Search NASA⌕ Search

SEARCH · Search NASA

Results for “Marginal Distribution”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,531 records · Page 85

Long-run Marginal Emission Rates for Electricity - Workbooks for 2023 Cambium Data

These workbooks contain modeled estimates of long-run marginal emission rates (LRMER) for the contiguous United States' electric sector. A LRMER is an estimate of the rate of emissions that would be either induced or avoided by a change in electric demand, taking into account how the change could influence both the operation as well as the structure of the grid (i.e., the building and retiring of capital assets, such as generators and transmission lines). These workbooks provide data for 18 GEA regions covering the contiguous United States. Mappings of these regions to ZIP codes and counties is given in this workbook in the corresponding tabs. For more data underlying these emissions factors, see the Cambium 2023 project at https://scenarioviewer.nrel.gov/. For more details on input assumptions and methodology see the associated report (Cambium 2023 Scenario Descriptions and Documentation, https://www.nrel.gov/docs/fy24osti/88507.pdf). Users are advised to review section 4 of the report, which discusses limitations and caveats of the data. This data is planned to be updated annually. Information on the latest versions can be found at https://www.nrel.gov/analysis/cambium.html.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Flexible $I_{Q}\!\!-\!\!V$ Scheme of a DFIG for Rapid Voltage Regulation of a Wind Power Plant

This paper proposes a flexible reactive current-to-voltage (I Q -V) scheme of a doubly-fed induction generator (DFIG) for the rapid voltage regulation of a wind power plant (WPP). In the proposed scheme, the WPP controller dispatches different voltage set points to the DFIGs depending on their rotor voltage margins. The DFIGs inject different reactive power with the flexible I Q -V schemes implemented in the rotor-side and grid-side converters. The I Q -V characteristic, which consists of the gain and width of a linear band and I Q capability, varies with time depending on the I Q capability of the converters and a voltage dip at the point of interconnection (POI). To increase the I Q capability during a fault, the active current is reduced in proportion to a voltage dip. If the I Q capability and/or the POI voltage dip are large, the I Q -V gain is set to be high, thereby providing rapid voltage regulation. To avoid an overvoltage after the fault clearance, a rapid I Q reduction scheme is implemented in the WPP and DFIG controllers. The performance of the proposed flexible scheme was verified under scenarios with various disturbances. In conclusion, the proposed scheme can help increase wind power penetration without jeopardizing voltage stability.

17 WIND ENERGY↗

Service Life Extension of the Propulsion System of Long-Term Manned Orbital Stations

One of the critical non-replaceable systems of a long-term manned orbital station is the propulsion system. Since the propulsion system operates beginning with the launch of station elements into orbit, its service life determines the service life of the station overall. Weighing almost a million pounds, the International Space Station (ISS) is about four times as large as the Russian space station Mir and about five times as large as the U.S. Skylab. Constructed over a span of more than a decade with the help of over 100 space flights, elements and modules of the ISS provide more research space than any spacecraft ever built. Originally envisaged for a service life of fifteen years, this Earth orbiting laboratory has been in orbit since 1998. Some elements that have been launched later in the assembly sequence were not yet built when the first elements were placed in orbit. Hence, some of the early modules that were launched at the inception of the program were already nearing the end of their design life when the ISS was finally ready and operational. To maximize the return on global investments on ISS, it is essential for the valuable research on ISS to continue as long as the station can be sustained safely in orbit. This paper describes the work performed to extend the service life of the ISS propulsion system. A system comprises of many components with varying failure rates. Reliability of a system is the probability that it will perform its intended function under encountered operating conditions, for a specified period of time. As we are interested in finding out how reliable a system would be in the future, reliability expressed as a function of time provides valuable insight. In a hypothetical bathtub shaped failure rate curve, the failure rate, defined as the number of failures per unit time that a currently healthy component will suffer in a given future time interval, decreases during infant-mortality period, stays nearly constant during the service life and increases at the end when the design service life ends and wear-out phase begins. However, the component failure rates do not remain constant over the entire cycle life. The failure rate depends on various factors such as design complexity, current age of the component, operating conditions, severity of environmental stress factors, etc. Development, qualification and acceptance test processes provide rigorous screening of components to weed out imperfections that might otherwise cause infant mortality failures. If sufficient samples are tested to failure, the failure time versus failure quantity can be analyzed statistically to develop a failure probability distribution function (PDF), a statistical model of the probability of failure versus time. Driven by cost and schedule constraints however, spacecraft components are generally not tested in large numbers. Uncertainties in failure rate and remaining life estimates increase when fewer units are tested. To account for this, spacecraft operators prefer to limit useful operations to a period shorter than the maximum demonstrated service life of the weakest component. Running each component to its failure to determine the maximum possible service life of a system can become overly expensive and impractical. Spacecraft operators therefore, specify the required service life and an acceptable factor of safety (FOS). The designers use these requirements to limit the life test duration. Midway through the design life, when benefits justify additional investments, supplementary life test may be performed to demonstrate the capability to safely extend the service life of the system. An innovative approach is required to evaluate the entire system, without having to go through an elaborate test program of propulsion system elements. Evaluating every component through a brute force test program would be a cost prohibitive and time consuming endeavor. ISS propulsion system components were designed and built decades ago. There are no representative ground test articles for some of the components. A 'test everything' approach would require manufacturing new test articles. The paper outlines some of the techniques used for selective testing, by way of cherry picking candidate components based on failure mode effects analysis, system level impacts, hazard analysis, etc. The type of testing required for extending the service life depends on the design and criticality of the component, failure modes and failure mechanisms, life cycle margin provided by the original certification, operational and environmental stresses encountered, etc. When specific failure mechanism being considered and the underlying relationship of that mode to the stresses provided in the test can be correlated by supporting analysis, time and effort required for conducting life extension testing can be significantly reduced. Exposure to corrosive propellants over long periods of time, for instance, lead to specific failure mechanisms in several components used in the propulsion system. Using Arrhenius model, which is tied to chemically dependent failure mechanisms such as corrosion or chemical reactions, it is possible to subject carefully selected test articles to accelerated life test. Arrhenius model reflects the proportional relationship between time to failure of a component and the exponential of the inverse of absolute temperature acting on the component. The acceleration factor is used to perform tests at higher stresses that allow direct correlation between the times to failure at a high test temperature to the temperatures to be expected in actual use. As long as the temperatures are such that new failure mechanisms are not introduced, this becomes a very useful method for testing to failure a relatively small sample of items for a much shorter amount of time. In this article, based on the example of the propulsion system of the first ISS module Zarya, theoretical approaches and practical activities of extending the service life of the propulsion system are reviewed with the goal of determining the maximum duration of its safe operation.

Kamath, Ulhas↗

International Space Station Evolution Data Book: Baseline Design - Volume 1

The International Space Station (ISS) will provide an Earth-orbiting facility that will accommodate engineering experiments as well as research in a microgravity environment for life and natural sciences. The ISS will distribute resource utilities and support permanent human habitation for conducting this research and experimentation in a safe and habitable environment. The objectives of the ISS program are to develop a world-class, international orbiting laboratory for conducting high-value scientific research for the benefit of humans on Earth; to provide access to the microgravity environment; to develop the ability to live and work in space for extended periods; and to provide a research test bed for developing advanced technology for human and robotic exploration of space. The current design and development of the ISS has been achieved through the outstanding efforts of many talented engineers, designers, technicians, and support personnel who have dedicated their time and hard work to producing a state-of-the-art Space Station. Despite these efforts, the current design of the ISS has limitations that have resulted from cost and technology issues. Regardless, the ISS must evolve during its operational lifetime to respond to changing user needs and long-term national and international goals. As technologies develop and user needs change, the ISS will be modified to meet these demands. The design and development of these modifications should begin now to prevent a significant lapse in time between the baseline design and the realization of future opportunities. For this effort to begin, an understanding of the baseline systems and current available opportunities for utilization needs to be achieved. Volume I of this document provides the consolidated overview of the ISS baseline systems. It also provides information on the current facilities available for pressurized and unpressurized payloads. Information on current plans for crew availability and utilization; resource timelines and margin summaries including power, thermal, and storage volumes; and an overview of the ISS cargo traffic and the vehicle traffic model is also included.

Jorgensen, Catherine A.↗

Energy Efficiency and Infrastructure Upgrades on Nuclear Clean-up Sites: The Hanford Experience - 18641

The Hanford site, located in southeastern Washington, produced much of our nation's weapons-grade plutonium for the Defense nuclear weapons program. This production lasted the better part of four decades with production ending in 1987. Since 1987, the focus of the Hanford site has turned to clean-up activities. Mission Support Alliance (MSA) is the integrator of the multi-contractor effort to clean up the Hanford site. MSA collaborates with the U.S. Department of Energy (DOE) and all Hanford site contractors in finding and implementing new, cost-saving, safe and practical solutions to cleanup challenges with a continual focus on innovative processes and technologies that reduce costs, energy use and bring safety improvements to the site. Support Services include environmental integration and land management; fleet and road maintenance; water/electric and utilities; cyber security and information management as well as the preservation of the site's cultural artifacts. This paper describes the process, challenges, and focus on infrastructure upgrade and energy efficiency projects in the context of a multi-contractor nuclear clean-up site. Project development and new technology deployment at Hanford has long been plagued with economic challenges. For example, despite extensive auditing, analysis, and project development, most of the energy-related projects on the Hanford site have gone unfunded due to the low cost of electricity, the relatively high cost of labor, and costs associated with detailed safety and cultural reviews. - The Hanford site is a direct-service customer of the Bonneville Power Administration (BPA) and has a marginal electricity rate of $0.033/kWh. - Labor costs on the Hanford site track high because of the requirements associated with the safety and security necessary to operate a legacy nuclear weapons complex. - In partnership with three federally recognized and other affected Native American tribes (Yakama Nation, Confederated Tribes of the Umatilla Indian Reservation, the Nez Perce Tribe, and Wanapum People), most activities on the Hanford site are afforded in-depth cultural reviews. To work within these constraints, the MSA Energy Management team has embarked on a three-pronged approach to energy project development: Program Visibility: The MSA Energy Management team has promoted both project opportunities and requirements across the Hanford site. This information comes in the form of site-wide newsletters, group meetings, e-mails, success stories, and recognition of staff. Single-point Analysis: To by-pass the inevitable duplications of effort, learning curve issues, and to improve project consistency/delivery, the MSA Energy Management team serves as the single resource to the site for energy project analysis. This resource includes initial assessment, engineering analysis, efficiency calculation and project recommendations. Contractor/utility Interface: In addition to the infrastructure under its own purview, MSA provides all support services for the contractor/utility interface. These activities include formulation and submission of incentive-based efficiency projects, project tracking, and incentive awards. All incentive awards are forwarded to the relevant contractor and then highlighted in the visibility campaign. Successful energy efficiency projects at Hanford have included high efficiency heating, ventilation, air conditioning (HVAC) systems, interior and exterior lighting/lighting control systems, pump and motor systems, and the right-sizing of transformers and area-wide electrical distribution systems. Prior to the initiation of this program and structure (roughly 3 years ago) the average annual energy efficiency incentive applied for and received was under $10,000, with an annual energy savings of approximately 36,000 kilowatt hours (kWh). In fiscal year 2017, the annual incentive received was over $419,000, with identified energy savings of over 1.3 million kWh. Details and case studies of the major project accomplishments are included. The success of this program can be traced to an understanding of the constraints, the development of a program to address these constraints, and good communication/coordination across DOE and the multiple contractors serving the Hanford site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radiological Verification for the Remediation of LLRW at the Port Granby Project - 19210

The Port Granby Project is part of the Port Hope Area Initiative (PHAI) that Canadian Nuclear Laboratory (CNL) is using to manage long-term historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the urban setting of Port Hope, Ontario. Port Granby remediation scope includes constructing a new, secure long-term waste management facility (LTWMF) and supporting infrastructure and excavating and relocating LLRW and marginally contaminated soil from the Port Granby Waste Management Facility (PGWMF) which accepted waste until the 1980's to the newly constructed LTWMF. The PGWMF contains an estimated 450,000 cubic meters of LLRW deposited in unmarked and unlined trenches throughout the southern portion of the site that borders Lake Ontario. Project requirements include excavating contaminated material, verifying that the trench bottoms are below action levels using Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance, and final restoration. This paper describes challenges of meeting remediation verification requirements using traditional field and laboratory confirmation methods in areas of deep trench areas located in rugged terrain with ponded water and mud and presents a process that has expedited the traditional MARSSIM method for verification with greater productivity, and with enhanced safety and reliability as compared to the use of traditional methods alone. This enhanced process has been successfully employed for in-situ verification so that the excavated area can be backfilled and returned to a vegetative state. This enhanced process has been examined by federal regulatory staff through the course of their onsite audits and outcomes from these examinations have all been positive. The method involves a visual inspection and traditional walkover of the area to identify any areas with radiation measurements above the region's background followed by a full area survey performed using Wood's proprietary Orion ScanPlotSM system. The ScanPlotSM data is evaluated, mapped and overlaid on top of an aerial image of the surveyed area allowing remaining radiological material at surface or near surface to be quickly and easily identified for removal. Field staff then collect soil samples from evenly distributed points within the surveyed area and field screen the samples using an X-ray fluorescence (XRF) analysis for the three primary contaminates of potential concern (CoPCs) (arsenic, uranium and lead) that are indicative of the historical contamination. Samples passing XRF field screening are packaged and sent to a local laboratory for a full suite of analyses and checked against the CoPC list to assess whether the soil matches the profile for nearby native soils and passes the remediation goals. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impacts of climate warming on the frozen ground and eco-hydrology in the Yellow River source region, China

The Yellow River source region is located in the transition region between permafrost and seasonally frozen ground on the northeastern Qinghai-Tibet Plateau. The region has experienced severe climate change, especially air temperature increases, in past decades. In this study, we employed a geomorphology-based eco-hydrological model (GBEHM) to assess the impacts of climate change on the frozen ground and eco-hydrological processes in the region. Based on a long-term simulation from 1981 to 2015, we found that the areal mean maximum thickness of seasonally frozen ground ranged from 1.1–1.8 m and decreased by 1.2 cm per year. Additionally, the ratio of the permafrost area to the total area decreased by 1.1% per year. These decreasing trends are faster than the average in China because the study area is on the sensitive margin of the Qinghai-Tibet Plateau. The annual runoff exhibited variations similar to those of the annual precipitation (R 2 = 0.85), although the annual evapotranspiration (ET) exhibited an increasing trend (14.3 mm/10 a) similar to that of the annual mean air temperature (0.66 °C/10 a). The runoff coefficient (annual runoff divided by annual precipitation) displayed a decreasing trend because of the increasing ET, and the vegetation responses to climate warming and permafrost degradation were manifested as increases in the leaf area index (LAI) and ET at the start of the growing season. Furthermore, the results showed that changes to the frozen ground depth affected vegetation growth. Notably, a rapid decrease in the frozen ground depth (< - 3.0 cm/a) decreased the topsoil moisture and then decreased the LAI. In conclusion, this study showed that the eco-hydrological processes in the headwater area of the Yellow River have changed because of permafrost degradation, and these changes could further influence the water resources availability in the middle and lower reaches of the basin.

54 ENVIRONMENTAL SCIENCES↗

THE SIMULTANEOUS OPTICAL-TO-X-RAY SPECTRAL ENERGY DISTRIBUTION OF SOFT X-RAY SELECTED ACTIVE GALACTIC NUCLEI OBSERVED BY SWIFT

We report Swift observations of a sample of 92 bright soft X-ray selected active galactic nuclei (AGNs). This sample represents the largest number of AGNs observed to study the spectral energy distribution (SED) of AGNs with simultaneous optical/UV and X-ray data. The principal motivation of this study is to understand the SEDs of AGNs in the optical/UV to X-ray regime and to provide bolometric corrections which are important in determining the Eddington ratio L/L {sub Edd}. In particular, we rigorously explore the dependence of the UV-EUV contribution to the bolometric correction on the assumed EUV spectral shape. We find strong correlations of the spectral slopes {alpha}{sub X} and {alpha}{sub UV} with L/L {sub Edd}. Although narrow-line Seyfert 1 galaxies (NLS1s) have steeper {alpha}{sub X} and higher L/L {sub Edd} than broad-line Seyfert 1 galaxies (BLS1s), their optical/UV to X-ray spectral slopes {alpha}{sub ox} and optical/UV slopes {alpha}{sub UV} are very similar. The mean SED of NLS1s shows that in general this type of AGNs appears to be fainter in the UV and at hard X-ray energies than BLS1s. We find a strong correlation between {alpha}{sub X} and {alpha}{sub UV} for AGNs with X-ray spectral slopes {alpha}{sub X}<1.6. For AGNs with steeper X-ray spectra, both this relation and the relation between {alpha}{sub X} and L/L {sub Edd} break down. At {alpha}{sub X}{approx}1.6, L/L {sub Edd} reaches unity. We note an offset in the {alpha}{sub UV}-L/L {sub Edd} relation between NLS1s and BLS1s. We argue that {alpha}{sub UV} is a good estimator of L/L {sub Edd} and suggest that {alpha}{sub UV} can be used to estimate L/L {sub Edd} in high-redshift QSOs. Although NLS1s appear to be highly variable in X-rays, they only vary marginally in the UV.

79 ASTRONOMY AND ASTROPHYSICS↗

A computationally efficient algorithm for computing convex hull prices

Electricity markets worldwide allow participants to bid non-convex production offers. While non-convex offers can more accurately reflect a resource's capabilities, they create challenges for market clearing processes. For example, system operators may be required to execute side payments to participants whose costs are not covered through energy sales as determined via traditional locational marginal pricing schemes. Convex hull pricing minimizes this and other types of side payments while providing uniform (i.e., locationally and temporally consistent) prices. Computing convex hull prices involves solving either a large-scale linear program or the Lagrangian dual of the corresponding non-convex scheduling problem. Further, the former approach requires explicit descriptions of market participants' convex hulls. While linear programs for computing convex hull prices are large, their structure is naturally decomposable by generators. Here, in this work, we propose and empirically analyze a Benders decomposition approach to computing convex hull prices that leverages recent advances in convex hull formulations for thermal generating units. We demonstrate across a large set of test instances that our decomposition approach only requires modest computational effort, obtaining solutions at least an order of magnitude faster than the equivalent large-scale linear programming approach. Overall, we provide a computationally feasible method for computing convex hull prices for industrial scale market clearing problems, enabling the possibility of practical adoption of this advanced pricing mechanism.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

2022 Summer Resource Adequacy in the ERCOT Region

This report is a 2022 update to the National Energy Technology Laboratory (NETL) report that examined the potential system performance of the Electric Reliability Council of Texas (ERCOT) system during the summer of 2021. Anticipated summer reserve margins in ERCOT have risen year-over-year from the 15.7 percent reported in ERCOT’s Final Seasonal Assessment of Resource Adequacy (SARA) for Summer 2021 to 22.8 percent in the Final SARA for Summer 2022, driven mostly by increases in wind and solar generation. Using data from ERCOT’s 2022 Summer SARA, Capacity, Demand and Reserves (CDR) reports, and historical performance data obtained from ERCOT and Hitachi Energy Velocity Suite, six economic dispatch scenarios using PROMOD were developed to assess the risk to ERCOT of a load shedding event for Summer 2022. The results suggests that ERCOT may be facing a very tight resource adequacy situation, with the potential for a serious shortfall during the summer peak, usually the end of July through mid-August, if demand and generator outage rates significantly exceed peak levels. Under these conditions, ERCOT will need to call on its operating tools, including Energy Emergency Alerts (EEA) and calls to conserve electricity, to maintain reliability and continue serving load. Those measures alone may not be sufficient to avert a shedding of load.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Treatment planning strategy for whole-brain radiotherapy with hippocampal sparing and simultaneous integrated boost for multiple brain metastases using intensity-modulated arc therapy

Purpose: To retrospectively evaluate the accuracy, plan quality and efficiency of intensity-modulated arc therapy (IMAT) for hippocampal sparing whole-brain radiotherapy (HS-WBRT) with simultaneous integrated boost (SIB) in patients with multiple brain metastases (m-BM). Materials and methods: A total of 5 patients with m-BM were retrospectively replanned for HS-WBRT with SIB using IMAT treatment planning. The hippocampus was contoured on diagnostic T1-weighted magnetic resonance imaging (MRI) which had been fused with the planning CT image set. The hippocampal avoidance zone (HAZ) was generated using a 5-mm uniform margin around the paired hippocampi. The m-BM planning target volumes (PTVs) were contoured on T1/T2-weighted MRI registered with the 3D planning computed tomography (CT). The whole-brain planning target volume (WB-PTV) was defined as the whole-brain tissue volume minus HAZ and m-BM PTVs. Highly conformal IMAT plans were generated in the Eclipse treatment planning system for Novalis-TX linear accelerator consisting of high-definition multileaf collimators (HD-MLCs: 2.5-mm leaf width at isocenter) and 6-MV beam. Prescription dose was 30 Gy for WB-PTV and 45 Gy for each m-BM in 10 fractions. Three full coplanar arcs with orbit avoidance sectors were used. Treatment plans were evaluated using homogeneity (HI) and conformity indices (CI) for target coverage and dose to organs at risk (OAR). Dose delivery efficiency and accuracy of each IMAT plan was assessed via quality assurance (QA) with a MapCHECK device. Actual beam-on time was recorded and a gamma index was used to compare dose agreement between the planned and measured doses. Results: All 5 HS-WBRT with SIB plans met WB-PTV D{sub 2%}, D{sub 98%}, and V{sub 30} {sub Gy} NRG-CC001 requirements. The plans demonstrated highly conformal and homogenous coverage of the WB-PTV with mean HI and CI values of 0.33 ± 0.04 (range: 0.27 to 0.36), and 0.96 ± 0.01 (range: 0.95 to 0.97), respectively. All 5 hippocampal sparing patients met protocol guidelines with maximum dose and dose to 100% of hippocampus (D{sub 100%}) less than 16 and 9 Gy, respectively. The dose to the optic apparatus was kept below protocol guidelines for all 5 patients. Highly conformal and homogenous radiosurgical dose distributions were achieved for all 5 patients with a total of 33 brain metastases. The m-BM PTVs had a mean HI = 0.09 ± 0.02 (range: 0.07 to 0.19) and a mean CI = 1.02 ± 0.06 (range: 0.93 to 1.2). The total number of monitor units (MU) was, on average, 1677 ± 166. The average beam-on time was 4.1 ± 0.4 minute . The IMAT plans demonstrated accurate dose delivery of 95.2 ± 0.6%, on average, for clinical gamma passing rate with 2%/2-mm criteria and 98.5 ± 0.9%, on average, with 3%/3-mm criteria. Conclusions: All hippocampal sparing plans were considered clinically acceptable per NRG-CC001 dosimetric compliance criteria. IMAT planning provided highly conformal and homogenous dose distributions for the WB-PTV and m-BM PTVs with lower doses to OAR such as the hippocampus. These results suggest that HS-WBRT with SIB is a clinically feasible, fast, and effective treatment option for patients with a relatively large numbers of m-BM lesions.

61 RADIATION PROTECTION AND DOSIMETRY↗

Impacts of hybridization and forecast errors on the probabilistic capacity credit of batteries

Battery storage is increasingly identified as being among the least-cost mix of technologies in the evolving U.S. electricity mix. This study explores the marginal capacity credit of batteries using a probabilistic, reliability-based, effective firm capacity method, which we apply for multiple battery power ratings, durations, coupling types, deployment locations, and dispatch profiles within a test system that is based on the Texas Interconnection in the year 2024. We find that the capacity credits for all battery durations depend on their ability to predict the timing of reliability events. Even 1-2 h forecast errors - resulting in early or delayed battery discharging relative to the onset of a reliability event - lead pronounced capacity credit reductions, especially for 4-h duration batteries. Coupling batteries with solar mitigates the uncertainty associated with a shorter-duration battery's availability during reliability events, primarily due to the relatively high solar capacity credit in our test system. Coupled (or hybrid) system designs with oversized solar arrays, the ability to charge the coupled battery with grid energy, and larger batteries lead to the greatest capacity credit benefits of hybridization. We do not see evidence that the hybrid capacity credit exceeds the sum of the separate battery and solar capacity credits.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Principles of Product Quality Control of German Radioactive Waste Forms from the Reprocessing of Spent Fuel: Vitrification, Compaction and Numerical Simulation - 12529

The German product quality control is inter alia responsible for control of two radioactive waste forms of heat generating waste: a) homogeneous vitrified HLW and b) heterogeneous compacted hulls, end-pieces and technological metallic waste. In either case, significantly different metrology is employed at the site of the conditioning plant for the obligatory nuclide inventory declaration. To facilitate an independent evaluation and checking of the accompanying documentation numerical simulations are carried out. The physical and chemical properties of radioactive waste residues are used to assess the data consistency and uncertainty margins, as well as to predict the long-term behavior of the radioactive waste. This is relevant for repository acceptance and safety considerations. Our new numerical approach follows a bottom-up simulation starting from the burn-up behavior of the fuel elements in the reactor core. The output of these burn-up calculations is then coupled with a program that simulates the material separation in the subsequent dissolution and extraction processes normalized to the mass balance. Follow-up simulations of the separated reprocessing lines of a) the vitrification of highly-active liquid and b) the compaction of residual intermediate-active metallic hulls remaining after fuel pellets dissolution, end-pieces and technological waste, allows calculating expectation values for the various repository relevant properties of either waste stream. The principles of the German product quality control of radioactive waste residues from the spent fuel reprocessing have been introduced and explained. Namely, heat generating homogeneous vitrified HLW and heterogeneous compacted metallic MLW have been discussed. The advantages of a complementary numerical property simulation have been made clear and examples of benefits are presented. We have compiled a new program suite to calculate the physical and radio-chemical properties of common nuclear waste residues. The immediate benefit is the independent assessment of radio-active inventory declarations and much facilitated product quality control of waste residues that need to be returned to Germany and submitted to a German HLW-repository requirements. Wherever possible, internationally accepted standard programs are used and embedded. The innovative coupling of burn-up calculations (SCALE) with neutron and gamma transport codes (MCPN-X) allows an application in the world of virtual waste properties. If-then-else scenarios of hypothetical waste material compositions and distributions provide valuable information of long term nuclide property propagation under repository conditions over a very long time span. Benchmarking the program with real residue data demonstrates the power and remarkable accuracy of this numerical approach, boosting the reliability of the confidence aforementioned numerous applications, namely the proof tool set for on-the-spot production quality checking and data evaluation and independent verification. Moreover, using the numerical bottom-up approach helps to avoid the accumulation of fake activities that may gradually build up in a repository from the so-called conservative or penalizing nuclide inventory declarations. The radioactive waste properties and the hydrolytic and chemical stability can be predicted. The interaction with invasive chemicals can be assessed and propagation scenarios can be developed from reliable and sound data and HLW properties. Hence, the appropriate design of a future HLW repository can be based upon predictable and quality assured waste characteristics. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

On the Rate Constant for NH 2 +HO 2 and Third-Body Collision Efficiencies for NH 2 +H(+M) and NH 2 +NH 2 (+M)

In low-temperature flash photolysis of NH 3 /O 2 /N 2 mixtures, the NH 2 consumption rate and the product distribution is controlled by the reactions NH 2 + HO 2 → products (R1), NH 2 + H (+M) → NH 3 (+M) (R2), and NH 2 + NH 2 (+M) → N 2 H 4 (+M) (R3). In the present work, published flash photolysis experiments by, among others, Cheskis and co-workers, are re-interpreted using recent direct measurements of NH 2 + H (+N 2 ) and NH 2 + NH 2 (+N 2 ) from Altinay and Macdonald. To facilitate analysis of the FP data, relative third-body collision efficiencies compared to N 2 for R2 and R3 were calculated for O 2 and NH 3 as well as for other selected molecules. We report results were in good agreement with the limited experimental data. Based on reported NH 2 decay rates in flash photolysis of NH 3 /O 2 /N 2 , a rate constant for NH 2 + HO 2 → NH 3 + O 2 (R1a) of $k_{1\text{a}}$ = 1.5(±0.5) × 10 14 cm 3 mol –1 s –1 at 295 K was derived. This value is higher than earlier determinations based on the FP results but in good agreement with recent theoretical work. Kinetic modeling of reported N 2 O yields indicates that NH 2 + HO 2 → H 2 NO + O (R1c) is competing with R1a, but perturbation experiments with addition of CH4 indicate that it is not a dominating channel. Measured HNO profiles indicate that this component is formed directly by NH 2 + HO 2 → HNO + H 2 O (R1b), but theoretical work indicates that R1b is only a minor channel. Based on this analysis, we estimate $k_{1\text{c}}$ = 2.5 × 10 13 cm 3 mol –1 s –1 and $k_{1\text{b}}$ = 2.5 × 10 12 cm 3 mol –1 s –1 at 295 K, with significant uncertainty margins.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Dosimetric and deformation effects of image-guided interventions during stereotactic body radiation therapy of the prostate using an endorectal balloon

Purpose: During stereotactic body radiation therapy (SBRT) for the treatment of prostate cancer, an inflatable endorectal balloon (ERB) may be used to reduce motion of the target and reduce the dose to the posterior rectal wall. This work assessed the dosimetric impact of manual interventions on ERB position in patients receiving prostate SBRT and investigated the impact of ERB interventions on prostate shape. Methods: The data of seven consecutive patients receiving SBRT for the treatment of clinical stage T1cN0M0 prostate cancer enrolled in a multi-institutional, IRB-approved trial were analyzed. The SBRT dose was 50 Gy in five fractions to a planning target volume (PTV) that included the prostate (implanted with three fiducial markers) with a 3-5 mm margin. All plans were based on simulation images that included an ERB inflated with 60 cm{sup 3} of air. Daily kilovoltage cone-beam computed tomography (CBCT) imaging was performed to localize the PTV, and an automated fusion with the planning images yielded displacements required for PTV relocalization. When the ERB volume and/or position were judged to yield inaccurate repositioning, manual adjustment (ERB reinflation and/or repositioning) was performed. Based on all 59 CBCT image sets acquired, a deformable registration algorithm was used to determine the dose received by, displacement of, and deformation of the prostate, bladder (BLA), and anterior rectal wall (ARW). This dose tracking methodology was applied to images taken before and after manual adjustment of the ERB (intervention), and the delivered dose was compared to that which would have been delivered in the absence of intervention. Results: Interventions occurred in 24 out of 35 (69%) of the treated fractions. The direct effect of these interventions was an increase in the prostate radiation dose that included 95% of the PTV (D95) from 9.6 {+-} 1.0 to 10.0 {+-} 0.2 Gy (p = 0.06) and an increase in prostate coverage from 94.0% {+-} 8.5% to 97.8% {+-} 1.9% (p = 0.03). Additionally, ERB interventions reduced prostate deformation in the anterior-posterior (AP) direction, reduced errors in the sagittal rotation of the prostate, and increased the similarity in shape of the prostate to the radiotherapy plan (increased Dice coefficient from 0.76 {+-} 0.06 to 0.80 {+-} 0.04, p = 0.01). Postintervention decreases in prostate volume receiving less than the prescribed dose and decreases in the voxel-wise displacement of the prostate, bladder, and anterior rectal wall were observed, which resulted in improved dose-volume histogram (DVH) characteristics. Conclusions: Image-guided interventions in ERB volume and/or position during prostate SBRT were necessary to ensure the delivery of the dose distribution as planned. ERB interventions resulted in reductions in prostate deformations that would have prevented accurate localization of patient anatomy.

60 APPLIED LIFE SCIENCES↗

Investigation of radiological properties and water equivalency of PRESAGE dosimeters

Purpose: PRESAGE is a dosimeter made of polyurethane, which is suitable for 3D dosimetry in modern radiation treatment techniques. Since an ideal dosimeter is radiologically water equivalent, the authors investigated water equivalency and the radiological properties of three different PRESAGE formulations that differ primarily in their elemental compositions. Two of the formulations are new and have lower halogen content than the original formulation. Methods: The radiological water equivalence was assessed by comparing the densities, interaction probabilities, and radiation dosimetry properties of the three different PRESAGE formulations to the corresponding values for water. The relative depth doses were calculated using Monte Carlo methods for 50, 100, 200, and 350 kVp and 6 MV x-ray beams. Results: The mass densities of the three PRESAGE formulations varied from 5.3% higher than that of water to as much as 10% higher than that of water for the original formulation. The probability of photoelectric absorption in the three different PRESAGE formulations varied from 2.2 times greater than that of water for the new formulations to 3.5 times greater than that of water for the original formulation. The mass attenuation coefficient for the three formulations is 12%-50% higher than the value for water. These differences occur over an energy range (10-100 keV) in which the photoelectric effect is the dominant interaction. The collision mass stopping powers of the relatively lower halogen-containing PRESAGE formulations also exhibit marginally better water equivalency than the original higher halogen-containing PRESAGE formulation. Furthermore, the depth dose curves for the lower halogen-containing PRESAGE formulations are slightly closer to that of water for a 6 MV beam. In the kilovoltage energy range, the depth dose curves for the lower halogen-containing PRESAGE formulations are in better agreement with water than the original PRESAGE formulation. Conclusions: Based on the results of this study, the new PRESAGE formulations with lower halogen content are more radiologically water equivalent overall than the original formulation. This indicates that the new PRESAGE formulations are better suited to clinical applications and are more accurate dosimeters and phantoms than the original PRESAGE formulation. While correction factors are still needed to convert the dose measured by the dosimeter to an absorbed dose in water in the kilovoltage energy range, these correction factors are considerably smaller for the new PRESAGE formulations compared to the original PRESAGE and the existing polymer gel dosimeters.

60 APPLIED LIFE SCIENCES↗

Surface and superficial dose dosimetric verification for postmastectomy radiotherapy

In patients given postmastectomy radiotherapy (PMRT), the chest wall is a very thin layer of soft tissue with a low-density lung tissue behind. Chest wall treated in this situation with a high-energy photon beam presents a high dosimetric uncertainty region for both calculation and measurement. The purpose of this study was to measure and to evaluate the surface and superficial doses for patients requiring PMRT with different treatment techniques. An elliptic cylinder cork and superflab boluses were used to simulate the lung and the chest wall, respectively. Sets of computed tomography (CT) images with different chest wall thicknesses were acquired for the study phantom. Hypothetical clinical target volumes (CTVs) were outlined and modified to fit a margin of 1-3 mm, depending on the chest wall thickness, away from the surface for the sets of CT images. The planning target volume (PTV) was initially created by expanding an isotropic 3-mm margin from the CTV, and then a margin of 3 mm was shrunk from the phantom surface to avoid artifact-driven results in the beam-let intensity. Treatment techniques using a pair of tangential wedged fields (TWFs) and 4-field intensity-modulated radiation therapy (IMRT) were designed with a prescribed fraction dose (D{sub p}) of 180 cGy. Superficial dose profiles around the phantom circumference at depths of 0, 1, 2, 3, and 5 mm were obtained for each treatment technique using radiochromic external beam therapy (EBT) films. EBT film exhibits good characteristics for dose measurements in the buildup region. Underdoses at the median and lateral regions of the TWF plans were shown. The dose profiles at shallow depths for the TWF plans show a dose buildup about 3 mm at the median and lateral tangential incident regions with a surface dose of about 52% of D{sub p}. The dose was gradually increased toward the most obliquely tangential angle with a maximum dose of about 118% of D{sub p.} Dose profiles were more uniform in the PTV region for the 4-F IMRT plans. Most of the PTV region had doses >94% of D{sub p} at depths >1 mm. The mean surface dose was about 65% of D{sub p} for the 4-F IMRT plans. The maximum dose for the 4-F IMRT plans was <118.4% of D{sub p}. The application of added bolus has to consider the treatment technique, tumor coverage, and possible skin reactions. For PMRT, if the chest surface and wall are treated adequately, at least 3 mm bolus should be added to the chest wall when tangential beams and 6-MV photon energy are arranged. However, when the surface and superficial regions are not high-risk areas, an IMRT plan with tangential beams and 6-MV photon energy can provide uniform dose distributions within the PTV, spare the skin reaction, and deliver sufficient doses to the chest wall at depths >1 mm.

61 RADIATION PROTECTION AND DOSIMETRY↗

To What Extent Will Decarbonization Deepen the Conversation Between Industry and the Grid?

Decarbonization - the transition away from un-mitigated fossil fuel combustion throughout the economy - requires big changes from both power and process systems. On the power system side, those changes are expected to include large increases in variable generation, e.g., from wind and solar, which has near-zero marginal costs and at large shares can produce infrequent but consequential energy droughts. On the process systems side, industries are investigating their options for direct and indirect electrification, the latter exemplified by replacing fossil fuel inputs with zero-carbon, energy-carrying chemicals like hydrogen and ammonia produced via electrochemical processes. The economic features of these changes within the larger context of power and process systems suggest that their realization could be accompanied by a paradigm shift in how industrial facilities interact with the grid. For example, the dominant type of demand participation in power markets could change from today's focus on load reductions at peak times to a new focus on shifting electricity use, enabled in part by large-scale product storage, to take advantage of renewable energy that would otherwise be curtailed and to avoid consumption during high-price energy droughts. This talk will describe these and other possible design and operational approaches from grid and industrial economic perspectives, culminating in an enumeration of open problems that lie at the interface of today and tomorrow's power and process systems.

co-design↗