Search NASA⌕ Search

SEARCH · Search NASA

Results for “Unit testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,495 records · Page 83

May 2010 Groundwater Sampling at the Central Nevada Test Area (Data Validation Package)

The U.S. Department of Energy Office of Legacy Management conducted annual sampling at the Central Nevada Test Area (CNTA) on June 7-9, 2010, in accordance with the 2004 Correction Action Decision Document/Corrective Action Plan for Corrective Action Unit 443: Central Nevada Test Area (CNTA)-Subsurface. Sampling and analysis were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PLN/S04351), continually updated).

54 ENVIRONMENTAL SCIENCES↗

Historic Context, Character-Defining Elements, And Photographic Record For A 26.45-Mile Segment Of The 138-Kilovolt Power Transmission System, Areas 3, 5, 6, And 23, Nevada National Security Site, Nye County, Nevada

The subject of this report is the 138-kilovolt (kV) power transmission line on the Nevada National Security Site (NNSS) (see Figure 1). The NNSS, formerly the Nevada Test Site (NTS), was the main continental nuclear test site for the United States between 1951 and 1992. Known as the battleground of the Cold War, the NNSS hosted a total of 928 nuclear tests during that period. It also served as the location of numerous scientific advancements in the fields of rocketry, big-hole drilling, nuclear waste management, and defense. From its construction in the 1960s through the present day, the 138 kV line has provided electrical power to the numerous buildings, facilities, experiments, and tests on the NNSS. The Department of Energy (DOE), in consultation with the Nevada State Historic Preservation Officer (SHPO), has determined that it may contribute to the character and significance of the Mercury Historic District (MHD) on the NNSS, as well as other historic districts that have not been recorded or evaluated yet. The purpose of this report is to fulfill two of the stipulations in the Memorandum of Agreement DEGM58-22NA25553 between the U.S. Department of Energy and the Nevada State Historic Preservation Officer Regarding Installation of a 138-kilovolt Transmission Line from the Mercury Switching Station to the U1a Facility and the Removal of the Historic 138-kilovolt Transmission Line from the Mercury Switching Station to the U1a Facility in Areas 1, 3, 5, 6, and 23 of the Nevada National Security Site (MOA). The MOA was executed as part of the DOE’s obligations under Section 106 of the National Historic Preservation Act (NHPA) to mitigate the adverse effects of two undertakings on historic properties. In particular, this report fulfills MOA Stipulations III.C.1-3, which state that the Department of Energy (DOE) will prepare the following: A historic context for the 138 kV transmission line and identification of the line’s characterdefining elements; High-quality digital images of the 26.45-mile segment of the 138 kV transmission line that is subject to the two undertakings for which the MOA was executed; and Photograph catalogs and map keys showing photograph viewpoints and directions.

54 ENVIRONMENTAL SCIENCES↗

NASA's Space Launch System Program Update

Hardware and software for the world's most powerful launch vehicle for exploration is being welded, assembled, and tested today in high bays, clean rooms and test stands across the United States. NASA's Space Launch System (SLS) continued to make significant progress in 2014 with more planned for 2015, including firing tests of both main propulsion elements and the program Critical Design Review (CDR). Developed with the goals of safety, affordability, and sustainability, SLS will still deliver unmatched capability for human and robotic exploration. The initial Block 1 configuration will deliver more than 70 metric tons of payload to low Earth orbit (LEO). The evolved Block 2 design will deliver some 130 metric tons to LEO. Both designs offer enormous opportunity and flexibility for larger payloads, simplifying payload design as well as ground and on-orbit operations, shortening interplanetary transit times, and decreasing overall mission risk. Over the past year, every vehicle element has manufactured or tested hardware. An RS-25 liquid propellant engine was hotfire-tested at NASA's Stennis Space Center, Miss. for the first time since 2009 exercising and validating the new engine controller, the renovated A-1 test stand, and the test teams. Four RS-25s will power the SLS core stage. A qualification five-segment solid rocket motor incorporating several design, material, and process changes was scheduled to be test-fired in March at the prime contractor's facility in Utah. The booster also successfully completed its Critical Design Review (CDR) validating the planned design. All six major manufacturing tools for the core stage are in place at the Michoud Assembly Facility in Louisiana, and have been used to build numerous pieces of confidence, qualification, and even flight hardware, including barrel sections, domes and rings used to assemble the world's largest rocket stage. SLS Systems Engineering accomplished several key tasks including vehicle avionics software and hardware build and testing, scale model acoustic and base heating tests. Construction of the Interim Cryogenic Propulsion Stage (ICPS) began. Advanced development provided a look into the future of SLS. Shell buckling knockdown factor testing refined decades-old design margins that added thousands of pounds to rocket payloads. Adaptive manufacturing and structured light scanning development promised to cut the cost and time associated with manufacturing and testing. This paper will provide an overview of the progress made over the past year and provide a glimpse of 2015 milestones and beyond on the way to the first launch in 2018.

May, Todd↗

NASA's Space Launch System Program Update

Hardware and software for the world's most powerful launch vehicle for exploration is being welded, assembled, and tested today in high bays, clean rooms and test stands across the United States. NASA's Space Launch System (SLS) continued to make significant progress in 2014 with more planned for 2015, including firing tests of both main propulsion elements and the program Critical Design Review (CDR). Developed with the goals of safety, affordability, and sustainability, SLS will still deliver unmatched capability for human and robotic exploration. The initial Block 1 configuration will deliver more than 70 metric tons of payload to low Earth orbit (LEO). The evolved Block 2 design will deliver some 130 metric tons to LEO. Both designs offer enormous opportunity and flexibility for larger payloads, simplifying payload design as well as ground and on-orbit operations, shortening interplanetary transit times, and decreasing overall mission risk. Over the past year, every vehicle element has manufactured or tested hardware. An RS-25 liquid propellant engine was hotfire-tested at NASA's Stennis Space Center, Miss. for the first time since 2009 exercising and validating the new engine controller, the renovated A-1 test stand, and the test teams. Four RS-25s will power the SLS core stage. A qualification five-segment solid rocket motor incorporating several design, material, and process changes was scheduled to be test-fired in March at the prime contractor's facility in Utah. The booster also successfully completed its Critical Design Review (CDR) validating the planned design. All six major manufacturing tools for the core stage are in place at the Michoud Assembly Facility in Louisiana, and have been used to build numerous pieces of confidence, qualification, and even flight hardware, including barrel sections, domes and rings used to assemble the world's largest rocket stage. SLS Systems Engineering accomplished several key tasks including vehicle avionics software and hardware build and testing, scale model acoustic and base heating tests. Construction of the Interim Cryogenic Propulsion Stage (ICPS) began. Advanced development provided a look into the future of SLS. Shell buckling knockdown factor testing refined decades-old design margins that added thousands of pounds to rocket payloads. Adaptive manufacturing and structured light scanning development promised to cut the cost and time associated with manufacturing and testing. This paper will provide an overview of the progress made over the past year and provide a glimpse of 2015 milestones and beyond on the way to the first launch in 2018.

May, Todd↗

Successful Completion of the JWST OGSE2 Cryogenic Test at JSC Chamber-A While Managing Numerous Challenges

The James Webb Space Telescope (JWST) Optical Telescope Element (OTE) assembly is the largest optically stable infrared-optimized telescope currently being manufactured and assembled, and scheduled for launch in 2018. The JWST OTE, including the primary mirrors, secondary mirror, and the Aft Optics Subsystems (AOS) are designed to be passively cooled and operate at near 45 degrees Kelvin. Due to the size of its large sunshield in relation to existing test facilities, JWST cannot be optically or thermally tested as a complete observatory-level system at flight temperatures. As a result, the telescope portion along with its instrument complement will be tested as a single unit very late in the program, and on the program schedule critical path. To mitigate schedule risks, a set of 'pathfinder' cryogenic tests will be performed to reduce program risks by demonstrating the optical testing capabilities of the facility, characterizing telescope thermal performance, and allowing project personnel to learn valuable testing lessons off-line. This paper describes the 'pathfinder' cryogenic test program, focusing on the recently completed second test in the series called the Optical Ground Support Equipment 2 (OGSE2) test. The JWST OGSE2 was successfully completed within the allocated project schedule while faced with numerous conflicting thermal requirements during cool-down to the final cryogenic operational temperatures, and during warm-up after the cryo-stable optical tests. The challenges include developing a pre-test cool-down and warm-up profiles without a reliable method to predict the thermal behaviors in a rarified helium environment, and managing the test article hardware safety driven by the project Limits and Constraints (L&C's). Furthermore, OGSE2 test included the time critical Aft Optics Subsystem (AOS), a part of the flight Optical Telescope Element that would need to be placed back in the overall telescope assembly integrations. The OGSE2 test requirements included the strict adherence of the project contamination controls due to the presence of the contamination sensitive flight optical elements. The test operations required close coordination of numerous personnel while they being exposed and trained for the 'final' combined OTE and instrument cryo-test in 2017. This paper will also encompass the OGSE2 thermal data look-back review.

JWST OGSE2 Cryogenic Test↗

Non-isolated 30 kW class arcjet PCU

A 30 kW class arcjet Power Conditioning Unit, PCU, was built and tested during this Phase 2 SBIR contract. The PCU is an improved version of two previously developed PCU's. All of these units are 3-phase, 20 kHz buck regulators with current mode feed back to modulate the duty cycle to control the arcjet current at any selected operating point. The steady state control can assure arcjet stability despite the negative dynamic resistance of the arc discharge. The system also has a circuit to produce a high voltage start pulse to breakdown the gas and initiate the arc. The start pulse is formed by temporarily switching a short current path across the output terminals with a special solid state switching array. The switches then open rapidly, and the energy stored in the output inductors of the buck regulator produces a pulse of approximately 2500 V for approximately 500 nsec. The system was tested and modified until the transition to steady operation occurred after start up with a very small surge current overshoot. The system also can withstand a direct short circuit across the output without damage. The automatic feed back control simply reduces the duty cycle to hold the current at the set point. When the short is removed the full power output is immediately restored. This latest version arcjet PCU is conduction cooled to remove waste heat by conduction to the base plate. This unit is closer to flight a type of design than the previous functional bread boards. Waste heat is small because the PCU has a very high efficiency, 296 percent. The PCU was extensively tested with resistor loads to simulate operation with an arcjet. The unit was tested with ammonia arcjets at the Jet Propulsion Laboratory. Approximately 400 hours of testing were completed, with several starts. Many hours were also demonstrated with resistive loads. Some testing with hydrogen arcjets was also carried out at NASA LeRC. This system concept is now the design base for the ATTD program.

Wong, See-Pok↗

Nuclear Testing and the Joint Task Force System

During the 1940s, 50s, and early 60s, the United States conducted eight nuclear test operations in the far reaches of the Pacific Ocean. These operations were possible only because of a military command and control organization, the joint task force. Commanded by the Army Navy, and Air Force on a rotating basis, each of the seven JTFs provided the means by which the thousands of ships, planes, material, and personnel were moved over thousands of miles of ocean. The first task force, JTF-1, was created to test the destructive effects of the Fat Man bomb on Naval vessels at Bikini Atoll in the summer of 1946. Commanded by Vice Admiral William “Spike” Blandy, JTF-1 was a purely military operation supported by the MED. Never meant to be a permanent organization, JTF-1 was dissolved soon after completing its mission.

99 GENERAL AND MISCELLANEOUS↗

Wastewater Surveillance for Poliovirus in Selected Jurisdictions, United States, 2022–2023

Wastewater testing can inform public health action as a component of polio outbreak response. During 2022-2023, a total of 7 US jurisdictions (5 states and 2 cities) participated in prospective or retrospective testing of wastewater for poliovirus after a paralytic polio case was identified in New York state. Two distinct vaccine-derived poliovirus type 2 viruses were detected in wastewater from New York state and New York City during 2022, representing 2 separate importation events. Of those viruses, 1 resulted in persistent community transmission in multiple New York counties and 1 paralytic case. No poliovirus was detected in the other participating jurisdictions (Connecticut, New Jersey, Michigan, and Illinois and Chicago, IL). The value of routine wastewater surveillance for poliovirus apart from an outbreak is unclear. However, these results highlight the ongoing risk for poliovirus importations into the United States and the need to identify undervaccinated communities and increase vaccination coverage to prevent paralytic polio.

60 APPLIED LIFE SCIENCES↗

Experimental and Numerical Analysis of Additively Manufactured Inconel 718 Coupons With Lattice Structure

Abstract In the present paper, two lattice geometries suitable for near surface and double wall cooling were developed and tested. The first type of unit cell consisted of six ligaments of 0.5 mm diameter joined at a common vertex near the middle. The second type of unit cell was derived from the first type by adding four mutually perpendicular ligaments in the middle plane. Two lattice configurations, referred to as L1 and L2, respectively, were obtained by repeating the corresponding unit cell in streamwise and spanwise directions in an inline fashion. Test coupons consisting of these lattice geometries embedded inside rectangular cooling channel with dimensions of 2.54 mm height, 38.07 mm width, and 38.1 mm in length were fabricated using Inconel 718 powder and selective laser sintering (SLS) process. The heat transfer and pressure drop performance was then evaluated using steady-state tests with constant wall temperature boundary condition and for channel Reynolds number ranging from 2800 to 15,000. The lattices depicted a higher heat transfer compared with a smooth channel and both the heat transfer and pressure drop increased with a decrease in the porosity from L1 to L2. Steady-state conjugate numerical results revealed formation of prominent vortical structures in the inter-unit cell spaces, which diverted the flow toward the top end wall and created an asymmetric heat transfer between the two end walls. In conclusion, these lattice structures provided an augmented heat transfer while favorably redistributing the coolant within channel.

Engineering↗

Multi-Evaporator Miniature Loop Heat Pipe for Small Spacecraft Thermal Control: Validation Results - Part 2

Under NASA s New Millennium Program Space Technology 8 (ST 8) Project, Goddard Space Fight Center has conducted a Thermal Loop experiment to advance the maturity of the Thermal Loop technology from proof of concept to prototype demonstration in a relevant environment , i.e. from a technology readiness level (TRL) of 3 to a level of 6. The thermal Loop is an advanced thermal control system consisting of a miniature loop heat pipe (MLHP) with multiple evaporators and multiple condensers designed for future small system applications requiring low mass, low power, and compactness. The MLHP retains all features of state-of-the-art loop heat pipes (LHPs) and offers additional advantages to enhance the functionality, performance, versatility, and reliability of the system. An MLHP breadboard was built and tested in the laboratory and thermal vacuum environments for the TRL 4 and TRL 5 validations, respectively, and an MLHP proto-flight unit was built and tested in a thermal vacuum chamber for the TRL 6 validation. In addition, an analytical model was developed to simulate the steady state and transient behaviors of the MLHP during various validation tests. The MLHP demonstrated excellent performance during experimental tests and the analytical model predictions agreed very well with experimental data. All success criteria at various TRLs were met. Hence, the Thermal Loop technology has reached a TRL of 6. This paper presents the validation results, both experimental and analytical, of such a technology development effort.

Ku, Jentung↗

PACE OCI Flight Unit Pre-launch Spectral Characterization

The Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) mission [1] will extend and improve the data record of NASA’s satellite observations of global ocean biology, aerosols, and clouds. The Ocean Color Instrument (OCI) is the primary sensor on-board the PACE platform [2]. The OCI is a scanning radiometer with hyperspectral coverage from the ultraviolet (UV) to the near infrared (NIR) wavelength range and a fiber-coupled multiband filter spectrograph in the short-wave infrared (SWIR) spectral region. The OCI Flight Unit completed system level testing in November 2022 at the Goddard Space Flight Center (GSFC). This paper presents the spectral characterization and performance of the OCI Flight Unit. The OCI Flight spectral performance was determined to be within design specifications and the characterization was measured within specified uncertainties.

PACE↗

Pace Oci Flight Unit Pre-Launch Spectral Characterization

The Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) mission [1] will extend and improve the data record of NASA’s satellite observations of global ocean biology, aerosols, and clouds. The Ocean Color Instrument (OCI) is the primary sensor on-board the PACE platform [2]. The OCI is a scanning radiometer with hyperspectral coverage from the ultraviolet (UV) to the near infrared (NIR) wavelength range and a fiber-coupled multiband filter spectrograph in the short-wave infrared (SWIR) spectral region. The OCI Flight Unit completed system level testing in November 2022 at the Goddard Space Flight Center (GSFC). This paper presents the spectral characterization and performance of the OCI Flight Unit. The OCI Flight spectral performance was determined to be within design specifications and the characterization was measured within specified uncertainties.

PACE↗