Search NASA⌕ Search

SEARCH · Search NASA

Results for “INTERCONNECTION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,549 records · Page 86

Jamaica National Net-Billing Pilot Program Evaluation

This technical report discusses the effectiveness of the Jamaica Public Service Company Limited Net-Billing Pilot Program. The National Renewable Energy Laboratory (NREL) collected and analyzed data from a wide range of stakeholders, conducted in-country research, and compared program elements to common interconnection practices to form programmatic recommendations for the Jamaica context. NREL finds that the net-billing pilot program has successfully contributed to the support of the emerging solar market in Jamaica with the interconnection of 80 systems under the program for a total of 1.38 megawatts (MW) at the time of original analysis.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Area of Interest 1. Interregional Electricity Reliability Issue and Assessment Analysis

In 2010, the U.S. Department of Energy (DOE) tasked Lawrence Berkeley National Laboratory (LBNL) and the Pacific Northwest National Laboratory (PNNL), in separate contracts, to provide coordinated technical support to the electricity industry for two national electricity reliability initiatives. The first initiative focused on improving the frequency response of each of the three North American interconnections. The second initiative focused on improving industry understanding of the causes and consequences of fault-induced delayed voltage recovery, which has been observed in all three interconnections. Both initiatives were conducted in close coordination with the North American Electric Reliability Corporation (NERC) and the Western Electric Coordination Council (WECC) and involved the participation of leading utilities from across the United States. This is the final report on LBNL’s activities. It consists of summaries of each activity, including references to published documents that were prepared through the course of the project. (Activities under taken by PNNL are reported on in a separate report.)

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Area of Interest 4.Technical Interest to Electric Infrastructure Planners on Other Subjects

In 2010, the U.S. Department of Energy (DOE) provided $60M in funding to five regional entities to conduct interregional transmission planning activities: the Eastern Interconnection Planning Collaborative (EIPC); the Eastern Interconnection States Planning Council (EISPC); the Transmission Expansion Planning and Policy Committee (TEPPC); the State Provincial Steering Committee (SPSC);and the Electricity Reliability Council of Texas (ERCOT). DOE also provided funding to the Lawrence Berkeley National Laboratory (LBNL) to support aspects of these interregional transmission planning activities. LBNL’s support involved both technical assistance to DOE in its oversight of the activities conducted by the five regional entities and the preparation of six, standalone technical studies that were conducted in direct support for specific entities. This is the final report on LBNL’s activities. It consists of summaries of each activity; references are provided to each of the stand-alone studies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Hiilangaay Hydroelectric Project – Final Report

The Hiilangaay Hydroelectric Project (“Hiilangaay” or the “Project”) is a 5-megawatt hydroelectric resource currently under construction on Prince of Wales Island (POW), Alaska, approximately ten miles east of Hydaburg. The objective of the Project is to interconnect with the existing transmission grid on Prince of Wales Island, increasing the hydroelectric generation capability by 5 MW, eliminating the need for diesel generation, increasing the reliability of the electrical system, and allowing the interconnected portion of the island to have 100 percent renewable energy generation. Pre-construction activities including construction planning, permit coordination and compliance, and final design have made it possible to move forward with construction of the Hiilangaay Project. Despite repeated delays to the schedule, persistence and long-term planning will culminate in the construction of the Project, and make Prince of Wales Island independent of diesel-fueled energy

13 HYDRO ENERGY↗

Analysis of PV Advanced Inverter Functions and Setpoints under Time Series Simulation.

Utilities are increasingly concerned about the potential negative impacts distributed PV may have on the operational integrity of their distribution feeders. Some have proposed novel methods for controlling a PV system's grid - tie inverter to mitigate poten tial PV - induced problems. This report investigates the effectiveness of several of these PV advanced inverter controls on improving distribution feeder operational metrics. The controls are simulated on a large PV system interconnected at several locations within two realistic distribution feeder models. Due to the time - domain nature of the advanced inverter controls, quasi - static time series simulations are performed under one week of representative variable irradiance and load data for each feeder. A para metric study is performed on each control type to determine how well certain measurable network metrics improve as a function of the control parameters. This methodology is used to determine appropriate advanced inverter settings for each location on the f eeder and overall for any interconnection location on the feeder.

14 SOLAR ENERGY↗

Great Lakes O shore Wind Project: Utility and Regional Integration Study

This project aims to identify transmission system upgrades needed to facilitate offshore wind projects as well as operational impacts of offshore generation on operation of the regional transmission system in the Great Lakes region. A simulation model of the US Eastern Interconnection was used as the test system as a case study for investigating the impact of the integration of a 1000MW offshore wind farm operating in Lake Erie into FirstEnergy/PJM service territory. The findings of this research provide recommendations on offshore wind integration scenarios, the locations of points of interconnection, wind profile modeling and simulation, and computational methods to quantify performance, along with operating changes and equipment upgrades needed to mitigate system performance issues introduced by an offshore wind project.

17 WIND ENERGY↗

Plug and Play PV Systems for American Homes

The core objectives of the Plug & Play PV Systems Project were to develop a PV system that can be installed on a residential rooftop for less than $1.50/W in 2020, and in less than 10 hours (from point of purchase to commissioning). The Fraunhofer CSE team’s approach to this challenge involved a holistic approach to system design – hardware and software – that make Plug & Play PV systems: • Quick, easy, and safe to install • Easy to demonstrate as code compliant • Permitted, inspected, and interconnected via an electronic process Throughout the three years of work during this Department of Energy SunShot funded project, the team engaged in a substantive way with inspectional services departments and utilities, manufacturers, installers, and distributors. We received iterative feedback on the system design and on ideas for how such systems can be commercialized. This ultimately led us to conceiving of Plug & Play PV Systems as a framework, with a variety of components compatible with the Plug & Play PV approach, including string or microinverters, conventional modules or emerging lightweight modules. The framework enables a broad group of manufacturers to participate in taking Plug & Play PV Systems to market, and increases the market size for such systems. Key aspects of the development effort centered on the system hardware and associated engineering work, the development of a Plug & Play PV Server to enable the electronic permitting, inspection and interconnection process, understanding the details of code compliance and, on occasion, supporting applications for modifications to the code to allow lightweight modules, for example. We have published a number of papers on our testing and assessment of novel technologies (e.g., adhered lightweight modules) and on the electronic architecture.

14 SOLAR ENERGY↗

On the Path to SunShot - Emerging Issues and Challenges with Integrating High Levels of Solar into the Distribution System

Wide use of advanced inverters could double the electricity-distribution system’s hosting capacity for distributed PV at low costs—from about 170 GW to 350 GW (see Palmintier et al. 2016). At the distribution system level, increased variable generation due to high penetrations of distributed PV (typically rooftop and smaller ground-mounted systems) could challenge the management of distribution voltage, potentially increase wear and tear on electromechanical utility equipment, and complicate the configuration of circuit-breakers and other protection systems—all of which could increase costs, limit further PV deployment, or both. However, improved analysis of distribution system hosting capacity—the amount of distributed PV that can be interconnected without changing the existing infrastructure or prematurely wearing out equipment—has overturned previous rule-of-thumb assumptions such as the idea that distributed PV penetrations higher than 15% require detailed impact studies. For example, new analysis suggests that the hosting capacity for distributed PV could rise from approximately 170 GW using traditional inverters to about 350 GW with the use of advanced inverters for voltage management, and it could be even higher using accessible and low-cost strategies such as careful siting of PV systems within a distribution feeder and additional minor changes in distribution operations. Also critical to facilitating distributed PV deployment is the improvement of interconnection processes, associated standards and codes, and compensation mechanisms so they embrace PV’s contributions to system-wide operations. Ultimately SunShot-level PV deployment will require unprecedented coordination of the historically separate distribution and transmission systems along with incorporation of energy storage and “virtual storage,” which exploits improved management of electric vehicle charging, building energy systems, and other large loads. Additional analysis and innovation are neede

14 SOLAR ENERGY↗

Christmas Valley Renewable Energy Assessment

In partnership with the Oregon Military Department, the Department of Energy used the award to assess and evaluate renewable resources in a 2,622-acre location in Lake County, central Oregon, leading to future development of up to 200 MW of solar electricity. In partnership with the Oregon Military Department, the Department of Energy used the award to assess and evaluate renewable resources in a 2,622-acre location in Lake County, central Oregon, leading to future development of up to 200 MW of solar electricity. The Oregon Military Department (Military) acquired a large parcel of land located in south central Oregon. The land was previously owned by the US Air Force and developed for an Over-the-Horizon Backscatter Radar Transmitter Facility, located about 10 miles east of the town of Christmas Valley. The Military is investigating a number of uses for the site, including Research and Development (R&D) laboratory, emergency response, military operations, developing renewable energy and related educational programs. One of the key potential uses would be for a large scale solar photovoltaic power plant. This is an attractive use because the site has excellent solar exposure; an existing strong electrical interconnection to the power grid; and a secure location at a moderate cost per acre. The project objectives include: 1. Site evaluation 2. Research and Development (R&D) facility analysis 3. Utility interconnection studies and agreements 4. Additional on-site renewable energy resources analysis 5. Community education, outreach and mitigation 6. Renewable energy and emergency readiness training program for veterans

14 SOLAR ENERGY↗

Challenges in reducing the computational time of QSTS simulations for distribution system analysis.

The rapid increase in penetration of distributed energy resources on the electric power distribution system has created a need for more comprehensive interconnection modelling and impact analysis. Unlike conventional scenario - based studies , quasi - static time - series (QSTS) simulation s can realistically model time - dependent voltage controllers and the diversity of potential impacts that can occur at different times of year . However, to accurately model a distribution system with all its controllable devices, a yearlong simulation at 1 - second resolution is often required , which could take conventional computers a computational time of 10 to 120 hours when an actual unbalanced distribution feeder is modeled . This computational burden is a clear l imitation to the adoption of QSTS simulation s in interconnection studies and for determining optimal control solutions for utility operations . Our ongoing research to improve the speed of QSTS simulation has revealed many unique aspects of distribution system modelling and sequential power flow analysis that make fast QSTS a very difficult problem to solve. In this report , the most relevant challenges in reducing the computational time of QSTS simulations are presented: number of power flows to solve, circuit complexity, time dependence between time steps, multiple valid power flow solutions, controllable element interactions, and extensive accurate simulation analysis.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Standard Inverter Interface and Compliance Framework

Electric Power Research Institute, Inc. (EPRI) and Sandia National Laboratories (SNL) collaborated to develop and demonstrate a standard communication interface for solar inverters as well as a compliance framework to verify proper product operation via that interface. This activity filled a key void in the needs of California in relation to revisions to California’s Electric Tariff Rule 21 interconnection guidelines. Rule 21 is a CPUC-approved tariff based on IEEE 1547 technical requirements that describes the interconnection, operating, and metering requirements for generation facilities to be connected to a utility’s distribution system, over which the CPUC has jurisdiction. These guidelines, as presently being developed, anticipate a requirement for future inverters to have a standard communication interface and to be testable to verify their proper operation prior to deployment.

14 SOLAR ENERGY↗

Ensuring Reliable Natural Gas-Fired Generation with Fuel Contracts and Storage - DOE/NETL-2017/1816

This report finds that natural gas-fired power plants purchase fuel both on the spot market and through firm supply contracts; there do not appear to be clear drivers propelling power plants toward one or the other type. Most natural gas-fired power generators are located near major natural gas transmission pipelines, and most natural gas contracts are currently procured on the spot market. Although there is some regional variation in the type of contract used, a strong regional pattern does not emerge. Whether gas prices are higher with spot or firm contracts varies by both region and year. Natural gas prices that push the generators higher in the supply curve would make them less likely to dispatch. Most of the natural gas generators discussed in this report would be unlikely to enter firm contracts if the agreed price would decrease their dispatch frequency. The price points at which these generators would be unlikely to enter a firm contract depends upon the region that the generator is in, and how dependent that region is on natural gas. The Electric Reliability Council of Texas (ERCOT) is more dependent on natural gas than either Eastern Interconnection or Western Interconnection. This report shows that above-ground storage is prohibitively expensive with respect to providing storage for an extended operational fuel reserve comparable to the amount of on-site fuel storage used for coal-fired plants. Further, both pressurized and atmospheric tanks require a significant amount of land for storage, even to support one day’s operation at full output. Underground storage offers the only viable option for 30-day operational storage of natural gas, and that is limited by the location of suitable geologic formations and depleted fields.

01 COAL, LIGNITE, AND PEAT↗

DISTINCT: Diversity in Solar Talent Through INnovative Curriculum and Training: An Integrated Research and Education Approach towards Creating Diversity and Advancing Utility-Scale Solar Technology

The DISTINCT project research objective is to develop an innovative N-port power converter for a utility-scale PV system that is modular, compact and cost-effective and that will enable the integration of a high-frequency, high-voltage solid-state transformer. The novelty of the proposed research is the electrical power conversion architecture using an N-port converter system that replaces the output 60Hz transformer with an integrated high-frequency low-weight solid-state transformer reducing power electronics and BOS costs to meet SunShot goals through modularity and direct high-voltage interconnection. A challenge in direct integration with a 13.8kV line is the high voltage handling capacity of the converters combined with high efficiency operation. The front-end converter for each port is a Neutral-Point Clamped (NPC) Multi-Level dc-dc Dual-Active Bridge (ML-DAB) which allows Maximum Power Point Tracking (MPPT). The integrated high frequency transformer provides the galvanic isolation between the PV and grid side and also steps up the low dc voltage from PV source. Following the ML-DAB stage, in each port, is an inverter with H-bridge configuration or NPC configuration. N number of NPC inverters’ outputs are cascaded to attain the per-phase line-to-neutral voltage to connect directly to the distribution grid (i.e. 13.8 kV). The cascaded inverters have the inherent advantage of using lower rated devices, smaller filters and low Total Harmonic Distortion (THD) required for PV grid interconnection. Our analysis and simulation results show improved performance on cost, efficiency, service life with zero downtime and THD. A comprehensive control scheme is presented to ensure the maximum power from each port and each phase are sent to the grid. A functional prototype of a 2-port converter with ML-DAB and cascaded H-bridges has been designed, built, and tested in a laboratory setup to verify the target technical metrics. The N-port converter system due to its modular structure with individual control per port can be easily adapted to integrate functionalities that go well beyond the conventional grid support functions and mitigates impacts of forecasted fast ramp downs or ramp ups and single-fault conditions by automatic reconfiguration of the output.

14 SOLAR ENERGY↗

Accelerating cost-effective deployment of solar generation on the distribution grid

The Task 1 objective is to “expedite the PV interconnection process by revising the screening process in California”. The goal of this task is to develop a data-driven, validated approach to determining feeder limits that can simplify interconnection processes and lead to greater PV adoption across the California distribution system.

14 SOLAR ENERGY↗

Peak Reliability Synchrophasor Program

Realizing the potential of high fidelity, time-synchronized, power system data will build on the existing infrastructure made available by the Western Interconnection Synchrophasor Program (WISP). This project will focus on fully utilizing the data made available by this infrastructure to ensure reliable and efficient operation of the Western Interconnection. The Recipient's objective is to advance the deployment of production-grade software applications that rely on synchrophasor data to enhance the reliability or improve the economic efficiency of bulk power system planning and operations.

99 GENERAL AND MISCELLANEOUS↗

Abstract - Cooperative Research and Development Agreement between AK Supply, Inc. and National Energy Technology Laboratory

The main goal of CRADA between AK Supply and NETL is to redesign the solid oxide fuel cell configuration for hybrid power generation systems for greater flexibility and operability. The new fuel cell design will consider incorporation of thermal energy storage into the fuel cell by modifying the material composition to increase the specific heat and/or the solid-solid phase transition and increasing the interconnect geometry (mass and volume) in the fuel cell. This developed technology will be tested using Hyper facility at NETL, Morgantown, to evaluate the performance in hybrid applications. Additionally, AK Supply and NETL will work on the development of a real-time, high temperature, intelligent micro-sensor for monitoring energy availability in the interconnect geometry. The will be used for control of stored energy release during load transients and will be tested on the NETL Hyper facility.

25 ENERGY STORAGE↗

CRADA 376 Final Report Development of Protective Coatings for 1 kW Hot Zone

Pacific Northwest National Laboratory (PNNL) has extensive experience in the development, fabrication, and evaluation of surface treatments and protective coatings for metallic solid oxide fuel cell (SOFC) components. For example, modified (Mn,Co)3O4 spinel coatings and coating/metal interfaces have been shown to substantially improve oxidation resistance, electrical performance, and oxide scale adhesion of ferritic stainless steel interconnects in planar SOFC stacks. At the time of the establishment of this CRADA, Protonex Technology Corporation had been working in the field of SOFC development for over 12 years and had demonstrated more than 250 thermal cycles with a less than 15 minutes start time and more than 2000 hours of continuous operation on a 250W tubular solid oxide hot zone module as part of a program for the Office of the Secretary of Defense (OSD). An industrial version of the military system, denoted P200i, had been developed that was launched at the 2015 Fuel Cell Expo in Tokyo. Feedback during beta testing of this unit was very positive. However, Protonex recognized that to transition from military markets, the commercial system would require longer life time and higher power. Leveraging their novel thermal management strategy from the tubular hot zone that allowed for rapid and repeated thermal cycling, Protonex developed a planar 1kW module aimed at the industrial and commercial market. However, more robust interconnect coatings were needed to bring the system into the 1000+ hour life time requested by customers. Therefore, PNNL’s experience and technology were engaged to enable the 1kw system to transition from military applications to commercial and industrial applications. In this CRADA, PNNL teamed with Protonex to leverage PNNL’s expertise in protective coating techniques for solid oxide fuel cell (SOFC) applications. As the first step in the collaboration, protective spinel coatings were fabricated at PNNL onto ten AISI 440 stainless steel bus bars provided by Protonex. A precursor slurry containing spinel powder was applied to the steel surfaces via an ultrasonic spray process. The coated bars were then subjected to a reducing atmosphere heat treatment (i.e., heated to 850°C at 3°C/min in a hydrogen atmosphere and held at that temperature for five hours). Five of the bars were left in this reduced condition; the other five bars were subjected to an oxidizing heat treatment (i.e., heated to 1000°C at 3°C/min in air and held at that temperature for one hour). The bars were then sent to Protonex for testing. Subsequently, Protonex decided to discontinue their SOFC development activities, so they had no further interest in continuing the collaboration with PNNL, and the CRADA activities were terminated.

30 DIRECT ENERGY CONVERSION↗

Wasatch Solar Project Final Report

The Wasatch Solar Project was a collaborative effort to conduct stakeholder engagement and provide technical assistance and analysis to support solar market development in Utah. The Wasatch Solar Project addressed four topic areas: 1) technical analysis to inform an assessment of the net benefits and costs of solar in Utah; 2) development of a 10-Year Solar Deployment Plan to create a clear path for continued solar deployment in Utah; 3) demonstration of the costs and resiliency benefits of solar and storage for resiliency at emergency response facilities or public facilities; and 4) technical assistance to create a replicable Commercial Property Assessed Clean Energy (C-PACE) financing program in Utah. The Wasatch Solar Project identified that new technical new technical challenges arise as nascent markets grow to higher penetrations of solar, requiring more detailed interconnection standards and improved efficiency in the interconnection process; that it is difficult for entities served by utilities that do not collect hourly usage data to assess the economic value of solar and storage; that despite significant resiliency benefits, the high cost of battery storage limits its adoption at healthcare and emergency response facilities in states like Utah that have low electricity rates; that administration of C-PACE financing at a local jurisdictional level can be complex, cumbersome, and a barrier to widespread utilization; and that investments in distributed generation can result in long-term savings for utility customers.

14 SOLAR ENERGY↗