Search NASA⌕ Search

SEARCH · Search NASA

Results for “prototype specifications”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,497 records · Page 84

Multi-Sourced Collaboration for the Production and Refining of Rare Elements and Critical Metals (Final Technical Report)

The project objective was to develop a feasible and cost-effective method for recovering rare earth elements (REEs) and critical materials (CMs) from coal and coal byproducts, resulting in high-purity individually separated REEs and CMs. The targeted REEs included Y, Pr, Nd, Gd, Dy, and Sm, with a purity of over 99.5%, while the CMs included Co, Mn, Ga, Sr, Li, Ni, Zn, and Ge, with a purity of over 90%. The project aimed to design a prototype facility capable of producing 1-3 tonnes/day of high-purity REO mixes. The work was divided into four designated circuits: 1) REE extraction and concentration, 2) REE separation and purification, 3) RE metal production, and 4) CM production. To achieve these goals, the project involved 11 tasks, including technology reviews, research, process flow diagram development, mass balance estimation, and preliminary technical-economic analysis. The project team included researchers from the University of Kentucky, University of Alabama and Virginia Tech as well as process specialists from Argonne National Laboratory. MP Materials provided technical support regarding rare earth markets and processing while Alliance Coal performed resource assessment. The project included a market analysis for Nd/Pr, Tb, Dy, Gd, Y, Co, Mn, Li, Sr, Ga, Ni, Zn, and Ge. These analyses provided insights into the supply and demand trends as well as historic and future projections of market price relative to purity requirements for these elements. Two coal resources were selected for the project: the West Kentucky No. 13 (Baker) Seam and an undisclosed lignite resource in the Illinois coal basin. The estimated quantities of REEs in these resources were calculated based on production samples and drilling data. It was estimated that there is adequate supply for an operation producing one metric ton daily of higher purity mixed rare earth oxides (MREO) for approximately 20 years at a site located in western Kentucky. In Circuit 1, project data was obtained from a pilot heap leach and REE concentration facility. It was concluded that the existing circuit, which generated a MREO concentrate, two types of CM mixed products, and Li- and Sr-containing waters, would be suitable feed for circuits 2-4. Data from the first-of-its-kind coal coarse refuse heap leach pilot pad played a crucial role in estimating reliable elemental concentrations of the pregnant leaching solution (PLS). The average total REE concentration in the PLS was found to be 28.6 ppm. In Circuit 2, several concepts were explored including a novel process referred to as solvent-assisted chromatography (SAC). This concept involved a novel columnar reactor that incorporated multiple mixer/settlers, thereby enabling the operation of counter-flowing aqueous and organic phases. Unfortunately, due to project time constraints, a complete fundamental modeling analysis could not be completed to fully evaluate the technology. Molten salt electrowinning was considered as an alternative for circuit 3 following circuit 2 purification circuit utilizing the novel SAC process. A mass and energy balance of Nd reduction to metal in a fluoride containing molten salt electrolyte was conducted. Comparisons were made with the current state of Asian molten salt electrorefining, and potential improvements in siphoning rare earth metals (REM) from the reactor were presented. A cost estimate was performed for the production of 1 tonne per day, which yielded a total of $2.29 million for the nine electrowinning (EW) cells required. The selected option for circuits 2 and 3 was a plasma distillation process, which initially separates rare earth elements (REEs) from other elements. This is followed by selective electrowinning in various ionic liquids. The selection was made on the basis of thermodynamic modeling and experimental data previously published by a project partner. The combination offers an innovative approach to integrated refining and RE metal production. For Circuit 4, an extensive literature review was conducted for the processing of the CMs. The ultimate decision was to utilize a combined plasma and ionic liquid process as well to produce individual high-purity concentrates of Zn, Ni, Co, Mn, and Mg. A separate flowsheet for Li and Sr was recommended, which would yield carbonates of these elements. Due to the lack of suitable experimental data at this time, a process recommendation could not be provided but several methods have been proposed for consideration. Lastly, a techno-economic analysis (TEA) was conducted to assess the effectiveness of the proposed process for further investigation. The TEA results revealed a capital expense (CapEx) of $737 million and an annual operational expense (OpEx) of $220 million. Due to the selected elements, the hypothetical heap leach pad can produce 1 metric tonne per day of REO equivalent, but a conscious decision was made to only treat targeted REEs, resulting in the production of 0.4 metric tonne of REM. An estimated annual revenue of $90.87 million was projected based on standard market pricing information provided by the funding agency. During the TEA, ten different modules were evaluated for costing purposes. The precipitation circuit was identified as the largest single operational expense, followed by the Mg/Mn process due to the amount of treated metal. In terms of capital expenditures, the heap leach process incurred the highest cost, followed by the Mg/Mn process. The scalability of the plasma process is a crucial consideration since the reactors cannot be scaled beyond the largest demonstrated size due to their reliance on surface area of the slag and vapor phase. The purity estimate for the REEs are generally 98%±2% to produce a metal. The purity level being lower than the project objective was due to the lack of specific experimental data needed to tighten the tolerance of the estimates. Based on literature and previous experience, the CMs are estimated as follows; Ga (95%+, metal), Sr (95%+, carbonate), Li (95%+, carbonate), Ni (98%±2%, metal), Zn (95%+, metal sponge), Ge (95%+, metal), Co (98%±2%, metal), and Mn (98%±2%, metal).

01 COAL, LIGNITE, AND PEAT↗

Long-Term Stewardship Optimization for a Decommissioned Nuclear Reactor - 19579

The decommissioned Hallam Nuclear Power Facility (Hallam), located in Lancaster County, Nebraska, approximately 19 miles south of Lincoln, was developed as a prototype to investigate the technical and economic feasibility of a sodium-cooled, graphite-moderated nuclear reactor. As part of its Power Demonstration Program, the US Atomic Energy Commission (US AEC), a predecessor agency of the US Department of Energy (US DOE), operated the Hallam reactor from 1962 to 1964. The radiological surveillance of the Hallam site was established when the operating agreement between AEC and the Nebraska Public Power District was terminated. The US DOE Chicago Operations Office and the Nebraska Department of Health (NDH) agreed to install a shallow groundwater monitoring system as part of the environmental surveillance program. Surveillance at the site was scheduled to end in fiscal year 2005, with no further activities planned after that. At that time, the plan was to transition the site to the Nebraska Public Power District with future use of the facility to remain restricted. US DOE has title to and responsibility for the entombed radioactive materials. A surveillance and monitoring program was initiated in 1970 by NDH and was funded by US AEC. It included the analysis of samples from deep production wells (groundwater from the regional aquifer at depths greater than 55 meters [180 feet]) at the Sheldon Station. NDH was concerned in 1990 about the possibility of shallow groundwater coming in contact with the buried radiological materials along the buried walls of the reactor. Subsequently, DOE and NDH agreed to further characterize hydrologic conditions and establish a monitoring program in the shallow, perched groundwater zones. The current monitoring program focuses on the shallow, perched groundwater. Today, decades since facility decommissioning, site inspections and groundwater monitoring continue at this Cold War-era legacy site. The US DOE Office of Legacy Management (LM) monitors groundwater as a best management practice in response to a request from the Nebraska Department of Health and Human Services (DHHS). In 2006, LM recommended discontinuing groundwater monitoring because analytical results since 1970 demonstrated there had been no impact to shallow, perched groundwater and no current or anticipated unacceptable risk to human health and the environment. The State of Nebraska did not concur with the recommendation to stop monitoring but did agree to a reduction in sampling and analysis from once a year to once every 2 years--a schedule that began in 2008. An updated assessment of the groundwater monitoring effort was issued in 2016. The entire body of water-quality data continues to demonstrate that there have been no negative impacts to the shallow, perched groundwater from radioactive materials entombed at the site 46 years ago. LM, with concurrence from Nebraska DHHS, changed the sampling frequency, effective in 2018, as follows: once every 5 years from 2021 to 2041 and once every 10 years from 2041 to 2071. In summary, LM remains committed to its primary mission to protect human health and the environment at each of its 92 legacy sites. With results from groundwater sampling events demonstrating compliance for 48 years, the Hallam site was able to set an LM benchmark to optimize long-term stewardship and define an end-state strategy for other decommissioned reactor facilities across the DOE complex. Continued collaboration with local communities, stakeholder, and regulators often leads to outcomes of sound protectiveness without compromise to safety or compliance, as demonstrated by the optimization of the long-term stewardship at the Hallam site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transition Core Planning and Safety Analyses in Support of LEU Fuel Conversion of the University of Missouri Research Reactor (MURR)

The University of Missouri Research Reactor (MURR®) is one of six U.S. High Performance Research Reactors (USHPRR), including one critical facility, that is working with the National Nuclear Security Administration (NNSA) Office of Material Management and Minimization (M3) Reactor Conversion Program to convert from highly enriched uranium (HEU) to low-enriched uranium (LEU) fuel. The M3 Reactor Conversion USHPRR Project objectives include the development of LEU fuel element designs that will ensure safe reactor operations and to maintain the existing experimental performance of each facility. The work is being conducted through many inter-related activities being completed by four Project Pillars: Fuel Qualification (FQ), Fuel Fabrication (FF), Reactor Conversion (RC), and Cross Cutting (CC). A new type of LEU fuel based on an alloy of uranium-10 wt% molybdenum (U-10Mo) is expected to allow the conversion of those USHPRR, like MURR, requiring higher density fuels. The very-high-density LEU U-10Mo monolithic fuel is currently undergoing irradiation testing and post-irradiation examination under a planned and documented fuel qualification effort. The FQ Pillar will document fuel property and fuel performance data and qualify the fuel for use in these reactors. The FF Pillar is fabricating fuel for ongoing and future irradiation tests, as well as conducting fabrication demonstrations to validate or update preliminary fabrication assumptions. The FF Pillar is also working to develop and install commercial manufacturing capacity with the U-10Mo monolithic fuel to produce prototypic fuel. Working with the RC Pillar at Argonne, MURR has progressed through a preliminary fuel element design using preliminary data for the proposed monolithic alloy of U-10Mo. Analyses were completed in previous work that found for typical equilibrium operations with the preliminary LEU fuel element design, in conjunction with a power uprate to 12 MW and appropriate changes to the MURR Limiting safety system settings (LSSS), MURR will have adequate margins to safety for steady-state operations and postulated transient accidents and will have experimental performance in key locations that meets or exceeds current operations with HEU fuel. The purpose of this work is to develop a sequence of transition cycles that will enable MURR to transition from operation with the reactor core loaded with fresh LEU fuel elements only to typical equilibrium operations with mixed-burnup cores following conversion while meeting operational requirements on safety and experimental performance. It is expected that the use of fresh LEU fuel at conversion and subsequent low burnup of the LEU fuel elements that will initially be available for use following conversion will result in critical control blade positions that will substantially change the axial power distribution in the core and the neutron flux available in key experimental locations relative to equilibrium LEU operations. Given the constraints of MURR safety margins, operational practices, and production and research, a novel method has been developed to identify a transition sequence that minimizes the time MURR operates atypically compared to the current prototypic cycles using HEU fuel. The proposed transition sequence moves quickly to the same sort of equilibrium cycles for the LEU fuel that have already been evaluated in documented preliminary safety analyses. Although shifting the neutron flux peak to the lower half of the core during initial cycles with LEU at 12 MW reduces the experiment performance in some key locations relative to current HEU operations at 10 MW, all LEU cores provide an average performance that meets or exceeds that of HEU. An LEU cycle is reached that meets or exceeds the level of experimental performance predicted for current HEU and equilibrium LEU operations in more than 450 key locations identified by a reactor specialist at MURR by the 23rd cycle following conversion and that afterwards will enable MURR to consistently meet its experimental performance requirements. The proposed transition sequence only requires the fabrication of 34 fresh LEU elements in the first year of operation and does not exceed the anticipated availability of fresh elements that can be produced by the fuel fabricator. By the third year after conversion, 22 fresh LEU elements will be required each year, which is the same as expected for equilibrium LEU operations and the same as current operations with HEU fuel. The proposed transition sequence thus combines a relatively short time period before equilibrium burnup is achieved, a temporary increase of fuel elements needed annually relative to typical operations that are within the production capabilities of the fuel fabricator, and demonstrates comparable experimental performance of the LEU cores relative to current HEU operations. Further measures may be taken to reduce any initial experimental performance penalty even further, where possible, by repositioning certain experiments to leverage the increased performance in the lower axial experimental positions in the initial cycles following conversion or leaving the experiments in the irradiation facilities longer in order to achieve the required neutron fluence. This analysis may require refinement depending on the experimental facilities in use at the time of conversion. Nonetheless, the results presented here, including the experimental performance, core burnup, and critical control blade positions throughout the transition cycles, show that the proposed transition cycle fuel management patterns are consistent with what is expected and desired for MURR operation with LEU U-10Mo fuel. Detailed core power distributions from the neutronics models were also used to evaluate safety margins during steady-state operations for the selected transition cycles and the equilibrium LEU core. It is shown that there are adequate safety margins for both steady-state operations and postulated accident scenarios. For the steady-state operations with the preliminary LEU fuel element design the analysis predicts at least 2.49 MW margin to the onset of flow instability at the LSSS power of 15 MW. Considering the LSSS power is 125% of full license power, the margin to OFI is sufficient. In addition, the critical heat flux ratio at LSSS power is well above the requirement of CHFR > 2.0 from NUREG-1537 for all considered cases. For postulated transient accidents, the minimum margin to the fuel temperature safety limit is at least 109 °C. In summary, the proposed sequence of core loadings for MURR operations following conversion to LEU fuel and a power uprate to 12 MW provides sufficient safety margins for both steady-state operations and postulated transient accidents during a proposed sequence of transition cycles to equilibrium operations. Analysis has shown that there are some local experimental performance penalties during the initial cycles. Although there are local shifts in the experimental performance, on average all LEU cores at 12 MW have equal or higher performance than HEU at 10 MW. Temporary adjustments are being planned that will produce suitable experimental performance during these cycles. The results indicate that for the equilibrium LEU core the experimental performance exceeds that of current HEU operations in all key locations while also demonstrating sufficient safety margins.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗