Search NASA⌕ Search

SEARCH · Search NASA

Results for “Padding”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,549 records · Page 86

Environmental Control Subsystem Development

Kennedy Space Center's Launch Pad 39B, part of Launch Complex 39, is currently undergoing construction to prepare it for NASA's Space Launch System missions. The Environmental Control Subsystem, which provides the vehicle with an air or nitrogen gas environment, required development of its local and remote display screens. The remote displays, developed by NASA contractors and previous interns, were developed without complete functionality; the remote displays were revised, adding functionality to over 90 displays. For the local displays, multiple test procedures were developed to assess the functionality of the screens, as well as verify requirements. One local display screen was also developed.

ECS↗

ISRU-Based Robotic Construction Technologies For Lunar And Martian Infrastructures

Economically viable and reliable building systems and tool sets are being sought, examined and tested for extraterrestrial infrastructure buildup. This project utilizes a unique architecture weaving the robotic building construction technology with designs for assisting rapid buildup of initial operational capability Lunar and Martian bases. The project intends to develop and test methodologies to construct certain crucial infrastructure elements in order to evaluate the merits, limitations and feasibility of adapting and using such technologies for extraterrestrial application. High priority infrastructure elements suggested by our NASA advisors to be considered include landing pads and aprons, roads, blast walls and shade walls, thermal and micrometeorite protection shields and dust-free platforms utilizing the well-known insitu resource utilization (ISRU) strategy. Current extraterrestrial settlement buildup philosophy holds that in order to minimize the materials needed to be flown in, at great transportation costs, strategies that maximize the use of locally available resources must be adopted. Tools and heavy equipment flown as cargo from Earth are proposed to build required infrastructure to support future missions and settlements on the Moon and Mars. Several unique systems including the Lunar Electric Rover, the unpressurized Chariot rover, the versatile light-weight crane and Tri-Athlete cargo transporter as well as the habitat module mockups and a new generation of spacesuits are undergoing coordinated tests at NASAs D-RATS. This project intends to draw up a detailed synergetic plan to utilize these maturing systems coupled with modern robotic fabrication technologies based primarily on 3D Printing, tailored for swift and reliable Lunar and Martian infrastructure development. This project also intends to increase astronaut safety, improve buildup performance, ameliorate dust interference and concerns, and reduce time-to-commission, all in an economic manner. The goal stated in our Phase I proposal was a high fidelity demonstration at D-RATS to be conducted at the conclusion of the Phase II study. In the course of the Phase I study, however, it became clear that such demonstration was neither possible (due to the maximum Phase II budget limitation and the cost of NASA assets and related overhead expenses to support such demonstrations), nor necessary (due to NASA's low TRL expectation of Phase II results). These important facts were revealed to us only after interacting with the NIAC administrators and meetings with potential future partners at JPL and KSC. Accordingly, it was decided by the team that in order to make best use of resources we should investigate novel directions in the adaptation of our fabrication technologies by using in-house laboratories and to produce truly useful technologies and data, and then proceed with high fidelity demonstration at a later opportunity when sufficient resources become available. Furthermore, we have recognized that in addition to our building scale 3D printing technology called Contour Crafting, variations of some of our other fabrication technologies under development are suitable for construction of infrastructure elements such as regolith based ceramic tiles and hence we have decided to include some related preliminary research in this Phase II proposal.

Extraterrestrial↗

Combining Stereo SECCHI COR2 and HI1 Images for Automatic CME Front Edge Tracking

COR2 coronagraph images are the most commonly used data for coronal mass ejection (CME) analysis among the various types of data provided by the STEREO (Solar Terrestrial Relations Observatory) SECCHI (Sun-Earth Connection Coronal and Heliospheric Investigation) suite of instruments. The field of view (FOV) in COR2 images covers 215 solar radii (Rs) that allow for tracking the front edge of a CME in its initial stage to forecast the lead-time of a CME and its chances of reaching the Earth. However, estimating the lead-time of a CME using COR2 images gives a larger lead-time, which may be associated with greater uncertainty. To reduce this uncertainty, CME front edge tracking should be continued beyond the FOV of COR2 images. Therefore, heliospheric imager (HI1) data that covers 1590 Rs FOV must be included. In this paper, we propose a novel automatic method that takes both COR2 and HI1 images into account and combine the results to track the front edges of a CME continuously. The method consists of two modules: pre-processing and tracking. The pre-processing module produces a set of segmented images, which contain the signature of a CME, for both COR2 and HI1 separately. In addition, the HI1 images are resized and padded, so that the center of the Sun is the central coordinate of the resized HI1 images. The resulting COR2 andHI1 image set is then fed into the tracking module to estimate the position angle (PA) and track the front edge of a CME. The detected front edge is then used to produce a height-time profile that is used to estimate the speed of a CME. The method was validated using 15 CME events observed in the period from January 1, 2008 to August 31, 2009. The results demonstrate that the proposed method is effective for CME front edge tracking in both COR2 and HI1 images. Using this method, the CME front edge can now be tracked automatically and continuously in a much larger range, i.e., from 2 to 90 Rs, for the first time. These improvement scan greatly help in making the quantitative CME analysis more accurate and have the potential to assist in space weather forecasting.

Kirnosov, Vladimir↗

In the Hot Seat: STS-115 Lightning Strike Stand Down Debate - NASA Case Study

There is no way the PIC's could have seen any current' was the gist of Mike Griffin's assessment. Griffin was the NASA Administrator at the time. The buck stopped at his desk. Holding a napkin out to Pat Lampton, Griffin showed Lampton the calculations he'd made over dinner that predicted that the Pyrotechnic Initiator Controllers (PIC's) at the base of the Space Shuttle Solid Rocket Boosters (SRBs) were fine. A lightning strike the day before, the worst ever experienced with a Space Shuttle on the launch pad, caused a halt to the launch count down as technicians, engineers, and managers scrambled identify any damage to the launch system. SRB technicians and engineers assessed the data against their Lightning Strike Re-Test Requirements, determining that all but one of the requirements could be checked if they resumed the countdown. For the one remaining requirement, testing the integrity of the PIC's would require 96 hours to set up, test, and reassemble. The engineers were convinced that there was no way to do calculations to show the PIC's were okay. The only option was to stand down. It was SRB Deputy Project Manager (PM) Pat Lampton's responsibility to decide what the SRB project position needed to be to certify that their hardware was safe to fly. He had to communicate that decision to the Mission Management Team (MMT) as a Go or No Go position to resume the count down. If the answer was Go they could still meet a delayed, but acceptable launch schedule. If the answer was No Go, rescheduling the launch would be a grueling shuffling of hardware, personnel, and mission timelines to accommodate Russian missions to the Space Station, supplies for the launch, and personnel manning launch operations. On top of that, Hurricane Ernesto was spinning off the coast of Florida, threatening the need for the Shuttle to roll back to the hangar if they waited too long.

Kummer, Lizette↗

High Temperature Characteristics of Pt/TaSi2/Pt/W and Pt/Ti/W Diffusion Barrier Systems for Ohmic Contacts to 4H-SiC

The degradation of ohmic contacts to 4H-SiC pressure sensors over time at high temperature is primarily due to two failure mechanisms: migrating bond pad Au and atmospheric O toward the ohmic contact SiC interface and the inter-metallic mixing between diffusion barrier systems (DBS) and the underlying ohmic contact metallization. We investigated the effectiveness of Pt/TaSi2/Pt/W (DBS-A) and Pt/Ti/W (DBS-B) in preventing Au and O diffusion through the underlying binary Ti/W or alloyed W50:Ni50 ohmic contacts to 4H-SiC and the DBS ohmic contact intermixing at temperature up to 700 C.

Platinum↗

Plume-Surface Interaction Modeling for a Human-Scale Mars Lander

Landing vehicles impart thermal and strain energy onto the landing site from the retrorocket exhaust. Depending on the design of the vehicle, the energy may be great enough to cause spallation at the landing site. This damage may be minor and repairable in the case of landing on a terrestrial landing pad. For missions to other planetary bodies, the spallation may cause the landing site to become uneven and unstable, as well as damage. Simulating this phenomenon in a laboratory or computationally would require a significant amount of time and other resources. These resources typically are not available during the design phase of a mission. This paper presents a computationally-efficient model for the temperature and stress distributions that arise during landing. These quantities can be used along with existing failure criteria, such as the Hoek-Brown criterion for geological materials, to quickly determine whether spallation will occur. The stress and temperature distributions at the landing site are inherently 3D; however, there is a plane of symmetry and in that plane the distributions are 2D. Both quantities are modeled using series solutions to their governing partial differential equations (PDEs). The stress is modeled using the Airy stress potential function and its governing PDE is the biharmonic equation. The temperature is governed by Fourier's law. The models assume that stress due to gravity can be neglected, the points in the plane do not accelerate, and that the material properties are constant.

Hart, Kenneth↗

Acoustic Model Testing Chronology

Scale models have been used for decades to replicate liftoff environments and in particular acoustics for launch vehicles. It is assumed, and analyses supports, that the key characteristics of noise generation, propagation, and measurement can be scaled. Over time significant insight was gained not just towards understanding the effects of thruster details, pad geometry, and sound mitigation but also to the physical processes involved. An overview of a selected set of scale model tests are compiled here to illustrate the variety of configurations that have been tested and the fundamental knowledge gained. The selected scale model tests are presented chronologically.

Nesman, Tom↗

Building an Economical and Sustainable Lunar Infrastructure to Enable Lunar Industrialization

A new concept study was initiated to examine the architecture needed to gradually develop an economical, evolvable and sustainable lunar infrastructure using a public/private partnerships approach. This approach would establish partnership agreements between NASA and industry teams to develop a lunar infrastructure system that would be mutually beneficial. This approach would also require NASA and its industry partners to share costs in the development phase and then transfer operation of these infrastructure services back to its industry owners in the execution phase. These infrastructure services may include but are not limited to the following: lunar cargo transportation, power stations, communication towers and satellites, autonomous rover operations, landing pads and resource extraction operations. The public/private partnerships approach used in this study leveraged best practices from NASA's Commercial Orbital Transportation Services (COTS) program which introduced an innovative and economical approach for partnering with industry to develop commercial cargo services to the International Space Station. This program was planned together with the ISS Commercial Resupply Services (CRS) contracts which was responsible for initiating commercial cargo delivery services to the ISS for the first time. The public/private partnerships approach undertaken in the COTS program proved to be very successful in dramatically reducing development costs for these ISS cargo delivery services as well as substantially reducing operational costs. To continue on this successful path towards installing economical infrastructure services for LEO and beyond, this new study, named Lunar COTS (Commercial Operations and Transport Services), was conducted to examine extending the NASA COTS model to cis-lunar space and the lunar surface. The goals of the Lunar COTS concept are to: 1) develop and demonstrate affordable and commercial cis-lunar and surface capabilities, such as lunar cargo delivery and surface power generation, in partnership with industry; 2) incentivize industry to establish economical and sustainable lunar infrastructure services to support NASA missions and initiate lunar commerce; and 3) encourage creation of new space markets for economic growth and benefit. A phased-development approach was also studied to allow for incremental development and demonstration of capabilities needed to build a lunar infrastructure. This paper will describe the Lunar COTS concept goals, objectives and approach for building an economical and sustainable lunar infrastructure. It will also describe the technical challenges and advantages of developing and operating each infrastructure element. It will also describe the potential benefits and progress that can be accomplished in the initial phase of this Lunar COTS approach. Finally, the paper will also look forward to the potential of a robust lunar industrialization environment and its potential effect on the next 50 years of space exploration.

Zuniga, Allison F.↗

Vented Launch Vehicle Adaptor for a Manned Spacecraft with "Pusher" Launch Abort System

A system, method, and apparatus for a vented launch vehicle adaptor (LVA) for a manned spacecraft with a "pusher" launch abort system are disclosed. The disclosed LVA provides a structural interface between a commercial crew vehicle (CCV) crew module/service module (CM/SM) spacecraft and an expendable launch vehicle. The LVA provides structural attachment of the module to the launch vehicle. It also provides a means to control the exhaust plume from a pusher-type launch abort system that is integrated into the module. In case of an on-pad or ascent abort, which requires the module to jettison away from the launch vehicle, the launch abort system exhaust plume must be safely directed away from critical and dangerous portions of the launch vehicle in order to achieve a safe and successful jettison.

Vandervort, Robert E.↗

Kennedy Space Center: Apollo to Multi-User Spaceport

NASA Kennedy Space Center (KSC) was established as the gateway to exploring beyond earth. Since the establishment of KSC in December 1963, the Center has been critical in the execution of the United States of Americas bold mission to send astronauts beyond the grasp of the terra firma. On May 25, 1961, a few weeks after a Soviet cosmonaut became the first person to fly in space, President John F. Kennedy laid out the ambitious goal of landing a man on the moon and returning him safely to the Earth by the end of the decade. The resultant Apollo program was massive endeavor, driven by the Cold War Space Race, and supported with a robust budget. The Apollo program consisted of 18 launches from newly developed infrastructure, including 12 manned missions and six lunar landings, ending with Apollo 17 that launched on December 7, 1972. Continuing to use this infrastructure, the Skylab program launched four missions. During the Skylab program, KSC infrastructure was redesigned to meet the needs of the Space Shuttle program, which launched its first vehicle (STS-1) on April 12, 1981. The Space Shuttle required significant modifications to the Apollo launch pads and assembly facilities, as well as new infrastructure, such as Orbiter and Payload Processing Facilities, as well as the Shuttle Landing Facility. The Space Shuttle was a workhorse that supported many satellite deployments, but was key for the construction and maintenance of the International Space Station, which required additional facilities at KSC to support processing of the flight hardware. After reaching the new Millennium, United States policymakers searched for new ways to reduce the cost of space exploration. The Constellation Program was initiated in 2005 with a goal of providing a crewed lunar landing with a much smaller budget. The very successful Space Shuttle made its last launch on July 8, 2011, after 135 missions. In the subsequent years, KSC continues to evolve, and this paper will address past and future efforts of the transformation of the KSC Apollo and Space Shuttle heritage infrastructure into a more versatile, multi-user spaceport. The paper will also discuss the US Congressional and NASA initiatives for developing and supporting multiple commercial partners, while simultaneously supporting NASAs human exploration initiative, consisting of Space Launch System (SLS), Orion spacecraft and associated ground launch systems. In addition, the paper explains the approach with examples for NASA KSC to leverage new technologies and innovative capabilities developed to reduce the cost to individual users.

launchpad↗

Machine Learning for Slow but Steady Interplanetary Construction

For prolonged manned missions to destinations such as the moon and Mars, there is a need for significant infrastructure construction ahead of time, such as habitats and landing pads. Unfortunately we have little experience in remote construction and using conventional methods is likely to be expensive, cumbersome and unreliable. Fortunately these challenges may be overcome by taking advantage of the long lead time for such missions and using teams of small and slow construction robots. We propose using teams of simple autonomous robots for this purpose that would perform continuous construction over a period of many years or even decades. While individual robot reliability will be low over such long time frames, system reliability will be maintained by using machine learning over simulations to achieve coordination and reconfigurations in the event of lost robots.

Tensegrity robots↗

KGCS and ECS Local HMI Display Control System Engineer

My time here at KSC has involved creating and updating HMI displays to support Pad 39B and the Mobile Launcher. I also had the opportunity to be involved with testing PLC hardware for Electromagnetic interferences. This report explains in more detail of the steps involved in successfully completing these responsibilities I have been fortunate enough to be involved with.

Curtis, Bryan↗

SLS Block 1-B and Exploration Upper Stage Navigation System Design

The SLS Block 1B vehicle is planned to extend NASA's heavy lift capability beyond the initial SLS Block 1 vehicle. The most noticeable change for this vehicle from SLS Block 1 is the swapping of the upper stage from the Interim Cryogenic Propulsion stage (ICPS), a modified Delta IV upper stage, to the more capable Exploration Upper Stage (EUS). As the vehicle evolves to provide greater lift capability and execute more demanding missions so must the SLS Integrated Navigation System to support those missions. The SLS Block 1 vehicle carries two independent navigation systems. The responsibility of the two systems is delineated between ascent and upper stage flight. The Block 1 navigation system is responsible for the phase of flight between the launch pad and insertion into Low-Earth Orbit (LEO). The upper stage system assumes the mission from LEO to payload separation. For the Block 1B vehicle, the two functions are combined into a single system intended to navigate from ground to payload insertion. Both are responsible for self-disposal once payload delivery is achieved. The evolution of the navigation hardware and algorithms from an inertial-only navigation system for Block 1 ascent flight to a tightly coupled GPS-aided inertial navigation system for Block 1-B is described. The Block 1 GN&C system has been designed to meet a LEO insertion target with a specified accuracy. The Block 1-B vehicle navigation system is designed to support the Block 1 LEO target accuracy as well as trans-lunar or trans-planetary injection accuracy. This is measured in terms of payload impact and stage disposal requirements. Additionally, the Block 1-B vehicle is designed to support human exploration and thus is designed to minimize the probability of Loss of Crew (LOC) through high-quality inertial instruments and Fault Detection, Isolation, and Recovery (FDIR) logic. The preliminary Block 1B integrated navigation system design is presented along with the challenges associated with meeting the design objectives. This paper also addresses the design considerations associated with the use of Block 1 and Commercial Off-the-Shelf (COTS) avionics for Block 1-B/EUS as part of an integrated vehicle suite for orbital operations.

Oliver, T. Emerson↗

Quantification of Dynamic Model Validation Metrics Using Uncertainty Propagation from Requirements

The Space Launch System, NASA's new large launch vehicle for long range space exploration, is presently in the final design and construction phases, with the first launch scheduled for 2019. A dynamic model of the system has been created and is critical for calculation of interface loads and natural frequencies and mode shapes for guidance, navigation, and control (GNC). Because of the program and schedule constraints, a single modal test of the SLS will be performed while bolted down to the Mobile Launch Pad just before the first launch. A Monte Carlo and optimization scheme will be performed to create thousands of possible models based on given dispersions in model properties and to determine which model best fits the natural frequencies and mode shapes from modal test. However, the question still remains as to whether this model is acceptable for the loads and GNC requirements. An uncertainty propagation and quantification (UP and UQ) technique to develop a quantitative set of validation metrics that is based on the flight requirements has therefore been developed and is discussed in this paper. There has been considerable research on UQ and UP and validation in the literature, but very little on propagating the uncertainties from requirements, so most validation metrics are "rules-of-thumb;" this research seeks to come up with more reason-based metrics. One of the main assumptions used to achieve this task is that the uncertainty in the modeling of the fixed boundary condition is accurate, so therefore that same uncertainty can be used in propagating the fixed-test configuration to the free-free actual configuration. The second main technique applied here is the usage of the limit-state formulation to quantify the final probabilistic parameters and to compare them with the requirements. These techniques are explored with a simple lumped spring-mass system and a simplified SLS model. When completed, it is anticipated that this requirements-based validation metric will provide a quantified confidence and probability of success for the final SLS dynamics model, which will be critical for a successful launch program, and can be applied in the many other industries where an accurate dynamic model is required.

Brown, Andrew M.↗

Environmental Control System Development

Since before the first men landed on the moon, human beings have aspired to reach farther into space, to discover and answer the great mysteries that exist beyond imagination. To reach where no one has gone before. To able to see all the wonderful things that can be found in space and that only satellites have revealed to us during all this time. Considering the last trip to the moon, mankind has been evolving and improving their technology to reach destinations whose distances had been impossible to transit. To reach that goal, the National Aeronautics and Space Administration (NASA) has designed and developed the largest and most powerful rocket ever created by the human race, the Space Launch System - better known as the SLS. To be able to send this large rocket to space, Kennedy Space Center (KSC) is doing upgrades to their existing facilities and equipment. At Launch Pad 39B, they are setting up a new Environmental Control System (ECS) developed to supply the rocket with the correct gases and mixtures that will be needed for the rocket to launch. The ECS is similar to an air conditioning unit. The main functionality of it is to supply the SLS with the correct gas mixture for it to launch. Also the ECS has been required to reduce or eliminate the possibility of a complete system failure. The system is part of the Ground Support Equipment (GSE) for the SLS that will be going to the Moon and Mars.

Flores Arroyo, Elvin A.↗

Utilizing Testing Frameworks for Launch Control Systems Continuous Integration

Command and control software is an integral part of the launch procedure. The most important part of this type of software is its ability to communicate well with the user and relay information in a correctly formatted way such that the user can understand the data. There is a tool that aides the communication between the different parts of the system, and effectively, the user. This instrument is capable of taking several complex values and ensuring that they are correctly sorted into their distinctive message values and distributed properly among the different facets of the system. This tool will easily translate and publish the data inside of messages in the system to something that is readable and understandable. The tool also allows for transmission of the recorded data to the user, effectively ensuring the communication between different components of the system. As well as keeping track of messages and ensuring that the information contained within each of them reaches the correct location, this tool has the ability to keep track of its own statistics and determine how many messages passed in were erroneous and how many were successfully transmitted. It is able to check and see what the total message failure count is when an invalid message is given, as well as the number of different messages and their respective types passed into the tool. This tool is of great value to the new Space Launch System (SLS). As such, the tool must be thoroughly tested with test cases that, although improbable, are possible, where the tool may not function properly. Testing an interface this complex is necessary to ensure mission safety and create unlikely scenarios where the tool would work as intended, and stretch its limits to test that even under the most uncommon conditions it would still continue to function. This software will be an important part of the control system for the newest spacecraft which will fly deeper into space than humans have ever travelled. It will fly beyond the moon, into deep space to Mars and perhaps set the groundwork for a manned mission even further to create more opportunities for interplanetary and even interstellar travel by humans. This mission relies heavily on software and hardware to ensure the safety of the humans that will be on board and therefore must be checked, exhausting each and every different situation, such that there is not a doubt surrounding the well-being of the humans aboard the rocket. That is why testing is such an important part of the mission. It provides evidence that the systems aboard the rocket and on the launch pad are safe.

Unit Testing↗

NASA's Space Launch System: Secondary Payload Accommodations in Block 1 and Beyond

Launching from pad 39B at Kennedy Space Center no earlier than December 2019, NASA's Space Launch System (SLS) will send the Orion crew vehicle to a distant retrograde lunar orbit in order to test and validate the new systems developed for SLS, Orion and Kennedy Space Center's Exploration Ground Systems (EGS). In addition to these primary mission objectives, the first integrated fight of NASA's new deep space exploration system, Exploration Mission-1 (EM-1), offers accommodations for 13 6U CubeSats, which will be deployed in deep space after Orion separates from the SLS Interim Cryogenic Propulsion Stage (ICPS). In 2017, the SLS Program, managed by NASA's Marshall Space Flight Center (MSFC) in Huntsville, Alabama, completed the ICPS and delivered it to the EGS Program, which has responsibility for stacking and launch operations. The 13 EM-1 secondary payloads will reside in the Orion Stage Adapter (OSA), which connects the ICPS to Orion's spacecraft adapter. The OSA is essentially complete with preparations being made for transporting the hardware to Kennedy Space Center with accommodations for secondary payload dispensers and with the secondary payload avionics unit installed.

Robinson, Kimberly F.↗

The Disruptive Technology That is Additive Construction: System Development Lessons Learned for Terrestrial and Planetary Applications

Disruptive technologies are unique in that they spawn other new technologies and applications as they grow. These activities are usually preceded by the question, "What If?" For example, "What if we could use an emerging technology and in-situ materials to promote exploration on the Moon or Mars, and then use that same technology to keep our troops out of harm's way and/or help the worlds' homeless?" This question allows us to flip the mindset of "how can people create more valuable innovation?" to "how can innovation create more valuable people?." This approach allows us to view augmented human labor as an inclusive opportunity, not a threat. The discipline of Additive Construction is growing rapidly due to the flexibility, speed, safety and logistics benefits offered as compared to standard construction techniques. Additive construction is a disruptive technology in that it employs the principles of additive manufacturing on a human habitat structure scale. Developed initially for emergency management and disaster relief applications, additive construction has now grown into military infrastructure and planetary (Moon and Mars) surface infrastructure applications as well. Additive Construction with Mobile Emplacement (ACME) is a NASA technology development project that seeks to demonstrate the feasibility of constructing shelters for human crews, and other surface infrastructure, on the Moon or Mars for a future human presence. The ACME project will allow, for the first time, the 3-dimensional printing of surface structures on planetary bodies using local materials for construction, thereby tremendously reducing launch and transportation mass and logistics. Some examples of infrastructure that could be constructed using robotic additive construction methods are landing pads, rocket engine blast protection berms, roads, dust free zones, equipment shelters, habitats and radiation shelters. Terrestrial applications include the development of surface structures using Earth-based materials for emergency response, disaster relief, general construction, and housing at all economic levels. This paper will describe the progress made by the NASA ACME project with a focus on prototypes and full scale additive construction demonstrations using both Portland cement concrete and other indigenous material mixtures. Rationale for the use of additive construction for both terrestrial and planetary applications will be explored and a thorough state-of-the-art of additive construction techniques will be presented. An evolutionary history of NASA's additive construction development efforts, dating back to 2004, will be included. The paper will then step through a series of trade studies performed to inform key processing and design decisions in the development of the full-scale ACES-3 system developed by NASA and the Jacobs Space Exploration Group for the U.S. Army Corps of Engineers (USACE) Construction Engineers Research Laboratory (CERL) in Champaign, IL. The selection of aggregate and binders, based on in-situ materials, will also be presented and discussed

Space Processing↗