Successful Implementation of a Natural Resource Restoration Plan at the Fernald Preserve - 19568

The Fernald Preserve, Ohio, Site is a former uranium-processing plant that underwent extensive remediation pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). It is situated on a 425-hectare (ha) (1050-acre) tract of land, approximately 29 kilometers (km) (18 miles) northwest of Cincinnati, Ohio. The US Department of Energy (DOE) Office of Legacy Management is responsible for management of the site. Site remediation and subsequent ecological restoration have converted the site from an industrial production facility to an undeveloped park, encompassing a series of wetlands, prairies, and forested communities. The remediation of buildings and contaminated soil was completed in 2006, but aquifer remediation is ongoing. Portions of the site are open to the public, including approximately 11 km (7 miles) of walking trails that are open year-round and a Fernald Preserve Visitors Center open four days a week. Stakeholders were instrumental in providing recommendations for final land use of the site as an undeveloped park with an emphasis on wildlife. Final land use decisions were also instrumental in the resolution of a CERCLA natural resource damage claim. The State of Ohio sued DOE in 1986 for damages to state natural resources under Section 107 of CERCLA. The suit was stayed until completion of all Records of Decision (RODs) for the site. The last ROD was signed in 1996. DOE, which was both a Natural Resource Trustee (NRT) and a potentially responsible party (PRP) under CERCLA, initiated consultation with other site NRTs in 1993. A Trustee Council was formed that included DOE, Ohio Environmental Protection Agency (representing the State of Ohio), and the US Fish and Wildlife Service (representing the US Department of the Interior). The NRTs agreed collectively to conduct sitewide ecological restoration, consistent with the stakeholder vision of final land use. A conceptual restoration plan was drafted in 1998. This Natural Resource Restoration Plan (NRRP) developed goals for site restoration, as well as provisions for monitoring and maintenance of restored areas. The NRTs signed a Memorandum of Understanding in 2001, and DOE integrated ecological restoration design and construction into remediation and closure activities for the site. The NRT relationship became contentious in the following years as a result of a disagreement over monitoring commitments and compensation for groundwater injury. Final settlement was reached in 2008. As part of the settlement, DOE paid $13.75 million into the NRT fund as compensation for natural resource damages. In addition, the NRRP was finalized, and long-term commitments for monitoring and maintenance of ecologically restored areas were put in place. An Environmental Covenant was established and recorded with Hamilton and Butler Counties that ensures site activity and use limitations remain in place. The NRTs used a portion of the settlement funds to initiate the Paddys Run Conservation Project. This effort is a means to secure development rights and conservation easements within the Paddys Run watershed. Paddys Run is a third-order stream located on the western side of the Fernald Preserve. The NRTs partnered with Three Valley Conservation Trust to obtain assistance with land acquisition and conservation easement management, and since the program's inception in the Fall of 2012, more than 1820 ha (4500 acres) have been permanently protected via easement or purchase. Future decisions by the NRTs regarding monitoring and maintenance of restored areas will be negotiated in 2020. The site Restored Area Maintenance Plan (RAMP) was developed in 2010. The RAMP is a requirement within the NRRP and is scheduled for review following 10 years of implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementation of Augmented Teleautonomy on a Hydraulic Manipulator for Nuclear Facility D and D - 19602

Robotic and remote system have been used in nuclear applications to keep the human workers from high radiation environment and enhance task performance. However, applications in the more unstructured nuclear environments present more formidable challenges to robotics and remote systems. In particular, remote operation tasks for nuclear facility D and D (or dismantling) requires dexterous manipulation of heavy objects with simple and rugged robotic equipment. To address such challenge, this paper presents a new teleoperation method of augmented teleautonomy for remote operation of tools for D and D tasks. Rather than imposing complex functionalities on the slave robot, focused innovation is directed to providing effective operator aids in such a way as to draw more performance out of human operators. In this regard, the development entails the implementation of an enhanced telerobotic operation method by incorporating multi-modal augmented reality operator aids and autonomous motion primitives. This paper presents the relevant technology development utilizing a mixed-reality telerobotic test bed, and system integration and demonstration with a rugged, hydraulic slave robot system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovative Implementation of Consolidated Dry Fuel Storage at the INL - 19655

An innovative nuclear-fuel storage bucket design provides increased fuel storage capacity at the Irradiated Fuel Storage Facility (IFSF) on the Idaho National Laboratory (INL) Site. The IFSF is a dry storage facility that is at approximately 93% of its fuel storage capacity. This innovative fuel storage bucket provides for higher density packaging, thereby allowing for the receipt of more fuel at the IFSF and subsequent completion of the wet-to-dry fuel transfer scope at the INL's Idaho Nuclear Technology and Engineering Center (INTEC). The subject fuel originates from the Advanced Test Reactor (ATR) at the INL Site. All spent nuclear fuel (SNF) at INTEC is required by the Idaho Settlement Agreement (ISA) to be out of wet storage by December 31, 2023. The ISA is a tri-party agreement between the U.S. Department of Energy, the U.S. Navy, and the State of Idaho. Currently, the INTEC CPP-666 pools contain all of the INL's SNF remaining in wet storage, and INTEC's Spent Fuel Project is on schedule to meet the ISA deadline. Interestingly, the INL Site's environmental cleanup contract awarded to Fluor Idaho in 2016 also initially required the Spent Fuel Project to continue SNF receipts from the ATR into wet storage at the CPP-666 pools. The continued receipts of ATR SNF into the CPP-666 basin were able to be redirected to the IFSF because of the new storage package design, enabling the Spent Fuel Project to meet the ISA requirement to have all SNF out of wet storage by 2023. Complicating the need to redirect ATR receipts from wet storage is the lack of interim storage capacity at the ATR site. This lack of ATR storage capacity threatened to terminate reactor operations if the SNF could not be received at INTEC. The contractual requirement for continued ATR SNF receipts to prevent termination of reactor operations is resolved by the implementation of the innovative consolidated dry storage configuration in the IFSF. Consolidated fuel storage at the IFSF provides increased fuel storage capacity to facilitate meeting the ISA and the Fluor Idaho contract requirements. It provides for the completion of the ATR wet-to-dry fuel transfer scope and supports continued operation of the ATR by allowing the receipt of additional ATR SNF directly into IFSF dry storage. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The German Site Selection Process - Implementation and Challenges - 20528

Federal Company for Radioactive Waste Disposal (Bundesgesellschaft fuer Endlagerung mbH; hereinafter referred to as BGE) is a state-owned company established in September 2016 following the 'Act on the Organisational Restructuring in the Field of Radioactive Waste Storage'. 'Repository Site Selection Act' (hereinafter referred to as StandAG) defines the site selection procedure, aiming to ensure the best possible safety for storing high-level radioactive waste in Germany for the duration of one million years. The selection procedure is a participatory, transparent, learning and self-questioning process based on scientific expertise. Possible repository sites are sought all over Germany, without excluding or predetermining any potential site at the beginning. The procedure consists of three phases. After each phase, the legislative decides on the regions for further consideration in the next phase of the site selection procedure. The current first phase (Phase I) is divided into two steps. Objective of Step 1 is to determine subareas of favorable geological conditions based on available data. Step 2 of Phase I will lead to identification of specific regions that are considered for further surface-based geoscientific and geophysical exploration. Potential host rocks are rock salt, clay rock and crystalline rock. As part of the site selection procedure, an overview of the status of the planning and implementation of R and D activities is given. Topics of particular interest are, for example, the adaptation of the maximum temperature of 100 deg. C at the container surface, the impact of long-term climate variations as well as minimally invasive exploration methods. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development and implementation of an in-situ cable condition monitoring method for nuclear power plants - 130

The sustainability of the existing fleet of nuclear power reactors depends on utilities' ability to manage the aging of key components that cannot easily or economically be replaced or upgraded. Cables, metals, and concrete structures are among the major and key components that the industry and government are working on to ensure the long term reliability and safety of nuclear plants. To ensure that these key components continue to meet their performance requirements, new testing and condition monitoring technologies must be developed that are capable of identifying and quantifying degradation in these materials. The work presented in this paper focuses on the development and implementation of an in-situ condition monitoring method for nuclear power plant cables. This cable condition monitoring method is based on the frequency domain reflectometry (FDR) technique, which is a non-destructive in-situ electrical test that uses the principle of transmission line theory to locate and quantify impedance changes in a cable circuit. Through extensive research, development, and validation, the FDR test technique has been adapted as a cable condition monitoring method that trends with increasing cable degradation. In addition, the FDR data has been correlated to the industry standard elongation at break (EAB) test to quantify the degree of localized degradation in nuclear plant cable insulation material caused by long term exposure to high temperatures and radiation. By correlating FDR to EAB, the aging condition of cables routed through harsh environments can be better understood in relation to its ability to perform its intended function. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Design and implementation of safety channels for the Idaho State University AGN-201m research reactor control console - 216

The purpose of the work described in this paper is to design, implement, and install new safety channels for the control console of the Idaho State University (ISU) AGN-201m Research Reactor. These channels will replace the current vacuum-tube driven system, which has been in operation for over 50 years at the ISU nuclear engineering laboratory. Due to the aging issues associated with this technology an entirely new control console is needed. There are 3 safety channels which serve as the monitors and safety systems for adequately shutting down the reactor should any limits be broken. These 3 safety channels work harmoniously with other systems within the new control console to ensure appropriate operation of the reactor. The safety channel replacements are composed of three complementary signal processing systems whose circuits monitor the operating parameters of the reactor. The key reactor information is shown on several independent meters corresponding to each of the three safety channels. Finally, the reactor trip points are set to correspond with the standards promulgated by the Nuclear Regulatory Commission (NRC) to ensure safe operation of the ISU AGN-201m Research Reactor. The interconnections between each of these systems ensure that if any Channel fails or otherwise breaks a limit the entire system will initiate a scram and the reactor will become adequately sub-critical. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Design and implementation of wearable devices in machine tools monitoring system - 279

The world's fourth industrial revolution has finally opened after the term Industry 4.0 was proposed by Germany at the Hannover Industrial Fair in 2011, which combined industrial production with an unmanned plant to perform automated production. With the rise of Internet of Things (IoT), cloud computing, and wearing computerized devices has brought more convenience to mankind with the immediate accessibility of the Internet and technology. For example, the development of mobile devices and network technology has inspired the rapid development of wearable devices on mobile devices. Thus, to enhance the current prospects of Taiwan's unmanned machinery factory's monitoring and maintenance capabilities, this paper studies the use of Google glass Machine Tools Monitoring system, GMTM system, to be implemented in Taiwan's machinery factories. GMTM system, via the Internet, monitors sensor tools to collect tool work data to be transferred to cloud computing for analysis, processing and show the actual working conditions of each machine tool. Furthermore, the proposed system uses the monitoring data in the database to inform the factory supervisors the working status of each machine to determine whether there is a need for machine tool maintenance. This system combines real-time monitoring of material with the presentation of Google Glass wearable devices and iBeacon interior space positioning technology. GMTM system can improve the quality of machine tool production and productivity as well as enhance Taiwan's industrial competitiveness. (authors)

47 OTHER INSTRUMENTATION↗

Consideration for Implementing the Safety Regulation Plans on Permanent Shut-own NPP during Transition Period in Korea

Recently the Korean regulatory body has been reviewing the change of permission on permanent shutdown Kori NPP (Nuclear Power Plant) unit 1, since the licensee (KHNP, Korea Hydro and Nuclear Power Co. Ltd) decided the permanent shut-down in June 2015 and applied the amendment of its licensing basis documents in June 2016. Although our institute with technical authority, the KINS (Korea Institute of Nuclear Safety), had performed the peer reviews for the construction permits of 3 NPPs and operating licenses of 25 NPPs, the safety control of permanent shut-down NPP and the transition activities including deactivation and decommissioning preparation are still in early stages and challenging fields. Currently the operation/only-possession system under defueled condition were defined through the peer review of fully revised documents and the major issues which concerned with the rearrangement of safety class or function based on new accident analysis results were produced. And also various transition activities were drawn as reflecting the decommissioning strategy on Kori unit 1. In this study, we described the status and problem of safety regulation based on our subordinate statute for permanent shut-down and transition activities. And then the detail implementation plans or the alternatives will be provided and discussed in order to solve the lack of regulatory experience and guide.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Implementation of a new dose record keeping system - Paper 45

During 2013, AWE implemented a new dosimetry system. As such events occur every twenty years or so, it was considered a major project that would require close collaboration between the end user, supplier and the regulator. This paper describes the journey taken by the project team to ensure a seamless transition from the current system to the newly approved dosimetry database. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

Monitoring the Long-Term Effectiveness of Integrated Safety Management System (ISMS) Implementation Through Use of a Performance Dashboard Process

This session will examine a method developed by Federal and Contractor personnel at the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) to examine long-term maintenance of DOE Integrated Safety Management System (ISMS) criteria, including safety culture attributes, as well as identification of process improvement opportunities. This process was initially developed in the summer of 2000 and has since been expanded to recognize the importance of safety culture attributes, and associated safety culture elements, as defined in DOE M 450.4-1, “Integrated Safety Management System Manual.” This process has proven to significantly enhance collective awareness of the importance of long-term ISMS implementation as well as support commitments by NNSA/NSO personnel to examine the continued effectiveness of ISMS processes.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

IMPLEMENTATION OF A HYBRID CONTROLLER FOR CRITICAL BUILDING HVAC SYSTEMS

Many industrial facilities utilize pressure control gradients to prevent migration of hazardous species from containment areas to occupied zones, often using Proportional-Integral-Derivative (PID) control systems. When operators rebalance the plant, variation from the desired gradients can occur and the operating conditions can change enough that the PID parameters are no longer adequate to maintain a stable system. As the goal of the ventilation control system is to optimize the pressure gradients and associated flows for the plant, Linear Quadratic Tracking (LQT) is a method that provides a time-based approach to guiding plant interactions. However, LQT methods are susceptible to modeling and measurement errors, and therefore the additional use of soft computing methods is proposed for implementation to account for these errors and nonlinearities. The performance of the resulting hybrid controller is demonstrated through simulation and experimental testing as compared to a representative PID controller.

47 OTHER INSTRUMENTATION↗

A User Driven Dynamic Circuit Network Implementation

The requirements for network predictability are becoming increasingly critical to the DoE science community where resources are widely distributed and collaborations are world-wide. To accommodate these emerging requirements, the Energy Sciences Network has established a Science Data Network to provide user driven guaranteed bandwidth allocations. In this paper we outline the design, implementation, and secure coordinated use of such a network, as well as some lessons learned.

97 MATHEMATICS AND COMPUTING↗

Several key issues on implementing delay line based TDCs using FPGAs

Several topics in FPGA delay line based TDCs are discussed in this document. First, FPGA specific issues such as considerations on the delay line choice in different FPGA families, Wave Union Launchers, 'bubble proof' encoding logic, etc. are examined. Next, common problems for both FPGA TDCs and ASIC TDCs such as schemes of coarse time counter implementation, bin-by-bin calibration and noise issues due to single ended signals are discussed. Several resource/power saving design approaches for various processing stages are described in the document.

43 PARTICLE ACCELERATORS↗

The Design and Implementation of the Swim Integrated Plasma Simulator

As computing capabilities have increased, the coupling of computational models has become an increasingly viable and therefore important way of improving the physical fidelity of simulations. Applications currently using some form of multicode or multi-component coupling include climate modeling, rocket simulations, and chemistry. In recent years, the plasma physics community has also begun to pursue integrated multiphysics simulations for space weather and fusion energy applications. Such model coupling generally exposes new issues in the physical, mathematical, and computational aspects of the problem. This paper focuses on the computational aspects of one such effort, detailing the design, and implementation of the Integrated Plasma Simulator (IPS) for the Center for Simulation of Wave Interactions with Magnetohydrodynamics (SWIM). The IPS framework focuses on maximizing flexibility for the creators of loosely-coupled component-based simulations, and provides services for execution coordination, resource management, data management, and inter-component communication. It also serves as a proving ground for a concurrent 'multi-tasking' execution model to improve resource utilization, and application-level fault tolerance. We also briefly describe how the IPS has been applied to several problems of interest to the fusion community.

33 ADVANCED PROPULSION SYSTEMS↗

Toward the Holy Grail of Perfect Information: Lessons Learned Implementing an Energy Information System in a Commercial Building

Energy information systems (real-time acquisition, analysis, and presentation of information from energy end-uses) in commercial buildings have demonstrated value as tools for improving energy efficiency and thermal comfort. These improvements include characterization through benchmarking, identification of retrofit opportunities, anomaly detection to inform retro-commissioning, and feedback to occupants to encourage shifts in behavior. Energy information systems can play a vital role in achieving a variety of ambitious sustainability goals for the existing stock of commercial buildings, but their implementation is often fraught with pitfalls. In this paper, we present a case study of an EIS and sub-metering project executed in a representative commercial office building. We describe the building, highlight a few of its problems, and detail the hardware and software technologies we employed to address them. We summarize the difficulties encountered and lessons learned, and suggest general guidelines for future EIS projects to improve performance and save energy in the commercial building fleet. These guidelines include measurement criteria, monitoring strategies, and analysis methods. In particular, we propose processes for: - Defining project goals, - Selecting end-use targets and depth of metering, - Selecting contractors and software vendors, - Installing and networking measurement devices, - Commissioning and using the energy information system.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Design and implementation of coupled thermomechanical failure experiments.

Coupled thermal-mechanical experiments with well-defined, controlled boundary conditions were designed through an iterative process involving a team of experimentalists, material modelers and computational analysts. First the basic experimental premise was selected: an axisymmetric tubular specimen mechanically loaded by internal pressurization and thermally loaded asymmetrically by side radiant heating. Then several integrated experimental-analytical steps were taken to determine the experimental details. The boundary conditions were mostly thermally driven and were chosen so they could be modeled accurately; the experimental fixtures were designed to ensure that the boundary conditions were met. Preliminary, uncoupled analyses were used to size the specimen diameter, height and thickness with experimental consideration of maximum pressure loads and fixture design. Iterations of analyses and experiments were used to efficiently determine heating parameters including lamp and heating shroud design, set off distance between the lamps and shroud and between the shroud and specimen, obtainable ramp rates, and the number and spatial placement of thermocouples. The design process and the experimental implementation of the final coupled thermomechanical failure experiment design will be presented.

42 ENGINEERING↗

Implementation and assessment of turbine wake models in the Weather Research and Forecasting model for both mesoscale and large-eddy simulation

Flow dynamics in large wind projects are influenced by the turbines located within. The turbine wakes, regions characterized by lower wind speeds and higher levels of turbulence than the surrounding free stream flow, can extend several rotor diameters downstream, and may meander and widen with increasing distance from the turbine. Turbine wakes can also reduce the power generated by downstream turbines and accelerate fatigue and damage to turbine components. An improved understanding of wake formation and transport within wind parks is essential for maximizing power output and increasing turbine lifespan. Moreover, the influence of wakes from large wind projects on neighboring wind farms, agricultural activities, and local climate are all areas of concern that can likewise be addressed by wake modeling. This work describes the formulation and application of an actuator disk model for studying flow dynamics of both individual turbines and arrays of turbines within wind projects. The actuator disk model is implemented in the Weather Research and Forecasting (WRF) model, which is an open-source atmospheric simulation code applicable to a wide range of scales, from mesoscale to large-eddy simulation. Preliminary results demonstrate the applicability of the actuator disk model within WRF to a moderately high-resolution large-eddy simulation study of a small array of turbines.

17 WIND ENERGY↗