Search NASA⌕ Search

SEARCH · Search NASA

Results for “facility development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,513 records · Page 84

Future High Power Proton Drivers for Neutrino Beams

Over the last two decades, significant efforts were made through several international studies to identify and develop technical solutions for potential Neutrino Factories and Superbeam Facilities. With many questions now settled, as well as clearer R&D needs, various proposals are being made for future facilities in China, Europe, Japan and North America. These include both developing and adapting existing machines as well as green-field solutions. In this paper, we review all the major accelerator programmes aimed at delivering high-power proton beams for neutrino physics.

43 PARTICLE ACCELERATORS↗

PREPARATION OF U-PLANT FOR FINAL DEMOLITION AND DISPOSAL - 12109E

The U-Plant is one of the five major nuclear materials processing facilities at Hanford and was chosen as a pilot project to develop the modalities for closure of the other four facilities at Hanford and the rest of the Department of Energy (DOE) complex. The remedy for this facility was determined by a Record of Decision (ROD) pursuant to the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). That remedy was to 'Close in Place - Partially Demolished Structure'. The U-Plant facility is identified as the 221-U Building and is a large, concrete structure nominally 247m (810 ft) long, 20 M (66 ft) wide and 24 m (77 ft) high with approximately 9 m (30 ft) being below grade level. It is a robust facility with walls ranging from 0.9 m to 2.7 m (3 ft to 9 ft) thick. One large room extends the entire length of the building that provides access to 40 sub-grade processing cells containing tanks, piping and other components. The work breakdown was divided into three major deliverables: (1) Tank D-10 Removal: removal of Tank D-10, which contained TRU waste; (2) Equipment Disposition: placement of contaminated equipment in the sub-grade cells; and (3) Canyon Grouting: grouting canyon void spaces to the maximum extent practical. A large number of pieces of contaminated equipment (pumps, piping, centrifuges, tanks, etc) from other facilities that had been stored on the canyon operating floor were placed inside of the sub-grade cells as final disposition, grouted and the cell shield plug reinstalled. This action precluded a large volume of waste being transported to another burial site. Finally, {approx}19,000 m3 ({approx}25,000 yd3) of grout was placed inside of the cells (in and around the contaminated equipment), in the major galleries. the ventilation tunnel, the external ventilation duct, and the hot pipe trench to minimize the potential for void spaces and to reduce the mobility, solubility, and/or toxicity of the grouted waste. The interim condition of the facility is 'cold and dark'. Upon availability of funding the structure will have contamination fixative applied to all contaminated surfaces and may be explosively demolished, with the remaining structure buried under an engineered barrier.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

GDE-55115 Rev 1 Dome Scheduling Application

This document describes how a reactor developer applies for time in the Demonstration of Microreactor Experiments (DOME) facility. It also describes how applications are evaluated to develop the annual and outyear DOME schedule. The application process assumes that testing in DOME is funded by the applicant, and may be superseded by government-funded projects to accommodate government priorities.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

A resonant ionization laser ion source at ORNL

We report that multi-step resonance laser ionization has become an essential tool for the production of isobarically pure radioactive ion beams at the isotope separator on-line (ISOL) facilities around the world. A resonant ionization laser ion source (RILIS) has been developed for the former Holifield Radioactive Ion Beam Facility (HRIBF) of Oak Ridge National Laboratory. The RILIS employs a hot-cavity ion source and a laser system featuring three grating-tuned and individually pumped Ti:Sapphire lasers, especially designed for stable and simple operation. The RILIS has been installed at the second ISOL production platform of former HRIBF and has successfully provided beams of exotic neutron-rich Ga isotopes for beta decay studies. Here, this paper reports the features, advantages, limitations, and on-line and off-line performance of the RILIS.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

In Situ Decommissioning Sensor Network, Meso-Scale Test Bed - Phase 3 Fluid Injection Test Summary Report

The DOE Office of Environmental management (DOE EM) faces the challenge of decommissioning thousands of excess nuclear facilities, many of which are highly contaminated. A number of these excess facilities are massive and robust concrete structures that are suitable for isolating the contained contamination for hundreds of years, and a permanent decommissioning end state option for these facilities is in situ decommissioning (ISD). The ISD option is feasible for a limited, but meaningful number of DOE contaminated facilities for which there is substantial incremental environmental, safety, and cost benefits versus alternate actions to demolish and excavate the entire facility and transport the rubble to a radioactive waste landfill. A general description of an ISD project encompasses an entombed facility; in some cases limited to the blow-grade portion of a facility. However, monitoring of the ISD structures is needed to demonstrate that the building retains its structural integrity and the contaminants remain entombed within the grout stabilization matrix. The DOE EM Office of Deactivation and Decommissioning and Facility Engineering (EM-13) Program Goal is to develop a monitoring system to demonstrate long-term performance of closed nuclear facilities using the ISD approach. The Savannah River National Laboratory (SRNL) has designed and implemented the In Situ Decommissioning Sensor Network, Meso-Scale Test Bed (ISDSN-MSTB) to address the feasibility of deploying a long-term monitoring system into an ISD closed nuclear facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Management of Decommissioning on a Multi-Facility Site

The management of the decommissioning of multi-facility sites may be inadequate or inappropriate if based on approaches and strategies developed for sites consisting of only a single facility. The varied nature of activities undertaken, their interfaces and their interdependencies are likely to complicate the management of decommissioning. These issues can be exacerbated where some facilities are entering the decommissioning phase while others are still operational or even new facilities are being built. Multi-facility sites are not uncommon worldwide but perhaps insufficient attention has been paid to optimizing the overall site decommissioning in the context of the entire life cycle of facilities. Decommissioning management arrangements need to be established taking a view across the whole site. A site-wide decommissioning management system is required. This should include a project evaluation and approval process and specific arrangements to manage identified interfaces and interdependencies. A group should be created to manage decommissioning across the site, ensuring adequate and consistent practices in accordance with the management system. Decommissioning management should be aimed at the entire life cycle of facilities. In the case of multi facility sites, the process becomes more complex and decommissioning management arrangements need to be established with a view to the whole site. A site decommissioning management system, a group that is responsible for decommissioning on site, a site project evaluation and approval process and specific arrangements to manage the identified interfaces are key areas of a site decommissioning management structure that need to be addressed to ensure adequate and consistent decommissioning practices. A decommissioning strategy based on single facilities in a sequential manner is deemed inadequate.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fuel Fabrication Facility Study for FCF HALEU

Nuclear energy technology developers seek to bring to market new advanced reactor designs and new light water reactor fuel designs, many of which would deploy fuel made from uranium with 235 U enrichment ranging from 5% to 19.75%. There is currently no commercial supply of uranium in this enrichment range, which is higher than used in today’s light water reactors but still lower than the safeguards limit of 20% 235 U. This limitation is a barrier to development of demonstration of these new nuclear energy technologies. As a means to address this near-term need, DOE and Idaho National Laboratory (INL) has considered how the HALEU product from sodium-bonded spent fuel treatment in the INL Fuel Conditioning Facility (FCF), located at the Materials and Fuels Complex (MFC), might be provided and fabricated into some of the new fuel designs. The evaluation presented in this report addresses the potential establishment of two types of fuel fabrication capability at INL, represented generically as a ceramic-type (or pellet-type) fuel fabrication line and a metallic fuel fabrication line. Because the FCF HALEU feedstock contains residual transuranic contamination and a relatively small amount of residual fission products, fabrication with that material is necessarily performed inside of engineered confinement barriers, such as gloveboxes, which would be filled with inert gas for most of the fuel types considered. The throughput rate of the fabrication lines envisioned is 2.5 metric tons of HALEU fuel per year, which is judged to be sufficiently representative of engineering-scale. Space in three existing buildings was identified for consideration in this study of pre-conceptual equipment layouts. The scope and nature of the work needed to prepare each of the three buildings for each type of fuel fabrication was identified (though not in engineering detail), and three-dimensional models of envisioned fabrication equipment were laid out in each of the buildings to assess adequacy of space. The study concluded that either type of fuel fabrication line can feasibly be installed and operated in either of the three buildings. However, each of the three buildings presents different challenges in preparation, due to accommodating current missions that would need to be relocated or necessary decontamination and decommissioning work to free-up space for fuel fabrication, or due to complications of accessibility. Rough order-of-magnitude (ROM) cost estimates for preparing buildings begin at $10M ( 20%/+50%) and would increase with increased complexity of building modifications. The cost of fabrication equipment and gloveboxes is roughly estimated to be $21M (-20%/+50%) for a metallic fuel fabrication line and $27M (-20%/+50%) for a ceramic/intermetallic fuel fabrication line. Nominal operating costs are estimated to be $7M per year (in 2019 dollars), increasing from lower amounts needed as the operating crew is being assembled and trained.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Performing a multi-unit level-3 PSA with MACCS

MACCS (MELCOR Accident Consequence Code System), WinMACCS, and MelMACCS now facilitate a multi-unit consequence analysis. MACCS evaluates the consequences of an atmospheric release of radioactive gases and aerosols into the atmosphere and is most commonly used to perform probabilistic safety assessments (PSAs) and related consequence analyses for nuclear power plants (NPPs). WinMACCS is a user-friendly preprocessor for MACCS. MelMACCS extracts source-term information from a MELCOR plot file. The current development can combine an arbitrary number of source terms, representing simultaneous releases from a multi-unit facility, into a single consequence analysis. The development supports different release signatures, fission product inventories, and accident initiation times for each unit. The treatment is completely general except that the model is currently limited to collocated units. A major practical consideration for performing a multi-unit PSA is that a comprehensive treatment for more than two units may involve an intractable number of combinations of source terms. This paper proposes and evaluates an approach for reducing the number of calculations to be tractable, even for sites with eight or ten units. The approximation error introduced by the approach is acceptable and is considerably less than other errors and uncertainties inherent in a Level 3 PSA.

42 ENGINEERING↗

Strong interaction physics at the luminosity frontier with 22 GeV electrons at Jefferson Lab

Here, the purpose of this document is to outline the developing scientific case for pursuing an energy upgrade to 22 GeV of the Continuous Electron Beam Accelerator Facility (CEBAF) at the Thomas Jefferson National Accelerator Facility (TJNAF, or JLab). This document was developed with input from a series of workshops held in the period between March 2022 and April 2023 that were organized by the JLab user community and staff with guidance from JLab management (see Sec. 10). The scientific case for the 22 GeV energy upgrade leverages existing or already planned Hall equipment and world-wide uniqueness of CEBAF high-luminosity operations.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Russian University Education in Nuclear Safeguards and Security

As safeguards and security (S&S) systems are installed and upgraded in nuclear facilities throughout Russia, it becomes increasingly important to develop mechanisms for educating future Russian nuclear scientists and engineers in the technologies and methodologies of physical protection (PP) and nuclear material control and accounting (MC&A). As part of the U.S. Department of Energy’s (DOE) program to secure nuclear materials in Russia, the Education Project supports technical S&S degree programs at key Russian universities and nonproliferation education initiatives throughout the Russian Federation that are necessary to achieve the overall objective of fostering qualified and vigilant Russian S&S personnel. The Education Project supports major educational degree programs at the Moscow Engineering Physics Institute (MEPhI) and Tomsk Polytechnic University (TPU). The S&S Graduate Program is available only at MEPhI and is the world’s first S&S degree program. Ten classes of students have graduated with a total of 79 Masters Degrees as of early 2009. At least 84% of the graduates over the ten years are still working in the S&S field. Most work at government agencies or research organizations, and some are pursuing their PhD. A 5½ year Engineering Degree Program (EDP) in S&S is currently under development at MEPhI and TPU. The EDP is more tailored to the needs of nuclear facilities. The program’s first students (14) graduated from MEPhI in February 2007. Similar-sized classes are graduating from MEPhI each February. All of the EDP graduates are working in the S&S field, many at nuclear facilities. TPU also established an EDP and graduated its first class of approximately 18 students in February 2009. For each of these degree programs, the American project team works with MEPhI and TPU to develop appropriate curriculum, identify and acquire various training aids, develop and publish textbooks, and strengthen instructor skills. The project has also supported the instruction of policy-oriented nonproliferation courses at various Russian universities. These courses are targeted towards future workers in the nuclear field to help build an effective nonproliferation awareness within the nuclear complex. A long-range goal of this project is to assist the educational programs at MEPhI and TPU in becoming self-sustainable and therefore able to maintain the three degree programs without DOE support. This paper describes current development of these education programs and new initiatives. The paper also describes general nonproliferation education activities supported by DOE that complement the more technical S&S degree programs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

OFFGAS GENERATION FROM THE DISPOSITION OF SCRAP PLUTONIUM BY VITRIFICATION SIMULANT TESTS

The Department of Energy Office of Environmental Management is supporting R&D for the conceptual design of the Plutonium Disposition Project at the Savannah River Site in Aiken, SC to reduce the attractiveness of plutonium scrap by fabricating a durable plutonium oxide glass form and immobilizing this form within the high-level waste glass prepared in the Defense Waste Processing Facility. A glass formulation was developed that is capable of incorporating large amounts of actinides as well as accommodating many impurities that may be associated with impure Pu feed streams. The basis for the glass formulation was derived from commercial glasses that had high lanthanide loadings. A development effort led to a Lanthanide BoroSilicate (LaBS) glass that accommodated significant quantities of actinides, tolerated impurities associated with the actinide feed streams and could be processed using established melter technologies. A Cylindrical Induction Melter (CIM) was used for vitrification of the Pu LaBS glass. Induction melting for the immobilization of americium and curium (Am/Cm) in a glass matrix was first demonstrated in 1997. The induction melting system was developed to vitrify a non-radioactive Am/Cm simulant combined with a glass frit. Most of the development of the melter itself was completed as part of that work. This same melter system used for Am/Cm was used for the current work. The CIM system used consisted of a 5 inch (12.7 cm) diameter inductively heated platinum-rhodium (Pt-Rh) containment vessel with a control system and offgas characterization. Scrap plutonium can contain numerous impurities including significant amounts of chlorides, fluorides, sodium, potassium, lead, gallium, chromium, and nickel. Smaller amounts of additional elements can also be present. The amount of chlorides present is unusually high for a melter feed. In commercial applications there is no reason to have chloride at such high concentrations. Because the melter operates at 1400-1475 C, many of the impurities present are extremely volatile. An alternative being considered is to pre-treat the impure PuO{sub 2} by water washing to remove the soluble salts, which would significantly reduce the melter emissions. The disadvantage of the washing alternative is the criticality concerns of using water with plutonium. In this paper, the testing that has been conducted at the Savannah River National Laboratory (SRNL) to demonstrate induction melting of impure plutonium simulants will be described. The work described concentrates on quantification of the gaseous and particulate emissions from the induction melter. The Pt-Rh melter vessel is a cylinder with a conical bottom and a tubular drain as shown in Figure 1. A 5-inch (12.7 cm) diameter CIM was used for all of the emissions tests. A 6-inch (15.24 cm) diameter CIM, which is the size of the full-scale melter, has since been constructed for further testing. The 5-inch CIM is heated by three induction coils: one for the 5 inch cylinder, one for the conical section, and one for the 1/4-inch (6.35 mm) drain tube. The 6-inch CIM is similar except the cylinder heater extends lower and also heats the cone. The induction heating system is manufactured by Ameritherm{trademark}. The heating system is controlled by a PC to maintain a specific heat up profile and then maintain a constant energy input that maintains a constant temperature. The CIM is operated in batch mode where the plutonium simulant and the glass-forming frit are first thoroughly mixed in an attrittor mill, then added to the melter. Hafnium oxide (HfO{sub 2}) is used as a simulant for the radioactive PuO{sub 2}. The melter is heated until the mixture begins to melt at about 1100 C, then completely melts at about 1400-1450 C. This temperature is maintained for about three hours. While the temperature is maintained at {approx} 1400 C, an air bubbler is normally used to promote mixing of the glass-forming frit and the waste simulant.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning Lines-of-Inquiry for Design Review of New Nuclear Facilities

An independent review of the design of the Salt Waste Processing Facility (SWPF) at Savannah River included a requirement to address the ability to decommission the facility. This paper addresses the lines of inquiry (that were developed for the review and their use in future for reviews of other projects, referred to herein as 'DDLOI'. Decommissioning activities for almost any type of facility are well within the technological state-of-the-art. The major impacts for complications resulting from insufficient consideration during design of a new facility that involves radioactive processes and/or material is the cost of: a) gaining access to high radiation areas and b) dealing with high levels of contamination. For this reason, the DDLOI were developed as a way of raising the awareness of designers and design reviewers to design features that can impede or facilitate ultimate decommissioning. The intent is that this report can be used not only for review, but also by engineers in the early stages of design development when requirements are being assembled. The focus for the DDLOI is on types of facilities that contain nuclear and/or radioactive processes and materials. The level of detail is more specific than would be found in decommissioning plans prepared for regulatory purposes. In commencing this review, the author's could find no precedent for a systematic review of design for decommissioning that included results of a review. Therefore, it was decided to create a report that would provide detailed lines of inquiry along with the rationale for each. The resulting DDLOI report included 21 topical areas for design review. The DDLOI combined the authors' experience in developing baselines for facilities to be deactivated or demolished with prior publications by the U.S. Army and the International Atomic Energy Agency. These two references were found via an Internet search and were the only ones judged to be useful at a field application level. Most others addressed principles or methods but did not have specific recommendations at a detailed design level. The DDLOI not only recommended what reviewers should look for, but also provides the reason as to why each item is important. Overall, the 21 topical areas there are presented in four main sections, which are: - Yard and Exterior Spaces addresses yard areas, underground tunnels, vaults, roofs and siding. - Structures and Interior Spaces addresses interior spaces, use of hazardous materials, placement of large or heavy equipment, and walls and floors designed for shielding. - Systems and Equipment first addresses systems for deactivation, service and utility systems isolation, pipes and ducts, tanks, and crud traps. In addition, DDLOI for laboratories, gloveboxes, and hot cells are included. - Contamination Control addresses the design of, walls, floors, ceilings, sumps, and drains with regard to contamination control. The ability to decontaminate is also included. The final section of the report is a listing of the individual DDLOI topics in a table format, which is designed as a tool that for use as a review checklist. In applying the DDLOI, two cautions are advised: - Designing for the operational mission of the facility is a higher priority than accommodating ease of decommissioning. The recommendations should be considered as preferable design practices when they can be accommodated without compromising the primary design objectives. - The DDLOI should be considered as guidance and not design requirements; noting some will become requirements because they are incorporated in modern building codes. Applying the DDLOI to the SWPF resulted in an overall conclusion that the design for the most part was compatible with the ability to decommission the facility. The most significant recommendation was to completely line the walls of a hot cell with stainless steel that was originally designed with two of its sides as the concrete wall of the building. This recommendation was subsequently incorporated in the design. Future design reviews of nuclear or radioactively contaminated facilities, whether by independent parties or the designers themselves, can benefit from the lines-of-inquiry that are the subject of this paper. The DDLOI, with an example of their use, are in a public domain report, which is freely available from the authors.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of Novel Materials for Direct Air Capture of CO 2 : MIL-101(Cr)-Amine Sorbents Evaluation Under Realistic Direct Air Capture Conditions (Final Report)

The overarching goal of this project is to evaluate the CO 2 adsorption properties of a small family of metal-organic framework (MOFs) materials functionalized with amines at sub-ambient conditions. Our goal is to develop capabilities to measure CO 2 adsorption at conditions more relevant to the weather of the planet. For this purpose, Georgia Tech is constructing a “sub-ambient adsorption facility” in partnership with ZCP Sorbent Development, LLC, aimed specifically at rapidly and deeply characterizing the performance of DAC candidate materials in this important operational range (adsorption at -20 to 20 °C and RH of 0-100%). Here, we use the sub-ambient lab instrumentation designed or adapted to study the behavior of the pristine metal organic framework (MOF) MIL-101(Cr) and the MOF in the presence of amines ranging from small molecules (e.g. TREN, tris(2-aminoethylamine)) to oligomers (e.g. PEI, poly(ethyleneimine)). Any DAC sorbent must be amenable to deployment in practical contactors for gas-solid contacting (traditional pellet-based fixed beds are impossible at scale). To this end, we developed and tested these DAC materials in the forms of composite polymer/MOF fibers and custom 3D-printed monolith structures containing MOF DAC sorbents. The proposed studies advance these materials from technology readiness level (TRL) 2 to TRL 3.

01 COAL, LIGNITE, AND PEAT↗

ENHANCEMENT OF ENVIRONMENTAL SAMPLING THROUGH AN IMPROVED AIR MONITORING TECHNIQUE

Environmental sampling (ES) is a key component of International Atomic Energy Agency (IAEA) safeguarding approaches throughout the world. Performance of ES (e.g. air, water, vegetation, sediments, soil and biota) supports the IAEAs mission of drawing conclusions concerning the absence of undeclared nuclear material or nuclear activities in a State and has been available since the introduction of safeguards strengthening measures approved by the IAEA Board of Governors (1992-1997). A recent step-change improvement in the gathering and analysis of air samples at uranium/plutonium bulk handling facilities is an important addition to the international nuclear safeguards inspector's toolkit. Utilizing commonly used equipment throughout the IAEA network of analytical laboratories for particle analysis, researchers are developing the next generation of ES equipment for air grab and constant samples. Isotopic analysis of collected particles from an Aerosol Contaminant Extractor (ACE) silicon substrate has been performed with excellent results in determining attribute and isotopic composition of chemical elements present in an actual test-bed sample. The new collection equipment will allow IAEA nuclear safeguards inspectors to develop enhanced safeguarding approaches for complicated facilities. This paper will explore the use of air monitoring to establish a baseline environmental signature of a particular facility that could be used for comparison of consistencies in declared operations. The implementation of air monitoring will be contrasted against the use of smear ES when used during unannounced inspections, design information verification, limited frequency unannounced access, and complementary access visits at bulk handling facilities. Technical aspects of the air monitoring device and the analysis of its environmental samples will demonstrate the essential parameters required for successful application of the system.

54 ENVIRONMENTAL SCIENCES↗

Vulnerability Assessments and Resilience Planning at Federal Sites

U.S. government agencies are now directed to assess the vulnerability of their operations and facilities to climate change and to develop adaptation plans to increase their resilience. Specific guidance on methods is still evolving based on the many different available frameworks. This technical paper synthesizes lessons and insights from a series of research case studies conducted by the investigators at facilities of the U.S. Departments of Energy and Defense. The paper provides a framework of steps for climate vulnerability assessments at Federal facilities and elaborates on three sets of methods required for assessments, regardless of the detailed framework used. In a concluding section, the paper suggests a roadmap to further develop methods to support agencies in preparing for climate change.

54 ENVIRONMENTAL SCIENCES↗

A terahertz pump mega-electron-volt ultrafast electron diffraction probe apparatus at the SLAC Accelerator Structure Test Area facility

Here, we describe a new experimental setup capable of measuring structural dynamics following intense terahertz excitation. This system, developed at the SLAC Accelerator Structure Test Area facility, uses a high-energy ultrafast laser to produce intense terahertz pulses and femtosecond electron bunches that are accelerated to mega-electron-volt kinetic energies. The focused terahertz pulses have electric fields in excess of 600 kV/cm, and the resulting structural dynamics can be followed by electron diffraction. We also present some examples demonstrating its implementation where interactions between the THz pulses and the electron bunch are used to characterize the spatial and temporal characteristics of the THz field.

42 ENGINEERING↗

Findings on subtask 3.3 – applicability of automated brine chemistry determinations for treatment and recovery processes through facility automation/modularization: engineering design study

Under the Energy & Environmental Research Center’s (EERC’s) ~$\$$22 million Phase II Brine Extraction and Storage Test (BEST) Program, a multimillion-dollar brine treatment technology test bed facility was established in western North Dakota to provide a platform for evaluating developing technologies and approaches for brine treatment and volume reduction. The initial facility, and associated research effort, was funded by the U.S. Department of Energy (DOE), with in-kind contributions provided by several industry participants and the state of North Dakota. Since its opening, the Brine Technology Test Facility (BTTF) has supported performance evaluations of desalination technologies capable of treating high-salinity produced water (PW) and enabled data collection for multiple approaches of PW management and critical material recovery. As part of the decommissioning process for the original project, facility ownership and liability were transferred to Select Water, which is providing the EERC with a continuing site access option for state or federal research and/or commercial technology development. This report documents the findings from a design study conducted by the EERC and the engineering firm that was originally contracted to design and construct the facility (Advanced Engineering and Environmental Services, LLC [AE2S]) that evaluated the current status of BTTF and its systems and developed a retrofit design to increase the facility’s capabilities through automation and modularization of its PW treatment infrastructure. The proposed retrofit will provide DOE and industry with an expanded range of conditioned PW that can be produced at the facility for evaluating fit-for-purpose water treatment technologies, online instrumentation for brine chemistry determination, and systems that recover critical materials like lithium and magnesium. The current facility consists of an 9600-square-foot facility that includes a 40-foot by 65-foot Class 1, Division 2-rated demonstration area and associated control rooms and lab-ready space capable of sourcing oil and gas PW and wastewater from industrial sources or tailoring brine compositions up to 300,000 mg/L total dissolved solids (TDS) and supplying them at rates up to 25 gpm for extended-duration technology demonstrations. The colocation of the facility with Select Water’s water management facilities allows for access and unloading of more than 10,000 bbl/day of trucked water delivered to site and associated access to on-site Class I and Class II brine disposal wells and nearby hazardous waste landfills operated and/or contracted by Select Water to dispose of concentrate and/or effluents associated with the testing.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Recent Advances in Domesticating Non-model Microorganisms

Non-model microorganisms have been increasingly explored as microbial cell factories for production of chemicals, fuels, and materials owing to their unique physiology and metabolic capabilities. Yet, these microorganisms often lack facile genetic tools for strain development, which hinders their adoption as production hosts. In this review, we describe recent advances in domestication of non-model microorganisms, including bacteria, actinobacteria, cyanobacteria, yeast, and fungi, with a focus on the development of genetic tools. Furthermore, we highlight some successful applications of non-model microorganisms as microbial cell factories.

synthetic biology↗