Environmental Cleanup of the East Tennessee Technology Park Year One - Execution with Certainty SM - 13120

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its five-year, $1.4 billion cleanup of the East Tennessee Technology Park (ETTP), located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation in Tennessee. UCOR will close out cleanup operations that began in 1998 under a previous contract. When the Contract Base scope of work [1] is completed in 2016, the K-25 gaseous diffusion building will have been demolished and all waste dispositioned, demolition will have started on the K-27 gaseous diffusion building, all contact-handled and remote-handled transuranic waste in inventory (approximately 500 cubic meters) will have been transferred to the Transuranic Waste Processing Center, previously designated 'No-Path-To-Disposition Waste' will have been dispositioned to the extent possible, and UCOR will have managed DOE Office of Environmental Management (EM)- owned facilities at ETTP, Oak Ridge National Laboratory (ORNL), and the Y-12 National Security Complex in a safe and cost-effective manner. Since assuming its responsibilities as the ETTP cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline; received its Earned Value Management System (EVMS) certification; advanced the deactivation and demolition (D and D) of the K-25 gaseous diffusion building; recovered and completed the Tank W-1A and K-1070-B Burial Ground remediation projects; characterized, packaged, and shipped contact-handled transuranic waste to the Transuranic Waste Processing Center; disposed of more than 90,000 cubic yards of cleanup waste while managing the Environmental Management Waste Management Facility (EMWMF); and provided operations, surveillance, and maintenance activities at DOE EM facilities at ETTP, ORNL, and the Y-12 National Security Complex. Project performance as of December 31, 2012 has been excellent: - Cost Performance Index - 1.06; - Schedule Performance Index - 1.02. At the same time, since safety is the foundation of all cleanup work, UCOR's safety record goes hand in hand with its excellent project performance. Through calendar year 2012, UCOR's recordable injury rate was 0.33, and the company has worked close to 4 million hours without a lost work day injury. UCOR's safety record is one of the best in the DOE EM Complex. This performance was due, in large part, to the people and processes URS and CH2M HILL, the parent companies of UCOR, brought to the project. Key approaches included: - Selected and deployed experienced staff in key leadership positions throughout the organization; - Approached 'Transition' as the 'true' beginning of the cleanup project - kicking off a number of project initiatives such as Partnering, PMB development, D and D Plan execution, etc. - Established a project baseline for performance measurement and obtained EVMS certification in record time; - Determined material differences and changed conditions that warranted contract change - then quickly addressed these changes with the DOE client; - Aligned the project and the contract within one year - also done in record time; - Implemented Safety Trained Supervisor and Safety Conscious Work Environment Programs, and kicked off the pursuit of certification under DOE's Voluntary Protection Program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Applying Lean Concepts to Waste Site Closure - 13137

Washington Closure Hanford (WCH) was selected by the U.S. Department of Energy, Richland Operations Office to manage the River Corridor Closure Project, a 10-year contract in which WCH will clean up 220 mi{sup 2} of contaminated land at the Hanford Site in Richland, Washington. In the summer of 2011, with Tri-Party (DOE-RL, Environmental Protection Agency and Washington State Department of Ecology) Agreement Milestones due at the end of the calendar year, standard work practices were challenged in regards to closure documentation development. The Lean process, a concept that maximizes customer value while minimizing waste, was introduced to WCH's Sample Design and Cleanup Verification organization with the intention of eliminating waste and maximizing efficiencies. The outcome of implementing Lean processes and concepts was impressive. It was determined that the number of non-value added steps far outnumbered the value added steps. Internal processing time, document size, and review times were all reduced significantly; relationships with the customer and the regulators were also improved; and collaborative working relationships with the Tri Parties have been strengthened by working together on Lean initiatives. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The River Corridor Closure Contract How Washington Closure Hanford is Closing A Unique Department of Energy Project - 12425

Cleanup of the Hanford River Corridor has been one of Hanford Site's top priorities since the early 1990's. This urgency is due to the proximity of hundreds of waste sites to the Columbia River and the groundwater that continues to threaten the Columbia River. In April 2005, the U.S. Department of Energy, Richland Operations Office (DOE-RL) awarded the Hanford River Corridor Closure Contract (RCCC), a cost-plus incentive-fee closure contract with a 2015 end date and first of its kind at Hanford Site, to Washington Closure Hanford (WCH), a limited-liability company owned by URS, Bechtel National, and CH2M HILL. WCH is a single-purpose company whose goal is to safely, compliantly, and efficiently accelerate cleanup in the Hanford River Corridor and reduce or eliminate future obligations to DOE-RL for maintaining long-term stewardship over the site. Accelerated performance of the work-scope while keeping a perspective on contract completion presents challenges that require proactive strategies to support the remaining work-scope through the end of the RCCC. This paper outlines the processes to address the challenges of completing work-scope while planning for contract termination. WCH is responsible for cleanup of the River Corridor 569.8 km{sup 2} (220 mi{sup 2}) of the 1,517.7 km{sup 2} (586 mi{sup 2}) Hanford Site's footprint reduction. At the end of calendar year 2011, WCH's closure implementation is well underway. Fieldwork is complete in three of the largest areas within the RCCC scope (Segments 1, 2, and 3), approximately 44.5% of the River Corridor (Figure 3). Working together, DOE-RL and WCH are in the process of completing the 'paper work' that will document the completion of the work-scope and allow DOE-RL to relieve WCH of contractual responsibilities and transition the completed areas to the Long-Term Stewardship Program, pending final action RODs. Within the next 4 years, WCH will continue to complete cleanup of the River Corridor following the completion goals. As field work-scope is completed, progressive reductions of business processes, physical facilities, and staff will occur. Organizations will collapse and flatten commensurate with workload. WCH employees will move on to new endeavors, proud of their accomplishments and the legacy they are leaving behind as being the first and largest environmental cleanup closure contract at Hanford. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning Small Research and Training Reactors; Experience on Three Recent University Projects - 12455

Decommissioning small reactors within the confines of an active University environment presents unique challenges. These range from the radiological protection of the nearby University population and grounds, to the logistical challenges of working in limited space without benefit of the established controlled, protected, and vital areas common to commercial facilities. These challenges, and others, are discussed in brief project histories of three recent (calendar year 2011) decommissioning activities at three University training and research reactors. These facilities include three separate Universities in three states. The work at each of the facilities addresses multiple phases of the decommissioning process, from initial characterization and pre-decommissioning waste removal, to core component removal and safe storage, through to complete structural dismantlement and site release. The results of the efforts at each University are presented, along with the challenges that were either anticipated or discovered during the decommissioning efforts, and results and lessons learned from each of the projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental cleanup of the East Tennessee Technology Park - Year three - A status report - 15522

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its five-year, $1.4 billion cleanup of the East Tennessee Technology Park (ETTP), the former Oak Ridge Gaseous Diffusion Plant, located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation (Reservation) in Tennessee. Under the contract, the base period scope of work to be completed by 2016 includes demolition of both the K-25 and K-31 gaseous diffusion buildings and all demolition waste dispositioned, initiation of demolition on the remaining K-27 gaseous diffusion building, safe storage of transuranic (TRU) waste for eventual transfer to the Transuranic Waste Processing Center, previously designated -No-Path-To-Disposition Waste- dispositioned to the extent possible, and completion of design and engineering of a mercury treatment system to be installed at the Y-12 National Security Complex (Y-12). UCOR will have also managed DOE Oak Ridge Office of Environmental Management (OREM)-owned facilities at ETTP, Oak Ridge National Laboratory (ORNL), and Y-12 in a safe and cost-effective manner. Since assuming responsibilities as the ETTP and Oak Ridge Reservation cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline; received its Earned Value Management System (EVMS) certification; completed the deactivation and demolition (D and D) of the 44-acre K-25 gaseous diffusion building; removed and disposed of a contaminated underground storage tank (Tank W-1A) at ORNL; dispositioned mercury-contaminated storage tanks at Y-12; completed closure of the Toxic Substances Control Act Incinerator; disposed of more than 158,000 cubic yards of cleanup waste while managing the on-site Environmental Management Waste Management Facility (EMWMF); and conducted operations, surveillance, and maintenance activities at 180 DOE EM facilities at ETTP, ORNL, and Y-12 in a safe and cost-effective manner. In 2014, UCOR completed the removal and disposal of all of the K-25 demolition debris; completed the removal of asbestos-laden transite siding on the K-31 gaseous diffusion building and began demolition of that 17-acre building; advanced the characterization and deactivation of the K-27 gaseous diffusion building, readying the building for the start of demolition in 2015; advanced the design and engineering of a Mercury Treatment Facility to be located at Y-12; continued the cost-effective and safe disposition of all cleanup wastes; and readied ETTP for Voluntary Protection Program Star Status Assessment in 2015. Project performance as of December 31, 2014, continued to be excellent: - Cost Performance Index - 1.12 - Schedule Performance Index - 1.02 At the same time, since safety is the foundation of all cleanup work, UCOR's safety record goes hand-in-hand with its excellent project performance. Through calendar year 2014, UCOR's recordable injury rate was 1.04 occurrences per 200,000 work hours, and the lost workday case rate was 0.52. This performance continues to be due, in large part, to the people and processes URS and CH2M HILL, the parent companies of UCOR, brought to the project. Key enablers included: - Selected and deployed experienced staff in key leadership positions throughout the organization, continually re-energizing the organization with new leaders - Implemented previously successful safety programs and initiatives from other DOE sites, such as DOE's Voluntary Protection Program - Brought fresh thinking and innovation to tackling tough project issues, such as the deactivation of the Technetium-99-contaminated areas of K-27, applying lessons learned from the D and D of K-25; and implementing a -waste factory- approach to cleanup - Maintained continuing alignment between UCOR's contract with DOE and its Performance Measurement Baseline - rapidly addressing contract changes when they arose - Maintained a readiness both from a process as well as experienced personnel perspective to support DOE OREM in performing other significant Oak Ridge Reservation cleanup activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Completing the Cleanup of the US Department of Energy's East Tennessee Technology Park - Four Years Early - 16067

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its $2.6 billion cleanup of the East Tennessee Technology Park (ETTP), the former Oak Ridge Gaseous Diffusion Plant, located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation (ORR) in Tennessee. Under the contract, the scope of work to be completed includes demolition of all gaseous diffusion buildings, namely K-25, K-31 and K-27, as well as other facilities such as the Toxic Substance Control Act (TSCA) Incinerator, the K-1200 Centrifuge Complex and the K-1037 Barrier Plant. Additionally, UCOR will remove contaminated soils and treat contaminated groundwater. Waste generated by these cleanup activities will be disposed at onsite as well as offsite facilities. UCOR will also continue to manage hundreds of the DOE Oak Ridge Office of Environmental Management (OREM)-owned facilities across the ORR. Due largely to funding challenges early in the project, the DOE estimated in their October 2013 Program Plan 2014-2024 that ETTP cleanup would not be achieved until 2024, four years later than originally scheduled in UCOR's contract with the DOE. In November 2014, the DOE Manager for OREM, Susan Cange, publicly shared her 'vision' for ETTP cleanup by 2020, four years earlier than the DOE's current plan. As part of Vision 2020, all gaseous diffusion buildings would be demolished by the end of 2016. In response to Ms. Cange's vision, UCOR published a Strategic Plan describing how ETTP could be cleaned up by 2020, provided that a number of funding and programmatic and technical challenges could be overcome. UCOR is in the midst of implementing its Strategic Plan, and progress is being made to that end. Since assuming its responsibilities as the ETTP cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline (PMB); received its Earned Value Management System (EVMS) certification; completed the D and D of the 44-acre K-25 and 17-acre K-31 gaseous diffusion buildings; completed the K-1070- B Burial Ground remediation project; completed RCRA closure of the TSCA Incinerator; and disposed of more than 541,411 cubic yards of cleanup waste while managing the on-site Environmental Management Waste Management Facility (EMWMF). In 2015, UCOR achieved safety 'Star Status' under the DOE's Voluntary Protection Program (VPP); completed the demolition of the K-31 gaseous diffusion building; advanced the characterization and deactivation of the K-27 gaseous diffusion building, readying the building for the start of demolition in 2016; and began characterization activities in the K-1037 Barrier Plant as well as a number of facilities in the Poplar Creek Area of the ETTP Site. Project performance through December 31, 2015, is as follows: Cost Performance Index - 1.12, Schedule Performance Index - 1.02. Since safety is the foundation of all cleanup work, UCOR's safety record goes hand-in-hand with its project performance. Through calendar year 2015, UCOR's recordable injury rate was 0.94 occurrences per 200,000 work hours, and the day away case rate was 0.31. These rates are both below the DOE and UCOR goals. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Simulation and Optimizing Groundwater Investigations, Conceptual Design Analysis, Model Calibration and Remedial Design Using Parallel Numerical Methods: Theory and Application - 16578

Optimization of environmental restoration efforts at complex groundwater sites involves the development of a conceptual and often numerical flow and transport models. Typically, a limited number of simulations are done to assess the impact of parameter uncertainty, to evaluate remedial alternatives and develop a remedy, or to modify an existing remedy. A limited number of simulations are performed because each simulation can take upwards of several hours per simulation and until now the ability to conduct the 100's to 1000's of simulations needed to derive an optimal remedy was beyond the reach of the everyday practitioner. HGL has developed and implemented new parallel simulation and optimization methods in their software and has successfully deployed applications on high performance Cloud-based computing platforms. This advancement removes the impediment of burdensome and unpredictable runtime requirements these types of projects have typically exhibited using heuristic trial-and-error or even automated serial computation approaches. A parallel numerical solver has been added to the subsurface flow and transport simulator MODFLOW-SURFACT{sup TM} and has demonstrated reductions in solution time by as much as a factor of 9.8. This is accomplished by distributing the numerical computations of every time step over multiple processors. The integrated parallel simulation and optimization method uses the breadth and depth search approach; iteratively producing sets of tens or 100's of candidate solutions that are evaluated concurrently instead sequentially (i.e. one model evaluation at a time). Solutions within 80-100% of the globally optimal solution are regularly found expending only 5-10% of the usual computational effort using this new parallel optimization method (reducing computation effort by 10 to 20 times). Distributing optimal search runs across multiple processors additionally reduces calendar time to solutions. Practitioners evaluating multiple conceptual site models, model calibration by auto-calibration methods and remedial design by heuristics can enjoy significant reductions in model solution time by using the parallel numerical matrix solver in the physics-based simulator. Combining investigation and design analysis with breadth and depth parallel optimization methods, projects at the fringe of practical optimization, along with projects that were beyond the reach of formal optimization methods are now wholly feasible and tractable optimization problems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Electronics Upgrades to the Green is Clean Phoswich Detector Systems and Programmatic Implementation at LANL - Phase II Completion - 18403

Los Alamos National Laboratory (LANL) radiological facilities produce low-density room trash that, in many cases, is not contaminated with radioactivity. It has been estimated that 50 to 90% of low-density room trash is free of radioactive contamination and eligible for inclusion in LANL's Green is Clean (GIC) program. The GIC program is a verification program for non-regulated waste from radiation controlled areas that has been actively segregated as nonradioactive through the use of the waste generator's acceptable knowledge. The GIC program has employed two large area Phoswich gamma ray detector systems (HERCULES and ZEUS) to verify that GIC candidate low-density waste contains no radioactivity above background. The large area (127 cm{sup 2}) Phoswich detectors consist of a thin NaI front crystal (3 mm thick) that is optically coupled to a thick CsI back crystal (50 mm thick). The scintillation properties of the two crystals are different enough to allow the system's electronic components to identify the origin of any pulse. The original systems utilize Nuclear Instrumentation Module (NIM) electronics to process the detector signals. The electronics currently in use by the systems are out of date and some components are no longer manufactured. In 2015, phase I upgrades to the GIC detector systems were completed. Phase I objectives included identifying more modern commercially available electronics that could replace the NIM electronics. A pulse shape discriminator (PSD) module, the Digital Gamma Finder (DGF) Pixie-4 made by XIA LLC, that fits in a compact National Instruments{sup TM} PXI chassis was identified to replace the majority of the original NIM bin electronics - a single Pixie-4 module replaces four NIM amplifiers and four NIM pulse shape analyzers (PSAs). Another phase I objective was to show that that new PSD could separate out the NaI and CsI detector signals in a manner equivalent to or better than the NIM electronics. Proof of concept was achieved in 2015 when a prototype upgrade system on ZEUS was built and tested and gating parameter settings were determined that successfully separated the NaI and CsI signals. Phase II required establishing a LabVIEW software interface with Pixie-4 electronics in lieu of the manufacturer provided Pixie-4 software called the Pixie Viewer. In addition, phase II included 1) final optimization of the gating parameters on the prototype Pixie-4 ZEUS system, 2) finalizing Requirements, Design and Test Plan documents, 3) LabVIEW software interface quality assurance (QA) testing, 4) setting up the HERCULES system with the Pixie-4 upgrade electronics, 5) check source and background calibration of both systems, 6) absolute efficiency determination on both systems and 7) procedure revisions and implementation of both systems into routine operations. In 2017 phase II was completed including the preparation of detailed Requirements, Design and Test Plan documents. The LabVIEW interface software that communicates and controls the Pixie-4 has been completed, merged with the preexisting LabVIEW operations software and fully tested. Gating parameter optimization, configuration of HERCULES with the Pixie-4 electronics, check source and background calibrations and absolute efficiency determinations have all been performed - quantitative results are presented in the full paper. For performance validation, comparison measurements of actual GIC bags on both the HERCULES system using the old NIM Bin electronics and the ZEUS system using the upgraded Pixie-4 electronics have been done and evaluated. Finally, procedure revisions and implementation of both systems into routine operations is currently in process and planned to be complete by the end of calendar year 2017. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Biofouling of Injection Wells at 200 West Pump and Treat - 19252

Located on the U.S. Department of Energy's Hanford Site in Richland, Washington, the 200 West Pump and Treat Facility (200 West P and T) has a 9,464 L/min capacity designed to capture and treat an 8 km{sup 2} contaminated groundwater plume. The 200 West P and T system was designed and built by CH2M Hill Plateau Remediation Company to capture and treat contaminated groundwater to reduce the mass of carbon tetrachloride, chromium (trivalent and hexavalent), cyanide, nitrate, and trichloroethene. The system was constructed in calendar years 2010 and 2011 and started operation in 2012. Following treatment, the water is reinjected into the aquifer to serve as a recharge source and to provide flow-path control. Fouling of injection wells has occurred since system startup, characterized by reduced capacity and associated increases in dynamic water level during injection. In severe cases, the water level increases 30.5 m in the first 24 hours of injection. Video inspection of injection wells confirms that the accumulation of solids obstruct the well screens. Because replacement of treated groundwater to the aquifer is essential to the overall remedy, a comprehensive program was initiated to understand the nature/cause of well fouling and to identify mitigation strategies. As a result of this program, a sodium hypochlorite feed system was installed on the pipeline to one injection well to determine whether preventing biological growth would prevent well fouling. A residual of 0.5 to 1.0 mg/L as Cl{sub 2} not only halted fouling but also reversed fouling impacts. Current efforts focus on disinfecting the entire volume of injection water. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of H-Canyon Ventilation Exhaust Tunnel Inspection at the Savannah River Site - 20052

The Department of Energy (DOE) H-Canyon Facility at the Savannah River Site (SRS) is operated by Savannah River Nuclear Solutions (SRNS). The Facility Structural Integrity Program [1] provides a process to inspect, evaluate, and document the conditions of passive safety related structural systems and components, their degradation mechanisms and their impact on the safety envelope. The Structural Integrity Program performs periodic visual inspections to confirm the systems and components can perform their safety function and recommend corrective actions before the function is compromised. The H-Canyon Exhaust Tunnel is part of the H-Canyon Ventilation System and is periodically inspected under the Structural Integrity Program. The Tunnel performs a Safety Class passive design feature function that is available 100% of the time. The underground reinforced concrete Tunnel directs Canyon process air from the Canyon to the Sand Filter System. The radiological and chemical airborne activity coupled with the physical configuration of the tunnel precludes a manned entry into the tunnel to perform the inspection. Unlike active systems that can be subjected to physical testing to confirm capability, qualification calculations, including modeling, is performed to assess passive design feature capabilities relative to operational, accident and natural phenomena hazards events. Input for these calculations come from knowledge of field conditions, design drawings and conservative assumptions. The knowledge of field conditions comes from concrete and soil testing activities as well as inspection data. The use of cameras on crawlers to obtain inspection data and how that data is used in qualification calculations is the focus of this discussion. Remote Tunnel inspections have been performed using cameras on a stick, referred to as pole cameras, prior to Calendar Year 2003 (CY2003). Since CY2003, six camera equipped crawlers have been used. Crawlers have evolved and improved by incorporating lessons learned from the previous inspections. The latest 2019 crawler successfully traveled the entire length of the tunnel between the Canyon and Sand Filter System and captured images that were previously unseen, thus providing key visual data for the Structural Integrity Program report [2]. The inspection data serves as 1) input to qualification calculations, 2) validates current conditions remain bounded by qualification calculations, and 3) documents a record of change over time. This data is vital for the effective evaluation of the tunnel structure and aids with predicting the life cycle service life safety envelope to protect the public, environment, and facility worker. The goal of the 2019 deployment was to use a more robust vehicle to ensure travel over obstacles, perform the inspection with higher resolution cameras, and have the ability to elevate the cameras to view surfaces previously obscured by abandon-in-place ducts in the tunnel. The inspection information will serve to strengthen the input basis for qualification calculations, versus using excessive conservative calculation assumptions. This 2019 inspection was compared with previous crawler visual evidence to identify change over time to project remaining service life and confirm field conditions remain bounded by qualification calculations. The results of the 2019 Exhaust Tunnel inspection continue to improve and provide a firm basis to make sound engineering judgements regarding tunnel capability and approaches in projecting remaining service life with an aging system and component. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Infrastructure and DFLAW Support at Hanford - 20443

Manhattan Project era infrastructure systems are degrading at an accelerated pace across the Department of Energy's (DOE) Environmental Management complex. Revitalizing, rejuvenating and right-sizing these systems to ensure reliability for ongoing cleanup missions is a major focus at the 580-square- mile Hanford Site in southeast Washington State. The push to complete construction, commissioning, startup, and operation of facilities and systems in the Direct-Feed Low-Activity Waste (DFLAW) program at Hanford by 2023 requires considerable coordination among site contractors and a significant investment in infrastructure. The passage of time also poses a challenge. It has been about 75 years since facilities were first operated at the site, and approximately 40 years of plutonium production created a legacy of unidentified active and abandoned underground obstacles and waste sites that must be avoided when building and upgrading the infrastructure. Converting infrastructure systems originally built to support plutonium production from the 1940's to the 1980's and upgrading those systems to optimize technology is an ever-changing balance of funding profiles, available resources and execution strategies. The DOE Richland Operations Office (RL) has long recognized the need for increased investment in Hanford Site infrastructure to support the future processing of approximately 56 million gallons of waste currently stored in large underground tanks. When DFLAW is fully operational, safe and reliable infrastructure systems will be needed to ensure continuity of operations around the clock, 365 days a year. These include roadways, water, power, sewer, information technology systems and facilities. To ensure the readiness of Hanford's infrastructure to support treating tank waste in the next three years, 15 projects were identified with a combined value of $133.8 million. Through calendar year 2019, 7 infrastructure projects have been substantially completed and the remaining 8 projects, with a remaining value of $103.8 million, are scheduled to be completed by December 2023. RL and its site services/infrastructure contractor, Mission Support Alliance (MSA), regularly evaluate the needs of the DFLAW program and other Hanford Site missions to ensure the highest priority systems are addressed. In addition to a fast-approaching deadline for round-the-clock treatment operations, RL and MSA face another significant infrastructure challenge. As cleanup is being completed in a 220-square-mile area called the River Corridor, most of the cleanup operations going forward will occur in a 20-square-mile area in the center of the Hanford Site, known as the Central Plateau. Infrastructure systems are becoming more congested in an already overcrowded area. This paper/presentation will outline some of the challenges Hanford faces while executing infrastructure reliability projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

System Health and Status Reporting is Used to Improve Infrastructure Systems at the Hanford Site - 20449

Reliable physical infrastructure systems are vital to completing the clean-up mission and the start-up and commissioning of new nuclear waste processing facilities at the Hanford Site. Key infrastructure systems at Hanford include water, sewer, and electrical utilities, roads, telecommunications/network systems, and fire systems. All of the infrastructure systems are non-nuclear, General Service systems that are being maintained under formal engineering configuration control and none are specifically credited in any documented safety analysis (DSA). Starting in calendar year 2017, the Hanford Site's infrastructure and services contractor started producing system health and status reports for a total of 15 critical infrastructure systems as means to get a better understanding of each system's health and how it could be improved to ensure better and more reliable service delivery. As the reporting, tracking, and use of the metrics has matured, the number of systems for which reports are being developed has been expanded to a total of 23. Each of the critical infrastructure systems are assigned primary and alternate design authorities that complete qualifications on each assigned system. The design authorities actively manage and maintain configuration control on each of their systems and track metrics associated with availability, maintenance (corrective and preventive), and configuration of the technical baseline. The metrics are based on the principles established in Chapter V of DOE O 420.1C, Facility Safety, [1] and have been tailored as appropriate to each of the key infrastructure systems. An overall assessment of system health is performed and documented on a routine basis (e.g., quarterly). Included in this documentation is a quantitative score for each of the metrics (i.e., availability, maintenance, configuration management) along with results of system walk-downs, description of any permanent design modifications, identification of new or emerging issues and vulnerabilities affecting the system, and an assessment by the design authority of actions necessary to improve the system health score. The overall status scores are calculated using a formula and based on a pre-determined grading scale, a color is assigned for simple presentation. The information gained from developing the reports is being used to (1) assist with making timely and better informed decisions through the use of solid technical bases that are increasing the overall reliability and capabilities of the Site's infrastructure systems as new expense and capital projects in the Reliability Projects Investment Portfolio (RPIP) are prioritized and executed; (2) feed the risk management program, and (3) integrate the technical content of Master Plans that describe the Site's needs for the system and the system's capabilities to meet those future needs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SNF Data Visualization on the Centralized Used Fuel Resource for Information Exchange (CURIE) Website

To better inform stakeholders regarding the nature of spent nuclear fuel (SNF) at utility sites, an online data visualization system has been created for the U.S. Department of Energy's Office of Nuclear Energy (DOENE). The data visualization system is part of the Centralized Used Fuel Resource for Information Exchange (CURIE) website, hosted by the Oak Ridge National Laboratory (ORNL) for DOE-NE. The visualization employs a database that is part of an analysis tool known as the Used Nuclear Fuel Storage, Transportation and Disposal Analysis Resource and Data System (UNF-ST[and]DARDS). Because many of the previous document management and sharing tools related to SNF have been terminated (or are inaccessible), a new tool, the CURIE, was developed for DOE-NE and launched on March 1, 2013 at http://curie.ornl.gov. In addition to supporting DOE SNF programs, CURIE is a national resource that is accessible to industry, vendor, federal, and laboratory partners, as well as other stakeholders. CURIE's architecture was initially based on previous work that supported DOE's Bioenergy Technologies Office on the Bioenergy Knowledge Discovery Framework (KDF). The site uses an open-source search engine, Apache Solr, which provides intuitive search results based on a faceted search method similar to that used by Amazon.com{sup R}. This algorithm helps to ensure that finding documents and data is straightforward. SNF data visualization capability was added to the CURIE website which provides a capability to post and access documents and data related to the management of SNF. CURIE currently maintains over 4,100 documents and the Siting Experience Database (SED), which was developed in response to a near-term recommendation by the Blue Ribbon Commission on America's Nuclear Future (BRC). The SED is a database of the experience that has been gained and relevant documentation that has been produced in efforts to site nuclear waste facilities, both in the US and abroad. Most of these documents are publicly accessible. In addition, CURIE maintains a current calendar of related events, an SNF image gallery, featured documents, and external links to related databases and websites. CURIE also maintains private groups (or communities) to facilitate collaborative development through sharing and editing documents that are not publicly available. There are more than 250 registered users in 23 different communities within CURIE.ORNL has also been developing UNF-ST[and]DARDS to provide a controlled source of technical data for various waste management system analysis/evaluation tools, access to key technical data, and analysis capabilities for characterizing the SNF inventory. UNF-ST[and]DARDS also provides enhanced capabilities to assess safety, risk, and uncertainty throughout the integrated waste management system. This paper describes the UNF-ST[and]DARDS data available for visualization and the associated visualization techniques used by CURIE to display this data.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nevada National Security Site - Area 5 Waste Received Under Permit SW532

Calendar Year 23 Asbestos Report for Permit SW532 Being resubmitted to address a comment received by NDEP, the weight and volume of two packages on one of the shipments was rounded differently than the quarterly report and we are revising the annual report to match.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual FEC-PTC Report - CDRL F.70

The U.S. Department of Energy (DOE) Idaho National Laboratory (INL) Site operates facilities with potential emissions of criteria and hazardous air pollutants. This report documents the calendar year 2021 criteria and hazardous air pollutants emissions and has been prepared to comply with permit to construct (PTC) P-2015.0023 for the period of 1-1-2021 up to the effective date of PTC P 2020.0045 (1-29-2021), and PTC P-2020.0045 for the period from 1-29-2021 through 12-31-2021. The Idaho Administrative Procedures Act (IDAPA) 58.01.01.178, Standard Contents of Permits Establishing a Facility Emissions Cap (FEC) requires that all permits establishing a FEC shall include sufficient reporting to assure compliance with the permit establishing the FEC. Total hazardous air pollutant (HAP) emissions for the year were 0.10 tons in aggregate and the maximum individual HAP was toluene at 0.04 tons. Criteria pollutant emissions were 0.75 tons for sulfur dioxide, 24.33 tons for oxides of nitrogen, 6.07 tons of carbon monoxide, 2.53 tons of total particulate matter and 0.99 tons of volatile organic compounds (VOC).

99 GENERAL AND MISCELLANEOUS↗

Residual Dose Rates Analyses from Vent Lines Shield Block on the Target Cart at Spallation Neutron Source

The target carriage supports the mercury target vessel in the Spallation Neutron Source (SNS) in a cantilevered fashion and supplies the liquid mercury flowing to and from the target vessel. The target carriage is designed to move the target vessel into its target monolith position to receive the proton beam and then remove it horizontally back into an adjacent service cell, where the target vessel can be exchanged about 2-3 times per calendar year. At the time of the performed studies, the SNS mercury target can accept a proton beam at 1 GeV energy and 1.4 MW power; however, it will be upgraded to receive 1.3 GeV energy at 2 MW by the end of 2024 year [1]. The cart is practically a shield block on wheels to minimize fluxes and dose rates in the service cell downstream of the carriage. There are vent lines located inside a passage on top of the target carriage, and they are covered by a stepping-up steel shield block (vent lines shield block). Vent lines are permanently attached to the shield block. New vent lines with a different design are going to be installed. These lines are shielded by the new steel block to which the vent lines are attached. The estimate of the residual dose rates from the block after it is extracted from the target carriage is performed to estimate the radiation fields and to decide on the type of storage container to be used.

Popova, Irina I↗

Understanding LIB Battery Electrodes Through Classical Electrochemical Interface Theory

Classical models of the electrochemical interface can be applied to complex and dynamic electrodes to understand important mechanisms that are relevant to device-level phenomena like calendar aging or cycle life. Here, we show that negative alloy electrodes with wide electrochemical windows cannot be assumed to have static interfaces throughout all states of charge. Under high states of charge, the interface -including the solid electrolyte interphase - has characteristics that resemble a highly polarized electrode far from the point of zero charge. Under these conditions, the interface can be understood through the Helmholtz model. At lower states of charge, the interface capacitance decreases and the space charge layer length increases. This transformation resembles a metal electrode approaching the point of zero charge which is understood through the Gouy-Chapman-Stern-Grahame model of the electrochemical interface. This transformation happens at both silicon and carbon-coated silicon interfaces. From voltage-limited cycling experiments, in the limit of the diffuse double layer, the silicon electrode impedance rises significantly in the first few cycles. This rise is related to the continuous electrochemical reduction of electrolyte components from an interface that is not electronically screened from the electrolyte. In other words, an electrode interface for batteries should resemble a 'Helmholtz-like' structure.

anode↗