Search NASA⌕ Search

SEARCH · Search NASA

Results for “Contingency”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,531 records · Page 85

m:N and Human Autonomy Teaming Concepts for High Density Vertiport Operations

This report focuses on the role of the Fleet Manager (FM) and, in particular, the ways in which automation could support their position as they manage multiple aircraft and operators in a highly dynamic, advanced air mobility (e.g., air taxi) environment, specifically "high-density vertiport" (HDV) regions. Similar to terminal area operations for traditional aviation, operations involving HDVs will need to be highly structured while also remaining resilient to the various contingencies that can happen in that environment. The role of the FM is consistent with an “m:N” architecture, where “m” number of operators cooperatively manage “N” number of vehicles (where “N” is always larger than “m”). In such a paradigm it is critical to provide the operator with the tools and information necessary to manage their fleet safely and navigate the known pitfalls with highly automated, complex systems (e.g., brittleness, insufficient situation awareness, skill degradation). As the field of m:N has expanded as an area of study, a set of higher-level automation concepts have emerged—namely “plays,” “working agreements,” and “human-autonomy teaming” (HAT)—that could support operators in this new role.

human autonomy teaming↗

OSIRIS-REx Off-Nominal Re-entry Breakup Analysis

The Origins, Spectral Interpretation, Resource Identification, Security, Regolith Explorer (OSIRIS-REx) is a NASA asteroid sampling mission that launched on September 8, 2016. Its objectives are to study the asteroid Bennu for up to 505 days and obtain at least 60 grams of pristine regolith. The sample return to Earth is planned for September 2023. For contingency planning and risk assessment of a potential off-nominal Earth-return trajectory, a re-entry breakup analysis was performed to determine the response of the spacecraft to the environment and predict the breakup sequence and timeline, debris survival, and debris impact conditions. The failure scenario assumed a failure to separate between the bus and the sample return capsule (SRC), resulting in the combined bus+SRC configuration for the re-entry vehicle. Furthermore, consistent overburns or underburns were considered to produce three sets of initial conditions for the analysis consisting of nominal, steep, and shallow entry flight path angles. The results were compared to the breakup analysis performed for a similar vehicle, the Stardust spacecraft, which returned samples from the comet Wild 2 in 2006. This paper describes the OSIRIS-REx spacecraft and presents the results of the re-entry breakup analysis.

reentry breakup analysis↗

Robustness Computation of Dynamic Controllability in Probabilistic Temporal Networks with Ordinary Distributions

Most existing works in Probabilistic Simple Temporal Networks (PSTNs) base their frameworks on well-defined probability distributions. This paper addresses on PSTN Dynamic Controllability (DC) robustness measure, i.e. the execution success probability of a network under dynamic control.We consider PSTNs where the probability distributions of the contingent edges are ordinary distributed (e.g. non-parametric, non-symmetric). We introduce the concepts of dispatching protocol (DP) as well as DP-robustness, the probability of success under a predefined dynamic policy.We propose a fixed-parameter pseudo-polynomial time algorithm to compute the exact DP-robustness of any PSTN under \textit{NextFirst} protocol, and apply to various PSTN datasets, including the real case of planetary exploration in the context of the Mars 2020 rover, and propose an original structural analysis.

Saint-Guillain, Michael↗

On-demand Command and Control of ASTERIA with Cloud-based Ground Station Services

ASTERIA (Arcsecond Space Telescope Enabling Research in Astrophysics) was a 6-unit CubeSat technology demonstration mission that deployed from the International Space Station on November 20th, 2017. After successfully completing its 90-day primary mission that demonstrated arcsecond-level line-of-sight pointing and focal plane thermal stability for exoplanet detection, it entered an extended mission performing onboard software demonstrations to mature technology both in space and on the ground. One of the technologies was a completely cloud-based ground system leveraging Amazon Web Services (AWS) Ground Station service.Announced in December 2018 and launched in May 2019, AWS Ground Station is a fully managed ground station service that aims to reduce the overhead associated with developing and maintaining ground system infrastructure throughout the mission lifecycle. AWS Ground Station makes available the suite of features required for any ground system in support of low-Earth orbit (LEO) and medium-Earth Orbit (MEO) satellite operations on-demand and without setting up or maintaining long-term contracts. Charges are incurred on a per-minute basis for antenna usage during scheduled tracks. Support is available for S-band uplink and downlink, along with X-band narrowband and wideband downlink. Missions that use the service may reserve tracks with any licensed AWS Ground Station antennas located across each service region and have direct access to any AWS services in support of mission operations.The cloud-based architecture built around the AWS Ground Station service greatly enhanced ASTERIA mission operations by enabling end-to-end pass automation, on-demand contact scheduling and contingency planning, along with more efficient data downlink through station availability and station-to-station handovers. It incorporated open-source software, particularly NASA's AMMOS Instrument Toolkit (AIT) and Open Mission Control Technologies (OpenMCT), along with the AWS application programming interfaces (API) to the Ground Station, Elastic Compute Cloud (EC2) and Simple Storage Service (S3) services. After showcasing operability in August 2019, the team continued using and improving this novel ground system architecture until the end of mission in December 2019. This paper describes the cloud-based ground system, how it was designed, tested, and evaluated with an in-orbit spacecraft, the operational capabilities that it enabled, along with lessons learned and recommendations for future missions.

Fesq, Lorraine↗

Sample Return Container Opening Process Concept for Potential Mars Sample Return

Proposed Mars Sample Return (MSR) missions would require a pristine and secure opening method to ensure sample Contamination Control and backward Planetary Protection. In order to reach the samples, a series of five containers would need to be opened inside of a Mars Returned Sample Handling (MRSH) facility. The process would include opening the Containment Assurance Module (CAM) aboard the Earth Entry Vehicle (EEV), the Secondary Containment Vessel (SCV), Primary Containment Vessel (PCV), and the Orbiting Sample (OS) container, and finally removing and opening the Returned Sample Tube Assemblies (RSTA). Some of these containers can be opened by reversing the mechanical assembly process while others would require destructive means. Several containers are still in a conceptual design phase while others are en route to Mars aboard the M2020 rover. In order to inform the design of the containers that are still in the conceptual stages, a study was performed at each level of the containment assembly. The studies were used to determine the least destructive and most robust methods to disassemble and open the containers while minimizing risk to the samples or the personnel. In addition to the envisioned disassembly and breaching method, contingency plans were made for completing the disassembly if damage to the vehicle and containment system occurred.

Liu, Yang↗

Human Interfaces and Management of Information (HIMI) Challenges for “In-time” Aviation Safety Management Systems (IASMS)

The envisioned transformation of the National Airspace System to integrate an In-time Aviation Safety Management System(IASMS)to assure safety in Advanced Air Mobility(AAM)brings unprecedented challenges to the design of human interfaces and management of safety information. Safety in design and operational safety assurance are critical factors for how humans will interact with increasingly autonomous systems. The IASMS Concept of Operations builds from traditional commercial operator safety management and scales in complexity to AAM. The transformative changes in future aviation systems pose potential new critical safety risks with novel types of aircraft and other vehicles having different performance capabilities, flying in increasingly complex airspace, and using adaptive contingencies to manage normal and non-normal operations. These changes compel development of new and emerging capabilities that enable innovative ways for humans to interact with data and manage information. In-creasing complexity of AAM corresponds with use of predictive modeling, data analytics, machine learning, and artificial intelligence to effectively address known hazards and emergent risks. The roles of humans will dynamically evolve in increments with this technological and operational evolution. The interfaces for how humans will interact with increasingly complex and assured systems designed to operate autonomously and how information will need to be presented are important challenges to be resolved.

Lawrence J Prinzel↗

VERNE: Revealing the Mysteries and Histories of Venus

Introduction: The three Venus missions that were recently selected for upcoming flight (VERITAS, DAVINCI+, and EnVision) will be incredibly valuable to our understanding of Venus’ history, geology, and atmosphere. However, even once completed, key gaps in our knowledge of Venus, and more generally the formation and active processes on rocky, Earth-like planets, will still persist. Remaining questions include 1) how global intrinsic magnetic fields might be maintained on rocky worlds, and how they could then go extinct, and 2) what role atmospheric sulfur chemistry plays in climates of Earth-like planets, which is an increasingly timely subject as Earth’s own atmospheric sulfur content is climbing due to human activity. These questions require in-situ observations from Venus’ cloud deck, at the altitudes at which the UV absorber exists. The Venus Environment Research and Novel Exploration (VERNE) mission will address these questions with an aerial platform that will drift around the equatorial region of the planet for 9 days. VERNE will collect data to determine the identity of the mysterious UV absorber, while also taking magnetic field measurements over the tesserae, the regions on Venus that are most likely to retain remanent crustal magnetization, in order to understand the potential role of a past intrinsically-generated global magnetic field on Venus. Mission Objectives: The two major science objectives that drive the VERNE mission are: 1) Determine the identity of the Venusian unknown ultraviolet absorber(s). First observed approximately a century ago [1], the composition of Venus’ ultraviolet (UV) absorber is one of the oldest mysteries in Venus atmospheric chemistry [2,3]. While several candidate UV absorbers (mostly sulfur species) have been proposed, no consensus has been reached on its composition and its specific interactions with the atmosphere. Determining the identity of the UV absorber will aid climate models by showing how and where incident solar energy is absorbed by the atmosphere and make progress towards understanding the chemical and energetic processes taking place above Venus’ upper cloud deck [4]. 2) Determine if Venus retains evidence of a past, internally-generated magnetic field. While Venus does not currently have an intrinsically-generated magnetic field, evidence for the existence of a past field on Venus and a timeline of its decay will fill in a more holistic picture of the evolution of Venus’ geological record and atmosphere. As the oldest geologic units on the surface, Venus’ tesserae may still have remanent crustal magnetization signatures within the rocky composition [5]. In any case, the signatures detected will provide insight into Venus’ past geological and core dynamo activity. Mission Summary: VERNE includes a 3-part flight system made up of 1) an entry system with a HEEET (Heatshield for Extreme Entry Environment Technology) aeroshell, 2) an orbiter for data relay, and 3) an in-situ balloon and gondola. After entry into Venus’ atmosphere, the balloon will be deployed within the upper cloud deck, at an altitude of 62 km, over a tesserae region. The in-situ data collection will last for the duration of 2 full circumnavigations of the planet, which will take ~9 days. Instrumentation Suite: The four instruments that comprise VERNE’s instrument payload will enable the identification of the unknown UV absorber and the detection of remanent crustal magnetization if it exists in the tesserae. The proposed instrument suite cycle during mission operations is shown in Fig. 1. The four instruments are described below: 1) Adams (ion neutral mass spectrometer) has a range of 18-257 AMU and will detect and distinguish the mixing ratios of O₂, H₂O, H₂SO₄, S, S₂, S₃, S₄, S₅, S₆, S₇, S₈, SO, SO₂, OSSO, SO₃, Cl₂, FeCl₃ and other trace sulfur and organic species. The spatial (longitudinal) and temporal (day/night) variations will be observed throughout 2 circumnavigations with a sample cadence of 12 minutes. 2) Shelley (nephelometer) will determine the size distribution of the aerosols (0.4 to 36 um) in the atmosphere. With a size resolution of <0.7 um, it can determine which mode of H2SO4 is present and characterize the large (>30 um) organic particles previously detected by the Venera and Galileo missions [6,7]. 3) Herbert (UV imager) will measure UV radiance at 283 nm (the wavelength of SO2 absorption) and 365 nm (the unknown part of the absorber). UV images will be taken concurrently with the INMS and nephelometer to correlate UV absorption with abundances of the UV absorber species. 4) Vonnegut (magnetometer) has a range of >600 nT and a precision and accuracy of 1 nT. If magnetized by a past field, the crust may have retained a magnetization of up to 3 A/m2 [5]. With a noise floor of 10 nT, the magnetometer will be able to detect RCM from an altitude of 62 km, even if the thickness of the magnetized crust is just 1 km (Fig. 2). Mission Concept Design: VERNE will be launched with a mass of 3300 kg in an intermediate-high performance class vehicle with a 4-m fairing. The 475-day mission includes 466 days for the cruise, coasting, and orbit initialization phases before entry, descent, and balloon deployment. During the 9-day science phase, the aerial platform will make 2 circumnavigations of the planet at an altitude of 62 km. The INMS and the nephelometer will acquire data for 2 hours during the daytime and nighttime during each circumnavigation, while the UV imager will be on for the duration of the daytime, and the magnetometer will be operational throughout the entirety of the science phase. Data will be stored and processed with the JPL-designed Sphinx command and data handling system. Data will be sent from the balloon to the orbiter using an S-band relay link, stored on the orbiter, and then forwarded to Earth where it will be received by the DSN. Conclusion: VERNE will fill key gaps in our understanding of the history and ongoing processes related to the geology and atmosphere of Venus and rocky worlds in general. Even with adequate flight system contingencies and expected costs below the $900M New Frontiers cost cap, VERNE is not without its risks and challenges. Further trade spaces to explore include 1) using solely battery power vs. including solar panels to increase the mission duration and 2) investigating the use of lightweight materials and 3D-printed structures to reduce the gondola mass, among others. Acknowledgments: We would like to thank the JPL Planetary Science Summer School, especially our mentors Troy Hudson, Karl Mitchell, and Leslie Lowes, as well as our Team-X study lead Al Nash and the members of Team-X. We’d additionally like to thank our review panel for asking insightful questions and providing valuable feedback. References: [1] Ross, F. E. (1928) Astrophysical J., 68, 57-92. [2] Rossow, W. B. et al. (1980) J. Geophysical Research, 85, 8107-8128. [3] Pinto, J. P. et al. (2021) Nature Communications, 12, 175. [4] Titov, D. V. et al. (2007) Cosmic Research, 21, 401. [5] O’Rourke, J. et al. (2019) Geophysical Research Lett., 46, 5768–5777. [6] Limaye, S. S. et al. (2018) Astrobiology, 18(9), 1181-1198. [7] Grinspoon, D. H. et al. (2013) Planetary and Space Sci., 41(7), 515-542. [8] Parker, R. L. (2003) J. Geophysical Research, 108, 5006. *The cost information contained in this document is of a budgetary and planning nature and is intended for informational purposes only. It does not constitute a commitment on the part of JPL and/or Caltech.

H Alpert↗

Mars Sample Return (MSR) Sample Receiving Facility (SRF) Assessment Study (MSAS)

NASA, in partnership with the European Space Agency (ESA), is seeking to return Martian geological and atmospheric samples to Earth for scientific study in the early 2030s. Due to the possibility that the samples could contain extraterrestrial life, Mars Sample Return (MSR) is classified as a Category V: Restricted Earth Return mission by the NASA Planetary Protection Office. As a result of this classification, a MSR Sample Receiving Facility (SRF) must not only provide a pristine environment to ensure samples are protected from terrestrial contamination for scientific investigations, it must also provide high-containment (biosafety level 4 [BSL-4]-equivalence) to isolate the samples from Earth’s biosphere until the samples are deemed safe for release and/or sterilized. The nominal utilization period for a SRF is anticipated to be 2-5 years and is intended to enable curation activities, biohazard assessment, select early science activities, and the rapid release of samples to the scientific community. However, to account for possible delays in schedule or the identification of extant life, this anticipated period of time must be flexible to accommodate schedule extensions and contingency plans. Due to requirements for high-level biological containment and cleanliness, a traditional receiving/curation facility cannot be utilized for MSR. Therefore, beginning in 2022, NASA Johnson Space Center is performing a MSR SRF Assessment Study (MSAS) to investigate the most optimal facility modality for a MSR SRF, as well as start to define programmatic early estimate of costs and schedules before the initial design phase begins. NASA is partnering with industry contractors (architectural and engineering firms with BSL-4 and cleanroom technology experience, as well as other contracted infrastructure and construction specialists) along with selected experts from NASA, ESA, existing U.S. BSL-4 facilities, and other U.S. government agencies, to carry out the assessment study. The MSAS should also aid in the future refinement of the science requirements (e.g., contamination control, equipment accommodations) before site-specific design would commence. As part of the MSAS, NASA is planning to assess an array of possibilities for a MSR SRF. One of the main considerations is the facility modality and whether an existing BSL-4 facility can be utilized (for some or all functions); or, if new constructure would be required, would a traditional fixed facility or a modular facility the best choice. MSAS will also investigate the ability of the modalities to accommodate two different facility capability endmembers: 1) a minimal facility focusing on biohazard assessment and curation tasks with a small footprint, and 2) an enhanced facility with additional capabilities to enable expedited processing and the completion of time-sensitive and (some) sterilization-sensitive science. The assessment is intended to generate information that will inform the selection of facility modalities for high-level conceptual design development. While the assessment study will focus on SRF requirements for accommodating curation, science, and sample safety assessment infrastructure, it will also consider an array of other factors, such as ease of access for international users, decommissioning, repurposing, future sale or lease following MSR’s use of the facility, and uncontained preparatory laboratory spaces. Upon completion of the study, the preferred modality and refined requirements would be utilized for site-specific design but will not be finalized until NASA’s completion of the National Environmental Policy Act (NEPA) process.

A.D. Harrington↗

On-demand Command and Control of ASTERIA with Cloud-based Ground Station Services

ASTERIA (Arcsecond Space Telescope Enabling Research in Astrophysics) was a 6-unit CubeSat technology demonstration mission that deployed from the International Space Station on November 20th, 2017. After successfully completing its 90-day primary mission that demonstrated arcsecond-level line-of-sight pointing and focal plane thermal stability for exoplanet detection, it entered an extended mission performing onboard software demonstrations to mature technology both in space and on the ground. One of the technologies was a completely cloud-based ground system leveraging Amazon Web Services (AWS) Ground Station service. Announced in December 2018 and launched in May 2019, AWS Ground Station is a fully managed ground station service that aims to reduce the overhead associated with developing and maintaining ground system infrastructure throughout the mission lifecycle. AWS Ground Station makes available the suite of features required for any ground system in support of low-Earth orbit (LEO) and medium-Earth Orbit (MEO) satellite operations on-demand and without setting up or maintaining long-term contracts. Charges are incurred on a per-minute basis for antenna usage during scheduled tracks. Support is available for S-band uplink and downlink, along with X-band narrowband and wideband downlink. Missions that use the service may reserve tracks with any licensed AWS Ground Station antennas located across each service region and have direct access to any AWS services in support of mission operations. The cloud-based architecture built around the AWS Ground Station service greatly enhanced ASTERIA mission operations by enabling end-to-end pass automation, on-demand contact scheduling and contingency planning, along with more efficient data downlink through station availability and station-tostation handovers. It incorporated open-source software, particularly NASA's AMMOS Instrument Toolkit (AIT) and Open Mission Control Technologies (OpenMCT), along with the AWS application programming interfaces (API) to the Ground Station, Elastic Compute Cloud (EC2) and Simple Storage Service (S3) services. After showcasing operability in August 2019, the team continued using and improving this novel ground system architecture until the end of mission in December 2019. This paper describes the cloud-based ground system, how it was designed, tested, and evaluated with an inorbit spacecraft, the operational capabilities that it enabled, along with lessons learned and recommendations for future missions.

Fesq, Lorraine↗

EOS Terra Constellation Exit Review

This package presents the plans for Terra lowering its orbit by 5-6 kms and effectively removing itself from the 705km constellation in October 2022. Also, presented is all the work done to get ready for these maneuvers from both the Flight Dynamics and Flight Operations Team perspective, as well discussion of any contingencies and their associated pre-planned responses.

Dimitrios Mantziaras↗

Regenerative Life Support Systems for Exploration Habitats: Unique Capabilities and Challenges to Enable Long-Duration-Mission Habitats Beyond Low Earth Orbit

The Artemis I launch of NASA’s Space Launch System and Orion crew vehicle will mark a major milestone in the agency’s efforts to return humans to the Moon. Work is underway on the Human Landing System that will carry the next astronauts to the lunar surface, and the lunar orbiting Gateway that will host science and serve as a platform to support sustained human presence on the Moon and ultimately crewed missions to Mars. Two decades of continuous human presence on the International Space Station has provided a wealth of experience operating, upgrading, and demonstrating advanced Regenerative Environmental Control and Life Support Systems (Regen ECLSS). However, habitats that enable sustained lunar surface presence and transit to Mars will encounter many unique conditions and challenges. System characteristics including reliability, maintainability, mass, and power become significantly more critical. Operating environments associated with lower total pressure, low gravity, contingency protocols, and extensive un-crewed and dormant periods impose additional functionality requirements and alter the performance of certain critical systems. Integration and combined operations with other elements such as orbiting outposts, logistics suppliers, and mobility platforms impact capability and interface requirements. Limits on allocated water and oxygen consumable mass influence the need for higher levels of water and oxygen recovery from waste products. Impacts and challenges these unique exploration circumstances impose on the suite of Regen ECLSS systems are explored and discussed herein.

David F Howard↗

Medical countermeasures for extraterrestrial environments: Current status and future prospects with focus on acute injuries

In all space exploratory activities involving humans there are associated risks to health and well-being. Exposure to ionizing radiation represents one of the more serious health concerns. Although medical issues can arise shortly following the rare acute exposures, the more likely radiation-associated injuries will manifest in a delayed fashion following sub-acute exposures or protracted exposures to relatively low radiation doses. The radiological conditions that present these health risks during extraterrestrial space travel are presented in this article, along with current physical and medical countermeasures for such exposure contingencies. The aim of this article is to discuss radiation medical countermeasures that may be considered for future space exploration and travel. Biomedical advances have occurred toward the control and minimization of acute, sub-acute, and fractionated radiation exposure injuries, whether they stem from intentional application of radio-therapeutic procedures or unintentional, accidental terrestrial-based exposures. Those advances, based largely on novel bioengineering, genetic, and combinatorial pharmaceutical strategies, are briefly reviewed here, along with the promising prospects of additional, new and improved medical countering systems/agents that will be forthcoming with additional research and development efforts.

Acute/chronic radiation injuries↗

Communication Network Awareness Machine System Phase I Development: The Intelligent Party-Line Schema

As NextGen continues toward the full implementation of a Net-Centric Architecture (N-CA)it will inherently provide a continuous increase to the Three-Vs components (Volume, Velocity, and Variety) of big data . This will create an insurmountable environment for direct-action aviation personnel (DAAP)as the DAAP’s natural abilities to manage and process data into actionable information will be overmatched by the Three-Vs. Therefore, conducting operations within a N-CA requires that new tools and applications be researched and developed to aid the DAAP’s ability to understand and manage data, mitigate non-normals, create contingency plans and actions. This paper will describe a research area at NASA Langley Research Center known as the Intelligent Party-Line (IPL).

Intelligent Party-Line↗

Rapid Development of Instrument Thermal Models: Perspectives and Guidelines from NASA Goddard’s Instrument Design Laboratory

- The design and development of robotic spaceflight instruments is a critical part of NASA’s vision to discover and expand knowledge for the benefit of humanity - For typical flight instrument projects, thermal engineers will develop initial instrument thermal models over weeks or months, then iterate them over a project’s lifespan – In each iteration, the engineer will: - Refine their thermal models and thermal designs in accordance with updates from other subsystems - Perform trade studies - Solve very detailed and complex analysis problems, including worst-cases and contingencies - Pick hardware and plan for testing and integration - However, prior to a project being established, or for proposal development at an early conceptual stage, the luxury of multiple instrument design iterations may be limited or nonexistent – Within a short timeline, how do you complete a thermal model or explore multiple possible instrument configurations? – What are the critical parameters for your model? Which details do you include or leave out?

Kan Yang↗

Using Open Standards and NASA Open Source Simulation Tools to Model Artemis Base Camp Mission Timelines

The United States’ National Aeronautics and Space Administration (NASA) has announced that the Artemis Program will return humans to the Moon, establishing a persistent presence with the Artemis Base Camp (ABC), and extend human exploration to Mars. The NASA Exploration Systems Simulations (NExSyS) team at NASA’s Johnson Space Center is using internationally developed simulation interoperability standards and NASA open source simulation tools to support Artemis concept, analysis, designs, development, training, and ultimately operations. The NExSyS team has been tasked to support early ABC architecture and mission analysis using mission time lines developed by the crew operations mission planning team. The NExSyS team is developing a distributed simulation framework with initial Artemis element implementations to model the ABC mission timelines using the international simulation interoperability standard High Level Architecture (HLA), the Simulation Interoperability Standards Organization’s Space Reference Federation Object Model (SpaceFOM), the NASA open source Trick Simulation Environment, and another NASA open source interface package called TrickHLA. The ABC architecture is composed of a number of key surface elements and resources. Some examples of modeled elements (also known as entities) are landers, habitats, rovers, logistics carriers, and astronauts. Some examples of modeled transferable and consumable resources are power, water, oxygen, nitrogen, scientific samples, and food. These entities and resources are modeled in a collection of individual simulations called Federates. A coordinated collection of interoperable federates is called a Federation and when these federates are tied together in a coordinated simulation run, it is referred to as a Federation Execution. The federates communicate through HLA using data exchange formats defined by a collection of machine readable files called Federation Object Models (FOMs). These FOM files are based on extensions to the SpaceFOM. This enables the instantiation and sharing of objects and interactions between federates in the federation. These provide for entity and resource tracking, object transfer, and data collection. Federate interactions are used to trigger events and notify federates of entity or resource transfers. For the initial implementation, the constituent federates are Trick-based simulations that use TrickHLA to provide the required HLA-base interoperability. These Trick-based simulations provide the required modeling for the individual Artemis elements along with the associated element resources. These federates provide a means to explore traverses between surface elements and exploration sites as scheduled in a mission timeline and explore the affects traverse times have on the overall mission timeline. The mission time lines are modeled using a Trick input file event handling capabilities. Each timeline operation is handled as individual simulation events, and triggered based on previous event status, time of operation, and simulated task completions. In addition, the ABC Federation can be used to perform Monte Carlo analysis. The Monte Carlo tool can vary the inputs, timings, and malfunctions to show how various contingencies in the mission can affect the mission timeline.

Keaton Craig Dodd↗

Planning and Execution of the Three Mid-Course Correction Maneuvers for the James Webb Space Telescope

The James Webb Space Telescope (JWST) was successfully launched on December 25, 2021 12:20 UTC on an Ariane 5 rocket out of Kourou, French Guiana on a direct, lower energy manifold transfer out to the Sun Earth-Moon (SEM) L2 point. Three mid-course correction (MCC) maneuvers, designated MCC-1, MCC-1b, and MCC-2, were required to provide the energy necessary to reach L2 due to a purposeful biasing down of the launch vehicle. This paper will document the prelaunch preparation, nominal planning, contingency preparation, and successful execution of the three mid-course correction maneuvers.

Maneuver Planning↗

Flight Dynamics Planning and Operations Support for the JWST Mission

The James Webb Space Telescope (JWST) was launched from Kourou Spaceport on December 25, 2021, at 12:20 UTC on an Ariane 5 launch vehicle. The launch vehicle inserted JWST into a 30-day transfer trajectory to the Sun-Earth-Moon (SEM) Lagrange point L2 region. JWST executed three mid-course correction maneuvers (MCCs) to insert the spacecraft into a quasi-halo orbit about SEM L2; JWST will maintain its trajectory about L2 for at least 5.5 years, with a goal of at least 10.5 years. This paper summarizes the flight dynamics support for JWST, including the prelaunch nominal trajectory design, the launch window analysis, contingency planning for trajectory-related anomalies, mission operations support for the first 6 months, and a comparison of the planned and achieved actual JWST trajectory results. The orbit determination strategy, both planned and executed, will be summarized, and the method of addressing the anomalies as they occurred will be included.

Space Operations↗

Hazard Perception & Avoidance (HPA): Part Task 1 - Results Outbrief

n April 2022, the Human Autonomy Teaming Lab (NASA Ames Research Center) conducted a manned, human-in-the-loop (HITL) simulation. This part task HITL began the lab’s Hazard Perception and Avoidance (HPA) technical work under NASA’s Advanced Air Mobility (AAM), Automated Flight and Contingency Management (AFCM) Sub-Project. The goals were to assess levels of automation for manned, electric vertical takeoff and landing (eVTOL) aircraft. This simulation tested manual and automated Resolution Advisory (RA) responses and return-to-course (RTC) maneuvers for the first version of the Airborne Collision Avoidance System’s (ACAS) rotary-wing (Xr) variant. This was conducted on a fixed-based simulator designed to fly eVTOL aircraft while maneuvering for intruding traffic. Variables for this study included levels of autonomy (i.e., manual and automated) as well as the types of alerts at the onset of conflicts (i.e., Corrective and RA). The data collected included response times, losses of well clear, and maneuver sizes and durations as well as subjective ratings like acceptability, and perceived workload. Additional details and future anticipations are also discussed.

air taxis↗