Search NASA⌕ Search

SEARCH · Search NASA

Results for “accelerator test facility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,495 records · Page 83

Transuranic (TRU) Waste Repackaging at the Nevada Test Site

This paper describes the activities required to modify a facility and the process of characterizing, repackaging, and preparing for shipment the Nevada Test Site’s (NTS) legacy transuranic (TRU) waste in 58 oversize boxes (OSB). The waste, generated at other U.S. Department of Energy (DOE) sites and shipped to the NTS between 1974 and 1990, requires size-reduction for off-site shipment and disposal. The waste processing approach was tailored to reduce the volume of TRU waste by employing decontamination and non-destructive assay. As a result, the low-level waste (LLW) generated by this process was packaged, with minimal size reduction, in large sea-land containers for disposal at the NTS Area 5 Radioactive Waste Management Complex (RWMC). The remaining TRU waste was repackaged and sent to the Idaho National Laboratory Consolidation Site for additional characterization in preparation for disposal at the Waste Isolation Pilot Plant (WIPP), near Carlsbad, New Mexico. The DOE National Nuclear Security Administration Nevada Site Office and the NTS Management and Operating (M&O) contractor, NSTec, successfully partnered to modify and upgrade an existing facility, the Visual Examination and Repackaging Building (VERB). The VERB modifications, including a new ventilation system and modified containment structure, required an approved Preliminary Documented Safety Analysis prior to project procurement and construction. Upgrade of the VERB from a radiological facility to a Hazard Category 3 Nuclear Facility required new rigor in the design and construction areas and was executed on an aggressive schedule. The facility Documented Safety Analysis required that OSBs be vented prior to introduction into the VERB. Box venting was safely completed after developing and implementing two types of custom venting systems for the heavy gauge box construction. A remotely operated punching process was used on boxes with wall thickness of up to 3.05 mm (0.120 in) to insert aluminum bronze filters and sample ports to prevent sparking during penetration. A remotely operated cold-drilling process with self-drilling, self-tapping titanium coated spark-resistant filters was used for boxes with wall thickness of up to 6.35 mm (0.25 in). The box headspace was sampled for the presence of flammable gases. To further accelerate the project schedule, an innovative treatment process was used. Several of the OSBs were re-assayed and determined to be mixed low-level waste (MLLW) which allowed treatment, followed by disposal in the Mixed Waste Disposal Unit at the NTS Area 5 Radioactive Waste Management Complex (RWMC). The MLLW boxes were certified using real-time radiography and overpacked into custom-built polyethylene-lined macroencapsulation containers. The polyethylene-lined lid was welded to the poly-lined box using automatically controlled resistance heating through embedded wiring in the lid. The work was performed under the existing Documented Safety Analysis since plastic welding is accomplished at low temperature and does not introduce the risks of other macroencapsulation processes, such as welding stainless steel containers. The macroencapsulation process for MLLW not only accelerated the schedule by reducing the number of boxes requiring size reduction, but it also resulted in significantly improved safety with as low as reasonable achievable levels of exposure to workers plus reduced cost by eliminating the need to perform repackaging in the VERB.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multi-Differential Charged Current $\nu_{\mu}$ - Argon Cross Section without Pions in the Final State Measurement in MicroBooNE

MicroBooNE, an 85-tonne liquid argon time projection chamber (LArTPC) detector is on-axis to the Booster Neutrino Beam (BNB) beamline facility at Fermi National Accelerator Laboratory. MicroBooNE is elucidating neutrino interactions with argon through cross-section measurements to refine interaction models and reduce uncertainties. In this poster, we present the status of the single and double multi-differential charged current (CC) cross section with zero pions in the final state (CC-0$\pi$) as a function of muon momentum ($0.1<p_\mu<2.0\,\mathrm{GeV/c}$) and the cosine of the muon angle ($-1<\cos\theta_\mu<1$). We present the details of the event selection and cross section extraction along with a set of tests using fake data to establish the robustness of the analysis methodology. We also discuss prospects for a future combined measurement with the Gd-H$_2$O target at the ANNIE experiment, to explore MicroBooNE’s proton multiplicity alongside ANNIE’s neutron multiplicity.

43 PARTICLE ACCELERATORS↗

H2@Scale - Validating an Electrolysis System with High Output Pressure: Cooperative Research and Development Final Report, CRADA Number CRD-18-00741

Electrolysis has been a commercially available product for a while and electrolyzers have been a proven capability to provide additional benefits (e.g. controllable load for grid services) in addition to production of hydrogen. The hydrogen output is typically compressed for storage and dispensing. Compression adds cost and decreases system reliability. Honda’s electrolyzer systems have been developed to include electrochemical compression to leverage the production system itself for at least partial compression. In this project, the team will evaluate Honda’s PEM based electrochemical compression system. The system is capable of compressing hydrogen up to 70 MPa electrochemically. Validation testing is the next step to accelerate this technology into the marketplace, as the validation will provide needed data under a variety of operation conditions and controls. These operating conditions and controls are based on over a decade of NLR research and development with low-temperature electrolysis. The validation testing will include preparing NLR’s site for third party evaluation, benchmark testing of Honda’s stack and system, and simulating operation connected to renewables or in a grid service profile. NLR’s Energy System Integration Lab will be the location for the electrolyzer validation research and integrated into the Hydrogen Infrastructure Test & Research Facility (HITRF). This will build into the existing retail style hydrogen fueling station for a fully integrated experimental setup.

08 HYDROGEN↗

First Characterization of a Fully Superconducting RF Photoinjector Cavity

As a first step towards a high brightness, high average current electron source for the BERLinPro ERL a fully superconducting photo-injector was developed by HZB in collaboration with Jefferson Laboratory, DESY and the A. Soltan Institute. This cavity-injector ensemble is made up of a 1.6-cell superconducting cavity with a superconducting lead cathode deposited on the half-cell backwall. A superconducting solenoid is used for emittance compensation. This system, including a diagnostics beamline, has been installed in the HoBiCaT facility to serve as a testbed for beam dynamics studies and to test the combination SRF cavity and superconducting solenoid. This paper summarizes the characterization of the cavity in this configuration including Q measurements, dark current tests and field-stability analyzes.

43 PARTICLE ACCELERATORS↗

NETL Direct Air Capture Center

In 2022 Congress authorized the $25M National Energy Technology Laboratory Direct Air Capture Center. The facility will be specifically targeted at accelerating the commercialization of technologies beyond the conceptual stage which have not yet reached full pilot-scale (TRL 3 to 6). The ability to operate over a wide range of conditions will help the developers to understand how their technologies respond in different climates, from summer to winter and arid to tropical. NETL recognizes that DAC technology is still early in its evolution, and a wide variety of highly varied technologies are being explored. The Center will be designed with substantial flexibility to accommodate the rapidly evolving technological landscape. Testing systems at three scales will be included: lab-scale systems designed to examine the long-term stability of DAC materials, bench-scale module testing systems capable of probing flow dynamics, and small pilot-scale skid rooms able to test prototype DAC units under a wide variety of climate conditions. The NETL DAC Center will feature dedicated engineering, technician, scientific and logistical support for experimental system design, installation, operation of experiments, and interpretation of results for projects including but not limited to kinetics of absorption/desorption, thermal duty, and post-mortem elemental characterization to understand degradation. The NETL DAC Center projects will also have access to dedicated process modeling and analysis to evaluate the technoeconomic aspects of new technologies. NETL’s Systems Engineering and Analysis (SEA) team, the Carbon Capture Simulation Initiative (CCSI), and the Institute for the Design of Advanced Energy Systems (IDAES) are all potential collaborators with NETL’s testing partners from industry, academia, and other research institutions. NETL also has world class capabilities in device scale modeling (i.e., MFIX) that will be available to help design more efficient contactors and optimize unique internal configurations that can be realized by advanced manufacturing. The talk will cover the design and capabilities of the center, the planned availability, and feedback will be solicited from the audience on DAC testing needs.

Luebke, David↗

Accelerating commercialization of direct air capture technology

In 2022 Congress authorized the $25M National Energy Technology Laboratory Direct Air Capture Center. The facility will be specifically targeted at accelerating the commercialization of technologies beyond the conceptual stage which have not yet reached full pilot-scale (TRL 3 to 6). The ability to operate over a wide range of conditions will help the developers to understand how their technologies respond in different climates, from summer to winter and arid to tropical. NETL recognizes that DAC technology is still early in its evolution, and a wide variety of highly varied technologies are being explored. The Center will be designed with substantial flexibility to accommodate the rapidly evolving technological landscape. Testing systems at three scales will be included: lab-scale systems designed to examine the long-term stability of DAC materials, bench-scale module testing systems capable of probing flow dynamics, and small pilot-scale skid rooms able to test prototype DAC units under a wide variety of climate conditions. The NETL DAC Center will feature dedicated engineering, technician, scientific and logistical support for experimental system design, installation, operation of experiments, and interpretation of results for projects including but not limited to kinetics of absorption/desorption, thermal duty, and post-mortem elemental characterization to understand degradation. The NETL DAC Center projects will also have access to dedicated process modeling and analysis to evaluate the technoeconomic aspects of new technologies. NETL’s Systems Engineering and Analysis (SEA) team, the Carbon Capture Simulation Initiative (CCSI), and the Institute for the Design of Advanced Energy Systems (IDAES) are all potential collaborators with NETL’s testing partners from industry, academia, and other research institutions. NETL also has world class capabilities in device scale modeling (i.e., MFIX) that will be available to help design more efficient contactors and optimize unique internal configurations that can be realized by advanced manufacturing. The talk will cover the design and capabilities of the center, the planned availability, and feedback will be solicited from the audience on DAC testing needs.

Luebke, David↗

CEBAF Upgrade: Cryomodule Performance And Lessons Learned

The Thomas Jefferson National Accelerator Facility is currently engaged in the 12 GeV Upgrade Project. The goal of the 12 GeV Upgrade is a doubling of the available beam energy of the Continuous Electron Beam Accelerator Facility (CEBAF) from 6 GeV to 12 GeV. This increase in beam energy will be due in large part to the addition of ten C100 cryomodules plus associated new RF in the CEBAF linacs. The C100 cryomodules are designed to deliver 100 MeV per installed cryomodule. Each C100 cryomodule is built around a string of eight seven-cell, electro-polished, superconducting RF cavities. While an average performance of 100MV per cryomodule is needed to achieve the overall 12 GeV beam energy goal, the actual performance goal for the cryomodules is an average energy gain of 108 MV to provide operational headroom. Cryomodule production started in December 2010. All ten of the C100 cryomodules are installed in the linac tunnels and are on schedule to complete commissioning by September 2013. Performance during Commissioning has ranged from 104 MV to 118 MV. In May, 2012 a test of an early C100 achieved 108 MV with full beam loading. This paper will discuss the performance of the C100 cryomodules along with operational challenges and lessons learned for future designs.

43 PARTICLE ACCELERATORS↗

SU-D-BRE-02: Development and Commissioning of A Gated Spot Scanning Proton Beam Therapy System with Real-Time Tumor-Tracking

Purpose: A novel Proton Beam Therapy system has been developed by integrating Real-Time Tumor-Tracking (RTRT) and discrete spot scanning techniques. The system dedicated for spot scanning delivers significant advantages for both clinical and economical points of view. The system has the ability to control dose distribution with spot scanning beams and to gate the beams from the synchrotron to irradiate moving tumors only when the actual positions of them are within the planned position. Methods: The newly designed system consists of a synchrotron, beam transport systems, a compact and rotating gantry system with robotic couch and two orthogonal sets of X-ray fluoroscopes. The fully compact design of the system has been realized by reducing the maximum energy of the beam to 220MeV, corresponding to 30g/cm2 range and the number of circulating protons per synchrotron operation cycle, due to higher beam utilization efficiency in spot scanning. To improve the irradiation efficiency in the integration of RTRT and spot scanning, a new control system has been developed to enable multiple gated irradiation per operation cycle according to the gating signals. After the completion of the equipment installation, beam tests and commissioning has been successfully performed. Results: The basic performances and beam characteristics through the synchrotron accelerator to iso-center have been confirmed and the performance test of the irradiation nozzle and whole system has been appropriately completed. CBCT image has been checked and sufficient quality was obtained. RTRT system has been demonstrated and realized accurate dose distributions for moving targets. Conclusion: The gated spot scanning Proton Beam Therapy system with Real-Time Tumor-Tracking has been developed, successfully installed and tested. The new system enables us to deliver higher dose to the moving target tumors while sparing surrounding normal tissues and to realize the compact design of the system and facility by maximizing the efficiency of proton beam utilization. This research is granted by the Japan Society for the Promotion of Science(JSPS) through the “Funding Program for World-Leading Innovative R and D on Science and Technology(FIRST Program)”, initiated by the Council for Science and Technology Policy(CSTP)

60 APPLIED LIFE SCIENCES↗

A Public-Private-Academic Partnership to Advance Solar Power Forecasting

Executive Summary NOAA is making major contributions to the solar forecasting project in three areas. First, it is improving its forecasts of solar irradiance, clouds, and aerosols in its numerical weather prediction models. Second, it is providing advanced satellite products for DOE's FOA awardees to use in their forecast systems. Third, it is using high-quality ground-based measurements from SURFRAD and ISIS stations to verify and validate forecast model output. This reports covers results from all three areas for the period May 1, 2014 - April 30, 2015. Modeling In its modeling effort, NOAA continues work to improve the skill of solar forecasts from the Earth System Research Lab (ESRL) research versions of the 13-km Rapid Refresh (RAP) and the 3-km High-Resolution Rapid Refresh (HRRR) models, which are in turn transitioned into operations at the National Centers for Environmental Prediction (NCEP). A major milestone was achieved in September 2014 with the initial operational implementation of the HRRR at NCEP. In the ESRL research versions of the models, testing and development, in both real-time runs and retrospective experiments, is guided by an extensive in-house verification system. Early in the SFIP project, we developed the capability to verify our model forecasts against the high-quality surface radiation measurements from the SURFRAD and ISIS networks. This highlighted some shortcomings with the RAP and HRRR forecasts of incoming shortwave radiation. Most of our effort during Phase 1 of SFIP was focused on addressing these problems with a variety of model system improvements. The RAP and HRRR models during the warm season of 2014 had a noticeable warm and dry bias in near-surface conditions over most of the central and eastern United States, and our new SURFRAD/ISIS verification revealed that there was also a large excess of incoming global horizontal irradiance in the models. We hypothesized that a lack of cloud cover (particularly low-level cloud cover) in the models was resulting in too much heating of the land surface. This, in turn, caused unrealistically strong surface heat fluxes and turbulent mixing in the planetary boundary layer (PBL), which further reduced the already deficient cloud cover. We addressed these issues with a combination of data assimilation system modifications and model physics improvements. Many of our data assimilation changes were made with a view towards improving the near-term representation of clouds and precipitation. One of these changes involved better accounting for regions of weak reflectivity in the RAP cloud / hydrometeor assimilation system, in order to improve the representation of light precipitation in the RAP initial conditions and provide more realistic initial cloud cover. Additional modifications more accurately accounted for radar beam blockage and data gaps (particularly in the western United States), which improves shorter lead times forecasts of clouds and precipitation. We have also tested the assimilation of new data sources within the RAP and the HRRR, including radar radial velocity data and surface mesonet observations. Within the HRRR, we have tested the cycling of the 3-km land surface fields to allow a higher-resolution treatment of land surface processes. In terms of model physics development for SFIP, we have implemented a shallow cumulus scheme within the RAP, and have made numerous improvements to the Mellor-Yamada-Nakanishi-Niino (MYNN) PBL scheme to address insufficient low-level cloud cover in the models. We have conducted tests incorporating the radiation effects of (parameterized) boundary-layer clouds within the modified MYNN PBL scheme (independent of the convective schemes). The Grell-Freitas-Olson shallow cumulus scheme has also been tested within the 3-km HRRR. Finally, we have also modified the RUC land surface model (LSM) treatment of the vegetation wilting point, reducing it to increase evapotranspiration and increase cloud cover in the boundary layer. All of these changes work in tandem to significantly improve the model forecasts of cloud cover, incoming shortwave radiation, and near-surface temperature and moisture. Satellite The role of NOAA/NESDIS in the Solar Forecasting Improvement Project is to provide Advanced Satellite Products (ASPs) for the two forecasting teams at NCAR and IBM. The ASPs are cloud, surface, and atmosphere products derived from geostationary satellite imagery at the highest possible spatial and temporal resolution - such quantities as cloud mask, cloud probability, cloud transmission, cloud top height, cloud top temperature, cloud effective particle size, etc. Ancillary data, such as elevation and numerical weather prediction fields are provided in the files at the same resolution as well. There are at this time 147 different variables in the ASP output, including quality flags and processing information. The main goals for Year 1 of the project were to implement an Advanced Satellite Products system for the use of the IBM and NCAR teams, begin validation, and make any needed changes based on feedback from the teams. ASP files are being produced every GOES Imager acquisition, which occur on a 15-30 minute schedule. Processing is done on a dedicated computer, with a turn-around time of 8-21 minutes from image acquisition to results available on ftp. Several helpful visualizations of the data are also created for users on web pages. Users have been provided with a document titled "User's Guide for 1km Cloud Products Derived from GOES Imager Data using CLAVR-x", which discusses the basics of the source imagery, the process by which it is turned into Advanced Satellite Products, and considerations users should make when using the data. Validation of selected variables from the older 4km version of the products was also included. Future work will concentrate on validation of the 1km products and improving the turn-around time, product variety, and product quality as needed. Ground Observations In the ground-based measurement effort, NOAA's main objectives are to provide high quality radiation products for validation and verification of short-term to day-ahead solar forecasts. More specifically for the three year project, our goals include (1) Maintaining and providing data from our 7 SURFRAD and 7 ISIS; (2) Update ISIS radiation measurements from 3 min to 1 min data: (3) Purchase and install new pyrheliometers for direct solar irradiance measurements at the 7 SURFRAD sites; (4) Building, testing, and deploying two mobile SURFRAD stations at two utility plants in collaboration with DOE sponsored partners, and includes ongoing maintenance and processing of the data at the mobile sites; (5) Upgrading the data acquisition and communications at 7 SURFRAD sites and 7 ISIS sites; (6) Providing radiation data at the 7 SURFRAD sites in near real-time; (7) Develop and provide aerosol optical depth and cloud images and cloud fraction at our two mobile sites; (8) Provide data recovery rates each year; (9) Provide temporally and spatially averaged radiation products for comparison to HRRR and RAP solar forecasts and advanced satellite products; (10) Provide a data-set for analysis of conversion of direct and diffuse to sloped surfaces; (11) and as time permits develop and provide spectral solar irradiance, cloud optical depth and spectral albedo from the mobile sites. Milestones this year include working with the DOE sponsored teams to find locations to deploy two mobile SURFRAD stations. One existing unit was deployed at a 30MW PV facility in the San Luis Valley in collaboration with Xcel and the NCAR team in August, 2014. The second unit was built and tested at our facilities in Boulder, CO and deployed near Green Mountain Power's Education Center in Rutland, VT in collaboration with Green Mountain Power and the IBM Team in October, 2014. Data processing was implemented and the radiation data from these two mobile sites have been made available on our ftp server in near real-time. We also are providing images and cloud fraction from the TSI cameras for these two mobile sites on our ftp site. Another milestone was upgrading our data acquisition and communication systems at 7 SURFRAD and 7 ISIS sites. We accelerated our schedule for these upgrades to provide timely radiation products. These upgrades allow more reliable and near-real time radiation data delivery to the DOE sponsored teams to meet their goals. Lastly, we changed the data rate at the ISIS sites from 3 min to 1 min.

14 SOLAR ENERGY↗

The MTA primary beamline description and performance [Slides]

The Muon Test Area (2003) was initially constructed to develop, test, and verify muon ionization apparatus using the 400-MeV proton beam from the Fermilab Linac. Since muon facilities involve the capture, collection and cooling of ~10 13 muons at a repetition conclusive tests require ~10 13 protons/pulse (full Linac beam): the original concept/request was for a full Linac capability (~10 14 p/sec). The beamline designed for MTA experiments, however, includes specialized insertions for linac beam diagnostics and beam measurements, greatly enhancing the functionality and complexity of the beamline. Installation of the beamline was complete fall, 2008. It represents the only facility in which experiments have direct access to a primary beam.

43 PARTICLE ACCELERATORS↗

Technical Evaluation of Accelerated Basin De-Inventory Material Addition to Sludge Batch 11

Savannah River Nuclear Solutions has a need to discard spent nuclear fuel (SNF), currently stored in L Basin, to the Defense Waste Processing Facility (DWPF) for vitrification. The Department of Energy (DOE) has approved the Accelerated Basin De-inventory (ABD) Program for discarding SNF via transfers from H-Canyon to the Savannah River Site (SRS) Liquid Waste (LW) system. The first ABD discards will occur during the preparation of Sludge Batch (SB) 11. An initial impact evaluation of the LW flowsheet was performed by the Savannah River National Laboratory (SRNL) prior to the approval of the ABD Program. This evaluation addressed the LW downstream facilities based on the current H-Canyon flowsheet sequence for the average ABD discard. The flowsheet evaluation only included aluminum-clad SNF, specifically Materials Test Reactor (MTR) fuel and High Flux Isotope Reactor (HFIR) fuel similar to the planned SB11 discard. Following this evaluation, the flowsheet has been slightly altered to address (i) new nuclear criticality safety controls for DWPF that credit a higher amount of gadolinium as a neutron poison for all of the enriched uranium contained in a SB and (ii) potential additions of the H-Canyon neutralized fuel stream prior to the Low Temperature Aluminum Dissolution (LTAD) process in Tank 51. The early introduction of ABD material into the SB assembly process is being investigated to provide flexibility regarding transfer opportunities for H-Canyon to Tank 51 for SB11 and future sludge batches.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High-Power Targetry R&D Roadmap for High Energy Physics

Designing a reliable target is already a challenge for MW-class facilities today and has led several major accelerator facilities to operate at lower power due to target concerns. With present plans to increase beam power for next-generation accelerator facilities in the next decade, timely R&D in support of robust high-power targets is critical to secure the full physics benefits of ambitious accelerator power upgrades. The next generation of high-power targets and beam-intercepting devices (beam dumps, absorbers, collimators ) will have more complex geometries, novel materials, and new concepts that allow for use of improved high-heat-flux cooling methods. Advanced numerical simulations need to be developed to support design of reliable high-power beam targets. In parallel, development of radiation-hardened beam instrumentation is needed. Irradiation methods for high-power targets must be further developed, and new irradiation facilities are needed since only a few facilities worldwide offer beams suitable for target testing. A comprehensive R&D program must be implemented to address the many complex challenges faced by multi-MW beam intercepting devices.

Pellemoine, Frederique [Fermilab]↗

νBDX: a Coherent Elastic Neutrino Nucleus Scattering (CEνNS) experiment at Jefferson Lab

Particle physics is an ever-changing field seeking to explain phenomena that lie at the limits of our current knowledge. Among discovered and hypothesized interactions, Coherent Elastic Neutrino-Nucleus Scattering (CE?NS) stands out as a fascinating and elusive phenomenon, offering a unique window into the nature of neutrinos and their interactions with matter. CE?NS, a process predicted by the Standard Model, represents one of the subtle ways in which neutrinos can interact with atomic nuclei. Unlike other neutrinonucleus interactions, CE?NS occurs coherently, meaning that the entire nucleus collectively responds to the neutrino-mediated weak force, resulting in small energy transfers to the nucleus as a whole. The extremely rare nature of CE?NS events presents a formidable challenge to experimenters seeking to detect and study these interactions. Recent advances in detector technologies and the implementation of large-scale experiments, such as coherent neutrino scattering experiments at research facilities around the world, have opened up new avenues for exploring this elusive phenomenon. These experiments aim not only to observe CE?NS directly but also to extract valuable information on neutrino properties, nuclear structure, and potential deviations from the Standard Model. This thesis aims to study the feasibility of an experiment to study CE?NS at The Thomas Jefferson National Accelerator Facility, Newport News, VA, USA. This would be an experiment that exploits the production of neutrinos by an electron beam dumped on a thick target (the beam dump). The large quantity of neutrinos produced and their energy profile are well suited to the purpose of studying the CE?NS. In my thesis, I will start from previous studies on CE?NS and from theoretical considerations regarding the process, then quantify the expected events for a hypothetical experiment and possible backgrounds through simulations aimed at optimizing the geometry of the future detector. I will also show some tests on selected detector components that will be part of a first prototype.

Grazzi, Stefano↗

Performance of 3.9 GHz SRF cavities at Fermilab's ILCTA_MDB nhorizontal test stand

Fermilab is building a cryomodule containing four 3.9 GHz superconducting radio frequency (SRF) cavities for the Free electron LASer in Hamburg (FLASH) facility at the Deutsches Elektronen-SYnchrotron (DESY) laboratory. Before assembling the cavities into the cryomodule, each individual cavity is tested at Fermilab's Horizontal Test Stand (HTS). The HTS provides the capability to test fully-dressed SRF cavities at 1.8 K with high-power pulsed RF in order to verify that the cavities achieve performance requirements under these conditions. The performance at the HTS of the 3.9 GHz cavities built for FLASH is presented here.

43 PARTICLE ACCELERATORS↗

PEP Run Report for Simulant Shakedown/Functional Testing

Pacific Northwest National Laboratory (PNNL) has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Waste Treatment Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed, constructed, and operated as part of a plan to respond to issue M12, "Undemonstrated Leaching Processes." The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. The PEP also includes non-prototypic ancillary equipment to support the core processing. Two operating scenarios are currently being evaluated for the ultrafiltration process (UFP) and leaching operations. The first scenario has caustic leaching performed in the UFP-2 ultrafiltration feed vessels (i.e., vessel UFP-VSL-T02A in the PEP; and vessels UFP-VSL-00002A and B in the WTP PTF). The second scenario has caustic leaching conducted in the UFP-1 ultrafiltration feed preparation vessels (i.e., vessels UFP-VSL-T01A and B in the PEP; vessels UFP-VSL-00001A and B in the WTP PTF). In both scenarios, 19-M sodium hydroxide solution (NaOH, caustic) is added to the waste slurry in the vessels to leach solid aluminum compounds (e.g., gibbsite, boehmite). Caustic addition is followed by a heating step that uses direct injection of steam to accelerate the leach process. Following the caustic leach, the vessel contents are cooled using vessel cooling jackets and/or external heat exchangers. The main difference between the two scenarios is that for leaching in UFP-1, the 19-M NaOH is added to un-concentrated waste slurry (3-8 wt% solids), while for leaching in UFP-2, the slurry is concentrated to nominally 20 wt% solids using cross-flow ultrafiltration before the addition of caustic. In both scenarios, following the caustic leach, the slurry was then concentrated to 17 wt% and washed with inhibited water to remove NaOH and other soluble salts. Next, the slurry was oxidatively leached using sodium permanganate to solubilize chrome. The slurry was then washed to remove the dissolved chrome and concentrated.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multidisciplinary Research and Development at the Dual-Axis Radiograph Hydrodynamic Test Facility (DARHT) [Slides]

DARHT is the nation’s premiere flash radiography facility. Flash radiography allows interior views of complex structures that are rapidly moving. DARHT is used to image the implosion of mock weapon assemblies containing surrogate materials. DARHT is the only dual-axis facility in the nation enabling 3D reconstructions, with multi-pulse capability for multiple time points. DARHT is an essential facility for Science-based Stockpile Stewardship at LANL and within the NNSA complex.

43 PARTICLE ACCELERATORS↗

The Dual-Axis Radiographic Hydrodynamic Test Facility Capability Expansion (DCX) Strategy

The Dual-Axis Radiographic Hydrodynamic Test (DARHT) facility is a vital and important part of the Nation’s nuclear security enterprise. With more than two decades of operations, DARHT has a storied history. Conceived in the 1970s, constructed in the 1990s, and operational since 2000, DARHT has advanced from open-air hydrodynamic experiments (hydros) to foam-confined hydros, to vessel-confined hydros, and in 2022, the 75th hydro was successfully completed. Radiography has advanced from a single-axis, single-pulse system to a dual-axis, multi-pulse capability to variable fields of view (VFV) on both accelerators. The culmination of these experiences, accomplishments, and advancements has brought us to a very important question: What do the next two decades at DARHT look like? The world is not the same place it was in the 1990s when construction at DARHT was in progress. Evolving threats, an expanding mission, and technology changes necessitate adaptation. To adapt, the aging facility, accelerators, vessels, and detector systems require improvements to ensure DARHT remains the Nation’s hydrodynamic data foundation for stockpile certification, safety, surety, and global security threats.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

TIME-TEMPERATURE-TRANSFORMATION DIAGRAMS FOR THE SLUDGE BATCH 3 - FRIT 418 GLASS SYSTEM

As a part of the Waste Acceptance Product Specifications (WAPS) for Vitrified High-Level Waste Forms defined by the Department of Energy - Office of Environmental Management, the phase stability must be determined for each of the projected high-level waste (HLW) types at the Savannah River Site (SRS). Specifically, WAPS 1.4.1 requires the glass transition temperature (Tg) to be defined and time-temperature-transformation (TTT) diagrams to be developed. The Tg of a glass is an indicator of the approximate temperature where the supercooled liquid converts to a solid on cooling or conversely, where the solid begins to behave as a viscoelastic solid on heating. A TTT diagram identifies the crystalline phases that can form as a function of time and temperature for a given waste type or more specifically, the borosilicate glass waste form. In order to assess durability, the Product Consistency Test (PCT) was used and the durability results compared to the Environmental Assessment (EA) glass. The measurement of glass transition temperature and the development of TTT diagrams have already been performed for the seven Defense Waste Processing Facility (DWPF) projected compositions as defined in the Waste Form Compliance Plan (WCP). These measurements were performed before DWPF start-up and the results were incorporated in Volume 7 of the Waste Form Qualification Report (WQR). Additional information exists for other projected compositions, but overall these compositions did not consider some of the processing scenarios now envisioned for DWPF to accelerate throughput. Changes in DWPF processing strategy have required this WAPS specification to be revisited to ensure that the resulting phases have been bounded. Frit 418 was primarily used to process HLW Sludge Batch 3 (SB3) at 38% waste loading (WL) through the DWPF. The Savannah River National Laboratory (SRNL) fabricated a cache of glass from reagent grade oxides to simulate the SB3-Frit 418 system at a 38 wt % WL for glass transition temperature measurement and TTT diagram development. The glass transition temperature (Tg) was measured using differential scanning calorimetry (DSC) and was recorded to be 443 {+-} 3 C. Using the previous TTT diagrams as guidance, subsamples of the glass were isothermally heat treated for 0.5 to 768 hours at temperatures between 400 C to 1100 C. Each of the 56 heat treated samples, along with quenched and centerline canister cooled (CCC) treated samples, were analyzed using Xray diffraction (XRD) and the PCT. Crystallization was detected only in samples treated at 600 C for more than 192 hours, and 700, 800, and 900 C for more than 48 hours. Phases crystallized were similar in composition if not the same as those found in the previous TTT studies. Six different crystalline phases were detected, including nepheline, acmite, lithium silicate, trevorite, krinovite, and albite. Overall, phases were spinel (iron) based, lithium metasilicate, sodium aluminosilicate or sodium transition metal silicate in composition. No new crystalline families were detected. Durability, as measured by the PCT, decreased when lithium silicate or nepheline crystals were present. Only one heat treated sample had a measured PCT response exceeding the benchmark EA glass, which was a sample treated at 600 C for 768 hours. During normal processing at the DWPF these conditions would be highly unlikely to occur, even in an extreme accident scenario. In order to continue to meet the requirements of the WCP, a simplified strategy is suggested for the generation of future TTT diagrams. A strategy has been developed that would require completing two more TTT diagrams for two averaged, future, predicted waste types. By creating diagrams for the resulting glass compositions of encompassing waste types, it will give insight to the crystallization regions possible for those averages. As discussed in the report, 'Initial MAR Assessments to Access the Impact of Al-Dissolution on DWPF Operating Windows' (WSRC-STI 2007-00688), the majority of waste compositions could be grouped into two future flowsheet scenarios, with and without Al-dissolution. Compositions Cluster 2 and Cluster 4 represent these waste projections. MAR assessments were completed on the two clusters and possible frits and windows of operation were selected for each projected waste type. It is recommended that a TTT diagram be developed for the following: (1) Cluster 2 combined with Frit-510 at a 34 wt % WL; and (2) Cluster 4 combined with Frit-418 at a 38 wt % WL. Given the results of the current study showed little change in the types of crystalline phases formed after heat treatment as compared to the TTT diagrams for the WCP glasses, it is unlikely that extreme differences will occur in the TTT diagram for future waste forms, as long as extreme waste stream changes or new frit components are not introduced.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗