Search NASA⌕ Search

SEARCH · Search NASA

Results for “Phase 2”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,513 records · Page 84

Formerly Used Sites Remedial Action Program (FUSRAP) W. R. Grace Building 23 Remedial Action-Challenges and Successes - 12247

Monazite sand processing was conducted at the W. R. Grace Curtis Bay Facility (Baltimore, Maryland) from mid-May 1956 through the spring of 1957 under license to the Atomic Energy Commission (AEC), for the extraction of source material in the form of thorium, as well as rare earth elements. The processing was conducted in the southwest quadrant of a ca. 100 year old, five-story, building (Building 23) in the active manufacturing portion of the facility. Building components and equipment in the southwest quadrant of Building 23 exhibited residual radiological activity remaining from the monazite sand processing. U.S. Army Corps of Engineers (USACE) conducted a remedial investigation (RI) and feasibility study (FS) and prepared a Record of Decision (ROD) to address residual radioactivity on building components and equipment in the southwest quadrant of Building 23. The remedy selected for the southwest quadrant of Building 23, which was documented in the ROD (dated May 2005), was identified as 'Alternative 2: Decontamination With Removal to Industrial Use Levels'. The selected remedy provided for either decontaminating or removing areas of radioactivity to meet the RGs. Demonstration of compliance with the selected ARAR was performed using the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) and other appropriate guidance, as well as appropriate dose modeling codes where necessary. USACE-Baltimore District along with its private industry partner worked together under the terms of a 2008 Settlement Agreement to implement the remedial action (RA) for the southwest quadrant of Building 23. The RA was conducted in two phases: Phase 1 was completed to improve the building condition for support of subsequent remedial action and decrease scope uncertainty of the remedial action, and Phase 2 included decontamination and removal activities to meet the RGs and demonstration of compliance with the selected ARAR. Challenges encountered during the RA include: coordination with stakeholders, coordination between multiple RA contractors, addressing unique structural challenges for Building 23, nonradiological hazards associated with the RA, weather issues, and complex final status survey (FSS) coordination. The challenges during the Phase 1 RA were handled successfully. The challenges for the Phase 2 RA, which is anticipated to be complete by late-summer of 2012, have been handled successfully so far. By fall of 2012, USACE is expecting to finalize a robust RA Closure Report, including the Final Status Survey Report, which summarizes the RA activities and documents compliance with the ROD. During the ongoing RA at Building 23, there have been and still are many challenges both technically and from a project management perspective, due in part to the nature and extent of impact at the site (residual radioactivity within an active processing building), dual oversight by the property owner and USACE, and site-specific challenges associated with a complex RA and multiple contractors. Currently, USACE and its industry partner are overseeing the completion of RA field activities. RA closure documentation for the remediation of Building 23 to address residual contamination in building materials will be reviewed/approved by USACE and its industry partner upon completion of the field activities. USACE and its industry partner are working well together, through the Settlement Agreement, to conduct a cost-efficient and effective remedial action to address the legacy issues at Building 23. This cooperative effort has set a firm foundation for achieving a successful RA at the RWDA using a 'forward think' approach, and it is a case study for other sites where an industry partner is involved. The collaborative effort led to implementation of an RA which is acceptable to the site owner, the regulators, and the public, thus allowing USACE to move this project forward successfully in the FUSRAP program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Iron nitride permanent magnet and technique for forming iron nitride permanent magnet

A permanent magnet may include a Fe 16 N 2 phase constitution. In some examples, the permanent magnet may be formed by a technique that includes straining an iron wire or sheet comprising at least one iron crystal in a direction substantially parallel to a <001> crystal axis of the iron crystal; nitridizing the iron wire or sheet to form a nitridized iron wire or sheet; annealing the nitridized iron wire or sheet to form a Fe 16 N 2 phase constitution in at least a portion of the nitridized iron wire or sheet; and pressing the nitridized iron wires and sheets to form bulk permanent magnet.

36 MATERIALS SCIENCE↗

Iron nitride permanent magnet and technique for forming iron nitride permanent magnet

A permanent magnet may include a Fe 16 N 2 phase constitution. In some examples, the permanent magnet may be formed by a technique that includes straining an iron wire or sheet comprising at least one iron crystal in a direction substantially parallel to a <001> crystal axis of the iron crystal; nitridizing the iron wire or sheet to form a nitridized iron wire or sheet; annealing the nitridized iron wire or sheet to form a Fe 16 N 2 phase constitution in at least a portion of the nitridized iron wire or sheet; and pressing the nitridized iron wires and sheets to form bulk permanent magnet.

Wang, Jian-Ping↗

Space Station Freedom: Dynamic instrumentation for a large space structure

A proposed approach called Modal Identification Experiment (MIE) for obtaining on-orbit dynamic response measurements on Space Station Freedom, the first of a family of large, flexible space structures is discussed. The Phase 2 conceptual design study which provides a conceptual design of a proposed measurement system and an experimental protocol for inobstrusively collecting dynamic response data critical to characterizing important vibration modes of Space Station Freedom were recently concluded. The case for conducting such a measurement program is presented and the specific MIE objectives that were identified, are listed. The sequence of discrete Space Station Freedom assembly configurations is described, and the Phase 2 conceptual design of the experiment and instrumentation system are defined. In addition, a plan to utilize a space station hydrid scale model in laboratory simulations as part of the design process are discussed.

Raney, John P.↗

Large cosmic ray transient decreases observed in the heliosphere at the Earth, Voyagers 1 and 2 and Pioneer 10 from 1987 to 1991

Using the greater than 70-MeV cosmic ray rate data from the Interplanetary Monitoring Platform (IMP), Voyager, and Pioneer spacecraft, we have examined the role of large transient decreases in the overall cosmic ray decrease from 1987 to 1990. At least 12 separate transient decreases with magnitudes greater than 5% were observed at Voyager 2, which moved from a heliocentric radius of approximately 23 to 35 AU during the time period. Many, but not all, of these decreases were observed at IMP 8 near the Earth and at the Pioneer 10 between 42 and 54 AU near the ecliptic plane. However, only five of these decreases were observed at Voyager 1 at north heliographic latitude approximately 30 deg and radial distance between 32 and 46 AU. The period of decreasing cosmic ray intensity from 1987 to 1990 can be divided into two phases. During phase 1, between mid-1987 and early 1989, the average heliospheric current sheet tilt rapidly increased from approximately 8 deg to 65 deg as the solar activity was also increasing rapidly and the intensity at the Earth decreased by about 35%. Four large transient decreases were observed at the Earth during this time; however, transient decreases beyond the Earth were observed only near the ecliptic plane. In phase 2, from early 1989 to mid-1990 when the intensity at the Earth decreased by an additional approximately 60%, five large transient decreases were observed at all latitudes. During this time the current sheet tilt was always greater than 60 deg. Using a procedure to separate these large transient decreases from any possible slower long-term variations, we argue that these decreases appear to be responsible for much of the overall intensity decrease of 20 - 35% observed at all spacecraft near the equatorial plane in phase 1 as well as most of the larger intensity decrease of about 45 - 60% observed at all spacecraft during phase 2. The recovery of the cosmic ray intensity that started at the Earth in early 1990 moved outward in the heliosphere reaching the Voyager and Pioneer spacecraft about 6 months later. This is in contrast to what happened as the intensity began to recover was observed to begin almost simultaneously at all radii less than 25 AU. This difference suggests that during the current cycle, the mechanism responsible for the recovery must have propagated outward from the Sun. This could have been related to the reversal of the solar polar magnetic field which occurred in early 1990. The effects of large transients propagating outward in the heliosphere and becoming ineffective when they reach the heliospheric boundary could not have played a major role in the onset of the recovery in 1990, since in this case the recovery should have been observed first in the outer heliosphere.

Webber, W. R.↗

°Enhancing High Temperature Anode Performance with 2° Anchoring Phases

Project accomplishments included developing and optimizing strength testing of aluminum titanate (ALT)-doped Ni-YSZ materials and identified the dopant levels that optimized mechanical strength and enhanced electrochemical performance. We also optimized our ability to fabricate electrolyte supported button cells with anodes consisting of powders provided by Fuel Cell Energy. In several instances, those anodes were infiltrated with ALT and tested with hydrogen for 30 hours at 800°C at an applied potential of 0.4 V. Our research activities were focused in three areas: 1) mechanical strength testing on as prepared and reducced nickel-YSZ structures that were either free of a dopant or prepared by mechanically mixing in ALT at various weight percents (up to 10 wt%); 2) 24-hour electrochemical testing of electroylte supported cells having anodes made from Ni/YSZ and Ni/YSZ/ALT anodes with specific attention focused on modeling degradation rates; and 3) operando EIS and optical testing of both in-house fabricated devices as well as membrane electrode assemblies that were acquired from commercial vendors.

25 ENERGY STORAGE↗

Surface modification induced phase transformation and structure variation on the rapidly solidified recast layer of titanium

In this study, neodymium-doped yttrium orthovanadate (Nd:YVO{sub 4}) as a laser source with different scanning speeds was used on biomedical Ti surface. The microstructural and biological properties of laser-modified samples were investigated by means of optical microscope, electron microscope, X-ray diffraction, surface roughness instrument, contact angle and cell cytotoxicity assay. After laser modification, the rough volcano-like recast layer with micro-/nanoporous structure and wave-like recast layer with nanoporous structure were generated on the surfaces of laser-modified samples, respectively. It was also found out that, an α → (α + rutile-TiO{sub 2}) phase transition occurred on the recast layers of laser-modified samples. The Ti surface becomes hydrophilic at a high speed laser scanning. Moreover, the cell cytotoxicity assay demonstrated that laser-modified samples did not influence the cell adhesion and proliferation behaviors of osteoblast (MG-63) cell. The laser with 50 mm/s scanning speed induced formation of rough volcano-like recast layer accompanied with micro-/nanoporous structure, which can promote cell adhesion and proliferation of MG-63 cell on Ti surface. The results indicated that the laser treatment was a potential technology to enhance the biocompatibility for titanium. - Highlights: • Laser induced the formation of recast layer with micro-/nanoporous structure on Ti. • An α → (α + rutile-TiO{sub 2}) phase transition was observed within the recast layer. • The Ti surface becomes hydrophilic at a high speed laser scanning. • Laser-modified samples exhibit good biocompatibility to osteoblast (MG-63) cell.

36 MATERIALS SCIENCE↗

Mars surface-based factory: Computer control of a water treatment system to support a space colony on Mars

In a continued effort to design a surface-based factory on Mars for the production of oxygen and water, the Design Group at Prairie View A&M University made a preliminary study of the surface and atmospheric composition on Mars and determined the mass densities of the various gases in the martian atmosphere. Based on the initial studies, the design group determined oxygen and water to be the two products that could be produced economically under the martian conditions. Studies were also made on present production techniques to obtain water and oxygen. Analyses were made to evaluate the current methods of production that were adaptable to the martian conditions. The detailed report was contained in an Interim Report submitted to NASA/USRA in Aug. of 1986. Even though the initial effort was the production of oxygen and water, we found it necessary to produce some diluted gases that can be mixed with oxygen to constitute 'breathable' air. In Phase 2--Task 1A, the Prairie View A&M University team completed the conceptual design of a breathable-air manufacturing system, a means of drilling for underground water, and storage of water for future use. The design objective of the team for the 1987-1988 academic year was the conceptual design of an integrated system for the supply of quality water for biological consumption, farming, and residential and industrial use. The design has also been completed. Phase 2--Task 1C is the present task for the Prairie View Design Team. This is a continuation of the previous task, and the continuation of this effort is the investigation into the extraction of water from beneath the surface and an alternative method of extraction from ice formations on the surface of Mars if accessible. In addition to investigation of water extraction, a system for computer control of extraction and treatment was developed with emphasis on fully automated control with robotic repair and maintenance. It is expected that oxygen- and water-producing plants on Mars will be limited in the amount of human control that will be available to operate large and/or isolated plants. Therefore, it is imperative that computers be integrated into plant operation with the capability to maintain life support systems and analyze and replace defective parts or systems with no human interface.

Brice, R.↗

NRC ARDC Guidance Support Status Report

This report provides a summary that reflects the progress and status of proposed regulatory design criteria for advanced non-light water reactor (LWR) designs in accordance with the Level 3 milestone M3AT-17IN2001013 in work package AT-17IN200101. These criteria have been designated as advanced reactor design criteria (ARDC) and they provide guidance to future applicants for addressing the general design criteria (GDC) that are currently applied specifically to LWR designs. This report provides a summary of Phase 2 activities related to the various tasks associated with ARDC development and the subsequent development of ARDC regulatory guidance for sodium fast reactor (SFR) and modular high-temperature gas-cooled reactor (HTGR) designs. Status Report Organization: Section 2 discusses the origin of the GDC and their application to LWRs. Section 3 addresses the objective of this initiative and how it benefits the advanced non-LWR reactor vendors. Section 4 discusses the scope and structure of the initiative. Section 5 provides background on the U.S. Department of Energy (DOE) ARDC team’s original development of the proposed ARDC that were submitted to the NRC for consideration. Section 6 provides a summary of recent ARDC Phase 2 activities. Appendices A through E document the DOE ARDC team’s public comments on various sections of the NRC’s draft regulatory guide DG–1330, “Guidance for Developing Principal Design Criteria for Non-Light Water Reactors.”

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Hot gas ingestion test results of a two-poster vectored thrust concept with flow visualization in the NASA Lewis 9- by 15-foot low speed wind tunnel

A 9.2 percent scale STOVL hot gas ingestion model was tested in the NASA Lewis 9 x 15-foot Low-Speed Wind Tunnel. Flow visualization from the Phase 1 test program, which evaluated the hot ingestion phenomena and control techniques, is covered. The Phase 2 test program evaluated the hot gas ingestion phenomena at higher temperatures and used a laser sheet to investigate the flow field. Hot gas ingestion levels were measured for the several forward nozzle splay configurations and with flow control/life improvement devices (LIDs) which reduced the hot gas ingestion. The test was conducted at full scale nozzle pressure ratios and inlet Mach numbers. Results are presented over a range of nozzle pressure ratios at a 10 kn headwind velocity. The Phase 2 program was conducted at exhaust nozzle temperatures up to 1460 R and utilized a sheet laser system for flow visualization of the model flow field in and out of ground effects. The results reported are for nozzle exhaust temperatures up to 1160 R and contain the compressor face pressure and temperature distortions, the total pressure recovery, the inlet temperature rise, and the environmental effects of the hot gas. The environmental effects include the ground plane contours, the model airframe heating, and the location of the ground flow separation.

Johns, Albert L.↗

Regenerable biocide delivery unit, volume 1

The Microbial Check Valve (MCV), which is currently used aboard the Shuttle Orbiter for disinfection of the potable water supply, is an expendable flow-through canister containing iodinated ion exchange resin. Means for extension of MCV life are desirable to avoid resupply penalties. The Phase 1 Regenerable Biocide Delivery Unit program demonstrated the feasibility of regenerating an MCV in situ, using a strong aqueous elemental iodine solution resulting from diversion of the MCV influent to a packed bed containing iodine crystals. In small column tests, eight manual regenerations of an MCV resin were accomplished. The term Regenerative Microbial Check Valve (RMCV) was adopted describing this new technology. The Phase 2 program resulted in the development of a full scale and fully autonomous prototype RMCV, capable of maintaining residual I(sub 2) levels between 2.0 - 4.0 mg/L for prolonged periods. During six months of testing at the Space Station baseline flow rate of 120 cm(sup 3)/min, the prototype RMCV underwent nine regenerations. RMCV life cycle tests, using a variety of influent streams, were conducted over an eighteen month period to determine the useful lives of MCV's incorporating this new technology and to determine ultimate failure mechanisms. MCV life extensions of 130 fold were demonstrated, limited only by the Phase 2 performance period. Based upon this work, it is certain that RMCV units can be developed to provide unattended biocide addition for the thirty year life of Space Station Freedom, or for other longer duration applications such as a Lunar Base or Mars mission. RMCV technology was also demonstrated capable of delivering, on demand, a concentrated aqueous I(sub 2) solution for potential use as a disinfectant during transient episodes of microbial surface contamination, for the control of biofilm formation, or as a preventative measure in systems which are particularly susceptible to the growth of microorganisms.

Atwater, James E.↗

Rotary Table Design for the Modular In-Chamber Electron Beam Welding System

The Modular In-Chamber Electron Beam Welding (MIC-EBW) system which is being designed and assembled under DOE Projects DE-NE0008846 (Phase 1--completed) and DE-NE0009039 (Phase 2—in progress) includes several major components: four modules (the lower vacuum module, electron beam module, a spacer module, and a lid), a robust rotary table, large vacuum pumps/system, electron beam welding system controls/power supply, and an electron beam generator/gun. Many of these components and their functions were described in the earlier EPRI-DOE report 3002018146. This report provides an overview of one of the primary components, the rotary table, that has been designed and will be manufactured by Rusach International in Phase 2 of the project.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Growth and defect structure of CdF{sub 2} crystal and nonstoichiometric Cd{sub 1-x}R{sub x}F{sub 2+x} phases (R are rare earth elements and in): 6. Growth and ionic conductivity of Cd{sub 0.904}In{sub 0.096}F{sub 2.096} single crystal

Cd{sub 0.904}In{sub 0.096}F{sub 2.096} crystals with fluorite-type defect structures have been grown from melt in a fluorinating atmosphere by the Bridgman method, and their ionic conductivity is investigated. The fluorine-ion transport activation enthalpy in Cd{sub 0.904}In{sub 0.096}F{sub 2.096} ({Delta}H = 0.68 eV) is much smaller than the corresponding characteristic of the crystals belonging to the isoconcentration series Cd{sub 0.9}R{sub 0.1}F{sub 2.1}, R = La-Lu, Y ({Delta}H = 0.8-0.9 eV). The ionic conductivity of Cd{sub 0.904}In{sub 0.096}F{sub 2.096} is {sigma} = 2 Multiplication-Sign 10{sup -4} S/cm (at 467 K); this value exceeds the conductivity of the CdF{sub 2} crystal matrix and the highest conductivity Cd{sub 0.9}R{sub 0.1}F{sub 2.1} crystals with rare earth elements by factors of 3 Multiplication-Sign 10{sup 3} and {approx}10, respectively. Nonstoichiometric crystals of solid electrolyte Cd{sub 1-x}In{sub x}F{sub 2+x} have the highest conductivity out of all studied electrolytes based on the CdF{sub 2} matrix.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Program Management Plan EnCore ® Accident Tolerant Fuel (ATF) Program

This Program Management Plan (PMP) is developed to support Westinghouse’s vision of developing and commercializing the Accident Tolerant Fuel. The near term goal of this Program is to deliver 2 fuel assemblies that consists of LTRs for Exelon Byron Unit 2 in spring of 2019. The longer term goal of this program is deployment of LTAs in 2022 of a mixture of coated zirconium cladding and SiC cladding with ADOPT and U3Si2 fuels. This is a high complexity program and is one of the largest research and development programs in Westinghouse and as such, the project scope is expected to change continuously. Integrated change control will be invoked as necessary. The Program consists of multiple funding streams (internal through Westinghouse innovation funding), external (through the DOE). The DOE funding consists of two phases: 1. Phase 2 – funded by DOE award number DE-NE0008222. 2. Phase 2B – funded by DOE – Westinghouse proposal reference # LTR-AMER-MKG-18-826, Rev. 1, August 23, 2018 (10/18 to 2/21), Award No. DE-NE0008824. 3. Cost share contributions from Westinghouse and program partners.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Battery Life Prediction Using Reduced-Order Physics Models and Machine Learning (CRADA Final Report)

Phase 1 (Original CRADA, plus no-cost extension modifications #1-3, 6/1/2017 to 3/13/2021): The Australian Department of Defence (AUDoD) is performing accelerated aging tests of Li-ion batteries to benchmark their reliability and degradation characteristics. Using its previously developed battery lifetime predictive model framework, the National Laboratory of the Rockies (NLR) will develop analytical models based the AUDoD data to predict lifetime of the multiple Li-ion battery chemistries under real-world use scenarios of interest to AUDoD. The NLR model is based on physical degradation mechanisms encountered by Li-ion batteries and has been previously validated. Phase 2 (CRADA modification #4, plus no-cost extension modification #5, 2/22/2021 to 3/30/2025): Train and support Australian Department of Defence personnel to use NLR software for model-based estimation of Li-ion battery lifetime using accelerated battery aging data collected by the Australian Department of Defence. Under separate DOE funding from 2019 to 2021, NLR enhanced its battery life-prediction software using machine learning algorithms to automate portions of the model-fitting process, requiring significantly less labor and expert judgment and also adding uncertainty quantification, increasing statistical rigor. Under Phase 2, NLR will customize NLR Software and provide it to AuDoD. NLR will enhance its NLR Model to capture aging modes of AuDoD's multi-cell modules, including cell-balancing effects. NLR will develop example single-cell and multi-cell models based on one AuDoD battery aging dataset. NLR will train AuDoD personnel on NLR Software. By the conclusion of the project, NLR will have provided AuDoD the training materials, a user manual and software needed to perform their own analysis of additional and/or future battery aging datasets.

33 ADVANCED PROPULSION SYSTEMS↗

CERF: IM3 Projected Western US Power Plant Locations

Overview The Capacity Expansion Regional Feasibility (CERF) model is an open-source geospatial python package that provides new power plant locations at a 1km resolution. The model ingests U.S. state or regional-scale electricity system capacity expansion plans, such as those produced by the Global Change Analysis Model (GCAM-USA), and identifies feasible, site-specific locations for individual new power plants (renewable and non-renewable). CERF combines high-resolution geospatial suitability analyses with an economic algorithm that selects individual plant siting locations based on grid interconnection costs and the locational marginal value of new generation. The model incorporates a wide range of dynamic constraints and opportunities, such as protected lands, population density, existing infrastructure, and water availability. This dataset provides CERF power plant siting results for IM3 Phase 2 simulations across eight different scenarios for the Western US through 2055. The scenarios include combinations of two Shared Socioeconomic Pathways (SSP3 and SSP5) with four high-resolution climate projections specific to the United States (see, https://tgw-data.msdlive.org/). These climate projections include "hotter" and "cooler" variants for two Representative Concentration Pathways (RCP4.5 and RCP8.5). The resulting eight simulations are: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 CERF siting results in this dataset correspond to capacity expansion plans in the GCAM-USA IM3 Phase 2 simulation data and are available for each of the above scenarios. Data Details Temporal Range: 2015-2055 in 5-year timesteps. Note that 2015 is the experiment base year and 2020 and beyond represent model simulation years. Spatial Range: Plant locations are provided for the eleven states in the Western US including Arizona, California, Colorado, Idaho, Montana, New Mexico, Nevada, Oregon, Utah, Washington, and Wyoming. Spatial Resolution: 1 km-squared, provided in x and y coordinates Geospatial Projection: Albers Equal Area Conic (ESRI:102003) File Type: csv The dataset contains subdirectories for each of the eight scenarios described in the overview. Each scenario folder contains two subfolders with the following information: 1. Power Plant Data This directory contains a single .csv file of power plant locations for both pre-existing (non-CERF sited plants in operation in 2015) and new (CERF-sited) power plants across the temporal range along with additional CERF model output parameters for CERF-sited plants. Plant with a siting year earlier than 2020 correspond to facilities that are operational leading into the first timestep CERF simulation. For a more detailed description of CERF model output parameters, see the CERF model documentation. Note that the cerf_plant_id parameter is unique within each scenario file but not across scenario files. Parameter Descriptions scenario - Name of scenario cerf_plant_id - Unique siting identifier cerf_sited - If True, indicates that plant was sited by CERF model. If False, indicates pre-existing facility region_name - Name of region (state) tech_id - Technology ID tech_name - Full generation technology name inclusive of cooling type (if applicable) and additional characteristics tech_simple - Simplified generation technology type unit_size_mw - Power plant unit size (MW) xcoord - X coordinate in the default CRS (meters) ycoord - Y coordinate in the default CRS (meters) index - Index position in the flattend 2D array buffer_in_km - Exclusion buffer around site (km) sited_year - Year of siting retirement_year - Year of retirement lmp_zone - Locational marginal price (LMP) zone ID locational_marginal_price_usd_per_mwh - Locational marginal price ($/MWh) generation_mwh_per_year - Generation output (MWh/yr) operating_cost_usd_per_year - Cost of plant operations ($/yr) net_operational_value - Net operational value based on LMP and and operating costs ($/yr) interconnection_cost - Cost of interconnection for transmission & gas pipeline (if applicable) net_locational_cost -- Difference of interconnection cost and operating value ($/yr) capacity_factor_fraction - Capacity factor (fraction) carbon_capture_rate_fraction - Carbon capture rate (fraction) fuel_co2_content_tons_per_btu - Fuel CO2 content (tons/Btu) fuel_price_usd_per_mmbtu - Fuel price ($/MMBtu) fuel_price_esc_rate_fraction - Fuel price escalation rate (fraction) heat_rate_btu_per_kWh - Heat rate (Btu/kWh) lifetime_yrs - Technology lifetime for annuity (years) operational_life_yrs - Operational lifetime for retirement (years) variable_om_usd_per_mwh - Variable operation and maintenance costs of yearly capacity use ($/MWh) variable_om_esc_rate_fraction - Variable operation and maintenance costs escalation rate (fraction) carbon_tax_usd_per_ton - Carbon tax ($/ton) carbon_tax_esc_rate_fraction - Carbon tax escalation rate (fraction) 2. Storage Data This directory contains information on new and pre-existing energy storage facilities operational in each timestep along with various storage operational parameters. The 2015 timestep provides pre-existing energy storage data and corresponds with facilities that are operational leading into the first model simulation timestep. Note that coordinates in the storage files correspond to the interconnection point on the grid (substation location), not individual energy storage locations. Energy storage is added in a cumulative process at each given interconnection point. That is, each individual file provides the total operational storage capacity interconnected to the specified substation for the given timestep, inclusive of previously installed storage at that location and new storage installed in that timestep at that location. Parameters scenario - Name of scenario timestep - Simulation timestep name - Unique storage identifier s_typ - Type of energy storage technology (battery or pumped storage hydro) s_node - Node ID of interconnecting substation xcoord - X coordinate in the default CRS (meters) ycoord - Y coordinate in the default CRS (meters) charge_rate - Maximum charge rate (power capacity) of storage system (MW) discharge_rate - Maximum discharge rate (power capacity) of storage system (MW) duration - Duration of storage system (hours) max_SoC - Allowed maximum state of charge (energy capacity) of storage system (MWh) min_SoC -Allowed minimum state of charge (energy capacity) of storage system (MWh) charge_eff - Efficiency of charge (fraction between 0 and 1) discharge_eff - Efficiency of discharge (fraction between 0 and 1) Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program.

CERF↗

Cloud fraction, layer, and direction of movement results from sky cameras during the FIRE IFO, Coffeyville, Kansas, experiment for the period Nov. 12 through Dec. 9, 1991

Tables and figures are presented which show local site observations of cloud fractions, the number of cloud layers, direction of movement, and precipitation data collected during the FIRE (First ISCCP Regional Experiment) Phase 2 Cirrus Intensive Field Observations (IFO) conducted in Coffeyville, Kansas during November and December, 1991. Selected data are also presented at the times of the TIROS Operational Vertical Sounder (TOVS) satellite overpass. Several major scientific projects have used surface-based observations of clouds to compare directly with those being observed from satellites. Characterizing the physical properties of clouds is extremely useful in obtaining a more accurate analysis of the effect of clouds and their movements on weather and climate. It is the purpose of this paper to report data collected during the FIRE Phase 2 IFO experiment and to provide a brief history of such a surface-based system and the technical information required for recording local cloud parameters.

Gerald C Purgold↗