Integrating spacecraft systems.
Spacecraft system integration involving project management, physical system integration and subsystem combination
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Spacecraft system integration involving project management, physical system integration and subsystem combination
Project management planning and mechanical and electrical subsystem integration for spacecraft system design
Parts and materials application review for project management of space systems engineering
The Second Workshop on Voltage Breakdown in Electronic Equipment at Low Air Pressure was sponsored by the Jet Propulsion Laboratory, Pasadena, California. It has been three and one-half years since the convening of the first workshop on voltage breakdown. In this interval, gains are evidenced in the progress and sophistication in solving voltage breakdown problems affecting electronic equipment operating at high altitudes or other low air pressure environments. Although space applications predominate the area of concern, other projects such as the SST are becoming increasingly involved with voltage breakdown. High-voltage breakdown in spacecraft continues; however, the incidences of occurrence appear to have decreased in spite of an increase in the number of missions flown. This, it is felt, is due to many project managers now requiring all equipment with voltage in excess of 270-V peak to be designed to operate in the critical pressure region without damage, even though its normal functional environment is sea level pressure and the hard vacuum of space. In addition, designers are becoming more aware of the principle of good high-voltage design by selecting void-free components, proper spacing of conductors, isolating high-voltage circuitry from lower voltage areas, etc. The consensus seems to be that the slight increase in cost to achieve a provable corona-free design is more than offset by the increase in confidence that the equipment will survive accidental loss of vacuum during high-vacuum tests, inadvertent turn on while passing through the critical air-pressure region of earth after launch or outgassing in flight pressurizing the enclosure into the critical pressure region.
The project is defined for design, development, fabrication, test, and pre-mission and mission operations of a shuttle-launched modular space station. The project management approach is described in terms of organization, management requirements, work breakdown structure, schedule, time-phased logic, implementation plans, manpower, and funding. The programmatic and technical problems are identified.
GERT was originally developed to aid in the analysis of stochastic networks. GERT can be used to graphically model and analyze complex systems. Recently a simulator model, GERTS II, has been developed to solve GERT Networks. The simulator language used in the development of this model was GASP II A. This paper discusses the possible application of GERTS II to model and analyze (1) assembly line operations, (2) project management networks, (3) conveyor systems and (4) inventory systems. Finally, an actual application dealing with a job shop loading problem is presented.
The functions and capabilities of the Dynamic Operational Requirements and Cost Analysis Program are explained. The existence and purpose of the program are presented to provide an evaluation of program applicability to areas of responsibility for potential users. The implementation of the program on the Univac 1108 computer is discussed. The application of the program for mission planning and project management is described.
An analysis of alternate space shuttle concepts is presented. The two main program alternatives are: (1) phased booster development with an interim solid rocket engine cluster preceding the reusable booster and (2) phased orbiter development with modified avionics, vehicle subsystems, thermal protection system, and redesigned rocket engines. Diagrams of the various concepts are provided. The predicted spacecraft performance capabilities are reported. Project management proposals are submitted.
In June 1969, the Federal Republic of Germany and the United States of America agreed on a joint cooperative solar probe project designated HELIOS. This basic agreement provides for the design, development, test and launch of two flight spacecraft (the first in mid-1974 and the second in late 1975) to within 0.3 AU of the sun. The primary purpose of the two spacecraft is to investigate the properties of and processes in interplanetary space in the direction of and close to the sun. In this technical paper, the scientific mission and German and American plans/design to accomplish this mission are presented by the German and United States Project Managers respectively. Emphasis is placed on the advanced technology required to successfully accomplish this mission.
This paper presents the results of a preliminary performance evaluation of the SNAP-19 TAGS thermoelectric generator which was selected as the power source for the Pioneer Space Flight Mission. The performance of the SNAP-19 generator was evaluated at various input powers and fin-root temperatures. Results of this evaluation are analyzed and discussed. Tests were also performed to provide the Pioneer Flight Project Management with applicable data such as generator thermal dynamic behavior during launch and prior to deployment. These special tests measure generator performance as a function of fin-root temperature and the dynamic frequency response of the generator.
The development of and operational programs for effective use in design are presented for liquid rocket pressure regulators, relief valves, check valves, burst disks, and explosive valves. A review of the total design problem is presented, and design elements are identified which are involved in successful design. Current technology pertaining to these elements is also described. Design criteria are presented which state what rule or standard must be imposed on each essential design element to assure successful design. These criteria serve as a checklist of rules for a project manager to use in guiding a design or in assessing its adequacy. Recommended practices are included which state how to satisfy each of the criteria.
System design and performance of the Skylab Airlock Module and Payload Shroud are presented for the communication and caution and warning systems. Crew station and storage, crew trainers, experiments, ground support equipment, and system support activities are also reviewed. Other areas documented include the reliability and safety programs, test philosophy, engineering project management, and mission operations support.
The use of sounding rockets for the conduct of, and verification of, processing experiments and techniques under conditions of weightlessness are summarized. The experimental payloads, project management, mission schedules are also discussed.
A manual which explains how to use the DOMONIC command language is presented. The manual consists of the following sections: 1. Introduction 2. What You Must Know to Use DOMONIC 3. Functions of DOMONIC 4. Entering and Manipulating Data 5. Templates and Data Definitions 6. Recipes and Document Generation 7. Initiating A Project and 8. Entering and Changing Security Controls. The first four sections must be known by all DOMONIC users. Sections five, seven and eight describe functions normally used only by project management. Section six tells how to generate documents. The manual specifies what commands to use in performing each of the functions mentioned above.
Fluid-flow components in a liquid propellant rocket engine and the rocket vehicle which it propels are interconnected by lines, bellows, and flexible hoses. Elements involved in the successful design of these components are identified and current technologies pertaining to these elements are reviewed, assessed, and summarized to provide a technology base for a checklist of rules to be followed by project managers in guiding a design or assessing its adequacy. Recommended procedures for satisfying each of the design criteria are included.
This bibliography of 326 readily usable references of basic and applied research programs related to the various areas of aviation meteorology was assembled. A literature search was conducted which surveyed the major abstract publications such as the International Aerospace Abstracts, the Meteorological and Geoastrophysical Abstracts, and the Scientific and Technical Aerospace Reports. In addition, NASA and DOT computer literature searches were run; and NASA, NOAA, and FAA research project managers were requested to provide writeups on their ongoing research.
Contractor information requirements necessary to support the power extension package project of the space shuttle program are specified for the following categories of data: project management; configuration management; systems engineering and test; manufacturing; reliability, quality assurance and safety; logistics; training; and operations.
The cost information which should be obtained from a contractor(s) on a major, cost type research and development contract(s), and the analyses and effective use of these data are discussed. Specific type(s) of information which should be required, methods for analyzing such information, and methods for effectively using the results of such analyses to enhance NASA contract and project management are included. The material presented is based primarily on the principal methods which have been effectively used in the management of major cost type research and development contracts.