Search NASA⌕ Search

SEARCH · Search NASA

Results for “Generation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,531 records · Page 85

Emulation and detection of physical faults and cyber-attacks on building energy systems through real-time hardware-in-the-loop experiments

The increasing use of remote or mobile access, integrated wearable technologies, data exchange, and cloud-based data analytics in modern smart buildings is steering the building industry towards open communication technologies. The increased connectivity and accessibility could lead to more cyber-attacks in smart buildings. On the other hand, physical faults (e.g., HVAC -heating, ventilation, and air-conditioning faults) may have similar adverse impacts as those from the cyber-attacks on building energy systems, such as occupant discomfort, energy wastage, and equipment downtime. However, current physical behavior-based anomaly detection methods fail to differentiate between cyber-attacks and physical faults in building energy systems. Moreover, the challenge in collecting real-world threat data with ground truth has led researchers to rely on numerical models with user-defined assumptions, which may not accurately reflect real-world conditions due to the lack of in-situ experimental datasets. To address these challenges and gaps, this paper presents a flexible hardware-in-the-loop (HIL) testbed for generating cyber-attack and physical fault datasets and demonstrating threat detection algorithms in a real building automation system (BAS) environment. This testbed combines hardware (i.e., real BAS with local HVAC controllers and a physical network) with software (i.e., high-fidelity models to represent behaviors of building envelope and HVAC energy systems), enabling emulations of realistic threats. Five HIL experiments, including one baseline without any threats, two with physical faults, and two with cyber-attacks, were conducted to generate datasets containing detailed network traffic and system states. A joint classification framework, incorporating a network analyzer and a physical HVAC fault detector, was proposed to automatically detect cyber-physical abnormalities on BAS at both the network and the physical HVAC levels. The network analyzer comprises a conditional random fields (CRF) based command validator and a statistics-based detection strategy. The fault detector employs a weather and schedule-based pattern matching and feature-based principal component analysis (WPM-FPCA) method. Evaluation of the classification using four metrics from the multi-class confusion matrix revealed an average accuracy of 90.2%, recall of 89.7%, precision of 88.5% and F1-score of 89.2%. Finally, these results demonstrate that the proposed joint classification framework can effectively differentiate between specific types of cyber-attacks (e.g., device reinitialization attack, network Denial-of-Service attack) and physical faults (e.g., air handling unit operational fault, cooling coil valve stuck) in real time for improved building energy management.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Real-time applications for remotely sensed lightning observations

Real-time monitoring of lightning activity, including the estimation of the location where the flash strikes the earth, provides a basis for the assessment of the impact of both the lightning hazard and severe weather on daily test and operation schedules. Applications to range meteorology are considered, taking into account the Space Transportation System, the handling of explosive materials, and test operations. Attention is given to details regarding forecasting and nowcasting, a low-cost lightning display system for electrical storm tracking and the support of lightning research activities, two versions of employed software, an example of the storm diagnostics and display products which will be available from the next generation weather radar, and a summary of the evolution of 12 New Mexico thunderstorms.

Goodman, S. J.↗

Jet Propulsion Laboratory: Annual Report 1999

The Jet Propulsion Laboratory, located in the foothills near Pasadena, California, is the nation's lead center for the robotic exploration of space. Intense activity in space missions was the hallmark of the Jet Propulsion Laboratory as a new generation of smaller, less expensive spacecraft were sent out from Earth. From late 1998 to mid-1999, JPL launched a craft testing a futuristic ion engine, an orbiter and lander bound for Mars, a mission to fly by a comet and return a sample of its dust to Earth, a small infrared telescope, and an Earth-circling satellite that uses radar to gauge winds over the oceans. This unprecedented schedule resulted in spectacular achievements, tempered by highly visible mission losses. Weighed together, the successes and failures dramatically underscored the difficulty and risk involved in the unique business of space science and exploration. Among the achievements, the ion-engine-powered Deep Space 1, comet-bound Stardust and Earth-orbiting SeaWinds were joined by such ongoing missions as Mars Global Surveyor, Galileo and Cassini in delivering on their promise and, in some cases, providing surprising new views of space and Earth. At the same time, mission teams were disappointed by the losses of an orbiter and lander at Mars, as well as a small infrared telescope. JPL worked closely with NASA to learn from these experiences and build successful future missions. The Laboratory also achieved a key goal by winning the International Organization of Standards' 'ISO 9001' certification - a standard shared by the world's best engineering organizations. As the year rolled to a close, clocks rolled over from 1999 to 2000. Operations teams at JPL and NASA watched with satisfaction as a major campaign of Year 2000 readiness paid off with no problems among the thousands of computer systems that support the Laboratory's missions. With that auspicious beginning, JPL was positioned to step into the 21st century and embark on even yet unimagined future explorations.

Jet Propulsion Laboratory (JPL)↗

Fast, Affordable, Science and Technology Satellite (FASTSAT) Huntsville-01 (HSV-01) Spacecraft Lessons Learned Report

The Fast Affordable Science and Technology Satellite (FASTSAT) project is a path finding effort to produce reliable satellite busses for different applications at an unprecedented speed and low cost. The project is designed to be a generational project and the first satellite produced is the Huntsville -01 (HSV-01) spacecraft. The subject of this report is the lessons learned gained during the development, testing, and up to the delivery of the FASTSAT HSV -01 spacecraft. The purpose of this report is to capture the major findings that will greatly benefit the future FASTSAT satellites and perhaps other projects interested in pushing the boundaries for cost and schedule. The FASTSAT HSV -01 primary objectives, success criteria, and team partners are summarized to give a frame of reference to the lessons learned.

Smith, Timothy A.↗

Computational Approaches to Simulation and Optimization of Global Aircraft Trajectories

This study examines three possible approaches to improving the speed in generating wind-optimal routes for air traffic at the national or global level. They are: (a) using the resources of a supercomputer, (b) running the computations on multiple commercially available computers and (c) implementing those same algorithms into NASA’s Future ATM Concepts Evaluation Tool (FACET) and compares those to a standard implementation run on a single CPU. Wind-optimal aircraft trajectories are computed using global air traffic schedules. The run time and wait time on the supercomputer for trajectory optimization using various numbers of CPUs ranging from 80 to 10,240 units are compared with the total computational time for running the same computation on a single desktop computer and on multiple commercially available computers for potential computational enhancement through parallel processing on the computer clusters. This study also re-implements the trajectory optimization algorithm for further reduction of computational time through algorithm modifications and integrates that with FACET to facilitate the use of the new features which calculate time-optimal routes between worldwide airport pairs in a wind field for use with existing FACET applications. The implementations of trajectory optimization algorithms use MATLAB, Python, and Java programming languages. The performance evaluations are done by comparing their computational efficiencies and based on the potential application of optimized trajectories. The paper shows that in the absence of special privileges on a supercomputer, a cluster of commercially available computers provides a good option for computing wind-optimal trajectories for national and global air traffic system studies.

Ng, Hok K.↗

La Hague Legacy Waste Recovery Program: Scope, Progress and Issues -12080

A significant inventory of process waste of varying natures and quantities has been generated during the thirty years of operation of UP2 400 facility on the site of La Hague, France. The retrieval, packaging and final storage of such an inventory has never been achieved before in France and thus requires the design and qualification of new processes, equipment, and waste packages. Following AREVA strategic decisions and French safety authority requirements, the legacy waste program has begun around the year 2000 and is scheduled to be completed around the year 2025. It is under the responsibility of AREVA Site Value Development Project teams. For each category of waste to be recovered, AREVA teams conducted detailed investigations, defined recovery modes, treatment processes, as well as final waste package forms, which they subsequently submitted to French safety and waste management authorities. A Task force initiative was subsequently launched to optimize the program cost and scenario, and lead to an optimization of about 15% of the entire program. The qualification of processes and waste packages required a significant amount of research and development which is now well under way for processes, and scheduled to be completed in 2015. Preparation work has begun on several installations to clear space for the construction of future retrieval facilities, scheduled to begin in the coming three years. La Hague Legacy waste retrieval program represents a significant challenge in the sense that it covers a significant variety and quantity of waste needing recovery and reconditioning, with tight financial objectives and a binding recovery schedule. During the past five years, AREVA SVD successfully conducted design, research, development, and qualification activities which lead to the definition of qualified processes and waste packages for each retrieval program. Preparation work and supplier consultations are now on-going, in order to meet our objectives of beginning retrieval operations in compliance with our commitments to the safety authorities, in 2015 and 2016. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technology Development Roadmaps - a Systematic Approach to Maturing Needed Technologies

Abstract. Planning and decision making represent important challenges for all projects. This paper presents the steps needed to assess technical readiness and determine the path forward to mature the technologies required for the Next Generation Nuclear Plant. A Technology Readiness Assessment is used to evaluate the required systems, subsystems, and components (SSC) comprising the desired plant architecture and assess the SSCs against established Technology Readiness Levels (TRLs). A validated TRL baseline is then established for the proposed physical design. Technology Development Roadmaps are generated to define the path forward and focus project research and development and engineering tasks on advancing the technologies to increasing levels of maturity. Tasks include modeling, testing, bench-scale demonstrations, pilot-scale demonstrations, and fully integrated prototype demonstrations. The roadmaps identify precise project objectives and requirements; create a consensus vision of project needs; provide a structured, defensible, decision-based project plan; and, minimize project costs and schedules.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Sustainable Energy Solutions Task 5.1:Expand the Number of Faculty Working in Wind Energy: Wind Energy Supply Chain and Logistics

Wind as a source of energy has gained a significant amount of attention because it is free and green. Construction of a wind farm involves considerable investment, which includes the cost of turbines, nacelles, and towers as well as logistical costs such as transportation of oversized parts and installation costs such as crane-rental costs. The terrain effects at the project site exert considerable influence on the turbine assembly rate and the project duration, which increases the overall installation cost. For higher capacity wind turbines (>3MW), the rental cost of the cranes is significant. In this study, the impact of interest rate, sales price of electricity, terrain effects and availability of cranes on the duration of installation and payback period for the project is analyzed. Optimization of the logistic activities involved during the construction phase of a wind farm contributes to the reduction of the project duration and also increases electricity generation during the construction phase.

17 WIND ENERGY↗

Sampling Size Optimization for Bioburden Density Estimation in Planetary Protection

Planetary protection (PP) is a discipline that focuses on minimizing the biological contamination of spacecraft to ensure compliance with international policy. Precise estimation of bioburden - the total number of microbes in or on spacecraft hardware – and the bioburden density are of utmost importance for PP. Such estimation is the way concordance with requirements is demonstrated, and it is critical for quantifying the potential risk of inadvertently contaminating other planetary bodies. Although a suite of molecular techniques have been used to thoroughly characterize and profile the microbiome of various cleanroom environments and spacecraft, the gold standard remains the physical enumeration of microbes via culturing of samples directly taken from spacecraft and associated surfaces. However, due to technical, budgetary, and programmatic constraints, only a manageable portion (around 10%) of the entire spacecraft surface is directly sampled with cotton swabs or wipes. To generate the bioburden current best estimate (CBE) for components not directly verifiable, the accepted approach is to apply a NASA-defined bioburden estimate based on the components’ manufacturing or assembly environment. This approach utilizes a prespecified bioburden density estimation that applies a maximum value across the total surface area of the specified component. For hardware components that underwent similar assembly processes, an implied bioburden is adopted for all components, based on a direct verification of a representative component within the same lot. Once all components have a CBE, the bioburden estimates are generated. In previous publication [ 1], we have shown that statistical risks quantifying the accuracy of the estimates for sampled, prespecified, and implied components can be derived and ranked. For mean squared error (MSE) function, the risks are available analytically and hence a cost function can be obtained to optimize the risks with respect to the sampling area and sampling cost. Since the sampling area and sampling cost are two complimentary variables, their sum will have a well-defined minimum. This paper presents the multivariate optimization of the integrated risk of an empirical Bayes estimator to determine the optimal sampling schedule for a given number of components. It is assumed that given a number of components, N, the bioburden density for each component can either be sampled, implied, or prespecified. The multivariate optimization searches through different options to sample, imply or prespecify the bioburden density for a component, and account for the component’s surface area and cost of sampling. The idea of the optimization is based on the observation that the statistical risk of using an estimator is a monotonically decreasing function of the sampled area. The larger the sampled area, the lower the risk of using the estimator as the estimator becomes more and more accurate as the sampling area increases. On the other hand, the cost of sampling is monotonically increasing as the sampled surface grows. This makes the risk and total cost of sampling complimentary variables which can be counterbalanced to achieve an optimal overall value with respect to the sampled surface. In this paper, the integrated risk has been used to quantify the accuracy of the estimator. This risk has been selected because it depends on neither the true value of the parameter nor on the collected data. The cost of each sample was also available to obtain the total cost of sampling of N components. The paper will present the results based on computer-simulated data as well as the data collected during the InSight mission. The computer-simulated data have N components with randomly generated total areas and each component assigned to one of the three categories according to the method of estimating of bioburden density: sampled, implied, or prespecified. The cost of sampling is also available. The cost of sampling is estimated based on a cost model provided by the planetary protection group at JPL. For this paper, the overall cost was assumed to be a linear function of exposure. The optimization process finds the allocation of the components to the three categories that minimizes the tradeoff between integrated risk and total cost. For the InSight data, a set of components is selected representing all three categories, and optimization is performed to determine if the performed allocation was optimal or if a better allocation could have been obtained. To the best of our knowledge, this work is the first attempt not only perform an accurate estimation of bioburden density but also do it in an optimal way.

97 - MATHEMATICS AND COMPUTING↗

Hierarchical fractional-step approximations and parallel kinetic Monte Carlo algorithms

We present a mathematical framework for constructing and analyzing parallel algorithms for lattice kinetic Monte Carlo (KMC) simulations. The resulting algorithms have the capacity to simulate a wide range of spatio-temporal scales in spatially distributed, non-equilibrium physiochemical processes with complex chemistry and transport micro-mechanisms. Rather than focusing on constructing exactly the stochastic trajectories, our approach relies on approximating the evolution of observables, such as density, coverage, correlations and so on. More specifically, we develop a spatial domain decomposition of the Markov operator (generator) that describes the evolution of all observables according to the kinetic Monte Carlo algorithm. This domain decomposition corresponds to a decomposition of the Markov generator into a hierarchy of operators and can be tailored to specific hierarchical parallel architectures such as multi-core processors or clusters of Graphical Processing Units (GPUs). Based on this operator decomposition, we formulate parallel Fractional step kinetic Monte Carlo algorithms by employing the Trotter Theorem and its randomized variants; these schemes, (a) are partially asynchronous on each fractional step time-window, and (b) are characterized by their communication schedule between processors. The proposed mathematical framework allows us to rigorously justify the numerical and statistical consistency of the proposed algorithms, showing the convergence of our approximating schemes to the original serial KMC. The approach also provides a systematic evaluation of different processor communicating schedules. We carry out a detailed benchmarking of the parallel KMC schemes using available exact solutions, for example, in Ising-type systems and we demonstrate the capabilities of the method to simulate complex spatially distributed reactions at very large scales on GPUs. Finally, we discuss work load balancing between processors and propose a re-balancing scheme based on probabilistic mass transport methods.

97 MATHEMATICS AND COMPUTING↗

Deep Vadose Zone-Applied Field Research Initiative Fiscal Year 2011 Annual Report

This annual report describes the background of the Deep Vadose Zone-Applied Field Research Initiative, and some of the programmatic approaches and transformational technologies in groundwater and deep vadose zone remediation developed during fiscal year 2011. The Department of Energy (DOE) Office of Technology Innovation and Development's (OTID) mission is to transform science into viable solutions for environmental cleanup. In 2010, OTID developed the Impact Plan, Science and Technology to Reduce the Life Cycle Cost of Closure to outline the benefits of research and development of the lifecycle cost of cleanup across the DOE complex. This plan outlines OTID's ability to reduce by $50 billion, the $200 billion life-cycle cost in waste processing, groundwater and soil, nuclear materials, and deactivation and decommissioning. The projected life-cycle costs and return on investment are based on actual savings realized from technology innovation, development, and insertion into remedial strategies and schedules at the Fernald, Mound, and Ashtabula sites. To achieve our goals, OTID developed Applied Field Research Initiatives to facilitate and accelerate collaborative development and implementation of new tools and approaches that reduce risk, cost and time for site closure. The primary mission of the Deep Vadose Zone-Applied Field Research Initiative (DVZ-AFRI) is to protect our nation's water resources, keeping them clean and safe for future generations. The DVZ-AFRI was established for the DOE to develop effective, science-based solutions for remediating, characterizing, monitoring, and predicting the behavior and fate of deep vadose zone contamination. Subsurface contaminants include radionuclides, metals, organics, and liquid waste that originated from various sources, including legacy waste from the nation's nuclear weapons complexes. The DVZ-AFRI project team is translating strategy into action by working to solve these complex challenges in a collaborative environment that leverages technology and scientific expertise from DOE, Pacific Northwest National Laboratory, CH2M HILL Plateau Remediation Company, and the broad scientific research community. As project manager for the DVZ-AFRI, I have had the privilege this past year to team with creative, talented members of the scientific community nationwide to develop effective long-term solutions to address deep vadose zone contamination. This report highlights how the DVZ-AFRI project team is delivering results by achieving significant programmatic accomplishments, and developing and field-testing transformational technologies to address the nation's most pressing groundwater and vadose zone contamination problems.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Regional Study: Andhra Pradesh [PowerPoint]

This chapter on Andhra Pradesh is one of six state chapters included in Appendix C of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study). The objective of the state chapters is to provide modeling assumptions, results, and next steps to use and improve the model specific to each state. The model has inherent uncertainties, particularly in how the intrastate transmission network and RE generation projects will develop (e.g., locations, capacities). The model also does not include information on contracts or must-run status of particular plants for reliability purposes. By providing details on the higher spatial resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.'

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Regional Study: Gujarat

This chapter on Andhra Pradesh is one of six state chapters included in Appendix C of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study). The objective of the state chapters is to provide modeling assumptions, results, and next steps to use and improve the model specific to each state. The model has inherent uncertainties, particularly in how the intrastate transmission network and RE generation projects will develop (e.g., locations, capacities). The model also does not include information on contracts or must-run status of particular plants for reliability purposes. By providing details on the higher spatial resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.'

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Regional Study: Karnataka

This chapter on Andhra Pradesh is one of six state chapters included in Appendix C of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study). The objective of the state chapters is to provide modeling assumptions, results, and next steps to use and improve the model specific to each state. The model has inherent uncertainties, particularly in how the intrastate transmission network and RE generation projects will develop (e.g., locations, capacities). The model also does not include information on contracts or must-run status of particular plants for reliability purposes. By providing details on the higher spatial resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.'

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Regional Study: Maharashtra

This chapter on Andhra Pradesh is one of six state chapters included in Appendix C of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study). The objective of the state chapters is to provide modeling assumptions, results, and next steps to use and improve the model specific to each state. The model has inherent uncertainties, particularly in how the intrastate transmission network and RE generation projects will develop (e.g., locations, capacities). The model also does not include information on contracts or must-run status of particular plants for reliability purposes. By providing details on the higher spatial resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.'

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Regional Study: Rajasthan

This chapter on Andhra Pradesh is one of six state chapters included in Appendix C of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study). The objective of the state chapters is to provide modeling assumptions, results, and next steps to use and improve the model specific to each state. The model has inherent uncertainties, particularly in how the intrastate transmission network and RE generation projects will develop (e.g., locations, capacities). The model also does not include information on contracts or must-run status of particular plants for reliability purposes. By providing details on the higher spatial resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.'

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Regional Study: Tamil Nadu

This chapter on Tamil Nadu is one of six state chapters included in Appendix C of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study). The objective of the state chapters is to provide modeling assumptions, results, and next steps to use and improve the model specific to each state. The model has inherent uncertainties, particularly in how the intrastate transmission network and RE generation projects will develop (e.g., locations, capacities). The model also does not include information on contracts or must-run status of particular plants for reliability purposes. By providing details on the higher spatial resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.'

24 POWER TRANSMISSION AND DISTRIBUTION↗

Extreme-scale stochastic optimization and simulation via learning-enhanced decomposition and parallelization (Final Technical Report)

Stochastic optimization and simulation models ubiquitously arise in designing and operating complex service/engineering systems. They can be extreme in scale due to high-dimensional data and decisions, and can also involve decisions made sequentially in response to newly revealed data, both causing significant computational challenge. The objective of this research is to explore a unified framework that integrates machine learning with discrete optimization and risk-averse modeling, to improve the efficiency of decomposition paradigms for stochastic optimization and simulations at extreme scale. The models we consider represent a broad class of complex decision-making problems, where 0-1 or continuous decisions are made before and/or after knowing multiple sources of uncertainties that could be correlated. We will employ machine learning methods to dynamically decide and prioritize computational procedures, including cut generation, branching, and bounding of the optimal objective. Furthermore, the research will shed new lights on the traditional decomposition algorithms for extreme-scale computing. Deliverables of the research include new modeling and computational methods for advancing the state-of-the-art research in optimization and simulation, bringing many relevant risk-averse, data-driven optimization problems in practice within the range of tractability. Examples include distributed computing server scheduling and sensor deployment for monitoring critical infrastructures. Success in this effort will enable progress in solving multiple extreme-scale problems in the complex system design and operations arising from DoE missions in energy, environment, and national security.

24 POWER TRANSMISSION AND DISTRIBUTION↗