Search NASA⌕ Search

SEARCH · Search NASA

Results for “certification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,495 records · Page 83

Geothermal FIT Design: International Experience and U.S. Considerations

Developing power plants is a risky endeavor, whether conventional or renewable generation. Feed-in tariff (FIT) policies can be designed to address some of these risks, and their design can be tailored to geothermal electric plant development. Geothermal projects face risks similar to other generation project development, including finding buyers for power, ensuring adequate transmissioncapacity, competing to supply electricity and/or renewable energy certificates (RECs), securing reliable revenue streams, navigating the legal issues related to project development, and reacting to changes in existing regulations or incentives. Although FITs have not been created specifically for geothermal in the United States to date, a variety of FIT design options could reduce geothermalpower plant development risks and are explored. This analysis focuses on the design of FIT incentive policies for geothermal electric projects and how FITs can be used to reduce risks (excluding drilling unproductive exploratory wells).

15 GEOTHERMAL ENERGY↗

Wynkoop Building Performance Measurement: Water

This report is a summary of the water analysis performance for the Denver, Colorado Wynkoop Building. The Wynkoop Building (Figure 1) was built in 2006 as the Environmental Protection Agency (EPA) Region 8 Headquarters intended to house over 900 occupants in the 301,292 gross square feet (248,849 rentable square feet). The building was built on a brownfield in the Lower Downtown Historic District as part of an urban redevelopment effort. The building was designed and constructed through a public-private partnership with the sustainable design elements developed jointly by General Services Administration (GSA) and EPA. That partnership is still active with all parties still engaged to optimize building operations and use the building as a Learning Laboratory. The building design achieved U.S. Green Building Council Leadership in Energy and Environmental Design for New Construction (LEED-NC) Gold Certification in 2008 (Figure 2) and a 2008 EPA Energy Star Rating of 96 with design highlights that include: (1) Water use was designed to use 40% less than a typical design baseline. The design included low flow fixtures, waterless urinals and dual flush toilets; (2) Native and adaptive vegetation were selected to minimize the need for irrigation water for landscaping; and (3) Energy use intensity was modeled at 66.1 kBtus/gross square foot, which is 39% better than ASHRAE 90.1 1999. The Wynkoop Building water use (10 gallons/square foot) was measured at lower than industry average (15 gallons/square foot) and GSA goals (13 gallons/square foot), however, it was higher than building management expected it would be. The type of occupants and number of occupants can have a significant impact on fixture water use. The occupancy per floor varied significantly over the study time period, which added uncertainty to the data analysis. Investigation of the fixture use on the 2nd, 5th, and 7th floors identified potential for water use reduction if the flush direction of the dual-flush toilet handles was reversed. The building management retrofitted the building's toilets with handles that operated on reduced flush when pushed down (0.8 gallons) and full flush when pulled up (1.1 gallons). The water pressure on the 5th floor (< 30 psi) is less than half the pressure on the 7th floor (>80 psi). The measured water savings post-retrofit was lower on the 5th floor than the 7th floor. The differences in water pressure may have had an impact on the quantity of water used per floor. The second floor water use was examined prior to and following the toilet fixture retrofit. This floor is where conference rooms for non-building occupants are available for use, thus occupancy is highly variable. The 3-day average volume per flush event was higher post-retrofit (0.79 gallons per event), in contrast to pre-retrofit (0.57 gallons per event). There were 40% more flush events post retrofit, which impacted the findings. Water use in the third floor fitness center was also measured for a limited number of days. Because of water line accessibility, only water use on the men's side of the fitness center was measured and from that the total fitness center water use was estimated. Using the limited data collected, the fitness center shower water use is approximately 2% of the whole building water use. Overall water use in the Wynkoop Building is below the industry baseline and GSA expectations. The dual flush fixture replacement appears to have resulted in additional water savings that are expected to show a savings in the total annual water use.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Site Sustainability Plan integrating with the Environmental Management System [Slides]

The ISO 14001 Environmental Management System (EMS) ensures robust, certified EMS for LANL decision-makers and workers and provides consistent comprehensive, and documented management of all activities, products, and services with environmental interactions. A successful External Re-Certification Audit (2/13 – 2/17/2012) resulted in no findings of non-conformance. The EMS process is used to document and track progress towards Institutional environmental objectives and targets, including those in the Site Sustainability and 50 Year Environmental Stewardship Plans.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Arms Reduction Treaties and Attribute Measurement [Slides]

This set of slides provides an overview of the drivers and current state of technology for arms control treaty verification systems. This overview includes the definitions of “authentication,” “certification,” “attribute,” “template,” and “information barrier” as well as a discussion of first, second and third generation attribute measurement systems. We include examples of U.S./Russian interactions and conclude with discussion of the concepts of joint design and random selection.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Lessons Learned from PNNL Support to Army Corp of Engineers Munitions Sites

PNNL developed and demonstrated statistically-based methods for characterizing sites where unexploded ordnance (UXO) is a concern. These methods, incorporated into PNNL’s Visual Sample Plan (VSP) software, can be used to design geophysical transect surveys and conduct data analyses to identify potential target areas, map and estimate anomaly density across the study area, and delineate target areas where UXO are most likely to be found. These methods have been tested and demonstrated on several wide area sites under the Department of Defense Environmental Security Technology Certification Program (ESTCP).

Pulsipher, Brent A.↗

Summary and Analysis of Responses to Surveys on Experience with GHP Installations in Federal Facilities and Minimum Qualifications of GHP-related Professionals

To increase customer confidence in geothermal heat pump (GHP) technology, reduce the potential of improperly installed GHP systems, and ensure the quality and performance of GHP installations, the Geothermal Heat Pump Consortium (GHPC, now known as the Geothermal Exchange Organization or GEO) is leading an effort to develop the first national certification standard for all primary personnel involved in the implementation of GHP systems. This standard will be developed through a collaborative methodology that solicits information and input from consumers, industry stakeholders, and professional and trade organizations to identify the required qualifications of all the primary personnel and incorporate this information into the standard.

GSHP National Survey↗

Practices and Processes of Leading High Performance Home Builders in the Upper Midwest

The NorthernSTAR Building America Partnership team proposed this study to gain insight into the business, sales, and construction processes of successful high performance builders. The knowledge gained by understanding the high performance strategies used by individual builders, as well as the process each followed to move from traditional builder to high performance builder, will be beneficiant proposing more in-depth research to yield specific action items to assist the industry at large transform to high performance new home construction. This investigation identified the best practices of three successful high performance builders in the upper Midwest. In-depth field analysis of the performance levels of their homes, their business models, and their strategies for market acceptance were explored. All three builders commonly seek ENERGY STAR certification on their homes and implement strategies that would allow them to meet the requirements for the Building America Builders Challenge program. Their desire for continuous improvement, willingness to seek outside assistance, and ambition to be leaders in their field are common themes. Problem solving to overcome challenges was accepted as part of doing business. It was concluded that crossing the gap from code-based building to high performance based building was a natural evolution for these leading builders.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Energy Recovery Linac: Laser and Laser Light Transport

Operation of the photocathode gun in the ERL requires that a tightly controlled optical pulse train, consisting of temporally and spatially shaped pulses, be delivered at the photocathode in synchrony with the RF field in the gun cavity. The pulse train must also be dynamically variable, in order to tune or ramp up the current in the ERL. A laser was developed especially for this task by Lumera Laser GmbH, of Kaiserslautern Germany, under design supervision and review of the ERL project. Following the final design review, the laser was delivered in August 2009. Preliminary tests certifying its compliance with design specifications have been performed, with further tests to follow the final certification of the ERL laser room in January 2010. The development of the necessary spatial and temporal shaping techniques is an ongoing project: proof of principle experiments have been successfully carried out with a laser of similar pulse width, operating at 532 nm and 81.5 MHz. The next stage is to evaluate the application of these techniques and alternatives, using the operations laser. A transport line has been designed and the propagation of a shaped pulse through it to the photocathode simulated and tested experimentally. As the performance of the complete photocathode drive system is critical for ERL operation, an extensive set of diagnostics will be in place to monitor and maintain its performance. The block diagram in Fig. 1 breaks the optical system down into its basic components, which are discussed in turn in the following sections.

43 PARTICLE ACCELERATORS↗

Duration Test Report for the SWIFT Wind Turbine

This test was conducted as part of the U.S. Department of Energy's (DOE) Independent Testing project. This project was established to help reduce the barriers of wind energy expansion by providing independent testing results for small turbines. Three turbines where selected for testing at the National Wind Technology Center (NWTC) as a part of round two of the Small Wind Turbine Independent Testing project. Duration testing is one of up to 5 tests that may be performed on the turbines. Other tests include power performance, safety and function, noise, and power quality. The results of the testing will provide the manufacturers with reports that may be used for small wind turbine certification.

17 WIND ENERGY↗

Overview of Deployed EDS Technologies And Third Party Involvement with Advancedments

The term explosive detection system (EDS) is used by the TSA to describe equipment that is certified to detect explosives in checked bags. The EDS, as certified, by the TSL must consist of device for interrogating a bag and an automated detection algorithm (ATD) for evaluating the results of the interrogation. We only consider CT as the interrogation device in this report. A schematic drawing of a CT-based EDS is shown in Figure 2. The output of the ATD is the binary decision of alarm or non-alarm. Alarms may true- or false-positives. Non-alarms may be true- or false-negatives. False positives are also denoted false alarms. The true detection means that the ATD reports an alarm when a threat is present in the scanned bag. The probability of detecting a threat given that a threat is present is denoted the probability of detection (PD). The probability of false alarm (PFA) is the case when an alarm is reported when a threat is not present in a bag. Certification in this context means passing tests for PD and PFA at the TSL. The results of the EDS include CT cross-sectional images of the bag and specifics about the alarmed objects generated by ATD. These results are presented on a display so that a person may override the decision of ATD and declare the alarm to be a non-alarm. This process is denoted clearing. Bags that are not cleared by the person are sent to a secondary inspection process. Here the bags may be opened or assessed with explosive trace detection (ETD) in order to clear the bags. Bags that are not cleared at this point are evaluated by an ordinance disposal team. The CT scanner along with ATD is denoted Level 1 screening. The process of clearing on a display is denoted Level 2 screening. Secondary inspection is denoted Level 3 screening. Vendors of the deployed EDSs supply the TSA with equipment for all three levels. Therefore, the term EDS may include the equipment provided for Levels 1, 2 and 3. A schematic diagram of an EDS and the levels of screening are shown in Figure 7. The decision processes used as a bag is scanned and cleared is shown in Figure 8. Shield alarms and exceptions are discussed below. Since most alarms are false alarms, the probability of alarm is oftentimes denoted the probability of a false alarm. The expenses associated with clearing false alarms occur in Levels 2 and 3.

42 ENGINEERING↗

Using Third-Party Inspectors in Building Energy Codes Enforcement in India

India is experiencing fast income growth and urbanization, and this leads to unprecedented increases in demand for building energy services and resulting energy consumption. In response to rapid growth in building energy use, the Government of India issued the Energy Conservation Building Code (ECBC) in 2007, which is consistent with and based on the 2001 Energy Conservation Act. ECBC implementation has been voluntary since its enactment and a few states have started to make progress towards mandatory implementation. Rajasthan is the first state in India to adopt ECBC as a mandatory code. The State adopted ECBC with minor additions on March 28, 2011 through a stakeholder process; it became mandatory in Rajasthan on September 28, 2011. Tamil Nadu, Gujarat, and Andhra Pradesh have started to draft an implementation roadmap and build capacity for its implementation. The Bureau of Energy Efficiency (BEE) plans to encourage more states to adopt ECBC in the near future, including Haryana, Uttar Pradesh, Karnataka, Maharashtra, West Bengal, and Delhi. Since its inception, India has applied the code on a voluntary basis, but the Government of India is developing a strategy to mandate compliance. Implementing ECBC requires coordination between the Ministry of Power and the Ministry of Urban Development at the national level as well as interdepartmental coordination at the state level. One challenge is that the Urban Local Bodies (ULBs), the enforcement entities of building by-laws, lack capacity to implement ECBC effectively. For example, ULBs in some states might find the building permitting procedures to be too complex; in other cases, lack of awareness and technical knowledge on ECBC slows down the amendment of local building by-laws as well as ECBC implementation. The intent of this white paper is to share with Indian decision-makers code enforcement approaches: through code officials, third-party inspectors, or a hybrid approach. Given the limited capacity and human resources available in the state and local governments, involving third-party inspectors could rapidly expand the capacity for plan reviews and broad implementation. However, the procedures of involving third-parties need to be carefully designed in order to guarantee a fair process. For example, there should be multiple checks and certification requirements for third-party inspectors, and the government should have the final approval when third-party inspectors are used in a project. This paper discusses different approaches of involving third-parties in ECBC enforcement; the Indian states may choose the approaches that work best in their given circumstances.

Yu, Sha↗

Guidelines for Home Energy Professionals Project: Multifamily Job Task Analyses Needs Assessment

This report describes the efforts carried out to determine whether there is a need to develop separate, multifamily-specific JTAs for the four proposed job categories. The multifamily SWS market committee considered these job designations to be the best candidates for developing JTAs and certification blueprints, as well as having the greatest potential for promoting job growth in the multifamily home performance industry.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Northwest Energy Efficient Manufactured Housing Program Specification Development

The Hood River Passive Project was developed by Root Design Build of Hood River Oregon using the Passive House Planning Package (PHPP) to meet all of the requirements for certification under the European Passive House standards. The Passive House design approach has been gaining momentum among residential designers for custom homes and BEopt modeling indicates that these designs may actually exceed the goal of the U.S. Department of Energy's (DOE) Building America program to reduce home energy use by 30%-50% (compared to 2009 energy codes for new homes). This report documents the short term test results of the Shift House and compares the results of PHPP and BEopt modeling of the project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Safety and Function Test Report for the SWIFT Wind Turbine

This test was conducted as part of the U.S. Department of Energy's (DOE) Independent Testing project. This project was established to help reduce the barriers of wind energy expansion by providing independent testing results for small turbines. Three turbines where selected for testing at the National Wind Technology Center (NWTC) as a part of round two of the Small Wind Turbine Independent Testing project. Safety and Function testing is one of up to 5 tests that may be performed on the turbines. Other tests include power performance, duration, noise, and power quality. The results of the testing will provide the manufacturers with reports that may be used for small wind turbine certification.

17 WIND ENERGY↗

Hood River Passive House

The Hood River Passive Project was developed by Root Design Build of Hood River Oregon using the Passive House Planning Package (PHPP) to meet all of the requirements for certification under the European Passive House standards. The Passive House design approach has been gaining momentum among residential designers for custom homes and BEopt modeling indicates that these designs may actually exceed the goal of the U.S. Department of Energy's (DOE) Building America program to reduce home energy use by 30%-50% (compared to 2009 energy codes for new homes). This report documents the short term test results of the Shift House and compares the results of PHPP and BEopt modeling of the project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Wind Energy Workforce Development: Engineering, Science, & Technology

Broadly, this project involved the development and delivery of a new curriculum in wind energy engineering at the Pennsylvania State University; this includes enhancement of the Renewable Energy program at the Pennsylvania College of Technology. The new curricula at Penn State includes addition of wind energy-focused material in more than five existing courses in aerospace engineering, mechanical engineering, engineering science and mechanics and energy engineering, as well as three new online graduate courses. The online graduate courses represent a stand-alone Graduate Certificate in Wind Energy, and provide the core of a Wind Energy Option in an online intercollege professional Masters degree in Renewable Energy and Sustainability Systems. The Pennsylvania College of Technology erected a 10 kilowatt Xzeres wind turbine that is dedicated to educating the renewable energy workforce. The entire construction process was incorporated into the Renewable Energy A.A.S. degree program, the Building Science and Sustainable Design B.S. program, and other construction-related coursework throughout the School of Construction and Design Technologies. Follow-on outcomes include additional non-credit opportunities as well as secondary school career readiness events, community outreach activities, and public awareness postings.

17 WIND ENERGY↗

In-Line Crack and Stress Detection in Silicon Solar Cells Using Resonance Ultrasonic Vibrations

The Phase II project has the following specific tasks: (i) specify optimal configurations of the in-line system's component hardware and software; (ii) develop and justify a system prototype that meets major specifications for an in-line crack detection unit, such as high throughput rate, high level of stability, reproducibility of data acquisition and analysis, and high sensitivity with respect to crack length and crack location; (iii) design a system platform that allows easy integration within and adaptation to various solar cell belt-type production lines; (iv) develop a testing protocol providing quality certification of the production-grade system. Commercial Application of the proposed activity consists of bringing to the solar market a new high-tech product based on an innovative solution and patented methodology to contribute to cost reduction of silicon solar module production. The solar industry, with crystalline silicon as a dominant segment, shows outstanding performance, with approximately 25% yearly growth during the last years. Despite a slowdown with only 5.6 GW installations in 2009, solar module production for the 2010 and 2011 years was recovered. According to European Photonics Industry Consortium new solar PV installations grow by 56% compared to 2010 reached 64.7 GW in 2011. Revenues in the PV industry reached a record high of $93 billion in 2011, a 13.4 percent gain over 2010 and 150 percent over 2009. This growth was forecasted to continue in 2013 with double digits growth. The solar industry is economically driven to make solar panels of the highest conversion efficiency and reliability at the lowest production cost. The Resonance Ultrasonic Vibration system addresses critical needs of the silicon-based solar industry by providing a quality control method and tool, which will improve productivity, increase reliability of products and reduce manufacturing cost of solar panels.

14 SOLAR ENERGY↗

HFE Process Guidance and Standards for potential application to updating NRC guidance

The U.S. Nuclear Regulatory Commission (NRC) reviews and evaluates the human factors engineering (HFE) programs of applicants for nuclear power plant construction permits, operating licenses, standard design certifications, and combined operating licenses. The purpose of these safety reviews is to help ensure that personnel performance and reliability are appropriately supported. Detailed design review procedures and guidance for the evaluations is provided in three key documents: the Standard Review Plan (NUREG-0800), the HFE Program Review Model (NUREG-0711), and the Human-System Interface Design Review Guidelines (NUREG-0700). These documents were last revised in 2007, 2004 and 2002, respectively. The NRC is committed to the periodic update and improvement of these guidance documents to ensure that they remain state-of-the-art design evaluation tools. Thus, the NRC has initiated a project with BNL to update the NRC guidance to remain current with recent research on human performance, advances in HFE methods and tools, and new technology. INL supported Brookhaven National Lab (BNL) to update the detailed HFE review criteria contained in NUREG-0711 and NUREG-0700 based on (1) feedback obtained from end users, (2) the results of NRC research and development efforts supporting the NRC staff’s HFE safety reviews, and (3) other material the project staff identify as applicable to the update effort. INL submitted comments on development plans and sections of NUREGs 0800, 0711, and 0700. The contractor prepared the report attached here as the deliverable for this work.

99 GENERAL AND MISCELLANEOUS↗