all regions face extreme electricity demand due to higher space cooling needs. Despite this, cooperative transmission planning remains advantageous, particularly for California Independent System Operator with significant diurnal solar generation capacity. This study suggests that cooperation in transmission planning is crucial for reducing costs and increasing reliability both during normal periods and extreme weather events. It highlights the importance of optimizing the strategic investments to mitigate challenges posed by wider-scale extreme weather events of the future.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Spinning reserve from hotel load response

Even though preliminary tests were not conducted during times of highest system or hotel loading during the summer, they showed that hotel load can be curtailed by 22 to 37 percent depending on the outdoor temperature and time of day. Full response occurred in 12 to 60 seconds from when the system operator's command to shed load was issued and the load drop was very rapid. (author)

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evaluation of information technology impact on effective internal control in the University system

Information Technology (IT) plays a key role in internal control system in various organizations in terms of maintaining records and other internal services. Internal control system is defined as an efficient control procedures set up by firm to safeguard resources and to assure the reliability and accuracy of both financial and non-financial records in line with applicable governance and procedure to acquire the established goal and objectives. This paper focuses on the impact of IT on internal control system in the Nigerian universities. Data are collected from three different universities via questionnaire. Descriptive statistics is used to analyze the data; Chi-square is performed to test the hypothesis. The results of the hypothesis showed that IT has a positive relationship with the effective internal control activities in the University system. It is concluded that the adoption of IT will significantly improve the effectiveness of the internal control system operations in the University in terms of quality service delivery.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Phase locking of a seven-channel continuous wave fibre laser system by a stochastic parallel gradient algorithm

A seven-channel fibre laser system operated by the master oscillator – multichannel power amplifier scheme is the phase locked using a stochastic parallel gradient algorithm. The phase modulators on lithium niobate crystals are controlled by a multichannel electronic unit with the microcontroller processing signals in real time. The dynamic phase locking of the laser system with the bandwidth of 14 kHz is demonstrated, the time of phasing is 3 – 4 ms. (fibre and integrated-optical structures)

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

IGMS: An Integrated ISO-to-Appliance Scale Grid Modeling System

This paper describes the Integrated Grid Modeling System (IGMS), a novel electric power system modeling platform for integrated transmission-distribution analysis that co-simulates off-the-shelf tools on high performance computing (HPC) platforms to offer unprecedented resolution from ISO markets down to appliances and other end uses. Specifically, the system simultaneously models hundreds or thousands of distribution systems in co-simulation with detailed Independent System Operator (ISO) markets and AGC-level reserve deployment. IGMS uses a new MPI-based hierarchical co-simulation framework to connect existing sub-domain models. Our initial efforts integrate opensource tools for wholesale markets (FESTIV), bulk AC power flow (MATPOWER), and full-featured distribution systems including physics-based end-use and distributed generation models (many instances of GridLAB-D[TM]). The modular IGMS framework enables tool substitution and additions for multi-domain analyses. This paper describes the IGMS tool, characterizes its performance, and demonstrates the impacts of the coupled simulations for analyzing high-penetration solar PV and price responsive load scenarios.

24 POWER TRANSMISSION AND DISTRIBUTION↗