Search NASA⌕ Search

SEARCH · Search NASA

Results for “Traffic simulation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,531 records · Page 85

Assistive Detect and Avoid Technology in Urban Air Mobility Environments

The use of Assistive Detect and Avoid (Assistive DAA or ADAA) technology in Urban Air Mobility (UAM) environments poses potential benefits as well as challenges. Assistive DAA refers to the leveraged use of DAA technology, originally developed to replace see-and-avoid capabilities for remotely piloted aircraft, in onboard-piloted aircraft to augment (rather than replace) pilots’ see-and-avoid abilities and thus enhance the safety and efficiency of visual flight operations. ADAA is anticipated to be especially safety-enhancing in airspace where traffic density is high or traditional air traffic services are limited, such as in future UAM environments. ADAA may also enable higher-tempo UAM operations than with only see-and-avoid capabilities, while still maintaining acceptable levels of safety. UAM concepts under development by the FAA, NASA, and industry focus on operations moving people and cargo in urban and suburban areas using innovative technologies, operations, and aircraft, including electric vertical takeoff and landing (eVTOL) aircraft. Researchers at NASA Langley Research Center, in collaboration with FAA researchers at the William J. Hughes Technical Center in Atlantic City, NJ, have conducted a series of medium-fidelity, human-in-the-loop research simulations of potential future UAM operations and concepts in both Class C and Class B airspace environments. These simulations have included use of a Langley-developed ADAA research tool called DANTi, which enables configurable ADAA displays to be presented to pilots of simulated eVTOL aircraft participating in higher-density and higher-tempo UAM operations. Experience and observations made during testing of the NASA-developed DANTi ADAA capability in the UAM NFLITE simulation environment will be reported in this paper together with a discussion of airspace integration and regulatory topics.

Detect and Avoid↗

Estimating Traveler Populations at Airport and Cruise Terminals for Population Distribution and Dynamics

In recent years, uses of high-resolution population distribution databases are increasing steadily for environmental, socioeconomic, public health, and disaster-related research and operations. With the development of daytime population distribution, temporal resolution of such databases has been improved. However, the lack of incorporation of transitional population, namely business and leisure travelers, leaves a significant population unaccounted for within the critical infrastructure networks, such as at transportation hubs. This paper presents two general methodologies for estimating passenger populations in airport and cruise port terminals at a high temporal resolution which can be incorporated into existing population distribution models. The methodologies are geographically scalable and are based on, and demonstrate how, two different transportation hubs with disparate temporal population dynamics can be modeled utilizing publicly available databases including novel data sources of flight activity from the Internet which are updated in near-real time. The airport population estimation model shows great potential for rapid implementation for a large collection of airports on a national scale, and the results suggest reasonable accuracy in the estimated passenger traffic. By incorporating population dynamics at high temporal resolutions into population distribution models, we hope to improve the estimates of populations exposed to or at risk to disasters, thereby improving emergency planning and response, and leading to more informed policy decisions.

airport↗

Evaluation of Multiple Flow Constrained Area Capacity Setting Methods for Collaborative Trajectory Options Program

The purpose of this study was to compare flow constrained area (FCA) capacity setting methods for Collaborative Trajectory Options Program (CTOP) as they pertain to the Integrated Demand Management (IDM) concept. IDM uses flow balancing to manage air traffic across multiple FCAs with a common downstream constraint, as well as constraints at the respective FCA locations. FCA capacity rates can be set manually, but generating capacities for multiple, interdependent FCAs could potentially over-burden a user. A new enhancement to CTOP called the FCA Balance Algorithm (FBA) was developed at NASA Ames Research Center to improve the process of allocating capacity across multiple flow constrained segments in the airspace. The FBA evaluates the predicted demand and capacity across multiple FCAs and dynamically generates capacity settings for the FCAs that best meet capacity limits for all identified constraints. In a human-in-the-loop simulation study, both manual and automated capacity setting methods were evaluated in terms of their overall feasibility using measures of system performance, human performance, and qualitative feedback. Subject matter experts were asked to use three different methods to allocate capacity to three FCAs, either (1) by manually setting capacity for every 60-minute time window, (2) by manually setting capacity for every 15-minute time window, or (3) by using the FBA capability to automatically generate capacity settings. Results showed no significant differences in terms of overall system performance, indicated by similar ground delay and airport throughput numbers between methods. However, differences in individual strategies afforded by the manual methods allowed some participants to achieve system-wide delay that was much lower than the average. The FBA was the fastest method of capacity setting, and it received the lowest subjective rating scores on physical task load, mental task load, task difficulty and task complexity out of the three methods. Finally, participants explained through qualitative feedback that there were many benefits to using the FBA, such as ease of use, accuracy, and low risk of human input error. Participants did not experience the same limitations with the FBA that they did with the manual methods, such as reduced accuracy in the 60-minute manual condition, or high complexity in the 15-minute/manual condition. These results suggest that the FBA automation enhancement to CTOP maintains system performance while improving human performance. Therefore, the FBA could be introduced as a way to mitigate operator workload while planning a CTOP.

NextGen↗

Evaluation of Multiple Flow Constrained Area Capacity Setting Methods for Collaborative Trajectory Options Program

The purpose of this study was to compare flow constrained area (FCA) capacity setting methods for Collaborative Trajectory Options Program (CTOP) as they pertain to the Integrated Demand Management (IDM) concept. IDM uses flow balancing to manage air traffic across multiple FCAs with a common downstream constraint, as well as constraints at the respective FCA locations. FCA capacity rates can be set manually, but generating capacities for multiple, interdependent FCAs could potentially over-burden a user. A new enhancement to CTOP called the FCA Balance Algorithm (FBA) was developed at NASA Ames Research Center to improve the process of allocating capacity across multiple flow constrained segments in the airspace. The FBA evaluates the predicted demand and capacity across multiple FCAs and dynamically generates capacity settings for the FCAs that best meet capacity limits for all identified constraints. In a human-in-the-loop simulation study, both manual and automated capacity setting methods were evaluated in terms of their overall feasibility using measures of system performance, human performance, and qualitative feedback. Subject matter experts were asked to use three different methods to allocate capacity to three FCAs, either (1) by manually setting capacity for every 60-minute time window, (2) by manually setting capacity for every 15-minute time window, or (3) by using the FBA capability to automatically generate capacity settings. Results showed no significant differences in terms of overall system performance, indicated by similar ground delay and airport throughput numbers between methods. However, differences in individual strategies afforded by the manual methods allowed some participants to achieve system-wide delay that was much lower than the average. The FBA was the fastest method of capacity setting, and it received the lowest subjective rating scores on physical task load, mental task load, task difficulty and task complexity out of the three methods. Finally, participants explained through qualitative feedback that there were many benefits to using the FBA, such as ease of use, accuracy, and low risk of human input error. Participants did not experience the same limitations with the FBA that they did with the manual methods, such as reduced accuracy in the 60-minute manual condition, or high complexity in the 15-minute/manual condition. These results suggest that the FBA automation enhancement to CTOP maintains system performance while improving human performance. Therefore, the FBA could be introduced as a way to mitigate operator workload while planning a CTOP.

NextGen↗

Achieving Equilibrium for Dense, Integrated, Vehicle Navigation

Drone usage has proliferated in recent years with many applications that have market-changing potential. Applications that include parcel delivery, wildlife protection, precision farming, law enforcement, and industrial inspection, just to name a few. In this paper, the term drone is used to mean both Unmanned Aerial Vehicle and small Unmanned Aircraft System vehicles. Flight infrastructure can currently only support a few thousand aircraft flying over the United States National Airspace System (NAS) at any given time. A delay atone airport sends ripple effects through the system, causing more delays and missed connections. Once regulations and safety policies are put in place to allow for the widespread use of unmanned drones, the number of aircraft in the NAS is expected to skyrocket to millions, potentially congesting the airspace resulting in possible separation violations. In air traffic control, separation is the concept of keeping an “ownship” aircraft outside a minimum distance from “intruder” aircraft to reduce the risk of the aircraft colliding, as well as preventing accidents due to secondary factors, such as wake turbulence. Maintaining proper separation is a safety critical property for drones in the airspace. This paper addresses separation in time and in distance for high volume corridors (en-route) and lanes(on ground). The requirements and necessary conditions for maintaining proper separation and reaching maximum throughput for a given corridor/lane are addressed assuming unidirectional corridors/lanes where an aircraft arrives from one side and departs from the opposite side. Simulation results are presented that show the presented solution guarantees a set of drones to reach the equilibrium state by adjusting their speed based on their distance to the aircraft in front of them. The equilibrium state is defined as a state when a set of n aircraft moving at a relatively constant speed and uniform spacing from each other in a congested system. A congested system is defined as a state when the aircraft cannot move at their maximum allowed speed. Unlike existing centralized and pre-planned approaches, the proposed solution is fully distributed and enables autonomous aircraft to decide to adjust their speed and distance with respect to the preceding aircraft, dynamically. Simulation results are presented that assess the feasibility of the approach using a large number of drones and evaluate the scalability of the proposed solution.

Mahyar R. Malekpour↗

An Elementary Algorithm for Autonomous Air Terminal Merging and Interval Management

A central element of air traffic management is the safe merging and spacing of aircraft during the terminal area flight phase. This paper derives and examines an algorithm for the merging and interval managing problem for Standard Terminal Arrival Routes. It describes a factor analysis for performance based on the distribution of arrivals, the operating period of the terminal, and the topology of the arrival routes; then presents results from a performance analysis and from a safety analysis for a realistic topology based on typical routes for a runway at Phoenix International Airport. The heart of the safety analysis is a statistical derivation on how to conduct a safety analysis for a local simulation when the safety requirement is given for the entire airspace.

White, Allan L.↗

In-Flight Evaluation of the Traffic Aware Planner on the NASA HU-25A Guardian Aircraft

NASA’s Traffic Aware Planner (TAP) software is a research-prototype decision support tool that provides pilots with time- and fuel-saving route recommendations that optimize their current trajectory. The software runs on a first-of-a-kind system architecture onboard three aircraft in revenue service conducting operational evaluations with a major domestic airline. Therefore, significant NASA-internal testing is required prior to releasing the software to the partner airline. This paper describes a flight test plan that exercises the functionality of the TAP software in a representative operational environment, describes the system architecture developed and implemented for the NASA Langley HU-25A Guardian aircraft to support the test objectives, presents outcomes of the flight test campaign, and discusses use cases that demonstrate the value of flight testing for this activity.Research into flight path optimization of transport aircraft conducted by the National Aeronautics and SpaceAdministration (NASA) has produced an operational concept known as Traffic Aware Strategic Aircrew Requests(TASAR) [1, 2]. This near-term concept [3] provides the aircrew with a flight deck decision support tool known asthe Traffic Aware Planner (TAP). The TAP software leverages a growing number of information sources on the flightdeck to make time- and fuel-saving route optimization recommendations to the aircrew while en route. The aircrewcan then use the suggestions provided by the tool to make route change requests with a greater likelihood of acceptanceby air traffic control (ATC). Since TASAR is a concept intended for the current operational environment, it isintentionally designed to have no safety-critical impact or require any changes to current Federal AviationAdministration (FAA) rules and procedures [4, 5].The research prototype TAP system [6–8], explained further in Section III.C, continually incorporates up-to-dateaircraft state data from onboard avionics, as well as the latest position of surrounding traffic, the most recent windforecast, and the most recent convective weather forecast, in order to calculate candidate trajectory modifications thatimprove upon the current active route. These trajectories account for user-selectable objective functions [3] of reducedfuel burn, reduced flight time, or an airline-derived combination of factors known as trip cost. Previous analyses andsimulations have estimated substantial savings for airlines employing this technique within the U.S. National AirspaceSystem (NAS) [9–11]. Operational evaluations with Alaska Airlines seek to validate these projected benefits usingmeasured data while simultaneously providing benefits to the airline [12, 13].The TAP software has undergone a number of human-in-the-loop simulations [14] and flight test activities[15–17] in order to validate the operational concept, evaluate human factors considerations (e.g., workload, usability,distraction, etc.), and to assess the ability of the software to function in a representative operational environment (e.g.,connected to live avionics data, using in-flight internet connectivity, etc.). However, these simulations and flight testcampaigns did not account for the hardware architecture implemented on the three aircraft for Alaska Airlines’operational evaluations of the TAP software. Therefore, a need was identified to thoroughly test the functionality ofthe software in a similar hardware architecture to that of the partner airline’s aircraft. Information regarding testapparatus and environments used to evaluate TAP prior to testing on the HU-25A can be found in reference [18].A campaign of flight trials on a NASA aircraft, the HU-25A Guardian, was conducted to ensure that the researchprototype TAP system functions well in a configuration similar to the Alaska Airlines aircraft prior to deployment.This airborne, networked environment enables an assessment of the operational factors unique to the flight environment. Additionally, this activity evaluated the effectiveness and benefit of new TAP functionality andoperation in a relevant flight environment while allowing the rapid prototyping of new concepts and features.This paper is organized as follows: Section II discusses the details of the flight test plan, flight profiles, and theduties of personnel involved with conducting flight operations. Section III describes the test platform, avionicsequipage, and system architecture. Section IV presents a discussion of results, and Section V contains concludingremarks.

Underwood, Matthew C.↗

An Interoperability Concept for Detect and Avoid and Collision Avoidance Systems: Results from a Human-In-The-Loop Simulation

The integration of Unmanned Aircraft Systems (UAS) into the National Airspace System (NAS) poses a variety of technical challenges to UAS developers and aviation regulators. In response to growing demand for access to civil airspace in the United States, the Federal Aviation Administration (FAA) has produced a roadmap identifying key areas requiring further research and development. One such technical challenge is the development of a "detect and avoid" system (DAA) capable of providing a means of compliance with the "see and avoid" requirement in manned aviation. The purpose of the DAA system is to support the pilot, situated at a ground control station (GCS), in maintaining "DAA well clear" of nearby aircraft through the use of GCS displays and alerts. In addition to its primary function of aiding the pilot in maintaining well clear, the DAA system must also safely interoperate with existing NAS systems and operations, such as the airspace management procedures of air traffic controllers (ATC) and Collision Avoidance (CA) systems currently in use by manned aircraft, namely the Traffic alert and Collision Avoidance System (TCAS) II. It is anticipated that many UAS architectures will integrate both a DAA system and a TCAS II. It is therefore necessary to explicitly study the integration of DAA and TCAS II alerting structures and maneuver guidance formats to ensure that pilots understand the appropriate type and urgency of their response to the various alerts. This paper presents a concept of interoperability for the two systems. The concept was developed with the goal of avoiding any negative impact on the performance level of TCAS II while retaining a DAA system that still effectively enables pilots to maintain DAA well clear.

unmanned aircraft systems↗

HEP Science Network Requirements--Final Report

The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In August 2009 ESnet and the Office of High Energy Physics (HEP), of the DOE Office of Science, organized a workshop to characterize the networking requirements of the programs funded by HEP. The International HEP community has been a leader in data intensive science from the beginning. HEP data sets have historically been the largest of all scientific data sets, and the communty of interest the most distributed. The HEP community was also the first to embrace Grid technologies. The requirements identified at the workshop are summarized below, and described in more detail in the case studies and the Findings section: (1) There will be more LHC Tier-3 sites than orginally thought, and likely more Tier-2 to Tier-2 traffic than was envisioned. It it not yet known what the impact of this will be on ESnet, but we will need to keep an eye on this traffic. (2) The LHC Tier-1 sites (BNL and FNAL) predict the need for 40-50 Gbps of data movement capacity in 2-5 years, and 100-200 Gbps in 5-10 years for HEP program related traffic. Other key HEP sites include LHC Tier-2 and Tier-3 sites, many of which are located at universities. To support the LHC, ESnet must continue its collaborations with university and international networks. (3) While in all cases the deployed 'raw' network bandwidth must exceed the user requirements in order to meet the data transfer and reliability requirements, network engineering for trans-Atlantic connectivity is more complex than network engineering for intra-US connectivity. This is because transoceanic circuits have lower reliability and longer repair times when compared with land-based circuits. Therefore, trans-Atlantic connectivity requires greater deployed bandwidth and diversity to ensure reliability and service continuity of the user-level required data transfer rates. (4) Trans-Atlantic traffic load and patterns must be monitored, and projections adjusted if necessary. There is currently a shutdown planned for the LHC in 2012 that may affect projections of trans-Atlantic bandwidth requirements. (5) There is a significant need for network tuning and troubleshooting during the establishment of new LHC Tier-2 and Tier-3 facilities. ESnet will work with the HEP community to help new sites effectively use the network. (6) SLAC is building the CCD camera for the LSST. This project will require significant bandwidth (up to 30Gbps) to NCSA over the next few years. (7) The accelerator modeling program at SLAC could require the movement of 1PB simulation data sets from the Leadership Computing Facilities at Argonne and Oak Ridge to SLAC. The data sets would need to be moved overnight, and moving 1PB in eight hours requires more than 300Gbps of throughput. This requirement is dependent on the deployment of analysis capabilities at SLAC, and is about five years away. (8) It is difficult to achieve high data transfer throughput to sites in China. Projects that need to transfer data in or out of China are encouraged to deploy test and measurement infrastructure (e.g. perfSONAR) and allow time for performance tuning.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

En route position and time control of aircraft using Kalman filtering of radio aid data

Fixed-time-of-arrival (FTA) guidance and navigation is investigated as a possible technique capable of operation within much more stringent en route separation standards and offering significant advantages in safety, higher traffic densities, and improved scheduling reliability, both en route and in the terminal areas. This study investigated the application of FTA guidance previously used in spacecraft guidance. These FTA guidance techniques have been modified and are employed to compute the velocity corrections necessary to return an aircraft to a specified great-circle reference path in order to exercise en route time and position control throughout the entire flight. The necessary position and velocity estimates to accomplish this task are provided by Kalman filtering of data from Loran-C, VORTAC/TACAN, Doppler radar, radio or barometric altitude,and altitude rate. The guidance and navigation system was evaluated using a digital simulation of the cruise phase of supersonic and subsonic flights between San Francisco and New York City, and between New York City and London.

Mcgee, L. A.↗

On-board closed-loop congestion control for satellite based packet switching networks

NASA LeRC is currently investigating a satellite architecture that incorporates on-board packet switching capability. Because of the statistical nature of packet switching, arrival traffic may fluctuate and thus it is necessary to integrate congestion control mechanism as part of the on-board processing unit. This study focuses on the closed-loop reactive control. We investigate the impact of the long propagation delay on the performance and propose a scheme to overcome the problem. The scheme uses a global feedback signal to regulate the packet arrival rate of ground stations. In this scheme, the satellite continuously broadcasts the status of its output buffer and the ground stations respond by selectively discarding packets or by tagging the excessive packets as low-priority. The two schemes are evaluated by theoretical queuing analysis and simulation. The former is used to analyze the simplified model and to determine the basic trends and bounds, and the later is used to assess the performance of a more realistic system and to evaluate the effectiveness of more sophisticated control schemes. The results show that the long propagation delay makes the closed-loop congestion control less responsive. The broadcasted information can only be used to extract statistical information. The discarding scheme needs carefully-chosen status information and reduction function, and normally requires a significant amount of ground discarding to reduce the on-board packet loss probability. The tagging scheme is more effective since it tolerates more uncertainties and allows a larger margin of error in status information. It can protect the high-priority packets from excessive loss and fully utilize the downlink bandwidth at the same time.

Chu, Pong P.↗

Operation Heli-STAR - Atlanta Communications Experiment (ACE)

Operation Heli-STAR (Helicopter Short-Haul Transportation and Aviation Research) was established and operated in Atlanta, Georgia, during the period of the 1996 Centennial Olympic Games. Heli-STAR had three major thrusts: (1) the establishment and operation of a helicopter-based cargo transportation system, (2) the management of low-altitude air traffic in the airspace of an urban area, and (3) the collection and analysis of research and development data associated with items 1 and 2. Heli-STAR was a cooperative industry/government program that included parcel package shippers and couriers in the Atlanta area, the helicopter industry, aviation electronics manufacturers, the Federal Aviation Administration (FAA), the National Aeronautics and Space Administration (NASA), and support contractors. Several detailed reports have been produced as a result of Operation Heli-STAR. These include four reports on acoustic measurements and associated analyses, and reports on the Heli-STAR tracking data including the data processing and retrieval system, the Heli-STAR cargo simulation, and the community response system. In addition, NASA's Advanced General Aviation Transport Experiments (AGATE) program has produced a report describing the Atlanta Communications Experiment (ACE) which produced the avionics and ground equipment using automatic dependent surveillance-broadcast (ADS-B) technology. This latter report is restricted to organizations belonging to NASA's AGATE industry consortium. A complete list of these reports is shown on the following page.

Source record↗

Improvement to Airport Throughput Using Intelligent Arrival Scheduling and an Expanded Planning Horizon

The first phase of this study investigated the amount of time a flight can be delayed or expedited within the Terminal Airspace using only speed changes. The Arrival Capacity Calculator analysis tool was used to predict the time adjustment envelope for standard descent arrivals and then for CDA arrivals. Results ranged from 0.77 to 5.38 minutes. STAR routes were configured for the ACES simulation, and a validation of the ACC results was conducted comparing the maximum predicted time adjustments to those seen in ACES. The final phase investigated full runway-to-runway trajectories using ACES. The radial distance used by the arrival scheduler was incrementally increased from 50 to 150 nautical miles (nmi). The increased Planning Horizon radii allowed the arrival scheduler to arrange, path stretch, and speed-adjust flights to more fully load the arrival stream. The average throughput for the high volume portion of the day increased from 30 aircraft per runway for the 50 nmi radius to 40 aircraft per runway for the 150 nmi radius for a traffic set representative of high volume 2018. The recommended radius for the arrival scheduler s Planning Horizon was found to be 130 nmi, which allowed more than 95% loading of the arrival stream.

Glaab, Patricia C.↗

Application of an automated wireless structural monitoring system for long-span suspension bridges

This paper describes an automated wireless structural monitoring system installed at the New Carquinez Bridge (NCB). The designed system utilizes a dense network of wireless sensors installed in the bridge but remotely controlled by a hierarchically designed cyber-environment. The early efforts have included performance verification of a dense network of wireless sensors installed on the bridge and the establishment of a cellular gateway to the system for remote access from the internet. Acceleration of the main bridge span was the primary focus of the initial field deployment of the wireless monitoring system. An additional focus of the study is on ensuring wireless sensors can survive for long periods without human intervention. Toward this end, the life-expectancy of the wireless sensors has been enhanced by embedding efficient power management schemes in the sensors while integrating solar panels for power harvesting. The dynamic characteristics of the NCB under daily traffic and wind loads were extracted from the vibration response of the bridge deck and towers. These results have been compared to a high-fidelity finite element model of the bridge.

42 ENGINEERING↗

Demonstration Assessment of Light-Emitting Diode (LED) Roadway Lighting at the I-35W Bridge, Minneapolis, MN

This report describes the process and results of a demonstration of solid-state lighting (SSL) technology conducted in 2009 at the recently reconstructed I-35W bridge in Minneapolis, MN. The project was supported under the U.S. Department of Energy (DOE) Solid-State Lighting GATEWAY Technology Demonstration Program. Other participants in the demonstration project included the Minnesota Department of Transportation (Mn/DOT), Federal Highways Administration (FHWA), and BetaLED™ (a division of Ruud Lighting). Pacific Northwest National Laboratory (PNNL) conducted the measurements and analysis of the results. DOE has implemented a three-year evaluation of the LED luminaires in this installation in order to develop new longitudinal field data on LED performance in a challenging, real-world environment. This document provides information through the initial phase of the I-35W bridge project, up to and including the opening of the bridge to the public and the initial feedback received on the LED lighting installation from bridge users. Initial findings of the evaluation are favorable, with minimum energy savings level of 13% for the LED installation relative to the simulated base case using 250W high-pressure sodium (HPS) fixtures. The LEDs had an average illuminance level of 0.91 foot candles compared to 1.29 fc for the HPS lamps. The LED luminaires cost $38,000 more than HPS lamps, yielding a lengthy payback period, however the bridge contractor had offered to include the LED luminaires as part of the construction package at no additional cost. One potentially significant benefit of the LEDs in this installation is avoiding rolling lane closures on the heavily-traveled interstate bridge for the purpose of relamping the HPS fixtures. Rolling lane closures involve multiple crew members and various maintenance and safety vehicles, diversion of traffic, as well as related administrative tasks (e.g., approvals, scheduling, etc.). Mn/DOT records show an average cost of relamping fixtures along interstate roadways of between $130-150 per pole. The previous bridge saw a lamp mortality rate of approximately 50% every two years, though the new bridge was designed to minimize many of the vibration issues. A voluntary Web-based feedback survey of nearly 500 self-described bridge users showed strong preference for the LED lighting - positive comments outnumbered negative ones by about five-to-one.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Display-based communications for advanced transport aircraft

The next generation of civil transport aircraft will depend increasingly upon ground-air-ground and satellite data link for information critical to safe and efficient air transportation. Previous studies which examined the concept of display-based communications in addition to, or in lieu of, conventional voice transmissions are reviewed. A full-mission flight simulation comparing voice and display-based communication modes in an advanced transport aircraft is also described. The results indicate that a display-based mode of information transfer does not result in significantly increased aircrew workload, but does result in substantially increased message acknowledgment times when compared to conventional voice transmissions. User acceptance of the display-based communication system was generally high, replicating the findings of previous studies. However, most pilots tested expressed concern over the potential loss of information available from frequency monitoring which might result from the introduction of discrete address communications. Concern was expressed by some pilots for the reduced time available to search for conflicting traffic when using the communications display system. The implications of the findings for the design of display-based communications are discussed.

Lee, Alfred T.↗

Evaluation of the Terminal Precision Scheduling and Spacing System for Near-Term NAS Application

NASA has developed a capability for terminal area precision scheduling and spacing (TAPSS) to provide higher capacity and more efficiently manage arrivals during peak demand periods. This advanced technology is NASA's vision for the NextGen terminal metering capability. A set of human-in-the-loop experiments was conducted to evaluate the performance of the TAPSS system for near-term implementation. The experiments evaluated the TAPSS system under the current terminal routing infrastructure to validate operational feasibility. A second goal of the study was to measure the benefit of the Center and TRACON advisory tools to help prioritize the requirements for controller radar display enhancements. Simulation results indicate that using the TAPSS system provides benefits under current operations, supporting a 10% increase in airport throughput. Enhancements to Center decision support tools had limited impact on improving the efficiency of terminal operations, but did provide more fuel-efficient advisories to achieve scheduling conformance within 20 seconds. The TRACON controller decision support tools were found to provide the most benefit, by improving the precision in schedule conformance to within 20 seconds, reducing the number of arrivals having lateral path deviations by 50% and lowering subjective controller workload. Overall, the TAPSS system was found to successfully develop an achievable terminal arrival metering plan that was sustainable under heavy traffic demand levels and reduce the complexity of terminal operations when coupled with the use of the terminal controller advisory tools.

Thipphavong, Jane↗

Study of eVTOL Charging Impact on Airport Electrical Grids

Growth in commercial air traffic has increased the aviation industry's contribution to global emissions. Aircraft electrification can reduce greenhouse gas emissions along with being efficient and reliable. Advanced air mobility introduces the idea of an advanced and more efficient air transportation system. Electric and hybrid aircraft designs, such as electric vertical takeoff and landing (eVTOL), are being considered for a number of applications, such as urban air mobility, cargo delivery, and medical emergencies. Although the electrification of aircraft provides environmental benefits, their charging needs will place significant demand on the electrical grid. This work presents a grid impact study and infrastructure upgrade requirements analysis of eVTOL charging on a realistic distribution grid through power flow simulation analysis. The case study results show that the eVTOL charging can lead to power quality issues, such as undervoltage and equipment capacity overloading. Grid infrastructure, such as lines and transformers, would need to be upgraded, and voltage management strategies would need to be deployed to accommodate eVTOL charging at an existing airport.

advanced air mobility (AAM)↗