Waste Encapsulation and Storage Facility Stabilization and Ventilation Project-18121
Department of Energy contractor CH2M HILL Plateau Remediation Company (CH2M) is responsible for the safe and compliant operation of the Waste Encapsulation and Storage Facility (WESF), a nuclear materials storage facility at Hanford containing 1,936 highly radioactive capsules containing cesium and strontium. The capsules are currently stored under approximately 4 m (13 ft) of water. The water shields workers from radiation and helps cool the capsules. WESF is a large, concrete structure nominally 48 m (160 ft) long, 30 m (98 ft) wide and 12 m (40 ft) high with the pool cells being approximately 4 m (13 ft) below grade level. It is a robust facility with walls ranging from 0.3 m to 1 m (1 ft to 3 ft) thick. While the capsules are currently in a safe configuration, WESF is an aging facility, and DOE and CH2M are modifying the facility to ensure continued safe and compliant operations and to support the eventual transfer of capsules to dry storage. Dry storage would eliminate the possibility of a release of radioactive material in the unlikely event of a major earthquake that might result in loss of pool storage water and overheating and breach of one or more capsules. The project was divided into two major deliverables: 1) Ventilation: replacement of the existing ventilation system which included a below-grade high efficiency particulate air (HEPA) filter pit with an above grade HEPA filter skid and new fans and ducting. 2) Stabilization: grouting deactivated facility hot cells and other void spaces to the maximum extent practical to reduce material at risk from legacy contamination. The aging ventilation system relied on HEPA filters that exceeded their operational life. Due to the high levels of radionuclide contamination, replacing the filters was impractical and highly hazardous. CH2M installed a new ventilation system to provide safe and compliant ventilation for future operations. The project used an existing, unused ventilation skid that was designed for another project. Repurposing the unused skid presented additional technical challenges to modify the system for the project specific requirements. The new system is above ground, easier to maintain and is built to current standards. New connections inside the facility were installed to allow the new ventilation to operate effectively. The stabilization project is unique in that core drilling and grouting was performed in an operating Hazard Category 2 nuclear facility, which brought forth safety basis and environmental regulatory challenges. The hot cells were isolated from all existing support utilities including electrical, process chemicals, manipulator ports, instrument air, etc. to seal the hot cells and prevent highly contaminated supernate or grout from leaking into adjacent galleries. A high flow grout was used to maximize the distance between injection ports. (authors)