Search NASA⌕ Search

SEARCH · Search NASA

Results for “Power Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,513 records · Page 84

Combined Heat and Power Systems Technology Development and Demonstration 370 kW High Efficiency Microturbine

The C370 Program was awarded in October 2010 with the ambitious goal of designing and testing the most electrically efficient recuperated microturbine engine at a rated power of less than 500 kW. The aggressive targets for electrical efficiency, emission regulatory compliance, and the estimated price point make the system state-of-the-art for microturbine engine systems. These goals will be met by designing a two stage microturbine engine identified as the low pressure spool and high pressure spool that are based on derivative hardware of Capstone’s current commercially available engines. The development and testing of the engine occurred in two phases. Phase I focused on developing a higher power and more efficient engine, that would become the low pressure spool which is based on Capstone’s C200 (200kW) engine architecture. Phase II integrated the low pressure spool created in Phase I with the high pressure spool, which is based on Capstone’s C65 (65 kW) commercially available engine. Integration of the engines, based on preliminary research, would allow the dual spool engine to provide electrical power in excess of 370 kW, with electrical efficiency approaching 42%. If both of these targets were met coupled with the overall CHP target of 85% total combined heating and electrical efficiency California Air Resources Board (CARB) level emissions, and a price target of $600 per kW, the system would represent a step change in the currently available commercial generation technology. Phase I of the C370 program required the development of the C370 low pressure spool. The goal was to increase the C200 engine power by a minimum of 25% — 250 kW — and efficiency from 32% to 37%. These increases in the C200 engine output were imperative to meet the power requirements of the engine when both spools were integrated. An additional benefit of designing and testing the C370 low pressure spool was the possibility of developing a stand-alone product for possible commercialization. The low pressure spool design activity focused on an aeropath derivative of the current C200 engine. The aeropath derivative included changes to the compressor section —compressor and inducer — and to the turbine nozzle. The increased power also necessitated a larger, more powerful generator and generator controller to support the increased power requirements. These two major design changes were completed by utilizing both advanced 3D modeling and computational fluid dynamics modelling. After design, modeling, and analysis, the decision was made to acquire and integrate the components for testing. The second task of Phase I was to integrate and test the components of the low pressure spool to validate power and efficiency. Acquisition of the components for the low pressure spool was completed utilizing Capstone’s current supplier base. Utilization of Capstone’s supply base for integration of the test article would allow — if the decision was made —expedited commercialization of the product. After integration of the engine components, the engine was tested and evaluated for performance and emissions. Test data analysis confirmed that the engine met all power and efficiency requirements and did so while maintaining CARB level emissions. The emissions were met without the use of any post processing or catalyst. After testing was completed, the DOE authorized — via a milestone review — proceeding to Phase II: the development of the integrated C370 engine. The C370 high pressure spool design activity required significant changes to the C65 engine architecture. The engine required a high power density generator, completely redesigned compressor stage, turbine section, recuperator, controls architecture, and intercooler stage asThe two most critical design challenges were the turbine section (the nozzle and turbine) and the controls architecture. The design and analysis of all of the components was completed and integrated into a system model. The system model — after numerous iterations — indicated that, once integrated, the engine will meet or exceed all system requirements. Unfortunately, the turbine section’s life requirements remain a technical challenge and will require continued refinement of the bi-metallic turbine wheel design and manufacturing approach to meet the life requirement at theses high temperatures. The current controls architecture requires substantial effort to develop a system capable of handling the high-speed, near real-time controls requirement, but it was determined not to be a technical roadblock for the project. The C370 Program has been a significant effort with state-of-the-art technical targets. The targets have pushed Capstone’s designers to the limits of current technology. The program has been fortunate to see many successes: the successful testing of the low pressure spool (C250), the development of new material processes, and the implementation of new design practices. The technology and practices learned during the program will be utilized in Capstone’s current product lines and future products. The C370 Program has been a resounding success on many fronts for the DOE and for Capstone.

none↗

Isotropy-violation diagnostics for B -mode polarization foregrounds to the Cosmic Microwave Background

Isotropy-violation statistics can highlight polarized galactic foregrounds that contaminate primordial B -modes in the Cosmic Microwave Background (CMB). We propose a particular isotropy-violation test and apply it to polarized Planck 353 GHz data, constructing a map that indicates B -mode foreground dust power over the sky. We build our main isotropy test in harmonic space via the bipolar spherical harmonic basis, and our method helps us to identify the least-contaminated directions. By this measure, there are regions of low foreground in and around the BICEP field, near the South Galactic Pole, and in the Northern Galactic Hemisphere. There is also a possible foreground feature in the BICEP field. In our study, we compare our results to those based on the local power spectrum, which is computed on discs using a version of the method of Planck Int. XXX (2016). The discs method is closely related to our isotropy-violation diagnostic. We pay special care to the treatment of noise, including chance correlations with the foregrounds. Currently we use our isotropy tool to assess the cleanest portions of the sky, but in the future such methods will allow isotropy-based null tests for foreground contamination in maps purported to measure primordial B -modes, particularly in cases of limited frequency coverage.

79 ASTRONOMY AND ASTROPHYSICS↗

Carbon Quantum Dots Modified Polyurethane Nanocomposite as Effective Photocatalytic and Antibacterial Agents

Development of new types of antibacterial coatings or nanocomposites is of great importance due to widespread multidrug-resistant infections including bacterial infections. Herein, we investigated biocompatibility as well as structural, photocatalytic, and antibacterial properties of photoactive hydrophobic carbon quantum dots/polyurethane nanocomposite. The swell-encapsulation-shrink method was applied for production of these nanocomposites. Hydrophobic carbon quantum dots/polyurethane nanocomposites were found to be highly effective generator of singlet oxygen upon irradiation by low-power blue light. Analysis of conducted antibacterial tests on Staphyloccocus aureus and Escherichia coli showed 5-log bactericidal effect of these nanocomposites within 60 min of irradiation. Very powerful degradation of dye (rose bengal) was observed within 180 min of blue light irradiation of the nanocomposites. Biocompatibility studies revealed that nanocomposites were not cytotoxic against mouse embryonic fibroblast cell line, whereas they showed moderate cytotoxicity toward adenocarcinomic human epithelial cell line. Minor hemolytic effect of these nanocomposites toward red blood cells was revealed.

60 APPLIED LIFE SCIENCES↗

Offshore Renewable Energy R&D (Fact Sheet)

This fact sheet describes the offshore renewable energy R&D efforts at NREL's NWTC. As the United States increases its efforts to tap the domestic energy sources needed to diversify its energy portfolio and secure its energy supply, more attention is being focused on the rich renewable resources located offshore. Offshore renewable energy sources include offshore wind, waves, tidal currents, ocean and river currents, and ocean thermal gradients. According to a report published by the National Renewable Energy Laboratory (NREL) in 2010,1 U.S. offshore wind resources have a gross potential generating capacity four times greater than the nation's present electric capacity, and the Electric Power Research Institute estimates that the nation's ocean energy resources could ultimately supply at least 10% of its electric supply. For more than 30 years, NREL has advanced the science of renewable energy while building the capabilities to guide rapid deployment of commercial applications. Since 1993, NREL's National Wind Technology Center (NWTC) has been the nation's premier wind energy research facility, specializing in the advancement of wind technologies that range in size from a kilowatt to several megawatts. For more than 8 years, the NWTC has been an international leader in the field of offshore floating wind system analysis. Today, researchers at the NWTC are taking their decades of experience and extensive capabilities and applying them to help industry develop cost-effective hydrokinetic systems that convert the kinetic energy in water to provide power for our nation's heavily populated coastal regions. The center's capabilities and experience cover a wide spectrum of wind and water energy engineering disciplines, including atmospheric and ocean fluid mechanics, aerodynamics; aeroacoustics, hydrodynamics, structural dynamics, control systems, electrical systems, and testing.

14 SOLAR ENERGY↗

A multichannel, real-time MRI RF power monitor for independent SAR determination

Purpose: Accurate measurements of the RF power delivered during clinical MRI are essential for safety and regulatory compliance, avoiding inappropriate restrictions on clinical MRI sequences, and for testing the MRI safety of peripheral and interventional devices at known RF exposure levels. The goal is to make independent RF power measurements to test the accuracy of scanner-reported specific absorption rate (SAR) over the extraordinary range of operating conditions routinely encountered in MRI. Methods: A six channel, high dynamic range, real-time power profiling system was designed and built for monitoring power delivery during MRI up to 440 MHz. The system was calibrated and used in two 3 T scanners to measure power applied to human subjects during MRI scans. The results were compared with the scanner-reported SAR. Results: The new power measurement system has highly linear performance over a 90 dB dynamic range and a wide range of MRI duty cycles. It has about 0.1 dB insertion loss that does not interfere with scanner operation. The measurements of whole-body SAR in volunteers showed that scanner-reported SAR was significantly overestimated by up to about 2.2 fold. Conclusions: The new power monitor system can accurately and independently measure RF power deposition over the wide range of conditions routinely encountered during MRI. Scanner-reported SAR values are not appropriate for setting exposure limits during device or pulse sequence testing.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Wave Energy Prize -- Carderock Test Design and Rigging to Accommodate Diversity of Device Types

Wave Energy Prize Carderock Test Design and Rigging to Accommodate Diversity of Device Types presentation from the Water Power Technologies Office Peer Review, FY14-FY16. The challenge was to determine testing conditions, develop processing algorithms, and execute tests for equitable and consistent evaluation of different wave energy converter (WEC) technologies.

13 HYDRO ENERGY↗

Convergence of Emerging Technologies - Spotter Test Results

The SpotterRF CK5 is a low-power draw doppler radar, approximately the size of a book (7” x 9”, see Figure 1). It is intended to provide coverage over short ranges (125 m). The SpotterRF CK5B radar was tested in a two-fence perimeter environment and followed the vendor-recommended configuration (Figure 2), with the exception of rotating the radar 90 degrees about the horizontal axis. The radar is advertised to take approximately 10 minutes to set up.

47 OTHER INSTRUMENTATION↗

Modeling and Power-Hardware-in-the-Loop Validation of Synchronous Wind: An Inverterless Grid-Forming Wind Power Plant

Grid-forming (GFM) control of Type-3 and Type-4 wind turbine generators (WTGs) has attracted substantial attention in power systems research; however, the limited overcurrent capability of power electronics converters continues to deteriorate the grid strength of the evolving power systems. Synchronous wind, also known as a Type-5 WTG, offers a unique GFM solution to address grid integration and grid strength issues by keeping the grid largely synchronous at very high integration levels of renewable generation. A Type-5 WTG interfaces with the electric grid via a synchronous generator driven by a variable-speed hydraulic torque converter; hence, the wind rotor operates in variable-speed mode for maximum power generation, and the generator shaft remains synchronous to the grid. This paper develops and tests a high-fidelity model of a Type-5 WTG in a power-hardware-in-the-loop (PHIL) testing environment. The PHIL demonstration shows that a Type-5 WTG inherently behaves as a GFM unit and can obtain similar performance in terms of power responses, wind rotor dynamics, and efficiency compared to a Type-3 WTG in high-wind conditions. The developed model provides further insight into how Type-5 WTGs can benefit the smooth transition to power systems with high integration levels of inverter-based resources.

grid strength↗

MASK4 Test Campaign for Sandia WaveBot Device

This data and report details the findings from a wave tank test focused on production of useful work of a wave energy converter (WEC) device. The experimental system and test were specifically designed to validate models for power transmission throughout the WEC system. Additionally, the validity of co-design informed changes to the power take-off (PTO) were assessed and shown to provide the expected improvements in system performance. These data describe the "MASK4" wave tank test of the Sandia WaveBot device. The WaveBot device has been tested a number of times in different permutations at the US Navy's Maneuvering and Sea Keeping (MASK) basin. Each test in this series is referred to as MASK1, MASK2, etc. The WaveBot device was first tested in one degree of freedom (heave) in 2016. This MASK1 test focused primarily on system identification and modeling. After MASK1, major modifications were performed to improve the overall real-time control and measurement system, improve the heave drive train, and add surge and pitch degrees of freedom. The second set of testing, which was broken up in to two stages: MASK2A and MASK2B, focused on bench testing and closed-loop control performance as well as nonlinear modeling. MASK3 then focused on multi-input, multi-output modeling and control for maximization of electrical power. The attached report presents the results from MASK4, which focuses on detailed modeling of the power conversion chain and validation co-design principles by way of the introduction of a magnetic spring. The test log, report, and data from the MASK4 test of the WaveBot augmented with a tunable magnetic spring. Processing codes can be found at the Github link below.

16 TIDAL AND WAVE POWER↗

Stage 2 Full-Scale Rotary Magnetic Gear for a Marine Hydrokinetic Generator

The goal of this project is to design, fabricate, and test a hermetically sealed 50 kilowatt (kW) multistage magnetically geared generator (MGG). This project will benefit MHK device developers by providing an MHK PTO that overcomes the reliability concerns of the mechanical gears and the sizing constraints of the direct-drive generators. Experimental Testing Data for a 6.66:1 gear ratio dual-stack magnetic gear with a measured peak torque of 1391 N-m

16 TIDAL AND WAVE POWER↗

Using Cost-Effectiveness Tests to Design CHP Incentive Programs

This paper examines the structure of cost-effectiveness tests to illustrate how they can accurately reflect the costs and benefits of CHP systems. This paper begins with a general background discussion on cost-effectiveness analysis of DER and then describes how cost-effectiveness tests can be applied to CHP. Cost-effectiveness results are then calculated and analyzed for CHP projects in five states: Arkansas, Colorado, Iowa, Maryland, and North Carolina. Based on the results obtained for these five states, this paper offers four considerations to inform regulators in the application of cost-effectiveness tests in developing CHP programs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Hybrid Membrane/Absorption Process for Post-combustion CO2 Capture

This report summarizes scientific/technical progress made for bench-scale membrane contactor technology for post-combustion CO2 capture from DOE Contract No. DE-FE-0004787. Budget Period 1 (BP1) membrane absorber, Budget Period 2 (BP2) membrane desorber and Budget Period 3 (BP3) integrated system and field testing studies have been completed successfully and met or exceeded the technical targets (≥ 90% CO2 removal and CO2 purity of 97% in one membrane stage). Significant breakthroughs are summarized below: BP1 research: The feasibility of utilizing the poly (ether ether ketone), PEEK, based hollow fiber contractor (HFC) in combination with chemical solvents to separate and capture at least 90% of the CO2 from simulated flue gases has been successfully established. Excellent progress has been made as we have achieved the BP1 goal: ≥ 1,000 membrane intrinsic CO2 permeance, ≥ 90% CO2 removal in one stage, ≤ 2 psi gas side pressure drop, and ≥ 1 (sec)-1 mass transfer coefficient. Initial test results also show that the CO2 capture performance, using activated Methyl Diethanol Amine (aMDEA) solvent, was not affected by flue gas contaminants O2 (~3%), NO2 (66 ppmv), and SO2 (145 ppmv). BP2 research: The feasibility of utilizing the PEEK HFC for CO2-loaded solvent regeneration has been successfully established High CO2 stripping flux, one order of magnitude higher than CO2 absorption flux, have been achieved. Refined economic evaluation based on BP1 membrane absorber and BP2 membrane desorber laboratory test data indicate that the CO2 capture costs are 36% lower than DOE’s benchmark amine absorption technology. BP3 research: A bench-scale system utilizing a membrane absorber and desorber was integrated into a continuous CO2 capture process using contactors containing 10 to 20 ft2 of membrane area. The integrated process operation was stable through a 100-hour laboratory test, utilizing a simulated flue gas stream. Greater than 90% CO2 capture combined with 97% CO2 product purity was achieved throughout the test. Membrane contactor modules have been scaled from bench scale 2-inch diameter by 12-inch long (20 ft2 membrane surface area) modules to 4-inch diameter by 60-inch long pilot scale modules (165 ft2 membrane surface area). Pilot scale modules were tested in an integrated absorption/regeneration system for CO2 capture field tests at a coal-fired power plant (Midwest Generation’s Will County Station located in Romeoville, IL). Absorption and regeneration contactors were constructed utilizing high performance super-hydrophobic, nano-porous PEEK membranes with CO2 gas permeance of 2,000 GPU and a 1,000 GPU, respectively. Field tests using aMDEA solvent achieved greater than 90% CO2 removal in a single stage. The absorption mass transfer coefficient was 1.2 (sec)-1, exceeding the initial target of 1.0 (sec)-1. This mass transfer coefficient is over one order of magnitude greater than that of conventional gas/liquid contacting equipment. The economic evaluation based on field tests data indicates that the CO2 capture cost associated with membrane contactor technology is $54.69 (Yr 2011$)/tonne of CO2 captured when using aMDEA as a solvent. It is projected that the DOE’s 2025 cost goal of $40 (Yr 2011$)/tonne of CO2 captured can be met by decreasing membrane module cost and by utilizing advanced CO2 capture solvents. In the second stage of the field test, an advanced solvent, Hitachi’s H3-1 was utilized. The use of H3-1 solvent increased mass transfer coefficient by 17% as compared to aMDEA solvent. The high mass transfer coefficient of H3-1 solvent combined with much more favorable solvent regeneration requirements, indicate that the projected savings achievable with membrane contactor process can be further improved. H3-1 solvent will be used in the next pilot-scale development phase. The integrated absorption/regeneration process design and high performance membrane contactors developed in the current bench-scale program will be used as the base technology for future pilot-scale development.

Coal-Environmental Processes↗

Integrated Boosting and Hybridization for Extreme Fuel Economy and Downsizing

The objective of this project was to develop, demonstrate, and evaluate commercialization of a highly efficient downsized engine by electrification of the air delivery and waste heat recovery system and optimizing energy usage to achieve significant fuel economy improvement at a commercially viable cost. The system consists of an Electrically Assisted Variable speed Supercharger (EAVS), driven by an electric motor and the engine through a planetary gear train, that provides engine boost pressure and provides the mild hybrid functions of engine start/stop, torque assist, and brake energy recovery. In the exhaust path of the engine is the electric Waste Heat Recovery (eWHR) system, a roots-based expander driven by another electric motor, that enables exhaust gas energy recovery along with controlled back pressure on the engine. The two electric motors are powered by a 48V rechargeable lithium-ion battery. Further, the EAVS system coupled to an EGR valve enables very precise high exhaust recirculation rates to control the NOx emissions. Through two budget periods, the project team of Eaton, Isuzu, Southwest Research Institute and AVL designed and developed the EAVS and eWHR systems, integrated with an Isuzu diesel engine, and validated the target fuel economy performance and emissions by engine dynamometer testing and vehicle level simulations. GT Power model-based analyses results were used to size the EAVS and eWHR systems for the 1.9L Isuzu Spark engine. The two systems were built and the functional testing was carried out to verify the boosting performance of the superchargers. Following the baseline engine dynamometer testing, the two systems were integrated with the engine and the fuel economy performance and emissions were determined by combined steady state and transient testing over three drive cycles, namely, FTP75, NEDC and HWFET. The EAVS/eWHR system demonstrated 4% improvement in fuel economy for the NEDC cycle in engine dyno testing, correlating well with vehicle simulation results (5.3%). The simulation results indicated that the combination of hybrid functions and drivetrain optimization, fuel economy improvement of more than 20% was feasible with the system. The commercialization study to evaluate the cost of the system and the scalability for different engine/vehicle classes was planned for the final budget period but not completed as the project was closed at the end of budget period two.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Eltron Research & Development

This topical report covers technical work conducted under contract DE-FC26-05NT42469 between FY06 Q1 through FY14 Q2. The project evolved through several budget periods, budget revisions and continuation applications. This report covers work performed under the “base” program. In 2010 ARRA funding was added to the project. A separate report covering the ARRA portion of the project was submitted to DOE. The original project was focused on research and development for scale-up of hydrogen separation membrane for a FutureGen type power plant. The work included membrane testing and evaluation of metal alloy flat plates vs. tubes and metal membranes vs. cermet membranes. In addition, economic analysis and process modeling was performed. The original project team included CoorsTek, NORAM, and Praxair. In FY10Q2 a continuation application was filed for conducting a scale-up test at Eastman Chemical. In this part of the project a Subscale Engineering Prototype (SEP) membrane skid was designed, fabricated, and operated on a gasified coal slip-stream on Eastman’s site in Kingsport, TN. Following operation, the project was reorganized and a second continuation application with a new statement of work was initiated in FY12Q1. Finally, based on DOE’s decision not to proceed with a Process Development Unit (PDU) field test, a third continuation application and statement of work was initiated in FY13Q1 to close out the project.

08 HYDROGEN↗

Risk-Based Distributionally Robust Optimal Power Flow With Dynamic Line Rating

In this paper, we propose a risk-based data-driven distributionally robust approach to investigating the optimal power flow with dynamic line rating. The risk terms, including penalties for load shedding, wind generation curtailment and line overload, are embedded into the objective function. To robustify the solution, we consider a distributional uncertainty set based on the second-order moment, that captures the correlation between wind generation outputs and line ratings, and also the Wasserstein distance, that hedges against data perturbations. We show that the proposed model can be reformulated as a convex conic program. Approximations of the proposed model are suggested, which leads to a significant reduction of the number of the constraints. For practical large-scale test systems, a distributionally robust optimal power flow model with Wasserstein-distance-based distributional uncertainty set and its convex reformulation are also provided. Simulation results on the 5-bus, the IEEE 118-bus and the Polish 2736-bus test systems validate the effectiveness of the proposed models.

distributionally robust optimization↗

Test case selection procedure for simulation-assisted automation testing - 321

Simulation-assisted automation testing is an efficient tool for validating the automation systems for nuclear power plants. This paper presented a systematic procedure for selecting test cases for simulation-assisted automation testing. The procedure is relies on the plant's licensing framework and allows associating the test cases to the functional requirements in order to produce traceable test set for validation. The procedure is demonstrated with a case study concerning the automation tests of Loviisa NPP's automation renewal project. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Test for Reconditioning RA Waste with Simulated Bitumen and Concrete in a 1,2 MW Plasma Test Facility - 20092

The operation and maintenance of nuclear power plants, the non nuclear fuel cycle, etc generate low-level radioactive waste which, along with the historical radioactive waste from past nuclear activities, needs to be treated and stored, awaiting final disposal. Plasma technology offers a very effective way of treating this waste with a high volume reduction factor (VRF), free from organics, liquids and moisture, and meets without a doubt the acceptance criteria for safe storage and disposal. By means of a plasma beam of approximately 5000 deg. C, the inorganic materials are melted into a glassy slag, containing most of the radioactive isotopes while the organic material is gasified, oxidized and purified in an off-gas cleaning system. First the paper describes the new full-scale Plasma Melting Facility (PMF) at the Kozloduy Nuclear Power Plant in Bulgaria which was taken in nuclear operation In May 2018. The plant has a capacity of 250 tons per year and the maximum contact dose rates of the incoming waste is 2 mSv/h. Different mixtures of radioactive waste packed in 200 l drums were successfully treated resulting in a glassy slag free from liquids and organic material with an important volume reduction factor (VRF). The Project was co-financed through a grant by Kozloduy International Decommissioning fund (KIDSF) administrated by the EBRD through Bulgarian national funding. Plasma is a suitable technology for treatment of problematic waste or even reconditioning waste so Belgoprocess was contracted to do plasma tests with simulated conditioned waste types. One can do tests on a laboratory scale on smaller samples and torch capacities of e.g. 50 kW but Belgoprocess wanted to do more realistic and reliable tests. So Belgoprocess contracted Phoenix Solutions Co who has a full-scope test facility equipped with a 1200 kW plasma torch for full-scope treatment of simulated conditioned waste. For a first confidential contract simulated 200 l (55 gallon) bitumen drums were treated. The drums contained different pucks of compacted waste such as rags, used filters, granulates, etc. The pucks were stacked in the 200 l drums and subsequently embedded with bitumen. A total of 6 drums were treated in the plasma facility. For a second contract simulated homogeneous 200 l (55 gallon) concrete drums with on the one hand concentrates and on the other hand spent resins were selected. A total of 6 drums with concrete and spent resins were treated and melted in the plasma testing facility. The paper describe the test facility, volume reduction factor (VRF) of different waste streams and most important parameters. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Gap Analysis of Existing IEEE 1547 and IEEE 2800 Standards Towards GFM Technology

This document describes the tests that are conducted on generic grid-forming (GFM) distributed energy resource (DER) and inverter-based resource (IBR) models to check if the performance of the model aligns respectively with the IEEE Std 1547 TM -2018 and IEEE Std 2800 TM -2022 requirements. For the IEEE Std 1547 TM -2018 requirements, specifically the tests related to volt-var requirements and frequency droop requirements are conducted. For the IEEE Std 2800 TM -2022 requirements, specifically the tests conducted are related to reactive- power-voltage control requirements, active-power-frequency response requirements, voltage disturbance ride through requirements and phase jump ride through requirements. This is an initial draft/document. There are many more tests still yet to be done to further verify if the existing standards have a gap or inadvertent barrier to GFM technology.

24 POWER TRANSMISSION AND DISTRIBUTION↗