Search NASA⌕ Search

SEARCH · Search NASA

Results for “program administration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,513 records · Page 84

Evaluating Impacts of the Inflation Reduction Act and Bipartisan Infrastructure Law on the U.S. Power System

The Inflation Reduction Act of 2022 (IRA) and the Infrastructure Investment and Jobs Act of 2021, commonly referred to as the 'Bipartisan Infrastructure Law (BIL),' collectively represent the largest commitment of the U.S. Federal Government to invest in the modernization and decarbonization of the U.S. energy system. The Congressional Budget Office (CBO) estimates that total support for the broad range of climate and clean energy programs, tax credits, and other incentives authorized through the two laws will exceed $430 billion from 2022 through 2031 (CRS 2022; CBO 2021, 2022). While the climate and clean energy provisions are numerous and have the potential to impact all aspects of the U.S. energy system from fuel and electricity production to final consumption in industry, transportation, and buildings, the provisions relevant to the electricity sector - in particular the suite of tax credits for clean generation, storage, and carbon dioxide ( CO 2 ) capture and storage - are expected to be some of the most consequential in terms of emissions reduction and clean energy deployment (Larsen et al. 2022; Jenkins, Mayfield, et al. 2022; Mahajan et al. 2022; Zhao et al. 2022). In this report, we detail the methods and results of a study estimating the potential impacts of key provisions of IRA and BIL on the contiguous U.S. power sector from present day through 2030. The analysis employs an advanced power system planning model, the Regional Energy Deployment System (ReEDS), to evaluate how major provisions from both laws impact investment in and operation of utility-scale generation, storage, and transmission, and, in turn, how those changes impact power system costs, emissions, and climate and health damages. While not exhaustive in capturing every provision, the analysis estimates the possible scale of power-sector impacts that could result from the modeled provisions in IRA and BIL. The study is structured around two scenarios to evaluate the potential impacts of both laws on the power sector: 1) No New Policy: A counter-factual scenario that reflects all Federal and state policies enacted as of September 2022, with exception to IRA and BIL, and assumes load growth consistent with the Energy Information Administration's Annual Energy Outlook 2022 (AEO22) Reference case (EIA 2022a); 2) IRA-BIL: A scenario reflecting all Federal and state policies enacted as of September 2022, including key IRA and BIL provisions, most notably the investment and production tax credits for zero-carbon emitting electricity generation and storage (ITC and PTC), the tax credit for CO 2 capture and storage (45Q), and the tax credit for existing nuclear plants (described further in Section 2.3). To account for the impacts of IRA and BIL on electrification, assumes increased load growth consistent with a scaled version of the Medium Electrification scenario from the Electrification Futures Study (Mai et al. 2018). These scenarios are simulated across seven sets of assumptions with varying projected future electricity market conditions, including technology costs and performance, natural gas prices, and the degree of availability, feasibility, and cost of development of renewable resources, electricity transmission, and CO 2 pipeline, injection, and storage infrastructure. In addition, we simulate two sensitivities on the 'policy' treatment in which we vary key assumptions pertaining to the realized value of the clean electricity ITC and PTC: 1) the cost of monetization of tax credits, and 2) the level of bonus crediting realized by project developers. We demonstrate that IRA and BIL have the collective potential to drive substantial growth in clean electricity by 2030, while reducing costs for consumers, mitigating climate change, and decreasing the human health impacts of power sector emissions. However, we also demonstrate that if expected cost improvements of clean technologies are not realized and/or constraints on deployment driven by factors such as supply-chain challenges, regulatory hurdles, and the social acceptability of energy infrastructure development limit the rate of clean energy and associated infrastructure deployment (such as transmission), then the share of clean generation achieved and the associated emissions benefits realized may be substantively reduced.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reconstructing Solar Particle Event Spectra from Absorbed Dose Measurements

The space radiation environment is unlike anything encountered on Earth. It is dominated by heavy charged particles consisting of highly charged nuclei with atomic numbers ranging from 1 to 94 with a broad spectrum of kinetic energies. The three primary sources of radiation in space are trapped belts, galactic cosmic rays (GCRs), and solar particle events (SPEs). The trapped belts are only of concern near bodies with significant magnetic fields and GCR flux spectra are relatively well-predicted using models that account for solar modulation of the local interstellar spectrum. SPEs, which consist primarily of protons, are difficult to predict in terms of occurrence, duration, intensity, and energy spectrum. SPE intensity and energy spectrum are critical for understanding radiation exposure-related health effects for astronauts in space. The National Aeronautics and Space Administration (NASA) relies on data from the Geostationary Operational Environmental Satellite series to characterize intensities and energy spectra of SPEs near Earth. However, these data are not applicable for spacecraft in other regions of the solar system. To understand the radiation environment for astronauts embarking on travel beyond Earth orbit, NASA is developing the Hybrid Electronic Radiation Assessor (HERA), a distributed dosimetry system that employs a solid-state silicon sensor coupled with the Timepix readout chip. The pixelated nature of the detector permits detailed analyses of charged particle tracks which can then be used to characterize the fluence spectrum at the location of the detector. Despite the unprecedented level of detail regarding the radiation environment provided by these detectors, knowledge of the fluence spectrum at all locations within the vehicle, specifically inside of astronauts, is desired to fully characterize the associated risk of harmful health effects. Radiation transport of the external radiation environment, considering the shielding provided by the vehicle, other objects, and even astronauts, is performed to obtain this information. Thus, there is clearly a need to define the external radiation environment using measurements performed within the vehicle. The number of detectors that may be flown as a part of HERA is limited by logistics, including data, power, and mass restrictions. The current configuration for crewed flight consists of six detectors at various locations with in the Orion Multi-Purpose Crew Vehicle (MPCV). It follows that an external proton fluence spectrum can be characterized with at most six energy bins with traditional matrix inversion techniques. The purpose of the present study is to determine whether it is possible to reconstruct SPE spectra with greater resolution from absorbed dose measurements and knowledge of the response of individual detectors using linear programming.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Carbon Capture and Sequestration (via Enhanced Oil Recovery) from a Hydrogen Production Facility in an Oil Refinery

The project proposed a commercial demonstration of advanced technologies that would capture and sequester CO2 emissions from an existing hydrogen production facility in an oil refinery into underground formations in combination with Enhanced Oil Recovery (EOR). The project is led by Praxair, Inc., with other project participants: BP Products North America Inc., Denbury Onshore, LLC (Denbury), and Gulf Coast Carbon Center (GCCC) at the Bureau of Economic Geology of The University of Texas at Austin. The project is located at the BP Refinery at Texas City, Texas. Praxair owns and operates a large hydrogen production facility within the refinery. As part of the project, Praxair would construct a CO2 capture and compression facility. The project aimed at demonstrating a novel vacuum pressure swing adsorption (VPSA) based technology to remove CO2 from the Steam Methane Reformers (SMR) process gas. The captured CO2 would be purified using refrigerated partial condensation separation (i.e., cold box). Denbury would purchase the CO2 from the project and inject the CO2 as part of its independent commercial EOR projects. The Gulf Coast Carbon Center at the Bureau of Economic Geology, a unit of University of Texas at Austin, would manage the research monitoring, verification and accounting (MVA) project for the sequestered CO2, in conjunction with Denbury. The sequestration and associated MVA activities would be carried out in the Hastings field at Brazoria County, TX. The project would exceed DOE’s target of capturing one million tons of CO2 per year (MTPY) by 2015. Phase 1 of the project (Project Definition) is being completed. The key objective of Phase 1 is to define the project in sufficient detail to enable an economic decision with regard to proceeding with Phase 2. This topical report summarizes the administrative, programmatic and technical accomplishments completed in Phase 1 of the project. It describes the work relative to project technical and design activities (associated with CO2 capture technologies and geologic sequestration MVA), and Environmental Information Volume. Specific accomplishments of this Phase include: 1. Finalization of the Project Management Plan 2. Development of engineering designs in sufficient detail for defining project performance and costs 3. Preparation of Environmental Information Volume 4. Completion of Hazard Identification Studies 5. Completion of control cost estimates and preparation of business plan During the Phase 1 detailed cost estimate, project costs increased substantially from the previous estimate. Furthermore, the detailed risk assessment identified integration risks associated with potentially impacting the steam methane reformer operation. While the Phase 1 work identified ways to mitigate these integration risks satisfactorily from an operational perspective, the associated costs and potential schedule impacts contributed to the decision not to proceed to Phase 2. We have concluded that the project costs and integration risks at Texas City are not commensurate with the potential benefits of the project at this time.

03 NATURAL GAS↗

WBS 1.2.3.405 - Life Cycle Assessment of Storage Technologies

Recent commitments by the Biden administration have established targets to achieve a net-zero energy system by 2050. Meeting these targets will spur a rapid transition to clean energy technologies and a commensurate need to develop and deploy energy storage technologies at scale. Pumped Storage Hydro (PSH) is expected to be part of this solution because its ability to provide grid flexibility and stability and enable the dispatching of disparate variable renewable energy technologies. Despite PSH being a mature technology with a history of deployment dating back several decades, there is very little information on the greenhouse gas (GHG) implications of PSH as compared to other storage technologies. The objective of this project is to perform a full lifecycle assessment (LCA) of new PSH projects in the U.S. This LCA includes all project phases (resource extraction, construction, operation, maintenance, end-of-life). The functional unit for this study is 1 kWh electricity delivered by system to grid substation connection point and the estimated lifetime for our base case is 80 years. Data used in this study are based on over 30 potential PSH projects that are in preliminary planning phases and are represent a wide range of potential closed-loop PSH systems in terms of location, technology, and capacity. The project approach, data sources, and modeling assumptions have been informed by a technical review committee of stakeholders that include experts from academia, national and international government, industry, and utilities. The GHGs and energy return on investment (EROI) from PSH will be compared to other storage technologies (e.g., stationary battery storage). Results from this project will improve the PSH community's understanding of the environmental impacts and sustainability of new PSH projects and how PSH compares to other storage technologies. The approach used in this project relies on open-source programming. The analysis framework (source code and data) and will be made publicly available at the end of the project. In addition to reporting results for the base case, we will perform rigorous sensitivity analysis to identify the major drivers, understand impacts of different configurations, and future energy markets. Results from this project will be published in a suitable journal.

ENERGY PLANNING, POLICY, AND ECONOMY,HYDRO ENERGY↗

Research and Development Concerning Coalbed Natural Gas

The Powder River Basin in northeastern Wyoming is one of the most active areas of coalbed natural gas (CBNG) development in the western United States. This resource provides clean energy but raises environmental concerns. Primary among these is the disposal of water that is co-produced with the gas during depressurization of the coal seam. Beginning with a few producing wells in Wyoming's Powder River Basin (PRB) in 1987, CBNG well numbers in this area increased to over 13,600 in 2004, with projected growth to 20,900 producing wells in the PRB by 2010. CBNG development is continuing apace since 2004, and CBNG is now being produced or evaluated in four other Wyoming coal basins in addition to the PRB, with roughly 3500-4000 new CBNG wells permitted statewide each year since 2004. This is clearly a very valuable source of clean fuel for the nation, and for Wyoming the economic benefits are substantial. For instance, in 2003 alone the total value of Wyoming CBNG production was about $1.5 billion, with tax and royalty income of about $90 million to counties, $140 million to the state, and $27 million to the federal government. In Wyoming, cumulative CBNG water production from 1987 through December 2004 was just over 380,000 acre-feet (2.9 billion barrels), while producing almost 1.5 trillion cubic feet (tcf) of CBNG gas statewide. Annual Wyoming CBNG water production in 2003 was 74,457 acre-feet (577 million barrels). Total production of CBNG water across all Wyoming coal fields could total roughly 7 million acre-feet (55.5 billion barrels), if all of the recoverable CBNG in the projected reserves of 31.7 tcf were produced over the coming decades. Pumping water from coals to produce CBNG has been designated a beneficial water use by the Wyoming State Engineer's Office (SEO), though recently the SEO has limited this beneficial use designation by requiring a certain gas/water production ratio. In the eastern part of the PRB where CBNG water is generally of good quality, most of it is discharged to surface drainages or to soil (for irrigation). CBNG water quality generally declines when moving from the Cheyenne River drainage northwestward to the Belle Fourche, Little Powder, and Powder River drainages and in the central and western part of the PRB, most CBNG water goes to evaporation-infiltration ponds or is discharged directly to surface drainages. Concerns center on the salinity of the water, usually measured as total dissolved solids (TDS), or electrical conductivity (EC) and sodium adsorption ratio (SAR). Other management options currently in use include injection, managed irrigation (with additives to mitigate the effects of high salinity), atomization, and treatment by reverse osmosis or ion exchange. A key water quality issue is the cumulative effect of numerous CBNG water discharges on the overall water quality of basin streams. This leads to one of the most contentious issues in CBNG development in Wyoming's PRB: Montana's concern about the potential downstream effects of water quality degradation on rivers flowing north into Montana. Many of the benefits and costs associated with CBNG development have been debated, but dealing with CBNG water quantity and quality arguably has been the most difficult of all the issues. Given the importance of these issues for continued development of CBNG resources in Wyoming and elsewhere, the DOE-NETL funded project presented here focuses on CBNG co-produced water management. The research was organized around nine separate, but interrelated, technical project tasks and one administrative task (Task 1). The nine technical project tasks were pursued by separate research teams at the University of Wyoming, but all nine tasks were coordinated to the extent possible in order to maximize information gained about CBNG co-produced waters. In addition to project management in Task 1, the key research tasks included: (2) estimating groundwater recharge rates in the PRB; (3) groundwater contamination of trace elements from CBNG disposal ponds; (4) use of environmental tracers in assessing water quality changes in ground and surface water systems; (5) development of a software toolbox to assess CBNG water treatment technologies; (6) potential value of CBNG water for enhanced oil recovery using low salinity waterflood; (7) evaluation of natural zeolites for low cost CBNG water treatment; (8) evaluation of aquatic toxicity testing methods required by regulatory agencies on some CBNG water discharges; (9) use of remote sensing to evaluate CBNG water discharges as habitat for West Nile Virus transmitting mosquitoes; and (10) a summary of lessons learned from historic CBNG management in Wyoming.

01 COAL, LIGNITE, AND PEAT↗

Incentivizing Cold-Climate Efficiency in Juneau (Final Report)

This is the final technical report for the DOE EERE BTO project Incentivizing Cold-Climate Efficiency in Juneau. The project implemented a community energy campaign to deploy heat pumps and efficiency for residents of Juneau, in Southeast Alaska. The project helped Juneau make progress towards its renewable energy goal of reaching 80% renewable energy for space heating by 2045. The Incentivizing Cold-Climate Efficiency in Juneau (ICE-Juneau) project began in 2020 and concluded three years later in 2023. During that time, a group of implementation partners and a research advisory team instituted a beneficial electrification campaign to promote energy savings and carbon reduction in residences of Juneau, Alaska. The campaign, Thermalize Juneau, focused on the installation of single head ductless mini-split heat pumps along with other efficiency upgrades. Thermalize Juneau was the first campaign of its kind in Alaska. After several months of planning, registration opened to the public in early 2021, and over the course of six months 164 participants enrolled. Campaign staff provided education to homeowners on heat pumps and efficiency, and each participant received a one-on-one heat pump assessment using a custom Microsoft Excel-based calculator that estimated energy savings for their residence based on building characteristics and past utility bills. Participants could also obtain a free energy audit from one of the two local energy auditors to further inform their decision. A heat pump installer, electrician, and builder were selected via a competitive RFP process. Participants who felt ready to install a heat pump or other efficiency upgrades received a site visit and custom quote from each of these contractors free of charge, and if they still felt energy upgrades were right for them, could move forward with an individual contract. Participants received a $400 heat pump installation rebate, offered by the installer if 40 heat pump installations occurred through the campaign. Overall, the campaign facilitated 75 heat pump installations (including participants that went with another contractor or heat pump model) and 30 efficiency upgrades (including participants that went with another builder or did DIY upgrades). The campaign created 3 new jobs as the heat pump installer hired an administrative assistant and two apprentices over the course of the campaign. It also helped Juneau work toward achieving its renewable energy goal of 80% renewable energy for space heating by 2045 by upgrading houses from fuel oil to heat pumps powered by the hydropower electric grid. Researchers conducted four surveys to inform Thermalize Juneau and future energy campaigns. The first surveyed existing and prospective heat pump owners in Juneau to identify barriers the campaign could address and inform recruitment efforts. Entry and exit surveys provided information on participant demographics, goals, outcomes, and suggestions for improving future campaigns. And a final survey of community members who had not participated in Thermalize Juneau gave insight on ways future campaigns could include a greater diversity of participants so they could realize similar benefits. Researchers also used pre-campaign energy modeling to predict energy savings, which was then compared to the savings estimated through aggregation of heat pump assessments and energy audits, and later to actual energy savings of 10 participants who installed a heat pump and were able to provide complete energy use data sets. In addition to energy savings, and to assist the electric utility in future planning efforts, researchers analyzed the overall change in electric use across participants with energy data and heat pump installations. They also completed a life cycle cost analysis, showing positive net present values for those displacing a fuel oil appliance, and a more mixed case for those switching from electric baseboard. This project proved the feasibility of energy campaigns, with a goal of beneficial electrification, in cold, remote locations. The Thermalize Juneau team compiled a Guidebook to Thermalize Campaigns, available online. In addition to documenting what occurred in Alaska’s first thermalize campaign, it provides tips and resources for other communities wishing to implement a similar program.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

FY2018 Discovery Through Situational Awareness: Anomalies, Oscillations, and Classification

This technical report is a summary of work performed under the DOE GMLC program under the task titled “Discovery through Situational Awareness”. The focus of this work was to apply big data, statistical techniques to PMU data to do the following: 1) baseline PMU data and find anomalies with a focus on phase angle pairs, 2) identify the frequencies of dominant modal oscillations between different parts of a power system, and 3) identify and classify frequency events in PMU data. This work was performed on PMU data from the Western Interconnect. Many of these algorithms will be applied to wide area phase angle pair data on the Eastern Interconnect in a tool called ESAMS (Eastern Interconnect Situational Awareness Monitoring System). ESAMS was built by EPG (Electric Power Group) and PNNL and is currently being installed on the Eastern Interconnect. The results discussed in this report were made from 14 PMUs from data ranging from Oct 2016 to May 2018. The PMU data were measured 60 times each second. Fourteen phase angle pairs were included, with reactive and active power being calculated at 14 sites. All results have been de-identified for this report. The methodologies applied in the ESAMS tool are described in Section 2. A baseline of PMU data is created using the last 120 days of data. This baseline describes typical behavior as understood from the data. The baseline is then applied to the next day’s data and anomalies from that baseline are identified. Plots are created to help describe what is anomalous during that specific moment in time. These algorithms are currently being installed on the Eastern Interconnect. FY19 work will include discussing the results and findings from the ESAMS tool. A new method of identifying the frequencies of dominant modal oscillations between different parts of a power system is described in Section 3. A list of 199 frequency events provided by Bonneville Power Administration were used to create algorithms to detect frequency events and to create classification rules that can be used to identify future frequency events. Section 4 discusses the results the performance of 7 different event detection, clustering-based methods. Accuracy percentages ranged from 93.59% to 99.16%, with most methods being very fast. GBM (Gradient Boosting Machine) performed well and quickly. These 7 different methods were also tested to determine how well each built classification rules on training data and then applied those rules to identify future frequency events. Accuracy percentages ranged from 89.09% to 99.9%, with all methods performing quickly. GLM (General Linear Model) was viewed as the top performer when considering accuracy and processing time. Because the list of events consisted of 80% of them as active power events and only 20% as faults, all methods struggled to identify events as faults. Small faults were especially difficult to identify. A separate algorithm was created to help with this. Additional work will be done in FY19 on event detection using more data and more events and refinements to the methods.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Fiscal Year 2010 Well Plugging and Abandonment Reconfiguration Program Description Addendum

This work plan describes an addendum to the program for plugging and abandonment (P&A) or reconfiguration of groundwater monitoring wells at the Waste Isolation Pilot Plant (WIPP) facility for fiscal year 2010. The addendum adds work scope to the previously developed program plan (DOE/WIPP 08-3376). Over the years a number of wells have been installed to monitor temporal and spatial changes in groundwater elevation and chemistry. Many of the wells used for this purpose were cased with carbon steel pipe that has deteriorated to varying degrees. For some wells, the integrity has failed and they must be either reconfigured or completely plugged, according to regulatory requirements, to prevent possible commingling of water from different water bearing formations. Others are nearing the end of their useful life and/or are no longer needed for monitoring. This work plan presents the field activities and objectives, requisite documentation, project organization, and project team roles and responsibilities. Work described in this plan will be performed by a New Mexico well drilling contractor holding a valid and current well driller license. The term "Contractor" refers to the licensed well driller and /or registered drill rig supervisor assigned by the well drilling contractor, who will be directed by the WIPP Subcontract Technical Representative (STR) or designee at the drilling site. This Contractor will arrange lower-tier subcontracts, to include geophysics, tool rental, and waste containers.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EMPOWERED Distributed Energy Resources Permit Accelerator Pilot

This report summarizes the EMPOWERED Distributed Energy Resources (DER) Permit Accelerator Pilot project. Its primary objective was to streamline the design, installation, permitting, and inspections of targeted Distributed Energy Resource (DER) solutions. Streamlining these processes is critical to strengthening and accelerating the adoption of DER solutions nationwide. Moreover, streamlined processes help expedite the clean energy transition and expand energy resilience by improving understanding and capability among key stakeholders like property owners, code officials, and the general workforce. The project team accomplished this by developing and deploying a set of design and permitting guides for simple DER solutions, which they rolled out via a permitting pilot program. The project team developed nine permitting and inspection guides for simple DER solutions, as follows: 1. Single-Family and Duplex: Electric Vehicle Service Equipment (EVSE), and Storage, Solar + Storage (each in two code cycles) 2. Multi-family and Office: EVSE, Storage, Solar + Storage (each in two code cycles) 3. A permitting process guide to support the implementation of the permitting guides. The guides cover key code requirements via plan review and field inspection checklists for code officials and building owners to follow to streamline the permitting and inspections process for DER solutions. Following the development of the initial set of guides, the project team formed two cohorts, each made up of four jurisdictions, to participate in the Permit Accelerator Pilot. Each cohort received training and technical assistance to support them in incorporating the guides into use. The project successfully engaged jurisdictions in two disparate US regions: Chelsea, Somerville, Natick, and Norwood in metro Boston; and Pima County, Town of Gilbert, Flagstaff, and Sedona in Arizona. Feedback gathered from the project was valuable in refining the guides to better address jurisdictional needs. After the pilot period, the project team developed final versions of the guides based on extensive feedback from the cohorts and from external technical peer review. Feedback included needs and barriers related to implementation, as well as detailed technical improvements from external peer review. The final guides were presented in a series of webinars with a national reach, with 192 attendees from 35 states in the live session of the final webinar, and the final guides are posted online and available for use nationwide. Key findings: • The most receptive jurisdictions were those adjacent to other jurisdictions that had already adopted similar initiatives. The least receptive jurisdictions were those in the midst of adopting new code cycles. • The most common barrier to jurisdictional adoption of new guidelines were internal administrative and process delays, more so than technical barriers. • The main technical barrier to adoption proved to be the concern of fire hazard risks posed by energy storage systems. There is some apprehension in the code enforcement community about the safety of the batteries. Education coordinated with fire and safety services will help alleviate concerns and increase confidence in the acceptance of innovative technologies. • Opportunities to further leverage and advance the guides and related resources include outreach, education, and jurisdictional support; updates to the resources to align with code cycle changes and local requirements; and advancements supporting emerging technologies.

14 SOLAR ENERGY↗

Assessment of Zero Power Critical Experiments and Needs for a Fission Surface Power System

The National Aeronautics and Space Administration (NASA) is providing funding to the Department of Energy to assess, develop, and test nuclear technologies that could provide surface power to a lunar outpost. Sufficient testing of this fission surface power (FSP) system will need to be completed to enable a decision by NASA for flight development. The near-term goal for the FSP work is to conduct the minimum amount of testing needed to validate the system performance within an acceptable risk. This paper provides an assessment of the current modeling capabilities and quantifies a preliminary bias associated with the modeling methods for designing the nuclear reactor. Advanced analysis techniques using Zero Power Plutonium Reactor (ZPPR)-20C data should provide sufficient information to preclude the necessity of a cold critical test of the FSP. Further testing to reduce uncertainties in the beryllium and uranium cross-section data should reduce the overall uncertainty in the computational models.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

TU-PIS-Exhibit Hall-01: CT Dose Optimization Technologies II

Partners in Solutions is an exciting new program in which AAPM partners with our vendors to present practical “hands-on” information about the equipment and software systems that we use in our clinics. The imaging topic this year is CT scanner dose optimization capabilities. Note that the sessions are being held in a special purpose room built on the Exhibit Hall Floor, to encourage further interaction with the vendors. Siemens‘ Commitment to the Right Dose in Computed Tomography Presentation Time: 11:15 - 11:45 AM Providing sustainable clinical results at highest patient safety: This is the challenge in medical imaging. Especially for Computed Tomography this means applying not simply the lowest, but the right dose for sound diagnostic imaging. Consequently, Siemens is committed to deliver the right dose in CT. In order to reduce radiation to the right dose, the first step is to provide the right dose technology. Through decades of research and development in CT imaging, Siemens CT has constantly introduced new ideas leading to a comprehensive portfolio of unique CARE technologies to deliver the right dose. For example automated kV adjustment based on patient size and the clinical question with CARE kV and three generations of iterative reconstruction. Based on the right dose technology, the next step is to actually scan at the right dose. For this, it is key to know the right dose targets for every examination. Siemens continuously involves CT experts to push developments further and outline how users can best adapt their procedures to the right dose. For users to know whether they met the right dose targets, it is therefore important to understand and monitor the actual absolute dose values. All scanners are delivered with defined default protocols which automatically use the available right dose technologies. Finally, to deliver the right dose not just in singular cases, but ideally to patients everywhere, organizations need then to manage dose across their institutions. Here Siemens offers the right dose management tools for administrations to analyze and document dose, to train their clinical staff and to continuously optimize the application of the right dose in clinical routine. Siemens CT is not only adhering to the ALARA principle, but is inspired by it. With CARE Right Siemens show their commitment to the right dose in CT. Toshiba Aquilion CT Dose Management Tools Presentation Time: 11:45 - 12:15 PM A practical review of Toshiba’s CT dose management technologies from the physicist’s perspective. This presentation will include an overview of Toshiba’s CT dose reduction technologies and dose safeguards. Content will include answers to frequently asked questions relating to dose management, dose tracking, CTDI measurement, ACR accreditation, ACR QC, and protocol review on Toshiba CT systems. Specific topics will include the following: Toshiba’s mechanism of tube current modulation; Exposure record format and interpretation of the values; Dose reporting and dose safeguard tools; Use of AIDR 3D iterative reconstruction; The configuration of task specific image quality target and its integration with AIDR 3D; Tips for scanning the ACR phantom with wide beam geometry; Measuring CTDI for wide beam geometry; Discussion of daily QC procedures and specifications; Tips for annual QC evaluation; Protocol management tools.

60 APPLIED LIFE SCIENCES↗

Comparative Study of the Standards and Guides of a Management System Applicable to Radioactive Waste - Paper 18292

A Management System may be defined as a set of standardized and interrelated practices that aim to improve effectiveness and produce better results. This system should be structured in such a way as to allow essential information to flow properly within the organization, including technical, administrative, production and human resources information, among others, within an adopted compliance model. There are, currently, several standards and guidelines for structuring a compliance model related to a management system. A system that covers various aspects of management in a single system is usually called integrated. Only the International Atomic Energy Agency - IAEA has a guide with this approach for radioactive waste: GS-G-3.3, 'The Management System for the Processing, Handling and Storage of Radioactive Waste' and GS-G-3.4, 'The Management System for the Disposal of Radioactive Waste'. The objective of this work is to present a comparison between existing standards, even if not specific for the management of radioactive waste, but which are widely used by companies. In due course, the result of this work will be object of proposal for specific standard to be presented to regulatory agency for this type of activity. This study should be useful for countries where there are no specific guidelines by the regulatory agency, adopting the best standard or guide as a conformity standards, creating and establishing a hybrid structure best suited to the safety and security aspects of the local culture. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Factors Influencing the Evaluation of Spent Fuel Rail Routes - 19010

The U.S. Department of Energy (DOE) is considering use of rail transport for future shipments of commercial spent nuclear fuel (SNF) from where it currently resides to storage or disposal facilities. Rail carriers transporting in commerce certain quantities of 'rail security sensitive materials,' including SNF, face a regulatory requirement from the U.S. Department of Transportation to perform route risk assessments on an annual basis. In performing these assessments, each affected rail carrier must take into consideration twenty-seven different route factors, and document its rationale for selecting preferred and alternative routes on the basis of the safety and security risk analysis results. The major freight rail carriers operating in the U.S. have invested in the development of a proprietary tool, for rail carrier use only, to assist them in making route selections. This tool utilizes operations data input by each affected rail carrier in conjunction with geographic information systems (GIS) data to represent proximate risk factors, to be integrated and assigned to individual points and segments on the railroad network. Separate safety and security risk values are generated for each rail route under consideration. These values are then placed on an equivalent scoring basis and summed together to allow direct comparison between different route options and to rank order each route in terms of its relative attractiveness. Each affected rail carrier files an annual report for evaluation by the Federal Railroad Administration (FRA) that documents its route risk assessment approach and analysis results. DOE has developed its own decision-support tool, Stakeholder Tool for Assessing Radioactive Transportation (START), which is capable of generating and analyzing routing options for transporting SNF by rail in addition to other freight modes. To better understand how affected rail carriers are likely to route SNF shipments in accordance with regulatory requirements and those route factors likely to be most influential in impacting DoE's evaluation of alternative SNF rail routes, a study was undertaken by DOE with the following objectives: - Review the shipment routes that have been historically used by rail carriers to move high hazard materials, including SNF; - Identify the physical, operational and proximate characteristics (attributes) associated with the rail segments that comprise these routes; - Evaluate the relationships between these attributes; - Make suggestions for how to streamline the factors used in DoE's rail route evaluations; - Contrast these relationships with how the factors are used by the rail carriers in applying their tool This paper describes the study approach, analysis results, and implications for rail route selection methodology. Differences between this evaluation and railroad industry information about rail route assessments are also discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Comparative Analysis of Standard and Advanced USL Methodologies for Nuclear Criticality Safety

The American National Standards Institute/American Nuclear Society national standards 8.1 and 8.24 provide guidance on the requirements and recommendations for establishing confidence in the results of the computerized models used to support operation with fissionable materials. By design, the guidance is not prescriptive, leaving freedom to the analysts to determine how the various sources of uncertainties are to be statistically aggregated. Due to the involved use of statistics entangled with heuristic recipes, the resulting safety margins are often difficult to interpret. Also, these technical margins are augmented by additional administrative margins, which are required to ensure compliance with safety standards or regulations, eliminating the incentive to understand their differences. With the new resurgent wave of advanced nuclear systems, e.g., advanced reactors, fuel cycles, and fuel concepts, focused on economizing operation, there is a strong need to develop a clear understanding of the uncertainties and their consolidation methods to reduce them in manners that can be scientifically defended. In response, the current studies compare the analyses behind four notable methodologies for upper subcriticality limit estimation that have been documented in the nuclear criticality safety literature: the parametric, nonparametric, Whisper, and TSURFER methodologies. Specifically, the work offers a deep dive into the various assumptions of the noted methodologies, their adequacies, and their limitations to provide guidance on developing confidence for the emergent nuclear systems that are expected to be challenged by the scarcity of experimental data. Here, to limit the scope, the current work focuses on the application of these methodologies to criticality safety experiments, where the goal is to calculate a bias, a bias uncertainty, and a tolerance limit for k eff in support of determining an upper subcriticality limit for nuclear criticality safety.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Elk Valley Rancheria Energy Efficiency and Alternatives Analysis

The Elk Valley Rancheria, California ('Tribe') is a federally recognized Indian tribe located in Del Norte County, California, in the northwestern corner of California. The Tribe, its members and Tribal enterprises are challenged by increasing energy costs and undeveloped local energy resources. The Tribe currently lacks an energy program. The Tribal government lacked sufficient information to make informed decisions about potential renewable energy resources, energy alternatives and other energy management issues. To meet this challenge efficiently, the Tribe contracted with Frank Zaino and Associates, Inc. to help become more energy self-sufficient, by reducing their energy costs and promoting energy alternatives that stimulate economic development. Frank Zaino & Associates, Inc. provided a high level economic screening analysis based on anticipated electric and natural gas rates. This was in an effort to determine which alternative energy system will performed at a higher level so the Tribe could reduce their energy model by 30% from alternative fuel sources. The feasibility study will identify suitable energy alternatives and conservation methods that will benefit the Tribe and tribal community through important reductions in cost. The lessons learned from these conservation efforts will yield knowledge that will serve a wider goal of executing energy efficiency measures and practices in Tribal residences and business facilities. Pacific Power is the provider of electrical power to the four properties under review at $ 0.08 per Kilowatt-hour (KWH). This is a very low energy cost compared to alternative energy sources. The Tribe used baseline audits to assess current and historic energy usage at four Rancheria owned facilities. Past electric and gas billing statements were retained for review for the four buildings that will be audited. A comparative assessment of the various energy usages will determine the demand, forecast future need and identify the differences in energy costs, narrowing the focus of the work and defining its scope. The Tribe's peak demand periods will help determine the scope of need for alternative energy sources. The Tribe's Energy Efficiency and Alternatives Analysis report included several system investigations which include fuel cells, wind turbines, solar panels, hydro electric, ground source heat pumps, bio mass, cogeneration & energy conservation and implementation for the existing properties. The energy analysis included site visits to collect and analyze historical energy usage and cost. The analysis also included the study of the building systems for the Elk Valley Casino, Elk Valley Rancheria administration complex, United Indian Health Service/Small Community Center complex and the Tribal Gaming Commission Offices. The analysis involved identifying modifications, performing an engineering economic analysis, preparation of a rank ordered list of modifications and preparation of a report to provide recommendations and actions for the Tribe to implement.

03 NATURAL GAS↗

Assessing the cumulative effects of nearshore habitat restoration actions for multiple populations of juvenile salmon in Whidbey Basin, Washington: foundation and approach for synthesis and evaluation

Ecosystem restoration is a common tool for re-establishing ecosystem processes, structures, and functions to improve biodiversity and services in coastal and estuarine ecosystems. In the Salish Sea, salmon habitats have been fragmented, reduced in size, and diminished in quality, and the ecosystem processes that form and sustain these habitats have been degraded and disrupted as well. This loss is especially prevalent in estuaries, where up to 90% of former salmon habitat has been lost or compromised. Salmon species are integral to the identities and cultures of people in the Pacific Northwest, yet salmon abundances remain at historic lows, especially in urbanized areas. Recent investments in restoration are creating rearing habitat and repairing lost ecosystem function. However, restoration efforts in this region have largely proceeded at the site scale, with less attention to big-picture thinking regarding how restoration will effectively recover degraded or lost habitats for target species. As a result, no landscape-scale evaluation program exists, and the cumulative benefits of multiple interventions are unknown. We describe innovative methods for science synthesis related to the evaluation of cumulative effects of ecosystem restoration for Pacific salmon, using years of existing, but disparate data. Building from previous work on cumulative effects evaluation and incorporating a hierarchy of hypotheses approach, we propose using causal inference across numerous hypotheses in a framework to assess the cumulative benefits to Pacific salmon from multiple estuarine restoration projects. We present the framework as a method that can be used to address many complex questions and provide examples from the Salish Sea where the approach is being implemented. The framework draws on science synthesis from numerous fields and uses a hierarchy of hypotheses, causal analysis at multiple scales, and a new hierarchy of synthesis for assessing multiple lines of evidence documenting restoration effects on Pacific salmon. We propose causal inference to synthesize dissimilar data streams, in our case, to identify various manifestations of cumulative effects of restoration and benefits to salmon, and to further inform restoration and recovery planning. A unifying framework would allow for the detection of thresholds at which restoration provides measurable improvement and would greatly advance understanding of the effects of restoration on ecosystems.

59 BASIC BIOLOGICAL SCIENCES↗

International Governmental Collaboration on Best Practice in Aging Infrastructure Management - 18027

Legacy nuclear sites in the US, UK and Canada are all facing a similar challenge of completing their operational and cleanup missions in parallel in a safe, efficient and cost-effective manner. Compounding the challenge is the fact that many important facilities are old with a significant level of deferred maintenance/capital needs, resulting in the need for a strategic approach to infrastructure management to ensure that maintenance and capital funding is directed at the highest priority items and that neither operations nor ongoing Decontamination and Decommissioning (D and D) activities are compromised. To help address this challenge, a Technical Information Exchange meeting was held in Ottawa, Canada in early June 2017 which brought together responsible parties from; - Government agencies including the UK Nuclear Decommissioning Authority (NDA), US Department of Energy Environmental Management (DOE EM), US National Nuclear Security Administration (NNSA), Atomic Energy of Canada Ltd (AECL) and Canadian Department of Defense - Implementers and other Government entities including Savannah River National Laboratory, Idaho National Laboratory and Canadian Nuclear Laboratories (CNL) - Associations including representation on behalf of the Institute of Asset Management and; - Contractors including Mission Support Alliance, Mott McDonald, and Longenecker and Associates The objective of this meeting was to share information about respective 'best practices' and to begin to develop common approaches to the prioritization and management of aging infrastructure investment across the organizations. The exchange focused on identifying common critical issues which were discussed through a series of presentations and small group discussions. The outcome from the meeting was an improved understanding by all participants of the latest approaches being applied to Infrastructure Asset Management and the formation of four International Working Groups which now meet on a regular (4-6 week) basis to share lessons learned and to develop international best practice in their area of interest. This paper details; - the issues and challenges that were identified during the meeting - how these were assimilated and distilled into discrete areas to enable formation of specific Working Groups - progress made by the Working Groups to date. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Restoration of Diesel-Range Organics from Project Chariot, Cape Thompson, Alaska - 16147

Cape Thompson, Alaska, is located approximately 120 miles north of Kotzebue, Alaska, within the Ogotoruk Creek valley. The remote Alaskan location is also home to the US Atomic Energy Commission (AEC) Project Chariot study area. Project Chariot was part of the Plowshare Program, created in 1957 by the AEC to study peaceful uses for atomic energy. Project Chariot began in 1958 when a scientific field team chose Cape Thompson as a potential site to excavate a harbor using a series of nuclear explosions. Between 1959 and 1962, AEC was responsible for over 40 pretest bio-environmental and geotechnical studies of the Cape Thompson area. Strong public opposition to the tests developed, which caused the project to be cancelled with no nuclear explosions ever conducted at the site. In the early 1960's, several deep boreholes were drilled to obtain subsurface, temperature, and high-explosive testing data. Refrigerated diesel was used as a drilling fluid to keep the boreholes open so that thermistors could measure subsurface temperatures. The test boreholes were named Able, Baker, Charlie, Dog, and X-1. In the summer of 2014, the US Department of Energy, Office of Legacy Management (LM) completed the remediation of remnant diesel at these sites. Prior to the 2014 remediation activities, LM conducted two separate characterization field studies to determine the nature and extent of the contamination from the 1960's drilling activities. In 2013, LM developed a remediation plan that was submitted and approved by the Alaska Department of Environmental Conservation (ADEC). The 2014 Project Chariot remediation had some unique logistical challenges and historic issues with stakeholders to overcome. Many of the historic issues centered on previous AEC scientific actions and a general mistrust of the government by the local stakeholders. Prior to and during the 2014 remediation work, an outreach campaign was implemented to discuss prior activities at the site and include stakeholders from Point Hope, Alaska, in the remediation-planning process. The remoteness of the region also provided unique logistical challenges. Because of the short field season, LM initiated several subcontracts over a year in advance. The field camp, heavy equipment, and soil storage containers were shipped by barge to the site. Personnel, food, and small materials were flown in by bush plane from Kotzebue, Alaska. Previous site characterization had identified diesel-range organics (DROs) as the primary contaminant. The cleanup levels for the site were provided by the Alaska Administrative Code (AAC) for the Arctic Zone region. The AAC cleanup level for DROs on gravel pads is 500 mg/kg and 12,500 mg/kg tundra in the arctic-zone region. To help determine the extent and direct soil excavation in the field, photoionization detectors (PIDs) were used for field screening. While the PID results provided rough limits for excavation, laboratory confirmation sampling was required to provide actual excavation guidance. All excavation locations remained open until laboratory results met AAC criteria and ADEC approved closure. The laboratory sample protocol required the bush plane to pick up samples almost daily and transfer them to Anchorage for analysis. In order to meet holding time requirements, all laboratory samples were analyzed on an expedited basis. Analytical results and ADEC approval notifications were e-mailed back to the site via satellite connection. A total of 202 laboratory analyses were needed to complete the remediation effort. At each location (Able, Baker, Charlie, Dog, and X-1), the boreholes were plugged and abandoned in accordance with ADEC regulations. Contaminated soil was excavated, and the material was placed in super-sacks and hauled to connex boxes located near the sea shore. Approximately 786 tons of material was removed and shipped by barge to the Columbia Ridge Landfill in Arlington, Oregon, for disposal. The well casings were cut and sealed below ground surface. Each location was graded to its original contours and reclaimed with native vegetation, and a geodetic survey was conducted. Tours with leaders of the Village of Point Hope and the land owner (Arctic Slope Regional Corporation) were conducted prior to the final demobilization. All remediation equipment and camp facilities were removed at the completion of the project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗