Search NASA⌕ Search

SEARCH · Search NASA

Results for “performance test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,495 records · Page 83

Performance and endurance testing of a prototype carbon dioxide and humidity control system for Space Shuttle extended mission capability

An advanced flight prototype regenerable CO2 and humidity control system was delivered to NASA-JSC in February 1980. It is pointed out that this system offers substantial weight savings compared with the Shuttle Orbiter expendable lithium hydroxide CO2 removal system for extended duration missions. The present paper provides a brief description of the 4- to 10-man regenerable CO2 and humidity control system. The potential advantages which can be realized for an extended duration Shuttle mission are considered along with the results of extensive testing conducted at JSC. The performance evaluation and endurance tests show that the system is capable of long-term operation (up to 60 days) without maintenance.

Lin, C. H.↗

Parametric testing of an externally configured thermionic converter

A 25.4-cm long externally configured converter was performance tested by electrically heating the emitter to simulate reactor thermal power input. The measured maximum output power was limited by the maximum input power available from the electric RF induction heater. With maximum heater input power, the converter electric output was 178 W (1.95 W/sq cm) at an emitter temperature of 1946 K. This electric output power was smaller than expected. A reactor-core-length (25.4-cm long) cylindrical thermionic converter power and maintaining the emitter-to-collector gap without shorting are of major importance to the feasibility of a 25.4-cm-long reactor fuel element. The emitter of the converter is located externally to the collector to increase the fuel-volume fraction and to allow redundant collector cooling in a reactor configuration.

Shimada, K.↗

Evaluation of class 2 biological cabinets

Basic investigations, consisting primarily of airflow measurements and visual smoke tests, were made on four commercially available units. The results indicated that performance varied considerably between units. Therefore, it was decided to outline the performance desired and to include in the overall equipment specifications a set of performance tests to assure a clean air safety cabinet with respect to chemical usage. The evaluation was to be based on aerodynamic performance under the various modes of operation.

Chamberlin, R. E.↗

Radiometric Testing of Germicidal UV Products, Round 1: UV-C Towers and Whole-Room Luminaires (CALiPER Summary Report)

This summary report analyzes the independently tested performance of 13 germicidal ultraviolet (GUV) products purchased between February and July 2022. A companion full report provides additional information and discussion of the tested products, test methods, and results. The products were of three different types: • Seven portable, consumer-oriented GUV towers designed to be placed on the floor or a desk of an unoccupied room to disinfect air and surfaces. Five of these products used LED sources and two products used low-pressure mercury (LPM) sources. • One non-portable GUV whole-room luminaire designed to be installed on a ceiling to disinfect air when a room is occupied. This product used an LED source. • Five non-portable GUV troffer or high-bay style whole-room luminaires designed to be installed in or suspended from a ceiling to disinfect air and surfaces when a room is unoccupied. All five used LPM sources. Radiometric and electrical performance was evaluated for all 13 products. Photobiological safety was also assessed for two of the products because their documentation included testable claims. The test results were compared across products and to manufacturer or vendor claims. The testing identified many issues related to the accuracy of reported GUV product performance. Claims were often untestable, contradictory, ambiguous, or used incorrect units and/or terminology. And when claims were testable, they often did not match test results. For example, three products that claimed to emit UV-C emitted only UV-A. These product claim issues were more numerous with consumer-oriented tower products, but problems with accurate performance claims were found across all products. The UV-C radiant efficiency of the products varied widely, even among similar products using the same source technologies. For example, the UV-C radiant efficiency of LPM products varied by greater than a factor of three for the same product type, indicating a large potential energy savings opportunity for products that are better designed for efficiency. LED products had orders-of-magnitude lower UV-C radiant efficiency than LPM products. Several testing challenges and limitations were identified. Most significant among these is the capability to accurately test and report the performance of larger GUV products. Integrating spheres require a specialized and costly coating to test UV, and the testing laboratory for this round of products had only a 20-inch diameter hemisphere with this capability. Only 2 of the 10 UV-C emitting products could be tested in this sphere. Goniometer testing had a different size limitation in that mirrors typically used to increase goniometer test distance to the far field are not reflective of UV and therefore could not be used to increase test distance. As a result, 7 of 13 products could not be tested far field. The implication is that electronic files of UV-C intensity data typically imported into design software for designing GUV applications may not be reliable for predicting irradiance at arbitrary far-field distances. It is currently unclear if these are industry-wide testing laboratory limitations, and what solutions may exist to address them. Specifiers and buyers of GUV products will need accurate performance claims and data to safely and effectively deploy GUV technology to reduce the transmission of diseases in buildings. This CALiPER GUV Round 1 report demonstrates the significant education and training that is needed for manufacturers and vendors to accurately test and report the performance of their GUV products. Further standards and guidelines are needed to improve test methods, address testing limitations, and improve reporting of product performance. Additionally, the wide range in UV-C radiant efficiency of GUV products means there is a large energy-savings opportunity for more energy efficient GUV products.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Performance of the Aspect Camera Assembly for the Advanced X-Ray Astrophysics Facility: Imaging

The Aspect Camera Assembly (ACA) is a "state-of-the-art" star tracker that provides real-time attitude information to the Advanced X-Ray Astrophysics Facility - Imaging (AXAF-I), and provides imaging data for "post-facto" ground processing. The ACA consists of a telescope with a CCD focal plane, associated focal plane read-out electronics, and an on-board processor that processes the focal plane data to produce star image location reports. On-board star image locations are resolved to 0.8 arcsec, and post-facto algorithms yield 0.2 arcsec star location accuracies (at end of life). The protoflight ACA has been built, along with a high accuracy vacuum test facility. Image position determination has been verified to < 0.2 arcsec accuracies. This paper is a follow-on paper to one presented by the author at the AeroSense '95 conference. This paper presents the "as built" configuration, the tested performance, and the test facility's design and demonstrated accuracy. The ACA has been delivered in anticipation of a August, 1998 shuttle launch.

Michaels, Dan↗

Testing of the International Space Station and X-38 Crew Return Vehicle GPS Receiver

This paper discusses the process and results of the performance testing of the GPS receiver planned for use on the International Space Station (ISS) and the X- 38CrewReturnVehicle(CRV). The receiver is a Force-19 unit manufactured by Trimble Navigation and modified in software by NASA:s Goddard Space Flight Center (GSFC) to perform navigation and attitude determination in space. The receiver is the primary source of navigation and attitude information for ISS and CRV. Engineers at GSFC have developed and tested the new receiver with a Global Simulation Systems Ltd (GSS) GPS Signal Generator (GPSSG). This paper documents the unique aspects of ground testing a GPS receiver that is designed for use in space. A discussion of the design of tests using the GPSSG, documentation, data capture, data analysis, and lessons learned will precede an overview of the performance of the new receiver. A description of the challenges that were overcome during this testing exercise will be presented. Results from testing show that the receiver will be within or near the specifications for ISS attitude and navigation performance. The process for verifying other requirements such as Time to First Fix, Time to First Attitude, selection/deselection of a specific GPS satellite vehicles (SV), minimum signal strength while still obtaining attitude and navigation, navigation and attitude output coverage, GPS week rollover, and Y2K requirements are also given in this paper.

Simpson, James↗

FY2020 Rotating Bed Reactor for Iodine Removal from WTP Melter Effluent to Support DFLAW Start-Up

In Performance Assessment (PA) of the Hanford Integrated Disposal Facility (IDF), 129 I is a significant contributor to the risk. The 2017 IDF PA accounted for 0.22% of the total 129 I inventory in Hanford tank waste as residing in the solidified liquid waste from the Effluent Treatment Facility (ETF). However, recent estimates suggest that higher percentages of the iodine processed at the Hanford Waste Treatment and Immobilization Plant (WTP) may be present in the liquid waste routed to the Liquid Effluent Retention Facility (LERF) for eventual treatment at the ETF. In addition, a recent integrated melter test performed at the Vitreous State Laboratory (VSL) at The Catholic University of America (CUA) showed the possibility that a significant fraction (>50%) of the total iodine in the melter feed could be present in the aqueous waste stream destined for the ETF. This stream represents a combination of the Effluent Management Facility (EMF) evaporator overhead condensate and the liquid waste from the WTP off-gas caustic scrubber. Higher levels of 129 I in this stream could affect the LERF and ETF Hazard Categorizations as well as the acceptability of the solidified ETF liquid secondary waste brine for disposal at the IDF. Accordingly, there is a need to investigate and develop potential methods and processes to mitigate this risk. Washington River Protection Solutions, LLC (WRPS) tasked Atkins and VSL to perform development and testing work to evaluate potential methods for removal of iodine species from the waste stream routed to the LERF. In particular, the testing investigated the use of an Atkins-SpinIonic™ Rotating Bed Reactor (RBR) system as a potential alternative to conventional column-based ion exchange or absorption processes. The present report provides results obtained from testing with an RBR system for the removal of iodine from simulants of the projected WTP waste stream that discharges to the LERF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Leading Your Leaders

Even though working on a problem has been your primary effort for the past year, your leadership may have heard about this once in a briefing a decade ago. Now they are basically clueless. Pretend that you are talking to your daughter's fifth-grade class. Explain how your complicated gizmo works. If possible, do not use acronyms. Define your terms. Put your work in context. Assume your leader has no idea what you do, who you work for, or what your gizmo does. That is a good place to start. Remember, taking the next century to study the problem or spending the Gross National Product to invent a new solution are probably not going to be acceptable solutions. Real engineers and technicians build real hardware that works in the real world in a reasonable manner within a reasonable time at a reasonable cost. True, skimping on time or money can cause mistakes, but folks whose gizmos are delayed unreasonably or cost more than is practical get their programs canceled, force the business into bankruptcy, or give the market over to the competition. Real engineers and technicians always consider cost and schedule in their work. Raising questions is important. However, we are in the business of doing things. Engineers and technicians are paid to get things done. Yes, you have to identify the problem, frame the design, identify the tests, perform the analysis, and assemble the hardware. But the goal is to solve the problem. Nobody ever said flying in space was easy. We make it look easy the same way that an Olympic champion makes her sport look easy: by working hard at improving performance every day. Better are the results of a well-defined test. Remember that a test on a laboratory bench is always an approximation of reality, and rules similar to those for good analysis also apply. One should always be mindful of Mechelay's rule: "It is better to be stupid than to run a stupid test." Often we try to overtest. If a piece of hardware passes an unbelievably difficult test, then life is good. More often when an unbelievably difficult test fails, we are left with a very long discussion of why and what was wrong in the design or execution of the test. Make sure that the test is well defined. Even then, it is important to explain to your leaders what inherent accuracy (or error) the test conditions or equipment have and what the assumptions or initial conditions were for the test. Test results without a good understanding of the test's accuracy or the pedigree of the test assumptions are worth very little. Finally, there is flight test data. Always limited, never at the edge of the envelope, it still shows how the real hardware works in a combined environment. Flight experience is dangerous because it typically doesn't show how close to the edge of the cliff the equipment is operating, but it does demonstrate how the hardware really works. A flight test is the ultimate test, again taken with the knowledge that it is probably not the extreme but something more like the middle of the environmental and systems performance. Good understanding of a problem and its solution always relies on a combination of all these methods. Be sure to lead your leaders by using all the tools you have at your disposal. At the end of the day, decisions in space flight always come down to a risk trade. Our business is not remotely safe, not in the sense that the public, the media, or our legislators use the term. Everything we do has a risk, cost, schedule, or performance trade-off. For your leaders to make an appropriate decision, you need to educate them, lead them, talk with them, and engage them in the discussion until full understanding takes place. It's your job. *

Hale, Wayne N.↗

Testing of the International Space Station and X-38 Crew Return Vehicle GPS Receiver

This paper discusses the process and results of the performance testing of the GPS receiver planned for use on the International Space Station (ISS) and the X-38 Crew Return Vehicle (CRV). The receiver is a Force-19 unit manufactured by Trimble Navigation and modified in software by the NASA Goddard Space Flight Center (GSFC) to perform navigation and attitude determination in space. The receiver is the primary source of navigation and attitude information for ISS and CRV. Engineers at GSFC have developed and tested the new receiver with a Global Simulation Systems Ltd (GSS) GPS Signal Generator (GPSSG). This paper documents the unique aspects of ground testing a GPS receiver that is designed for use in space. A discussion of the design of tests using the GPSSG, documentation, data capture, data analysis, and lessons learned will precede an overview of the performance of the new receiver. A description of the challenges that were overcome during this testing exercise will be presented. Results from testing show that the receiver will be within or near the specifications for ISS attitude and navigation performance. The process for verifying other requirements such as Time to First Fix, Time to First Attitude, selection/deselection of a specific GPS satellite vehicles (SV), minimum signal strength while still obtaining attitude and navigation, navigation and attitude output coverage, GPS week rollover, and Y2K requirements are also given in this paper.

Simpson, James↗

Three-Man Solid Electrolyte Carbon Dioxide Electrolysis Breadboard

The development of the Three-Man (2.2 lb CO2/man-day) Solid Electrolyte CO2 Electrolysis Breadboard consisted of a Phase 1 and 2 effort. The Phase 1 effort constituted fabrication of three electrolysis cell types and performing parametric testing, off-design testing, and cell life testing. The Phase 2 consisted of the preliminary design, incorporation of palladium (Pd) tubes for hydrogen separation from the electrolyzer cathode feed gases, design support testing, final design, fabrication, and performance testing of the breadboard system. The results of performance tests demonstrated that CO2 electrolysis in an oxygen reclamation system for long duration space-based habitats is feasible. Closure of the oxygen system loop, therefore, can be achieved by CO2 electrolysis. In a two step process the metabolic CO2 and H2O vapor are electrolyzed into O2, H2, and CO. The CO can subsequently be disproportionated into carbon and CO2 in a carbon deposition reactor and the CO2 in turn be recycled and electrolyzed for total O2 recovery. The development effort demonstrated electrolyzer system can be designed and built to operate safely and reliably and the incorporation of Pd tubes for hydrogen diffusion can be integrated safely with predictable performance.

Isenberg, Arnold O.↗

Testing of the International Space Station and X-38 Crew Return Vehicle GPS Receiver

This paper discusses the process and results of the performance testing of the GPS receiver planned for use on the International Space Station (ISS) and the X-38 Crew Return Vehicle (CRV). The receiver is a Force-19 unit manufactured by Trimble Navigation and Modified in software by the NASA Goddard Space Flight Center (GSFC) to perform navigation and attitude determination in space. The receiver is the primary source of navigation and attitude information for ISS and CRV. Engineers at GSFC have developed and tested the new receiver with a Global Simulation Systems Ltd (GSS) GPS Signal Generator (GPSSG). This paper documents the unique aspects of ground testing a GPS receiver that is designed for use in space. A discussion of the design and tests using the GPSSG, documentation, data capture, data analysis, and lessons learned will precede an overview of the performance of the new receiver. A description of the challenges of that were overcome during this testing exercise will be presented. Results from testing show that the receiver will be within or near the specifications for ISS attitude and navigation performance. The process for verifying other requirements such as Time to First Fix, Time to First Attitude, selection/deselection of a specific GPS satellite vehicles (SV), minimum signal strength while still obtaining attitude and navigation, navigation and attitude output coverage, GPS week rollover, and Y2K requirements are also given in this paper.

Simpson, James↗

Design, Fabrication, and Performance of Foil Gas Thrust Bearings for Microturbomachinery Applications

A methodology for the design and construction of simple foil thrust bearings intended for parametric performance testing and low marginal costs is presented. Features drawn from a review of the open literature are discussed as they relate to bearing performance. The design of fixtures and tooling required to fabricate foil thrust bearings is presented, using conventional machining processes where possible. A prototype bearing with dimensions drawn from the literature is constructed, with all fabrication steps described. A load-deflection curve for the bearing is presented to illustrate structural stiffness characteristics. Start-top cycles are performed on the bearing at a temperature of 425 C to demonstrate early-life wear patterns. A test of bearing load capacity demonstrates useful performance when compared with data obtained from the open literature.

Dykas, Brian↗

Investigation of a mixed compression axisymmetric inlet at Mach number 5.3

The hypersonic diffuser portion of an uncooled high performance mixed compression, axisymmetric inlet suitable for subsonic burning engines was designed and tested. Performance of a model with a 25.4-cm capture diameter was measured in a wind tunnel and the results were compared with theoretical predictions calculated by a comprehensive computer program. All tests were conducted at a Mach number of 5.3 at a total temperature of 667 K and a total pressure of 11.57 atm. The angle of attack ranged from 0 to + or - 3 deg. Performance at angle of attack remained high. Reasonably high performance in the throat (maximum throat pitot-pressure recovery of 77 percent and an average value of 58 percent) was obtained at 0 deg angle of attack with relatively large amounts of boundary-layer bleed (11 to 22 percent of the capture mass flow). The computer program used in the design of this inlet is considered marginally adequate for predicting hypersonic inlet flow fields. Although the program as it now exists is very useful, an improved computer program that more accurately predicts the boundary layer and the shock-wave-boundary-layer interaction and accounts for boundary-layer bleed should be developed for reliability predicting hypersonic inlet flow fields.

Latham, E. A.↗

Hollow Cathode Assembly Development for the HERMeS Hall Thruster

To support the operation of the HERMeS 12.5 kW Hall Thruster for NASA's Asteroid Redirect Robotic Mission, hollow cathodes using emitters based on barium oxide impregnate and lanthanum hexaboride are being evaluated through wear-testing, performance characterization, plasma modeling, and review of integration requirements. This presentation will present the development approach used to assess the cathode emitter options. A 2,000-hour wear-test of development model Barium Oxide (BaO) hollow cathode is being performed as part of the development plan. Specifically this test is to identify potential impacts cathode emitter life during operation in the HERMeS thruster. The cathode was operated with a magnetic field-equipped anode that simulates the HERMeS hall thruster operating environment. Cathode discharge performance has been stable with the device accumulating 743 hours at the time of this report. Observed voltage changes are attributed to keeper surface condition changes during testing. Cathode behavior during characterization sweeps exhibited stable behavior, including cathode temperature. The details of the cathode assembly operation of the wear-test will be presented.

Propulsion Technology↗

Project: Advanced Oxy-Combustion Technology Development and Scale Up for New and Existing Coal-Fired Power Plants (Phase II) (Final Report)

The objective of this project was to develop an advanced Oxy-Combustion Pressurized Fluidized Bed Combustor (Oxy-PFBC) technology and mature it to TRL 6 through pilot testing. Performance goals included demonstrating capture of 90% or greater of the produced carbon dioxide, with no more than a 35% increase in the cost of electricity. A 1 MWth pilot scale plant was designed, built and operated at CanmetENERGY in Ottawa. Extensive support work was carried out on component testing, analysis and commercial planning. The team members included GTI, Linde, Natural Resources Canada (CanmetENERGY), Pennsylvania State University, Electric Power Research Institute (EPRI), and General Electric. Additional research was provided by the University of Ottawa. Funding was provided by the US Department of Energy, Alberta Innovates and each of the team members. The total funding for Phase II was $\$$18.537M with $\$$12.058M. The period of performance for Phase II was from July 1, 2014 through December 31, 2018. Component testing conducted in preparation for pilot testing included cold flow testing at atmospheric and pressurized conditions, and coal and limestone reactivity tests at elevated temperatures and pressures. These tests validated in-bed heat exchanger heat transfer capability, bed stability, and coal particle residence time predictions. They also quantified coal and limestone reactivity at the expected combustor temperatures and pressures. The 1 MWth pilot testing achieved all performance goals with the exception of carbon conversion. The combustor achieved oxy-combustion at the full target pressure of 8 bar. Two key combustor performance goals that were achieved include exceeding the target sulfur capture in the combustor as well as exceeding the acid dewpoint target at full operating pressure. This validates assumptions about the pressures that can be achieved without acid gas condensation and the associated corrosion risks. The ability to achieve target operating pressures supports combustor cost assumptions. In addition, the CO 2 processing unit (CPU), demonstrated a new technology, the deoxidation (DeOxo) reactor. The CPU achieved all of its performance targets, while the DeOxo reactor demonstrated the ability to achieve 100 ppm or less of oxygen in the flue gas stream to meet CO 2 pipeline specs. The pilot combustor was damaged during testing and an incident investigation was conducted. The primary cause of the hardware damage was due to anomalous temperature readings, caused by sensors buried and insulated in bed particles trapped by heat exchanger tubes near the wall. This led to higher gas velocities than intended, which then caused lower fuel residence time, lower carbon conversion, freeboard burning, and undetected excess temperatures in the combustor. As a result, the TRL 6 goal was not achieved. Updated technoeconomic analysis predicts that the Oxy-PFBC can achieve the goal of <35% increase in COE with 90% CO 2 capture if the carbon conversion performance target can be demonstrated in future testing.

20 FOSSIL-FUELED POWER PLANTS↗

Extended Bandwidth Spread Spectrum Time Domain Reflectometry Cable Test for Thermal Aging, Low Resistance Fault, and Water Detection

In 2022, researchers at Pacific Northwest National Laboratory (PNNL) used the Accelerated and Real-Time Environmental Nodal Assessment (ARENA) cable and motor test bed to characterize spread spectrum time domain reflectometry (SSTDR) and compare the responses of an SSTDR instrument to those of a frequency domain reflectometry (FDR) instrument. Results showed both techniques could detect and locate cable anomalies such as phase-to-phase low resistance and shorts, thermal insulation damage, mechanical insulation damage, and the presence or absence of water in some conditions. The SSTDR tests used a commercial instrument provided by LiveWire Innovations Inc. This commercial instrument performed tests at 6, 12, 24, and 48 MHz bandwidth. The results of these tests were compared to FDR tests where bandwidths could be extended up to 1.3 GHz, although the best responses for cable tests were from 100 to 500 MHz. Lower bandwidth signals can propagate better along the cable while higher bandwidths have higher resolution for impedance change reflections allowing more precise indication of location and separation of anomalies. The 2022 research found that FDR responses were clearer than SSTDR and speculated that a higher bandwidth SSTDR could more successfully detect and locate cable anomalies. One advantage of the SSTDR system investigated was that it was designed for energized online use up to 1,000 volts, which may be a significant advantage for nuclear power plant use. The LiveWire SSTDR instrument is an established product in the rail and aircraft industry and updating the SSTDR hardware parameters is difficult to justify without more conclusive testing. Therefore, a software adjustable laboratory SSTDR instrument was developed by PNNL and was used to test extended bandwidth SSTDR cable tests. Within the ARENA test bed, 42 cable conditions were tested with the PNNL SSTDR, FDR, and the LiveWire SSTDR—each operating at four different bandwidths. Observations and conclusions regarding the relative performance of the three instruments over different bandwidths are note below. Responses of the PNNL SSTDR (at 50 MHz) and the LiveWire SSTDR (at 48 MHz) were similar. The PNNL SSTDR higher frequency bandwidths behaved as expected showing sharper peaks and higher noise. This validated the PNNL SSTDR as a reasonable implementation of the SSTDR technology. Lower bandwidth SSTDR responses (particularly 6 and 12 MHz) may have increased value for use within longer cables but were not particularly effective at identifying anomalous cable behavior in the 100 ft cables tested here. The higher bandwidths of the PNNL SSTDR (50, 100, 200, and 400 MHz) did not provide substantially clearer cable reflectometry responses, but having the higher frequency responses available did add to the cable test evaluation. Strong responses to shorts and low impedance faults between phases were particularly evident in the higher bandwidth PNNL SSTDR and the FDR data. Measurements were repeatable, with similar responses obtained from a thermally aged cable for tests taken a month apart. Signal noise was affected in the unshielded cable by the local in-tray cable arrangement including proximity to metal edges and rungs of the cable tray. Foam isolation of the cable from the tray metal reduced in both FDR and SSTDR responses. Cable condition monitoring in nuclear power plants will likely benefit from both more informative off-line testing methods and from the development of on-line methods for continuous monitoring of cables in use. The LWRS-funded ARENA test bed was a valuable resource for this development and direct comparison of nuclear electrical cable condition monitoring technologies. Test results are targeted to guide industry advancement of testing and monitoring tools for cable aging management.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Evaluation of bifacial module technologies with combined–accelerated stress testing

In view of the increasing interest and market share of bifacial cells and modules, suitable substrates such as glass and transparent backsheets along with ethylene vinyl acetate (EVA) and polyolefin elastomer (POE) encapsulants were examined in combined-accelerated stress testing (C-AST) to evaluate and compare degradation modes. Testing with both monofacial and bifacial cells, we found glass-glass modules with monofacial cells led to greater grid finger breakage than those with polymeric backsheets. Furthermore, this is attributed to previous X-ray topography and modeling work showing higher stress in cells and interconnections in glass-glass modules than glass-backsheet modules. Consistent with the objectives of C-AST, which stresses modules at levels corresponding to the limits seen in the natural environment, we observed the UV-fluorescence signatures of modules tested in C-AST (considering the degradation associated with developing chromophores, moisture penetration and photobleaching effects) to be like those in fielded modules, more so than other chamber stress testing implemented for comparison. We found light-induced degradation (LID) in module types with regenerated (inactive) cells with C-AST, suggesting the possibility of LID destabilization in some field conditions. We could also distinguish potential-induced degradation (PID) on the back of the bifacial passivated emitter and rear cells (PERC) in C-AST. Confirming with ex-situ tests, we found polarization-type PID most prevalent in glass-glass modules with EVA as would be anticipated considering the greater leakage current through such module encapsulation. Unlike PID tests performed in the dark, which can lead to false positive PID test results, field-representative illumination is experienced by the modules on the front and back side while –1200 V system voltage is applied in C-AST, supporting the conclusion that this module type with glass-glass construction would be susceptible to PID in the field.

14 SOLAR ENERGY↗