Optimizing HVAC Operations in Multi-unit Buildings for Grid Demand Response

The thermal inertia of buildings, along with the flexibility associated with thermostatically controlled loads (TCL) allows heating ventilation and cooling (HVAC) systems to be used for grid demand response (DR). In this work, we consider an HVAC system that serves multiple units in a residential building to meet their space heating requirements. We aim to determine the optimal power flow to each unit that minimizes the power costs incurred by the building's occupants while keeping in consideration their thermal comfort. The DR program is assumed to allow the building temperatures to deviate from the set-points up to a maximum limit. Despite the complex, non-linear structure of the problem, we show how the optimal solutions can be obtained efficiently using quadratic programming. Since HVAC systems can run on either electricity or natural gas, we study the efficacy of the DR regime for both hourly electricity prices and flat gas prices over the course of 24 hours. Finally, we run simulations to determine the optimal thermal power and the evolution of unit temperatures for various energy pricing schemes.

Naqvi, Syed A.↗

Torque equilibrium attitudes for the Space Station

All spacecraft orbiting in a low earth orbit (LEO) experience external torques due to environmental effects. Examples of these torques include those induced by aerodynamic, gravity-gradient, and solar forces. It is the gravity-gradient and aerodynamic torques that produce the greatest disturbances to the attitude of a spacecraft in LEO, and large asymmetric spacecraft, such as the space station, are affected to a greater degree because the magnitude of the torques will, in general, be larger in proportion to the moments of inertia. If left unchecked, these torques would cause the attitude of the space station to oscillate in a complex manner and the resulting motion would destroy the micro-gravity environment as well as prohibit the orbiter from docking. The application of control torques will maintain the proper attitude, but the controllers have limited momentum capacity. When any controller reaches its limit, propellant must then be used while the device is reset to a zero or negatively-biased momentum state. Consequently, the rate at which momentum is accumulated is a significant factor in the amount of propellant used and the frequency of resupply necessary to operate the station. A torque profile in which the area curve for a positive torque is not equal to the area under the curve for a negative torque is 'biased,' and the consequent momentum build-up about that axis is defined as secular momentum because it continues to grow with time. Conversely, when the areas are equal, the momentum is cyclic and bounded. A Torque Equilibrium Attitude (TEA) is thus defined as an attitude at which the external torques 'balance' each other as much as possible, and which will result in lower momentum growth in the controllers. Ideally, the positive and negative external moments experienced by a spacecraft at the TEA would exactly cancel each other out and small cyclic control torques would be required only for precise attitude control. Over time, the only momentum build-up in the controllers would be due to electro-mechanical losses within the device. However, the atmospheric torques are proportional to the density of the atmosphere and the density varies with the orbital position, time of day, time of year, and the solar cycle. In addition, there are unmodeled disturbances and uncertainties in the mass and inertias. Therefore, there is no constant attitude that will completely balance the environmental torques and the dynamic TEA cannot be solved in closed form. The objective of this research was to determine a method to calculate a dynamic TEA such that the rate of momentum build-up in the controllers would be minimized and to implement this method in the MATRIX(x) simulation software by Integrated Systems, Inc.

Thompson, Roger C.↗

Electric Power Infrastructure Reliability and Security (EPIRS) Reseach and Development Initiative

Power systems have become increasingly complex and face unprecedented challenges posed by population growth, climate change, national security issues, foreign energy dependence and an aging power infrastructure. Increased demand combined with increased economic and environmental constraints is forcing state, regional and national power grids to expand supply without the large safety and stability margins in generation and transmission capacity that have been the rule in the past. Deregulation, distributed generation, natural and man-made catastrophes and other causes serve to further challenge and complicate management of the electric power grid. To meet the challenges of the 21st century while also maintaining system reliability, the electric power grid must effectively integrate new and advanced technologies both in the actual equipment for energy conversion, transfer and use, and in the command, control, and communication systems by which effective and efficient operation of the system is orchestrated - in essence, the 'smart grid'. This evolution calls for advances in development, integration, analysis, and deployment approaches that ultimately seek to take into account, every step of the way, the dynamic behavior of the system, capturing critical effects due to interdependencies and interaction. This approach is necessary to better mitigate the risk of blackouts and other disruptions and to improve the flexibility and capacity of the grid. Building on prior Navy and Department of Energy investments in infrastructure and resources for electric power systems research, testing, modeling, and simulation at the Florida State University (FSU) Center for Advanced Power Systems (CAPS), this project has continued an initiative aimed at assuring reliable and secure grid operation through a more complete understanding and characterization of some of the key technologies that will be important in a modern electric system, while also fulfilling an education and outreach mission to provide future energy workforce talent and support the electric system stakeholder community. Building upon and extending portions of that research effort, this project has been focused in the following areas: (1) Building high-fidelity integrated power and controls hardware-in-the-loop research and development testbed capabilities (Figure 1). (2) Distributed Energy Resources Integration - (a) Testing Requirements and Methods for Fault Current Limiters, (b) Contributions to the Development of IEEE 1547.7, (c) Analysis of a STATCOM Application for Wind Resource Integration, (d) Development of a Grid-Interactive Inverter with Energy Storage Elements, (e) Simulation-Assisted Advancement of Microgrid Understanding and Applications; (3) Availability of High-Fidelity Dynamic Simulation Tools for Grid Disturbance Investigations; (4) HTS Material Characterization - (a) AC Loss Studies on High Temperature Superconductors, (b) Local Identification of Current-Limiting Mechanisms in Coated Conductors; (5) Cryogenic Dielectric Research; and (6) Workshops, education, and outreach.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Software-Defined Solutions for Managing Energy Use in Small to Medium Sized Commercial Buildings

The Project uses state-of-the-art computer science to extend the benefits of Building Automation Systems (BAS) typically found in large buildings (>100,000 square foot) to medium-sized commercial buildings (<50,000 sq ft). The BAS developed in this project, termed OpenBAS, uses an open-source and open software architecture platform, user interface, and plug-and-play control devices to facilitate adoption of energy efficiency strategies in the commercial building sector throughout the United States. At the heart of this “turn key” BAS is the platform with three types of controllers—thermostat, lighting controller, and general controller—that are easily “discovered” by the platform in a plug-and-play fashion. The user interface showcases the platform and provides the control system set-up, system status display and means of automatically mapping the control points in the system.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Automated Air Sealing Demonstration: Denver Federal Center Building 40

This project aimed to demonstrate building airtightness achieved by automated air sealing in a commercial building setting. The automated air sealing demonstrated in this project uses a modified blower door to pressurize and distribute the sealing aerosol to achieve the required building airtightness. To demonstrate this technology, Building 40 at the Denver Federal Center, a federally owned campus under the jurisdiction, custody and control of the U.S. General Services Administration (GSA), was selected for testing (Figure 2). This building is currently undergoing several retrofit projects, including increasing insulation, installing high-performance windows, and adding advanced equipment, control systems, and automated air sealing. This demonstration project involved installing automated air sealing and measuring the improvements in the building's airtightness. The automated air sealing was installed over two days by AeroBarrier, the vendor. An external blower door test contractor measured the airtightness of the demonstration space before and after air sealing. The new airtightness value and the percentage increase in airtightness were used to evaluate the energy savings potential of automated air sealing. These airtightness values were used to compute the energy savings and CO 2 emissions reduction for different climate zones, building types, and initial airtightness conditions. In addition, the heating, ventilation and air conditioning (HVAC) load reduction attributable to the reduced building air leakage was studied. This study included research to determine the cost and time reduction of automated air sealing. Finally, the automated air sealing performance was evaluated qualitatively using a focus group discussion that included GSA and Bristol, the general contractor. The installation has shown the demonstration site, with a floor size of 4,462 ft 2 , air leakage has reduced by more than 50% in less than 7 hours, including preparation, site sealing, and cleanup. The performance objectives were classified as quantitative or qualitative based on the evaluation metrics used to assess the project’s success. The key performance objectives for this project were the level of airtightness achieved, the time and cost required to perform the sealing, and the HVAC load reduction attributable to air sealing. Table 1 shows the quantitative performance objectives.

42 ENGINEERING↗

Artificial Intelligence/Deep Learning FRNN Software for Prediction & Real-Time Control of DIII-D Plasma Control System (PCS)

This collaborative project integrated an improved version of the Artificial Intelligence/Deep Learning FRNN prediction and control software into the real-time DIII-D PCS (plasma control system). A key AI/DL software challenge is to build a modern high-performance computing (HPC) enabled “synthetic plasma simulator” capable of carrying out HPC-driven real-time plasma control applications. This involves development of a deep learning framework to train the surrogate model for a first-principles-based instability analysis simulator (“SGTC”) derived from the global gyrokinetic code GTC. The role of SGTC is to provide accurate and detailed plasma instability information from a real-time AI-based simulator capability to complement the deep learning prediction and control from experimentally-measured signals, such as ECE Imaging, supplemented by synthetic SGTC-ECEI.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Expert Meeting: Recommended Approaches to Humidity Control in High Performance Homes

This meeting was held on October 16, 2012, in Westford, MA, and brought together experts in the field of residential humidity control to address modeling issues for dehumidification. The presentations and discussions centered on computer simulation and field experience with these systems, with the goal of developing foundational information to support the development of a Building America Measure Guideline on this topic.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

SiC Multi-Chip Power Modules as Power-System Building Blocks

The term "SiC MCPMs" (wherein "MCPM" signifies "multi-chip power module") denotes electronic power-supply modules containing multiple silicon carbide power devices and silicon-on-insulator (SOI) control integrated-circuit chips. SiC MCPMs are being developed as building blocks of advanced expandable, reconfigurable, fault-tolerant power-supply systems. Exploiting the ability of SiC semiconductor devices to operate at temperatures, breakdown voltages, and current densities significantly greater than those of conventional Si devices, the designs of SiC MCPMs and of systems comprising multiple SiC MCPMs are expected to afford a greater degree of miniaturization through stacking of modules with reduced requirements for heat sinking. Moreover, the higher-temperature capabilities of SiC MCPMs could enable operation in environments hotter than Si-based power systems can withstand. The stacked SiC MCPMs in a given system can be electrically connected in series, parallel, or a series/parallel combination to increase the overall power-handling capability of the system. In addition to power connections, the modules have communication connections. The SOI controllers in the modules communicate with each other as nodes of a decentralized control network, in which no single controller exerts overall command of the system. Control functions effected via the network include synchronization of switching of power devices and rapid reconfiguration of power connections to enable the power system to continue to supply power to a load in the event of failure of one of the modules. In addition to serving as building blocks of reliable power-supply systems, SiC MCPMs could be augmented with external control circuitry to make them perform additional power-handling functions as needed for specific applications: typical functions could include regulating voltages, storing energy, and driving motors. Because identical SiC MCPM building blocks could be utilized in a variety of ways, the cost and difficulty of designing new, highly reliable power systems would be reduced considerably. Several prototype DC-to-DC power-converter modules containing SiC power-switching devices were designed and built to demonstrate the feasibility of the SiC MCPM concept. In anticipation of a future need for operation at high temperature, the circuitry in the modules includes high-temperature inductors and capacitors. These modules were designed to be stacked to construct a system of four modules electrically connected in series and/or parallel. The packaging of the modules is designed to satisfy requirements for series and parallel interconnection among modules, high power density, high thermal efficiency, small size, and light weight. Each module includes four output power connectors two for serial and two for parallel output power connections among the modules. Each module also includes two signal connectors, electrically isolated from the power connectors, that afford four zones for signal interconnections among the SOI controllers. Finally, each module includes two input power connectors, through which it receives power from an in-line power bus. This design feature is included in anticipation of a custom-designed power bus incorporating sockets compatible with snap-on type connectors to enable rapid replacement of failed modules.

Lostetter, Alexander↗

Building America Expert Meeting Report: Hydronic Heating in Multifamily Buildings

This expert meeting was presented by the ARIES Collaborative, and discussed cost-effective controls and distribution retrofit options for hot water and steam space heating systems in multi-family buildings with the goals of reducing energy waste and improving occupant comfort.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Experimental apparatus and methodology to test and quantify thermal performance of micro and macro-encapsulated phase change materials in building envelope applications

Thermal energy storage (TES) is used as a viable technology to shift peak electricity demand caused by the space cooling requirements in buildings. Passive TES is implemented in building envelope via micro and macroencapsulation methods. This study describes the use of a state-of-the-art laboratory to test different PCM inclusions in simplified building walls. A microencapsulated PCM and two macroencapsulated PCMs are tested in a controlled environment to gather data for validation purposes of PCM modelling algorithms in building energy modelling programs. Data indicates that the chamber environment and the heating and cooling system can conduct full-cycle tests of wall panels with PCM inclusions. This study also generates data from parallel tests on 4 wall panels which can be used in building energy modelling programs to validate the PCM modelling algorithms. The cyclic tests also capture the thermal effects of PCMs and complex PCM behaviors like sub-cooling in PCM hydrate-salts.

25 ENERGY STORAGE↗

Embedded Sensors and Controls to Improve Component Performance and Reliability -- Bench-scale Testbed Design Report

Embedded instrumentation and control systems that can operate in extreme environments are challenging due to restrictions on sensors and materials. As a part of the Department of Energy's Nuclear Energy Enabling Technology cross-cutting technology development programs Advanced Sensors and Instrumentation topic, this report details the design of a bench-scale embedded instrumentation and control testbed. The design goal of the bench-scale testbed is to build a re-configurable system that can rapidly deploy and test advanced control algorithms in a hardware in the loop setup. The bench-scale testbed will be designed as a fluid pump analog that uses active magnetic bearings to support the shaft. The testbed represents an application that would improve the efficiency and performance of high temperature (700 C) pumps for liquid salt reactors that operate in an extreme environment and provide many engineering challenges that can be overcome with embedded instrumentation and control. This report will give details of the mechanical design, electromagnetic design, geometry optimization, power electronics design, and initial control system design.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Digial Technology Qualification Task 2 - Suitability of Digital Alternatives to Analog Sensors and Actuators

The next generation reactors in the U.S. are an opportunity for vendors to build new reactor technology with advanced Instrumentation and Control Systems (control rooms, DCS, etc.). The advances made in the development of many current generation operating reactors in other parts of the world are being used in the design and construction of new plants. These new plants are expected to have fully integrated digital control rooms, computerized procedures, integrated surveillance testing with on-line monitoring and a major effort toward improving the O&M and fault survivability of the overall systems. In addition the designs are also incorporating major improvements in the man-machine interface based on lessons learned in nuclear and other industries. The above relates primarily to the scope of supply in instrumentation and control systems addressed by Chapter 7 of the Standard Review Plan (SRP) NUREG-0800 (Reference 9.5), and the associated Balance of Plant (BOP) I&C systems. This does not relate directly to the actuator and motor, breaker, initiation circuitry, valve position, etc. which is the subject of this report and normally outside of the traditional Distributed Control System (DCS), for both safety and non-safety systems. The recommendations presented in this report will be used as input to I&C research programming for the implementation of lessons learned during the early phases of new build both for large light water reactors (LWR) and also small modular reactors (SMR). This report is intended to support current research plans and provide user (vendor, owner-operator) input to the optimization of these research plans.

99 GENERAL AND MISCELLANEOUS↗

Building 1090 Boil-Off Exhaust Modifications 90% Basis of Design

This document provides analysis and proposed modifications to correct current issues at Building 1090. Electrical modifications will add additional emergency Iighting in Labs 170, 174, 178, 182, 184, 186, and 190, and back-up power for the exhaust systems, fume hood lighting and exhaust system controls during a power outage. Mechanical modifications will address building pressurization between the lab and office areas, and replacement of corroded exhaust ductwork and fume hoods related to boil-off operations of corrosive chemicals. Mechanical modifications include the installation of a dedicated, chemical boil-off exhaust fan and ductwork to support corrosive boil-off operations in Lab 184. It should be noted that the proposed solution increases the overall building exhaust demand, also increasing the supply air needed. Electrical modifications include the installation of an uninterruptible power supply (UPS) to provide power to the exhaust fan, controls, and fume hoods to allow safe exit from Laboratory 186 during a power outage. The existing lighting inverter will also be replaced with a larger model to support additional emergency lighting within the labs. Architectural modifications include exterior doors on the east wall of the IDR room. An additional door in the corridor west of Lab 184 will provide direct access to Lab 186 without entering a common building corridor. Lab casework will be modified as-required to accommodate the new layout.

42 ENGINEERING↗

USING TIME VARIANT VOLTAGE TO CALCULATE ENERGY CONSUMPTION AND POWER USE OF BUILDING SYSTEMS

Buildings are the main consumers of electricity across the world. However, in the research and studies related to building performance assessment, the focus has been on evaluating the energy efficiency of buildings whereas the instantaneous power efficiency has been overlooked as an important aspect of total energy consumption. As a result, we never developed adequate models that capture both thermal and electrical characteristics (e.g., voltage) of building systems to assess the impact of variations in the power system and emerging technologies of the smart grid on buildings energy and power performance and vice versa. This paper argues that the power performance of buildings as a function of electrical parameters should be evaluated in addition to systems’ mechanical and thermal behavior. The main advantage of capturing electrical behavior of building load is to better understand instantaneous power consumption and more importantly to control it. Voltage is one of the electrical parameters that can be used to describe load. Hence, voltage dependent power models are constructed in this work and they are coupled with existing thermal energy models. Lack of models that describe electrical behavior of systems also adds to the uncertainty of energy consumption calculations carried out in building energy simulation tools such as EnergyPlus, a common building energy modeling and simulation tool. To integrate voltage-dependent power models with thermal models, the thermal cycle (operation mode) of each system was fed into the voltage-based electrical model. Energy consumption of systems used in this study were simulated using EnergyPlus. Simulated results were then compared with estimated and measured power data. The mean square error (MSE) between simulated, estimated, and measured values were calculated. Results indicate that estimated power has lower MSE when compared with measured data than simulated results. Results discussed in this paper will illustrate the significance of enhancing building energy models with electrical characteristics. This would support different studies such as those related to modernization of the power system that require micro scale building-grid interaction, evaluating building energy efficiency with power efficiency considerations, and also design and control decisions that rely on accuracy of building energy simulation results.

Makhmalbaf, Atefe↗

Economic Sizing of Batteries for the Smart Home: Preprint

This paper presents a methodology to economically size a home battery based on parametric analysis using home energy management system (HEMS) software to optimally dispatch the battery along with controllable loads under several use cases. We account for connected equipment, controls, renewable resources, and other factors such as building characteristics and utility tariffs. The paper defines an analytical pathway for such a sizing tool, develops initial sizing guidance, and clarifies technical and market opportunities for home batteries in the context of existing and emerging equipment and control technologies. A parametric analysis that included 132 scenarios has been performed based on different combinations of pertinent parameters. Results indicate that four variables dominate the decision-making process: application scenarios (new construction or retrofit), utility tariffs, existence of HEMS, and the anticipated payback time. Life-cycle cost analysis indicated that in the absence of utility incentives, batteries plus HEMS have a payback time of longer than 10 years for new construction under a time-of-use rate structure and feed-in tariff; larger batteries have a longer payback time but may provide more benefits to utilities on reducing power backfeed under certain circumstances.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Machine learning-enhanced MPC for demand flexibility in small commercial buildings: An experimental study

Small- and medium-sized commercial buildings (SMCBs) represent the majority of U.S. commercial building stock and a significant share of peak electricity demand, yet they often lack centralized building automation systems, representing a significant untapped resource for urban energy management. This infrastructure gap makes advanced control implementation challenging, limiting the potential for widespread demand flexibility. Model Predictive Control (MPC) has shown strong potential for load shifting, peak demand reduction, and cost savings, but its effectiveness is hindered by unmeasured disturbances such as internal heat gains. This paper presents a Hybrid MPC framework that integrates a physics-based gray-box building thermal model, identified using a lumped disturbance (LD) approach, with a machine learning (ML) model for forecasting unmeasured disturbances. The hybrid approach is designed for buildings with multiple individually controlled heat pump and thermostat pairs, common in SMCBs, and aims to optimize coordinated scheduling of multiple heat pumps under dynamic electricity pricing while respecting comfort constraints. The methodology is validated through both simulations of case study buildings and experimental studies at a highly-instrumented test facility. Simulation results show that the Hybrid MPC achieves substantial load shifting and peak demand reduction, approaching the performance of an ideal MPC with perfect disturbance knowledge, and outperforming a conventional MPC without disturbance forecasting. In experiments, the Hybrid MPC reduced daily HVAC energy costs by 8.7%, peak-price time load (load shifting) by 41.7%, and peak demand by 29.2% compared to baseline control, demonstrating comparable benefits to the 11.6% cost savings, 42.9% load shifting, and 23.2% peak reduction of the ideal MPC. These results demonstrate that the proposed hybrid modeling approach can significantly improve MPC performance in real-world SMCB applications without requiring additional disturbance measurements.

Demand Flexibility↗

Beyond Widgets: Validated Systems Energy Savings and Utility Custom Incentive Program Systems Trends

Energy efficiency upgrades to buildings to date through avenues such as utility incentive programs have been largely limited to component-based products (e.g., lamps, RTUs). While some utilities do provide ‘custom’ incentive programs with whole building and system level technical assistance, these programs require deeper levels of analysis, resulting in higher program costs. This results in custom programs being restricted to utilities with greater resources, and are typically applied mainly to large or energy-intensive facilities, leaving much of the market without cost effective access and incentives for these solutions. In addition, with increasingly stringent energy codes, cost effective component-based solutions that achieve significant savings are dwindling. Integrated building systems (e.g., integrated façade, HVAC and/or lighting solutions) can deliver higher savings (Regnier et al. 2017) that translate into large sector-wide savings if deployed at the scale of these programs. However, systems application poses a number of challenges – energy savings assessments are inherently more complex and are not easily suited to the deemed measure model, and implementation of systems can be more disruptive. This paper presents the outcomes of a project to develop validated utility incentive program packages for three specific integrated building systems, in collaboration with ComEd, a consortium of California Public Owned Utilities (CA POUs) (Northern California Power Agency(NCPA) and the Southern California Public Power Authority(SCPPA)), and Xcel Energy (CO, MN). Previous work described the potential for energy savings of these systems at the individual and market level, early test findings for the task-ambient lighting system, and described the work products to develop utility incentive programs (Regnier et al. 2016). This paper presents validated end use energy savings of all three systems showing energy savings of ~20% for automated shading combined with daylight dimming (does not include light fixture retrofit savings); 30-46% for task-ambient lighting systems combined with plug load occupancy controls, depending on technology package and office building size (no daylight dimming impacts); and ~94% in the south-façade daylit zone for workstation specific lighting systems with daylight dimming (including lighting retrofit and task tuning). Using a U.S. Department of Energy (DOE) reference building model (DOE 2018), this translates to whole building savings of 2-5% (large-medium commercial), 12-23% (large-small commercial), and 13-15% (medium-large commercial) for these systems respectively. Early findings from the utilities in deploying these systems through their incentive programs indicate that deployment methods such as direct install programs might be best suited for these integrated systems. Further, early findings from a scoping study across custom utility programs and federal retrofit programs indicate that component level retrofits are still prevalent even in these programs, pointing towards an opportunity for deeper energy savings deployment. High performance retrofit case studies demonstrate that deeper energy savings is possible through integrated approaches. Market stakeholder interviews indicate however that there is generally a low level of awareness of the potential for energy savings of these three integrated systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗