Scenario development for safety assessment in deep geologic disposal of high-level radioactive waste and spent nuclear fuel: A review

Radiation and radioactive substances result in the production of radioactive wastes which require safe management and disposal to avoid risks to human health and the environment. To ensure permanent safe disposal, the performance of a deep geological repository for radioactive waste is assessed against internationally agreed risk-based standards. Assessing postclosure safety of the future system's evolution includes screening of features, events, and processes (FEPs) relevant to the situation, their subsequent development into scenarios, and finally the development and execution of safety assessment (SA) models. Global FEP catalogs describe important natural and man-made repository system features and identify events and processes that may affect these features into the future. By combining FEPs, many of which are uncertain, different possible future system evolution scenarios are derived. Repository licensing should consider both the reference or “base” evolution as well as alternative futures that may lead to radiation release, pollution, or exposures. Scenarios are used to derive and consider both base and alternative evolutions, often through production of scenario-specific SA models and the recombination of their results into an assessment of the risk of harm. Furthermore, while the FEP-based scenario development process outlined here has evolved somewhat since its development in the 1980s, the fundamental ideas remain unchanged. A spectrum of common approaches is given here (e.g., bottom–up vs. top–down scenario development, probabilistic vs. bounding handling of uncertainty), related to how individual numerical models for possible futures are converted into a determination as to whether the system is safe (i.e., how aleatoric uncertainty and scenarios are integrated through bounding or Monte Carlo approaches).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Realization of the National Disposal Facility for Radioactive Waste in Bulgaria - 16611

Radioactive waste is generated in the Republic of Bulgaria from the operation and decommissioning of the country's nuclear power plants and from other sources in research, medical applications, and the industry. The need for building a National Disposal Facility (NDF) is recognized by the Bulgarian government and described and justified in its Environment Impact Assessment Decision. The Bulgarian State Enterprise for Radioactive Waste Management (SERAW) is endeavoring to build a near-surface repository for short-lived low- and intermediate-level radioactive waste (SL-LILW) to discharge its statutory responsibilities in waste management is. The European Union (EU) finances the establishment of the NDF through the Kozloduy International Decommissioning Support Fund (KIDSF). After an international tendering procedure, SERAW placed a contract for the development of the design of the NDF to the Consortium of Westinghouse Electric Spain S.A.R and DBE Technology GmbH of Germany, with ENRESA, the Spanish National Waste Management Agency providing technical review and support. Two Bulgarian companies participate also in the project as subcontractors - EQE Bulgaria and to a lesser extent KK-Project. The repository project official name is 'Technical Design and ISAR Preparation for the National Disposal Facility at Bulgaria', usually abbreviated as 'R-Project 5'. After obtaining SERAW's approval for the preferred repository conceptual design variant, the R Project 5 focused on developing the Technical Design on the one hand, and on preparing the Intermediate Safety Analysis Report (ISAR) to demonstrate the safety and suitability of the proposed NDF design on the other. These documents were handed over to the Bulgarian Nuclear Regulatory Authority (BNRA) as well as to the different authorities involved in the comprehensive licensing process required for nuclear facilities in the country. The corresponding permits have mostly been received or are expected for early 2016. In the last quarter of 2015 the procurement procedure for repository construction as turn-key project was started with the pre-qualification of possible constructors for the Phase I repository realization on a lump sum contract basis. Repository construction is now expected to start in 2016, with the start of waste disposal now scheduled for around 2020. With the realization of the Bulgarian National Disposal Facility an important milestone for waste disposal in the European Union is about to be achieved. This paper is a sequel of previously presented papers on the NDF construction, now including details of the complex licensing process that this disposal facility underwent, now in its final stages. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2013 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analyses

The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2013. This annual summary report presents data and conclusions from the FY 2013 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2013 include the following: • Development of a new Area 5 RWMS closure inventory estimate based on disposals through. FY 2013 • Evaluation of new or revised waste streams by special analysis. • Development of version 4.115 of the Area 5 RWMS GoldSim PA/CA model.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Verification and Validation of the Stakeholder Tool for Assessing Radioactive Transportation (START) – 22323

The U.S. Department of Energy (DOE) Office of Integrated Waste Management is planning for the eventual transportation, storage, and disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from nuclear power plant and DOE sites. The Stakeholder Tool for Assessing Radioactive Transportation (START) is a web-based, geospatial decision-support tool developed for evaluating routing options and other aspects of transporting SNF and HLW, covering rail, truck, barge, and intermodal infrastructure and operations in the continental United States. The verification and validation (V&V) process is intended to independently assess START to provide confidence in the ability of START to accurately provide intended results. The V&V process checks the START tool using a variety of methods, ranging from independent hand calculations to comparison of START performance and results to those of other codes. The V&V activity was conducted independently from the START development team with opportunities to provide feedback and collaborate throughout the process. The V&V analyzed attributes of transportation routes produced by START, including route distance and both population and population density captured within buffer zones around routes. Population in the buffer zone, population density in the buffer zone, and route distance were all identified as crucial outputs of the START code and were subject to V&V tasks. Some of the improvements identified through the V&V process were standardizing the underlying population data in START, changing the projection of the population raster data, and changes to the methodology used for population density to improve its applicability for expected users. This collaboration also led to suggested improvements to some of the underlying shape file segments within START. A formal series of test routes went through the V&V process from START version 3.2.1 following the implementation of the recommended improvements to START. The V&V of the buffer zone population and distance reported in START were achieved by utilizing a custom workflow developed in QGIS. This platform was chosen because it is fully independent of START. The buffer zone population and route distances in START showed excellent agreement to independent V&V test results. Over 200 route test cases were run; in all cases, the percent difference in the population within the buffer zone was less than +/- 5%, and the majority of cases were below +/- 1%. These cases were also duplicated in ArcMap, which is Environmental Systems Research Institute’s (ESRI) GIS desktop application. The ArcMap results also show good agreement; however, they cannot be considered independent of START because START also uses ESRI software. The V&V tasks are currently addressing population density and estimated radiation dose in START as well as implementing further automation of the V&V process to allow larger suites of test routes to be run more easily and quickly by less experienced GIS users. These improvements to the V&V process will make it a valuable tool for the development team and the stakeholders so that each new iteration of START can easily be checked for quality and consistency. This paper and presentation will describe the V&V process, findings and implications, and ongoing V&V activities.

START, DOE, Transporation, dose, GIS↗

Uncertainty in decommissioning, the benefits of 3D simulation - 15124

Any industrial plant whatever the industry is will face its end of life. In the nuclear field decommissioning is inevitable for returning to green. Because of the specificity of each plant, decommissioning projects are never the same. The choice of a specific strategy for each operation during a scenario has cascade consequences on the generated waste, extension of due date, costs and risks. Decommissioning in nuclear industry is a new domain where countries have a limited experience. When starting a decommissioning project engineers have to gather some data needed for planning and realizing the best scenario strategy. Scenario which should consider the costs, waste management, received dose and the planning. The quality of the input data has a strong influence on the risks and should be analyzed with care to reduce all doubts for the study. Nuclear plants running decommissioning programs concerns old plants with poorly documented history resulting in missing or uncertain data. The ambient dose rate is not always well-known as dose measurement or samples have not been taken or updated for many years. This kind of data may vary quite a lot when radiological events happen. An efficient way to reduce contingencies is to go through simulations. It allows determining the best scenario strategy for each set of data while evaluating the influence of all uncertainties. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Considerations for Maritime Nuclear Technologies, Economic Viability and Public Acceptance

The Maritime Nuclear Application Group (MNAG) is a working group convened by the National Reactor Innovation Center at Idaho National Laboratory (INL), the American Bureau of Shipping, and Morgan, Lewis, and Bockius LLP. This report documents an MNAG examination of considerations relevant to implementing nuclear technology in commercial maritime applications. In general, two types of use case are examined: maritime nuclear power plants and nuclear reactors used on board shipping vessels for propulsion and other ship needs. The report finds that there may be economic benefits related to maritime nuclear technologies, including the flexible deployment of maritime nuclear reactors, which would allow them to complement land-based nuclear projects, and operational differences for nuclear cargo ships that may lead to an overall increase in revenue. High-level analyses in this report show that, based on general small modular reactor and microreactor cost estimates developed by INL, maritime nuclear reactors may be economically competitive for electricity production in remote regions and for use in the propulsion of large cargo ships. Besides economic viability, public acceptance will be key to implementing maritime nuclear technologies. The report discusses the public’s current perception of nuclear technologies. Engaging with the public will be important to improving this perception. The report discusses some key benefits and risks associated with maritime nuclear technologies. Benefits include the creation of jobs, the production of reliable energy, and the potential to improve air quality. Risks that concern the public are the potential for radioactive releases during operation and decommissioning, as well as those related to waste management. Communicating the benefits and the risks of maritime nuclear technologies will be essential to improving public perception.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Design of the Long-term Waste Management Facility for Historic LLRW Port Hope Project - 13322

The Municipality of Port Hope is located on the northern shores of Lake Ontario approximately 100 km east of Toronto, Ontario, Canada. Starting in the 1930's, radium and later uranium processing by Eldorado Gold Mines Limited (subsequently Eldorado Nuclear Limited) (Eldorado) at their refinery in Port Hope resulted in the generation of process residues and wastes that were disposed of indiscriminately throughout the Municipality until about the mid-1950's. These process residues contained radium (Ra- 226), uranium, arsenic and other contaminants. Between 1944 and 1988, Eldorado was a Federal Crown Corporation, and as such, the Canadian Federal Government has assumed responsibility for the clean-up and long-term management of the historic waste produced by Eldorado during this period. The Port Hope Project involves the construction and development of a new long-term waste management facility (LTWMF), and the remediation and transfer of the historic wastes located within the Municipality of Port Hope to the new LTWMF. The new LTWMF will consist of an engineered above-ground containment mound designed to contain and isolate the wastes from the surrounding environment for the next several hundred years. The design of the engineered containment mound consists of a primary and secondary composite base liner system and composite final cover system, made up of both natural materials (e.g., compacted clay, granular materials) and synthetic materials (e.g., geo-synthetic clay liner, geo-membrane, geo-textiles). The engineered containment mound will cover an area of approximately 13 hectares and will contain the estimated 1.2 million cubic metres of waste that will be generated from the remedial activities within Port Hope. The LTWMF will also include infrastructure and support facilities such as access roads, administrative offices, laboratory, equipment and personnel decontamination facilities, waste water treatment plant and other ancillary facilities. Preliminary construction activities for the Port Hope LTWMF commenced in 2012 and are scheduled to continue over the next few years. The first cell of the engineered containment mound is scheduled to be constructed in 2015 with waste placement into the Port Hope LTWMF anticipated over the following seven year period. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 14: US DOE WIPP - Future Plans for the Utilization of a National Asset

This panel focused on the next phase of restoring the Waste Isolation Pilot Plant (WIPP: located in Carlsbad, New Mexico, USA) to full disposal operations. The US DOE Carlsbad Field Office (CBFO) is funded for two Capital Asset Projects that will facilitate the restoration of WIPP to full capability and allow for future repository space planning. The panel will include updates on the capital projects, infrastructure improvements to extend WIPP's operational life, regulatory actions in support of capital projects, and improvements in new processes to implement WAC and DSA enhancements. This panel is filled by CBFO and WIPP contractor leaders to provide the big picture leading to WIPP's future. Presentations proposed include: 1 - 2018 WIPP Year in Review (Bruce Covert, Nuclear Waste Partnership, LLC (USA)); 2 - TRU Waste Shipments and WIPP Operations (Mark Pearcy, Nuclear Waste Partnership, LLC (USA)); 3 - Projects and Activities at WIPP (Ronald Gill, US DOE (USA)); 4 - The Future of WIPP (J.R. Stroble, US DOE (USA), Todd Shrader, US DOE (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Waste Management Concepts for Uranium and Plutonium Multi-Recycling - 18533

The multiple recycling of plutonium and uranium will play a major role in gradually achieving a fully closed nuclear fuel cycle in the future, once the first Generation IV fast reactors (FR) are deployed in the NPP fleet. To reach this objective, optimizations of current processes and technologies and, in some cases, the development of innovative concepts are required to meet the scientific, technical and economic challenges imposed by the treatment of spent fuels with an increasingly higher Pu content. Based on the significant past experience acquired by France in LWR and FR MOX fuel treatment, the CEA is running R and D studies to develop new efficient processes for Pu recycling and for FR MOX fuel fabrication. More compact and economically competitive processes, ensuring the safety/security of the facilities (particularly as regards criticality and proliferation resistance) have to be developed taking into account that the amounts of plutonium involved will be one order of magnitude higher than in UOX fuels. New concepts of head-end treatment, dissolution, and separation have been proposed. Consequently, effluent and waste management must be adapted to these processes and to the characteristics of fast reactor MOX fuels. New waste treatment processes are suggested: 1) Cladding waste and undissolved metallic particles could be treated simultaneously in a melting process. The molten metal could be decontaminated by a specific slag and the oxides recovered, in particular PuO{sub 2}, would be recycled at the frond-end of the process, 2) Fission Products and Actinides (FPA) containment glass will also be optimized to accommodate significant amounts of iron, nickel and chromium coming from hull corrosion, and / or decontamination slag coming from the metal melting process. 3) New peraluminous-type glass formulations are under development to accept increased amounts of FPA, as well as iron, nickel, and chromium. The first trials to evaluate the melting process have indicated that metallic compounds from the dissolution residues could be easily incorporated into a molten metal at levels of 1, 2 and 3 w%. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Port Hope Area Initiative's Port Granby Project: From Planning to Execution - 17451

The Port Hope Area Initiative's Port Granby Project involves the construction of a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and the excavation and relocation of some 450,000 m{sup 3} of LLRW and marginally contaminated soil from the former Port Granby Waste Management Facility (PGWMF) to the newly constructed LTWMF. Presented is an overview of the Port Granby Project and a description of the planning needed to execute the project successfully. A comprehensive suite of approximately 40 pre-construction submittals were developed and submitted for review and approval by Canadian Nuclear Laboratories (CNL), the project authority. Importantly, comprehensive training programs were developed and implemented to ensure all project staff fully understood the scope of the planning documents (covering such things as Quality Control, Environmental Monitoring, Radiation Protection, Dust Management, Noise, Radiation Protection etc.) and possess the appropriate competencies for completing the work to which they have been assigned. The effective planning that has been invested in the Port Granby project, from initial design to project planning and implementation, has allowed this complex project to proceed with minimal difficulty. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Life Extension of Nuclear Plant Facilities through Monitoring and Detailed Analysis - 16175

The UK has accumulated a substantial legacy of radioactive waste from various civil nuclear and defence programmes. Presently, however most of the UK radioactive waste is generated from nine power stations which generate approximately one sixth of the of the country's electricity. Irradiated fuel is removed from these reactors and safe management of the radioactive solid and liquid effluents is required. The safe management of these effluents is essential. Sellafield, in West Cumbria UK, contains two reprocessing plants, one designed to process nuclear fuel from Magnox reactors (CO{sub 2} cooled with Uranium bar fuel) and the other to process nuclear fuel from Advanced Gas cooled Reactors and Pressurized Water Reactors. The reprocessing stage enables extraction of fissile material for recycling. This leaves a volume of dilute but high-level waste. The high-level radioactive liquid waste is concentrated to reduce its volume and then incorporated into borosilicate glass, using a process called vitrification. The glass is then poured into stainless steel containers and placed in long term storage. This required concentration of HLW liquor is achieved using a suite of aging evaporators. All evaporators are of similar design constructed from corrosion resistant stainless steel having dimensions height ∼11 m, internal diameter 3.05 m and capable of holding 13.7 m{sup 3} of liquor. The basic principle of operation is to heat the dilute liquor under partial vacuum, at constant volume, until the target concentration is achieved. Heating of the liquor is achieved using steam heated coils within the evaporator, and steam in the jacket which surrounds the lower half of the evaporator vessel. The evaporator is then brought to atmospheric pressure and the concentrated liquor is ejected whilst hot. The evaporator is then cooled with water cooled coils and a water filled jacket. New dilute liquor is then added for a new batch. The process is then repeated. As the evaporators reach the end of their original design life accurate prediction of the current condition of nuclear plant facilities is essential to safely justify continued plant operation by ensuring structural integrity. This poses a significant challenge as many aging UK nuclear facilities were not inherently built with inspection in mind. The potential life limiting components of the HA evaporators at Sellafield are the surfaces that contact the product liquor at elevated temperatures i.e. the steam heated surfaces of the coils within the evaporator vessel and the vessel base and wall surrounded by the steam jacket. Each heating component is critical to the operational life of the evaporator - the removal from service of a coil heating component significantly reduces the operational flexibility and remnant life of this plant. Over the last decade a variety of cutting-edge expertise and methodologies have been utilised to accurately measure and then predict the current condition of the plant and also to predict its remnant life. This paper provides an overview of the development of several techniques deployed, namely non-destructive testing/inspection, in-house software development and finite element modelling. These methods have been validated by lab-scale or full-scale experiments along with historical plant data. These techniques have been evolved and refined for over a decade, providing vital insights into the physical behaviour of this complex reprocessing system. This enables not only accurate assessment of the current condition of the plant equipment but also allows scientifically underpinned predictions to be made of how it will behave into the future. This is critical for Sellafield as this knowledge feeds into their safety case to the Office of Nuclear Regulation to justify continued operation. It is concluded that this integrated approach provides a robust analysis tool which has driven change and optimisation of plant procedures ensuring continued safe operation whilst extending the life of the facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Major Achievements of the Springfields Decommissioning Program - 16512

Since the 1940's, Springfields has manufactured fuel products for the UK's nuclear power stations and for international customers. The early operations were in support of the atomic weapons program, closely followed by fuel manufacture for electricity generation via the Magnox power stations commencing in the late 1950's. In 2005, responsibility for the assets and liabilities of Springfields was transferred to the Nuclear Decommissioning Authority (NDA). A new company, Springfields Fuels Limited, was created to run the site, which was managed and operated by Westinghouse Electric UK Ltd on the NDA's behalf. On April 1, 2010, Westinghouse entered into an agreement with the NDA for a long-term lease of the Springfields site, which transferred responsibility for the commercial fuel manufacturing business and Springfields Fuels Limited to Westinghouse. Today, the main Springfields activities include: - Oxide fuels for Advanced Gas-cooled and Light Water Reactors, as well as intermediate fuel products, such as powders, granules and pellets, - Manufacture of Uranium Hexafluoride (now in Care and Maintenance), - Processing and recovery of Uranium residues, - Decommissioning and demolition of redundant plants and buildings. Some 120 plant buildings and support facilities have been successfully decommissioned and demolished in the period 1996 to date. These range from 1940's buildings, subsequently converted for nuclear fuel manufacture, together with some of the formerly sealed chemical agent manufacture and storage facilities. Decommissioning of the now redundant Magnox manufacturing facilities is ongoing at Springfields without compromising the other site operations. Westinghouse is managing all activities related to the whole lifecycle, planning, design, safety case, radiation protection, Post Operational Clean Out (POCO), service diversions, characterization, decommissioning all phases through to ground remediation, waste disposal and agreed end states. Decommissioning of process plants starts with the removal of the majority of radiological activity or hazard contained within the plant. This is known as Post Operational Clean Out. Once this is complete, the plant may be dismantled. Work is scoped and defined within packages (at plant or cell level) to aid control and commercial monitoring as the decommissioning is progressed. This package approach also enables clean or lightly contaminated items to be removed separately to aid potential re-cycling and minimize decontamination and waste disposal costs. Westinghouse is further optimising work package delivery by planning parallel POCO and Decommissioning work phases within plant at a cell level to systematically remove redundant plant and reduce hazard earlier, whilst optimising use of both internal and external resources to reduce total project cost. Waste and Residues from all phases are disposed of via authorized disposal routes and in accordance with our environmental authorizations. On completion of decommissioning and removal of plant and equipment the building is re-assessed radiologically, categorized and appropriate remediation work progressed to render it safe for conventional demolition. The major elements of the success achieved to date can be attributed to the following elements: - Overall programme management with extensive experience of planning, cost, and risk management. Integration of the programme within a major commercial site without compromising safety or operations. - Complete site EHS management working within a complex regulatory framework including the Nuclear Site Licenses, Environmental Authorisations and Security requirements. - Avoiding safety complacency by use of rigorous and systematic process to emphasise safety over competing goals. Including structured use of Human Performance and Corrective Action and Learning processes. - Unique safety experiences attained through complex hazard reduction across a broad range of uranium manufacturing and chemical hazard/agent facilities. - Project leadership and excellence utilizing a core site team to deploy repeatable processes and safe practices to deliver complex scope within budget and schedule. - Optimised use of internal and external resources, with extensive use of Operating Experience to drive continuous improvement and problem resolution. - Management of Contractors from initial selection, pre-qualification, tender assessment and Performance using varied contract forms across delivery phases. - Use of Westinghouse expertise for safety case, waste management, uranium recovery, health physics and design. - Implementation of a work package to ensure gated discreet manageable packages. Underpinned by package specific method statements, with appropriate hold points to maintain management and control of the works. - Continuous local safety focus via safety planning, induction, plant specific training, proactive risk assessment, and a defined approach to decoupling operating plant safety cases enabling focussed and usable documentation. This paper will provide an overview of the latest decommissioning activities achieved on the Springfields site and will focus on best practices that allowed Westinghouse to maintain the program on time and on budget. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Remediation Liquid Waste Operations Lifecycle Savings through a Lean Business System at the Savannah River Site - 17245

Savannah River Remediation (SRR) was contracted by the U.S. Department of Energy (DOE) to manage its liquid waste project at the Savannah River Site. The liquid waste project is a unique, high hazard nuclear waste treatment and disposal facility consisting of 51 one million-gallon underground waste tanks, a solvent extraction processing unit, a vitrification facility for the highest radioactive waste, and a grout solidification and disposal facility for lower radioactive decontaminated salt solution. Our Project mission is to treat the nuclear waste and close the associated storage and treatment facilities, of which, 8 tanks have been closed to date. The Lean philosophy took root decades ago in the manufacturing sector and started with the work of W. Edwards Deming and his contemporaries. In more recent years the process has matured in the Toyota Production System and migrated into fields as diverse as services industries, health-care, and now the DOE complex. At SRR, a Lean business management system was adopted to address site inefficiencies, aging infrastructure concerns and budget constraints. With yearly escalation and flat budgets, continuous improvement is taking on a larger role - improving the work accomplished for each dollar. This paper focuses on the program results achieved to date, including the lifecycle savings identified through the Rapid Improvement Event (RIE) process. The RIE process is a Lean tool which creates a cross-functional team to analyze, develop and implement improvements for a given process. DOE-EM has recently emphasized the value of contractor's continuous improvement programs through their implementation of Plan of Action and Milestone (POAM): Goal 2 (Increase Efficiency/Improve Performance) Reduce EM Operations Cost in FY16. POAM Goal 2 was a FY 16 effort to achieve 5% cost savings across most programs. This past year's cost savings initiatives will likely become a trend as DOE and its contractors look to do more with less. In support of our own business objectives, as well as, DOE's motivation to improve efficiencies, SRR has held over one hundred formal Lean events and dozens of 5S events that have driven improvement across the Project, including tank closure and production facilities. These improvements have significantly reduced the time required to process material and achieve the overall goal of hazard reduction and tank closure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Waste Vitrification in the U.S.: Recent Developments and Future Options

Nuclear power plays a key role in maintaining current world wide energy growth while minimizing the greenhouse gas emissions. A disposition path for used nuclear fuel (UNF) must be found for this technology to achieve its promise. One likely option is the recycling of UNF and immobilization of the high-level waste (HLW) by vitrification. Vitrification is the technology of choice for immobilizing HLW from defense and commercial fuel reprocessing around the world. Recent advances in both recycling technology and vitrification show great promise in closing the nuclear fuel cycle in an efficient and economical fashion. This article summarizes the recent trends developments and future options in waste vitrification for both defense waste cleanup and closing the nuclear fuel cycle in the U.S.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Nanohybrid of Silver‐MXene: A Promising Sorbent for Iodine Gas Capture from Nuclear Waste

The increasing reliance on nuclear energy as a significant low-carbon power source necessitates effective solutions for managing radioactive emissions. This study introduces a novel application of MXene nanohybrids, specifically silver-MXene (Ag-Ti 3 C 2 T x ), as an effective sorbent for radioiodine off-gas capture at an operating temperature of 150 °C. Through comprehensive material characterization, including X-ray diffraction, scanning and transmission electron microscopies, energy-dispersive X-ray spectroscopy, Raman spectroscopy, thermogravimetric analysis, inductively coupled plasma optical emission spectroscopy, and gas sorption analyses, the successful loading of Ag nanoparticles onto Ti 3 C 2 T x is confirmed and the subsequent formation of AgI upon iodine capture. The results demonstrate that Ag-Ti 3 C 2 T x exhibits superior iodine uptake compared to traditional silver-based sorbents such as silver mordenite zeolite (AgZ) and silver-functionalized silica aerogel (AgAero). The Ag-Ti 3 C 2 T x achieves an iodine loading of 946 mg g −1 , significantly outperforming AgZ (131 mg g −1 ). These findings highlight the potential of Ag-Ti 3 C 2 T x as a highly efficient, thermally stable sorbent for radioiodine capture, and potentially addressing key limitations of existing materials.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Area V: Waste Management and Subsurface Science (FY21-23 Final Report)

The objective of the Waste Management and Subsurface Science Topic Area V project is to evaluate the feasibility and safety of an intermediate-depth borehole for disposal of Israel Atomic Energy Commission (IAEC) nuclear waste. The IAEC nuclear waste is currently stored in above ground and/or in near-surface facilities that provide short-term radiological worker safety but do not provide long-term, full security and safeguards protection for the nuclear material. Disposal of the IAEC nuclear waste several hundred meters below the surface in a sealed borehole would provide long-term security and safeguards due to its depth underground, as well as long-term radiological safety, due to its isolation in a stable geological formation. This project supports the nuclear security and safeguards initiatives of the Science and Technology Working Group of the NNSA/IAEC Memorandum of Understanding (MOU) and addresses the Topic Area V objective and associated goals. The goals for Topic Area V are: (1) Assess the suitability of the vadose zone in the Yamin Plain of the northern Negev Desert, Israel as a host location for intermediate-depth borehole disposal of radioactive waste, (2) Define and refine the necessary characterization needs to better understand the regional climate, structure, and stratigraphy, geomechanics, geochemistry, hydrogeology, and seismicity of the stratigraphic sequence from the surface to the water table in the vicinity of the proposed host location for the disposal borehole(s), and (3) Develop a preliminary plan and schedule, including necessary resources and costs, for a borehole disposal concept and robust and transparent pre-closure and post-closure safety assessments. The safety assessments will require iteration with process level models at both site and regional scales. Upon completion, the information collected by this effort will allow the IAEC to make decisions regarding the viability and applicability of an intermediate depth (<500m) borehole for disposal in the vadose zone of the Yamin Plain. This FY21-23 final report is provided in lieu of a workshop report that was originally planned for delivery in January, 2024. Due to the conflict in Israel and associated delays, the workshop has been delayed to April 2024. The workshop will be held at LLNL but offsite and will switch to hybrid if travel restrictions remain in place. The associated workshop report will be provided as part of a new FY24-26 LCP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and Construction of a Loess-Cement Cushion as an Integral Component of an SL-LILW Repository - 16077

The Bulgarian State Enterprise for Radioactive Waste Management (SERAW) is planning the construction of a near-surface repository for short-lived low and intermediate level radioactive waste, the National Disposal Facility (NDF), adjacent to the Kozloduy Nuclear Power Plant (KNPP). The NDF will be constructed as a reinforced concrete vault-type repository system, where prefabricated cubic waste packages (2 m on a side) will be emplaced in large reinforced concrete disposal cells. Waste emplacement operations will be conducted in three phases over a total of 60 years of operations. After the last waste packages have been disposed, an engineered multilayer cover will be installed over the site to further isolate the waste from the accessible environment. The Radiana Site where the NDF will be constructed is a sloping area located between the second and sixth loess terraces above the River Danube with elevations ranging from approximately +40 m to elevation +95 m. The unsaturated zone at the location selected for waste disposal ranges from 13 m to 16 m in thickness. After construction, the unsaturated zone will consist of a 5 m thick, engineered loess-cement cushion installed over naturally occurring Pliocene clays and sandy clayey sediments of the Brusarci Formation with a thickness above the top of groundwater ranging from 8 m to 11 m. The loess-cement cushion is a key component of the 'engineered fill' barrier as identified in the Intermediate Safety Assessment Report (ISAR) for the NDF. This barrier consists of engineered fill both below the disposal cells, i.e., the loess-cement cushion, and above the disposal cells, i.e. the final multilayer cover to be installed at closure of the facility. The loess-cement cushion component of this barrier will act to provide a geo-technically stable foundation for the disposal system. In addition, the barrier will raise the base of the disposal cells and increases the unsaturated zone thickness above the top of the groundwater table, as well as to serve as a chemical barrier that will act to sorb radionuclides thereby retarding their migration to the underlying groundwater. In addition to its assigned barrier functions the loess cement cushion also houses key embedded components required as part of the overall NDF safety concept, including systems necessary for operational and post-closure performance monitoring as well as the support foundation structures required for the mobile roofs, which are designed to handle and protect the waste during emplacement operations. The post-closure monitoring period, i.e., the period of institutional control, is given by as 300 years. While similar although less massive cushions have been previously constructed as foundations for various structures at the KNPP, the loess-cement cushion planned for construction at the NDF including the embedded structures will represent a first of its kind construction in terms of both its physical dimensioning as well as its requirements for long-term performance. This paper describes the design of the cushion, its functions and its construction as planned for the NDF as an integral component of the site safety concept. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multi-Phased, Post-Accident Support of the Fukushima Dai-Ichi Nuclear Power Plant - 12246

In the wake of the March 11 earthquake and tsunami and the subsequent flooding of several of the Fukushima Dai-Ichi reactors, Japan and the Japanese utility TEPCO faced a crisis situation with incredible challenges: substantial amounts of radioactive mixed seawater and freshwater accumulated in the basements of four reactor and other buildings on the site. This water held varying levels of contamination due to the fact that it had been in contact with damaged fuel elements in the cores and with other contaminated components. The overall water inventory was estimated at around 110,000 tons of water with contamination levels up to the order of 1 Ci/l. Time was of the essence to avoid overflow of this accumulated water into the ocean. AREVA proposed, designed and implemented a water treatment solution using a proven chemical coprecipitation process with ppFeNi reagent, which is currently in use for effluent treatment on several nuclear sites including AREVA sites. In addition to the extremely short schedule the other challenge was to adapt the chemical treatment process to the expected composition of the Fukushima water and, in particular, to evaluate the impact of salinity on process performance. It was also necessary to define operating conditions for the VEOLIA equipment that had been selected for implementation of the process in the future facility. The operation phase began on June 17, and by the end of July more than 30,000 tons of highly radioactive saltwater had been decontaminated - the Decontamination Factor (DF) for Cesium was ∼10{sup 4}. It allowed recycling the contaminated water to cool the reactors while protecting workers and the environment. This paper focuses on the Actiflo{sup TM}-Rad water treatment unit project that was part of the TEPCO general water treatment scheme. It presents a detailed look at the principles of the Actiflo{sup TM}-Rad, related on-the-fly R and D, an explanation of system implementation challenges, and a brief summary of operation results to date. AREVA's response to the Fukushima Dai-Ichi crisis was multi-phased: emergency aid and relief supply was sent within days after the accident; AREVA-Veolia engineering teams designed and implemented a water treatment solution in record time, only 3 months; and AREVA continues to support TEPCO and propose solutions for waste management, soil remediation and decontamination of the Fukushima Dai-Ichi site. Despite the huge challenges, the Actiflo{sup TM}-Rad project has been a success: the water treatment unit started on time and performed as expected. The performance is the result of many key elements: AREVA expertise in radioactive effluents decontamination, Veolia know-how in water treatment equipments in crisis environment, and of course AREVA and Veolia teams' creativity. The project success is also due to AREVA and Veolia teams' reactivity and high level of commitment with engineering teams working 24/7 in Japan, France and Germany. AREVA and Veolia deep knowledge of the Japanese industry ensured that the multi-cultural exchanges were not an issue. Finally the excellent overall project management and execution by TEPCO and other Japanese stakeholders was very efficient. The emergency water treatment was a key step of the roadmap towards restoration from the accident at Fukushima Dai-Ichi that TEPCO designed and keeps executing with success. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗