Search NASA⌕ Search

SEARCH · Search NASA

Results for “projects”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,513 records · Page 84

Aniak Energy Efficiency Retrofit Project

The Native Village of Aniak (NVA) is a remote Yup’ik community in western Alaska. NVA is proposing to install energy efficiency measures in the Tribal Office, Community Center, Association of Village Council Presidents (AVCP) Office, and Duplex. The goal of the project is to reduce the overall energy use of the NVA by implementing energy efficiency measures in four high-use tribal buildings. This project expects to have the following outcomes: projected annual energy savings of approximately $24,238; projected annual reduction in fuel oil of roughly 1,802 gallons and electricity of around 24,537 kWh; and annual reduction in carbon dioxide emissions of approximately 84,594 pounds/year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Muckleshoot Indian Tribe-Energy Deployment (MITED) Project

The Muckleshoot Indian Tribe (MIT) collaborated with our Project Partner, GRID Alternatives (GRID), to install 132 kilowatts of direct current (kW-DC) of rooftop solar on three Tribal facilities. The three facilities are the Tribe’s Youth Drop-In Center, Canoe Shed, and Water Treatment Facility. The solar PV systems were originally anticipated to offset approximately 45% of the aggregate annual electricity usage of the three buildings. A major aspect of the MIT-ED project was providing hands-on paid training to five Muckleshoot Building Maintenance workers in solar PV installations, operations, and maintenance. The scope of work aligns with the Tribe’s goals of building local capacity and providing real world work experience and potential career opportunities in solar PV to its citizens. The Building Maintenance Department committed five of its current FTE employees to the project. GRID provided guidance for the MIT project team on identifying paid trainees as well as end goals of skill development through training, including a long-term Operations and Maintenance (O&M) plan tailored to the Tribe’s goals of local capacity building and stewardship of natural resources.

14 SOLAR ENERGY↗

A Recipe for ABC Multifamily Retrofits: Technologies, Financing, and Project Delivery

This report documents the final technical accomplishments and outcomes of Rocky Mountain Institute’s project under the U.S. Department of Energy (DOE) Award DE-EE0009064. The project aimed to develop, validate, and scale whole building retrofit solutions for multifamily buildings, including two configurations of Integrated Mechanical System Pods (IMSP-C and IMSP-U), in alignment with DOE Advanced Building Construction (ABC) initiative's decarbonization and energy efficiency goals. While the project made significant progress in Budget Period 1 (Phase 1) and throughout Budget Period 2 (Phase 2), activities were discontinued as of March 26, 2025, following a Stop Work Order issued by DOE. As such, this report reflects all completed work through that date. The project did not enter Budget Periods 3 and 4 (Phase 2), and demonstration site implementation, field M&V, and final commercialization execution were not conducted.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Ohio River Valley CO2 Storage Project AEP Mountaineer Plan, West Virginia

This report includes an evaluation of deep rock formations with the objective of providing practical maps, data, and some of the issues considered for carbon dioxide (CO{sub 2}) storage projects in the Ohio River Valley. Injection and storage of CO{sub 2} into deep rock formations represents a feasible option for reducing greenhouse gas emissions from coal-burning power plants concentrated along the Ohio River Valley area. This study is sponsored by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL), American Electric Power (AEP), BP, Ohio Coal Development Office, Schlumberger, and Battelle along with its Pacific Northwest Division. An extensive program of drilling, sampling, and testing of a deep well combined with a seismic survey was used to characterize the local and regional geologic features at AEP's 1300-megawatt (MW) Mountaineer Power Plant. Site characterization information has been used as part of a systematic design feasibility assessment for a first-of-a-kind integrated capture and storage facility at an existing coal-fired power plant in the Ohio River Valley region--an area with a large concentration of power plants and other emission sources. Subsurface characterization data have been used for reservoir simulations and to support the review of the issues relating to injection, monitoring, strategy, risk assessment, and regulatory permitting. The high-sulfur coal samples from the region have been tested in a capture test facility to evaluate and optimize basic design for a small-scale capture system and eventually to prepare a detailed design for a capture, local transport, and injection facility. The Ohio River Valley CO{sub 2} Storage Project was conducted in phases with the ultimate objectives of demonstrating both the technical aspects of CO{sub 2} storage and the testing, logistical, regulatory, and outreach issues related to conducting such a project at a large point source under realistic constraints. The site characterization phase was completed, laying the groundwork for moving the project towards a potential injection phase. Feasibility and design assessment activities included an assessment of the CO{sub 2} source options (a slip-stream capture system or transported CO{sub 2}); development of the injection and monitoring system design; preparation of regulatory permits; and continued stakeholder outreach.

01 COAL, LIGNITE, AND PEAT↗

This Letter is a Non-Technical Annual Report of Activities on Project 2007-275-00, Impact of American Shad for the Period February 1, 2008 through January 31, 2009.

This letter is a non-technical annual report of activities on Project 2007-275-00, Impact of American Shad for the period February 1, 2008 through January 31, 2009. A non-technical report is appropriate at this time since data collection is ongoing and results are preliminary. This report is intended to highlight accomplishments during this performance period. Progress on administrative work elements in the statement of work has been captured in the periodic status reports provided through Pisces. During this performance period the USGS accomplished the following tasks: (1) Co-chaired a symposium on American shad in the Columbia Basin at the annual meeting of the Western Division, American Fisheries Society. The USGS gave four presentations from work done during this project. Abstracts of the presentations were attached to the 2007 progress report. (2) Continued parameterization of a bioenergetics model for juvenile American shad. We performed a literature review to determine the applicability of the existing adult salmon bioenergetics parameters to juvenile fall Chinook salmon in support of our modeling investigation of diet overlap between juvenile American shad and fall Chinook salmon. We formulated testable hypotheses to investigate using bioenergetics models and conceptually developed model simulations. Held an in-house workshop to obtain feedback on the physiological parameters we selected for the American shad bioenergetics model and to solicit feedback on our modeling approach to address research questions. (3) Received a Section 10 ESA sampling permit based on the application submitted in the 2007 contract period. With the ESA permit in hand, we obtained scientific collection permits from the states of Washington and Oregon that allowed us to use a variety of fisheries sampling techniques to capture juvenile and adult American shad. (4) Conducted field sampling to meet project objectives. Gillnetting efforts to capture adult American shad near Astoria were discontinued in accordance with our ESA permit after encountering a higher-than-expected number of salmonids. Only 30 PIT-tagged adult pre-spawn American shad were released. Another 53 adults were processed for diet and population characterization. Collection objectives for adult pre-spawn fish were met for areas downstream from Bonneville, John Day, and McNary dams. In October we captured 30 post-spawn adult shad from the McNary Dam forebay for diet analysis. Collection objectives for juvenile American shad were met for all four areas. (5) Began laboratory work to enumerate and accomplish dry-weight analysis of prey items from juvenile and adult shad stomachs. (6) Continued to exchange information and develop relations with others interested in American shad research. As an example, at the request of the U.S. Fish and Wildlife Service, Northeast Fishery Center, Lamar, PA, we provided tissue samples from adult Columbia River American shad for use in genetic comparisons with Hudson River fish. Key findings during this contract period: (1) Determined that prevalence of Ichthyophonus infection among adult American shad was the highest level detected in any population of fish throughout the Pacific region. A manuscript describing results is in preparation. (2) Thiaminase specific activity assessed from Columbia River juvenile and adult American shad is higher than that of forage fish of salmonines in the Great Lakes. The consumption of forage fish high in thiaminase can lead to thiamine deficiency in the predator if the diet of the predators contains little other prey. (3) Adult American shad are feeding during their freshwater migration. Plans for next year: (1) Completing laboratory analysis of the gut contents of juvenile and adult American shad collected. (2) Completing bioenergetics model parameterization and testing hypotheses. (3) Describing the age composition of the adult American shad run during the 2008 spawning migration via aging of scales and otoliths. (4) Providing a draft final report describing project tasks and findings.

13 HYDRO ENERGY↗

Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) - Year 5 : Annual Report for FY 2008.

The Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) is a coordinated effort to improve the quality, consistency, and focus of fish population and habitat data to answer key monitoring and evaluation questions relevant to major decisions in the Columbia River Basin. CSMEP was initiated by the Columbia Basin Fish and Wildlife Authority (CBFWA) in October 2003. The project is funded by the Bonneville Power Administration (BPA) through the Northwest Power and Conservation Council's Fish and Wildlife Program (NPCC). CSMEP is a major effort of the federal state and Tribal fish and wildlife managers to develop regionally integrated monitoring and evaluation (M&E) across the Columbia River Basin. CSMEP has focused its work on five monitoring domains: status and trends monitoring of populations and action effectiveness monitoring of habitat, harvest, hatcheries, and the hydrosystem. CSMEP's specific goals are to: (1) interact with federal, state and tribal programmatic and technical entities responsible for M&E of fish and wildlife, to ensure that work plans developed and executed under this project are well integrated with ongoing work by these entities; (2) document, integrate, and make available existing monitoring data on listed salmon, steelhead, bull trout and other fish species of concern; (3) critically assess strengths and weaknesses of these data for answering key monitoring questions; and (4) collaboratively design, implement and evaluate improved M&E methods with other programmatic entities in the Pacific Northwest. During FY2008 CSMEP biologists continued their reviews of the strengths and weaknesses (S&W) of existing subbasin inventory data for addressing monitoring questions about population status and trends at different spatial and temporal scales. Work was focused on Lower Columbia Chinook and steelhead, Snake River fall Chinook, Upper Columbia Spring Chinook and steelhead, and Middle Columbia River Chinook and steelhead. These FY2008 data assessments and others assembled over the years of the CSMEP project can be accessed on the CBFWA public website. The CSMEP web database (http://csmep.streamnet.org/) houses metadata inventories from S&W assessments of Columbia River Basin watersheds that were completed prior to FY2008. These older S&W assessments are maintained by StreamNet, but budget cutbacks prevented us from adding the new FY2008 assessments into the database. Progress was made in FY2008 on CSMEP's goals of collaborative design of improved M&E methods. CSMEP convened two monitoring design workshops in Portland (December 5 and 6, 2007 and February 11 and 12, 2008) to continue exploration of how best to integrate the most robust features of existing M&E programs with new approaches. CSMEP continued to build on this information to develop improved designs and analytical tools for monitoring the status and trends of fish populations and the effectiveness of hatchery and hydrosystem recovery actions within the Columbia River Basin. CSMEP did not do any new work on habitat or harvest effectiveness monitoring designs in FY2008 due to budget cutbacks. CSMEP presented the results of the Snake Basin Pilot Study to the Independent Scientific Review Panel (ISRP) in Portland on December 7, 2008. This study is the finalization of CSMEP's pilot exercise of developing design alternatives across different M&E domains within the Snake River Basin spring/summer Chinook ESU. This work has been summarized in two linked reports (CSMEP 2007a and CSMEP 2007b). CSMEP participants presented many of the analyses developed for the Snake Basin Pilot work at the Western Division American Fisheries Society (AFS) conference in Portland on May 4 to 7, 2008. For the AFS conference CSMEP organized a symposium on regional monitoring and evaluation approaches. A presentation on CSMEP's Cost Integration Database Tool and Salmon Viability Monitoring Simulation Model developed for the Snake Basin Pilot Study was also given to the Pacific Northwest Aquatic monitoring Partnership (PNAMP) steering committee in Portland on August 28, 2008. Further information on CSMEP strengths and weaknesses assessments and monitoring design products for FY2008 is presented in the main text and appendices of this Annual Report as well as being available on CBFWA's public website.

13 HYDRO ENERGY↗

Little Goose Dam Full Flow PIT-Tag Detection System Project Summary.

In 2006, the design phase of this project was kicked off and was for the most part modeled after the Full Flow PIT installation installed at Lower Monumental Dam during winter and spring of 2006 and 2007. As the Goose Full Flow design progressed and the project started to move towards construction, issues within contracting occurred and the project was put on delay for 1 year. Starting in mid December of 2008, Harcon Inc. was awarded the contract and construction of the new Goose Full Flow PIT-tag detection system began. The purpose of this document is to summarize the installation of the Little Goose Full Flow project from start to finish and to highlight the notable successes and challenges that the installation presented along with the final results and current status.

13 HYDRO ENERGY↗

Self-Correcting HVAC Controls Project Final Report

This document represents the final project report for the Self-Correcting Heating, Ventilating and Air-Conditioning (HVAC) Controls Project jointly funded by Bonneville Power Administration (BPA) and the U.S. Department of Energy (DOE) Building Technologies Program (BTP). The project, initiated in October 2008, focused on exploratory initial development of self-correcting controls for selected HVAC components in air handlers. This report, along with the companion report documenting the algorithms developed, Self-Correcting HVAC Controls: Algorithms for Sensors and Dampers in Air-Handling Units (Fernandez et al. 2009), document the work performed and results of this project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Revealing the Hidden Value that the Federal Investment Tax Credit and Treasury Cash Grant Provide To Community Wind Projects

Although the global financial crisis of 2008/2009 has slowed wind power development in general, the crisis has, in several respects, been a blessing in disguise for community wind project development in the United States. For xample, the crisis-induced slowdown in the broader commercial wind market has, for the first time since 2004, created slack in the supply chain, creating an opportunity for shovel-ready community wind projects to finally proceed towards onstruction. Many such projects had been forced to wait on the sidelines as the commercial wind boom of 2005-2008 consumed virtually all available resources needed to complete a wind project (e.g., turbines, cranes, contractors).

17 WIND ENERGY↗

Santa Clara County Planar Solid Oxide Fuel Cell Demonstration Project

The Santa Clara County Planar Solid Oxide Fuel Cell (PSOFC) project demonstrated the technical viability of pre-commercial PSOFC technology at the County 911 Communications headquarters, as well as the input fuel flexibility of the PSOFC. PSOFC operation was demonstrated on natural gas and denatured ethanol. The Santa Clara County Planar Solid Oxide Fuel Cell (PSOFC) project goals were to acquire, site, and demonstrate the technical viability of a pre-commercial PSOFC technology at the County 911 Communications headquarters. Additional goals included educating local permit approval authorities, and other governmental entities about PSOFC technology, existing fuel cell standards and specific code requirements. The project demonstrated the Bloom Energy (BE) PSOFC technology in grid parallel mode, delivering a minimum 15 kW over 8760 operational hours. The PSOFC system demonstrated greater than 81% electricity availability and 41% electrical efficiency (LHV net AC), providing reliable, stable power to a critical, sensitive 911 communications system that serves geographical boundaries of the entire Santa Clara County. The project also demonstrated input fuel flexibility. BE developed and demonstrated the capability to run its prototype PSOFC system on ethanol. BE designed the hardware necessary to deliver ethanol into its existing PSOFC system. Operational parameters were determined for running the system on ethanol, natural gas (NG), and a combination of both. Required modeling was performed to determine viable operational regimes and regimes where coking could occur.

03 NATURAL GAS↗

Integrated Mid-Continent Carbon Capture, Sequestration & Enhanced Oil Recovery Project

A consortium of research partners led by the Southwest Regional Partnership on Carbon Sequestration and industry partners, including CAP CO2 LLC, Blue Source LLC, Coffeyville Resources, Nitrogen Fertilizers LLC, Ash Grove Cement Company, Kansas Ethanol LLC, Headwaters Clean Carbon Services, Black & Veatch, and Schlumberger Carbon Services, conducted a feasibility study of a large-scale CCS commercialization project that included large-scale CO{sub 2} sources. The overall objective of this project, entitled the 'Integrated Mid-Continent Carbon Capture, Sequestration and Enhanced Oil Recovery Project' was to design an integrated system of US mid-continent industrial CO{sub 2} sources with CO{sub 2} capture, and geologic sequestration in deep saline formations and in oil field reservoirs with concomitant EOR. Findings of this project suggest that deep saline sequestration in the mid-continent region is not feasible without major financial incentives, such as tax credits or otherwise, that do not exist at this time. However, results of the analysis suggest that enhanced oil recovery with carbon sequestration is indeed feasible and practical for specific types of geologic settings in the Midwestern U.S.

02 PETROLEUM↗

NorthernSTAR Project Overcoat: Exterior Insulation Strategies for 1.5-Story Roof Applications in Cold Climates

This is a repository for all NorthernSTAR Overcoat insulation retrofit projects. Both houses received Overcoat insulation retrofit on roof only, performed by Cocoon Insulation. 1 - St. Louis Park house - St. Louis Park, MN 2 - Edina house - Edina, MN In this second study, the team wished to analyze the before and after air-tightness data from roof only ETMMS retrofits on 1.5-story homes in cold and very cold climates. To identify homes to analyze, we reached out to our national network of energy professionals, home performance contractors, and general contractors who had expressed interest in promoting roof-only External Thermal Moisture Management System (ETMMS) to clients. Five projects by three contractors were submitted for consideration as they were being done to mitigate severe ice dams for homeowners. Only two of the five projects followed a roof only ETMMS protocol. Data from the other three projects, however, were reviewed with the air-tightness data of 250 roof-only, interior-applied energy retrofits on 1.5-story homes provided by three NorthernSTAR industry partners. These data represent homes in the general market as well as homes that were part of the state of Minnesota weatherization program.

adhered applied membrane↗

Manhattan Project 1940s research on the prompt fission neutron spectrum

We describe how the prompt fission neutron spectrum (PFNS) was determined for the Manhattan Project at Los Alamos. Early work before World War II at American and British universities is described, together with theoretical work by Feather at Cambridge and Bethe at Los Alamos. As the Manhattan Project was being planned in 1942, two experiments on natural uranium were commissioned that proved to be influential: 1) An integral experiment at Chicago by Christy and Manley that accurately determined the average PFNS spectrum energy, 2.2 ± 0.2 MeV; 2) Bloch and Staub’s Stanford cyclotron measurement of the PFNS spectrum, which obtained an average energy of 1.70 ± 0.34 MeV. These two papers, previously unavailable outside of Los Alamos, are reproduced in the Supplementary Appendix. From these data, at the beginning of the project in 1943 Serber estimated an average 235 U PFNS energy of 2 MeV, and indeed this agrees with today’s best estimate. The challenges facing the scientists involved both the availability of only very small samples of enriched uranium and plutonium targets, and fast neutron detection technologies. During the project, 235 U and 239 Pu PFNS were measured by Nicodemus and Staub. These also proved to be quite accurate and gave an average spectrum energy of 2 MeV for 235 U. [This is not reproduced in the Appendix because it was published after the war in Physical Review 89, 1288 (1953)]. New methods were developed to enable more accurate measurements, and this paper describes how the PFNS was determined surprisingly well by 1945. We end by describing the post-war measurements in the 50s, including the PFNS data used by Ford and Wheeler in their simulations in 1951, the Bonner 1952 data, the seminal 1952 Watt paper with a new empirical parametrization of the PFNS, and the accurate PFNS measurement undertaken at Los Alamos by Cranberg et al. in 1956. We compare the measurements with our best understanding today as embodied in the Evaluated Nuclear Data File ENDF/B-VIII.0. Some images from historical documents in our Los Alamos National Security Research Center (NSRC) archives are shown.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Entering a New Stage of Learning from the U.S. Fuel Cell Electric Vehicle Demonstration Project: Preprint

The National Fuel Cell Electric Vehicle Learning Demonstration is a U.S. Department of Energy (DOE) project that started in 2004. The purpose of this project is to conduct an integrated field validation that simultaneously examines the performance of fuel cell vehicles and the supporting hydrogen infrastructure. The DOE's National Renewable Energy Laboratory (NREL) has now analyzed data from overfive years of the seven-year project. During this time, over 144 fuel cell electric vehicles have been deployed, and 23 project refueling stations were placed in use.

08 HYDROGEN↗

The Projected Dark and Baryonic Ellipsoidal Structure of 20 CLASH Galaxy Clusters

We reconstruct the two-dimensional (2D) matter distributions in 20 high-mass galaxy clusters selected from the CLASH survey by using the new approach of performing a joint weak gravitational lensing analysis of 2D shear and azimuthally averaged magnification measurements. This combination allows for a complete analysis of the field, effectively breaking the mass-sheet degeneracy. In a Bayesian framework, we simultaneously constrain the mass profile and morphology of each individual cluster, assuming an elliptical Navarro–Frenk–White halo characterized by the mass, concentration, projected axis ratio, and position angle (PA) of the projected major axis. We find that spherical mass estimates of the clusters from azimuthally averaged weak-lensing measurements in previous work are in excellent agreement with our results from a full 2D analysis. Combining all 20 clusters in our sample, we detect the elliptical shape of weak-lensing halos at the 5σ significance level within a scale of 2 $\mathrm{Mpc}\,{h}^{-1}$. The median projected axis ratio is 0.67 ± 0.07 at a virial mass of ${M}_{\mathrm{vir}}=(15.2\pm 2.8)\times {10}^{14}\,{M}_{\odot }$, which is in agreement with theoretical predictions from recent numerical simulations of the standard collisionless cold dark matter model. We also study misalignment statistics of the brightest cluster galaxy, X-ray, thermal Sunyaev–Zel'dovich effect, and strong-lensing morphologies with respect to the weak-lensing signal. Among the three baryonic tracers studied here, we find that the X-ray morphology is best aligned with the weak-lensing mass distribution, with a median misalignment angle of $| {\rm{\Delta }}\mathrm{PA}| =21^\circ \pm 7^\circ $. We also conduct a stacked quadrupole shear analysis of the 20 clusters assuming that the X-ray major axis is aligned with that of the projected mass distribution. In conclusion, this yields a consistent axis ratio of 0.67 ± 0.10, suggesting again a tight alignment between the intracluster gas and dark matter.

79 ASTRONOMY AND ASTROPHYSICS↗

Introduction to the SPARC Reanalysis Intercomparison Project (S-RIP) and overview of the reanalysis systems

Abstract. The climate research community uses atmospheric reanalysis data sets to understand a wide range of processes and variability in the atmosphere, yet different reanalyses may give very different results for the same diagnostics. The Stratosphere–troposphere Processes And their Role in Climate (SPARC) Reanalysis Intercomparison Project (S-RIP) is a coordinated activity to compare reanalysis data sets using a variety of key diagnostics. The objectives of this project are to identify differences among reanalyses and understand their underlying causes, to provide guidance on appropriate usage of various reanalysis products in scientific studies, particularly those of relevance to SPARC, and to contribute to future improvements in the reanalysis products by establishing collaborative links between reanalysis centres and data users. The project focuses predominantly on differences among reanalyses, although studies that include operational analyses and studies comparing reanalyses with observations are also included when appropriate. The emphasis is on diagnostics of the upper troposphere, stratosphere, and lower mesosphere. This paper summarizes the motivation and goals of the S-RIP activity and extensively reviews key technical aspects of the reanalysis data sets that are the focus of this activity. The special issue The SPARC Reanalysis Intercomparison Project (S-RIP) in this journal serves to collect research with relevance to the S-RIP in preparation for the publication of the planned two (interim and full) S-RIP reports.

54 ENVIRONMENTAL SCIENCES↗

What is the importance of climate model bias when projecting the impacts of climate change on land surface processes?

Regional climate change impact (CCI) studies have widely involved downscaling and bias-correcting (BC) Global Climate Model (GCM)-projected climate for driving land surface models. However, BC may cause uncertainties in projecting hydrologic and biogeochemical responses to future climate due to the impaired spatiotemporal covariance of climate variables and a breakdown of physical conservation principles. Here we quantify the impact of BC on simulated climate-driven changes in water variables(evapotranspiration, ET; runoff; snow water equivalent, SWE; and water demand for irrigation), crop yield, biogenic volatile organic compounds (BVOC), nitric oxide (NO) emissions, and dissolved inorganic nitrogen (DIN) export over the Pacific Northwest (PNW) Region. We also quantify the impacts on net primary production (NPP) over a small watershed in the region (HJ Andrews). Simulation results from the coupled ECHAM5/MPI-OM model with A1B emission scenario were firstly dynamically downscaled to 12 km resolutions with WRF model. Then a quantile mapping based statistical downscaling model was used to downscale them into 1/16th degree resolution daily climate data over historical and future periods. Two series climate data were generated according to the option of bias-correction (i.e. with bias-correction (BC) and without bias-correction, NBC). Impact models were then applied to estimate hydrologic and biogeochemical responses to both BC and NBC meteorological datasets. These im20 pact models include a macro-scale hydrologic model (VIC), a coupled cropping system model (VIC-CropSyst), an ecohydrologic model (RHESSys), a biogenic emissions model (MEGAN), and a nutrient export model (Global-NEWS). Results demonstrate that the BC and NBC climate data provide consistent estimates of the climate-driven changes in water fluxes (ET, runoff, and water demand), VOCs (isoprene and monoterpenes) and NO emissions, mean crop yield, and river DIN export over the PNW domain. However, significant differences rise from projected SWE, crop yield from dry lands, and HJ Andrews’s ET between BC and NBC data. Even though BC post-processing has no significant impacts on most of the studied variables when taking PNW as a whole, their effects have large spatial variations and some local areas are substantially influenced. In addition, there are months during which BC and NBC post-processing produces significant differences in projected changes, such as summer runoff. Factor-controlled simulations indicate that BC post-processing of precipitation and temperature both substantially contribute to these differences at region scales. We conclude that there are trade-offs between using BC climate data for offline CCI studies vs. direct modeled climate data. These trade-offs should be considered when designing integrated modeling frameworks for specific applications; e.g., BC may be more important when considering impacts on reservoir operations in mountainous watersheds than when investigating impacts on biogenic emissions and air quality (where VOCs are a primary indicator).

Liu, M. L.↗

Evaluation and projection of long period return values of extreme daily precipitation in the CMIP5 and CMIP6 models

Using a non-stationary Generalized Extreme Value statistical method, we calculate selected extreme daily precipitation indices and their 20 year return values from the CMIP5 and CMIP6 climate models over the historical and future periods. We evaluate model performance of these indices and their return values in replicating similar quantities calculated from multiple gridded observational products. Difficulties in interpreting model quality in the context of observational uncertainties are discussed. Projections are framed in terms of specified global warming target temperatures rather than at specific times and under specific emissions scenarios. The change in framing shifts projection uncertainty due to differences in model climate sensitivity from the values of the projections to the timing of the global warming target. At their standard resolutions, we find there are no meaningful differences between the two generations of models in their quality or projections of simulated extreme daily precipitation.

54 ENVIRONMENTAL SCIENCES↗