Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,549 records · Page 86

Yield Model Development (YMD) implementation plan for fiscal years 1981 and 1982

A plan is described for supporting USDA crop production forecasting and estimation by (1) testing, evaluating, and selecting crop yield models for application testing; (2) identifying areas of feasible research for improvement of models; and (3) conducting research to modify existing models and to develop new crop yield assessment methods. Tasks to be performed for each of these efforts are described as well as for project management and support. The responsibilities of USDA, USDC, USDI, and NASA are delineated as well as problem areas to be addressed.

Ambroziak, R. A.↗

The extension of the thermal-vacuum test optimization program to multiple flights

The thermal vacuum test optimization model developed to provide an approach to the optimization of a test program based on prediction of flight performance with a single flight option in mind is extended to consider reflight as in space shuttle missions. The concept of 'utility', developed under the name of 'availability', is used to follow performance through the various options encountered when the capabilities of reflight and retrievability of space shuttle are available. Also, a 'lost value' model is modified to produce a measure of the probability of a mission's success, achieving a desired utility using a minimal cost test strategy. The resulting matrix of probabilities and their associated costs provides a means for project management to evaluate various test and reflight strategies.

Williams, R. E.↗

Analysis of scanner data for crop inventories

Accomplishments for a machine-oriented small grains labeler T&E, and for Argentina ground data collection are reported. Features of the small grains labeler include temporal-spectral profiles, which characterize continuous patterns of crop spectral development, and crop calendar shift estimation, which adjusts for planting date differences of fields within a crop type. Corn and soybean classification technology development for area estimation for foreign commodity production forecasting is reported. Presentations supporting quarterly project management reviews and a quarterly technical interchange meeting are also included.

Horvath, R.↗

Relations between information system engineering and software engineering

This paper examines some of the relations between information system engineering and software engineering. A model for the development process of an information system is presented that focuses on problems common to both disciplines. The concepts of complexity, multiplicity of view, distortion in communication, and concurrency and iteration in implementation are treated. A set of design constructs for the description of an information system is presented. The role of project management is treated. The issue of how to characterize requirements analysis is answered by making it a design activity from the point of view of a user of the product system.

Callender, E. D.↗

Yield model development project implementation plan

Tasks remaining to be completed are summarized for the following major project elements: (1) evaluation of crop yield models; (2) crop yield model research and development; (3) data acquisition processing, and storage; (4) related yield research: defining spectral and/or remote sensing data requirements; developing input for driving and testing crop growth/yield models; real time testing of wheat plant process models) and (5) project management and support.

Ambroziak, R. A.↗

First Spacelab mission status and lessons learned

There are 38 experiments and/or facilities currently under development, or undergoing testing, which will be incorporated into Spacelab for its first mission. These experiments cover a range of scientific disciplines which includes atmospheric research, life sciences, space plasma research, materials science, and space industrialization technology. In addition to the full development of individual experiments, the final design of the integrated payload and the development of all requisite integration hardware have been accomplished. Attention is given to the project management lessons learned during payload integration development.

Craft, H. G., Jr.↗

Overview of Advanced Stirling and Gas Turbine Engine Development Programs and Implications for Solar Thermal Electrical Applications

The DOE automotive advanced engine development projects managed by the NASA Lewis Research Center were described. These included one Stirling cycle engine development and two air Brayton cycle development. Other engine research activities included: (1) an air Brayton engine development sponsored by the Gas Research Institute, and (2) plans for development of a Stirling cycle engine for space use. Current and potential use of these various engines with solar parabolic dishes were discussed.

Alger, D.↗

Global Resources Information System

The basic design criteria and operating characteristics of a Global Resources Information System GRIS are defined. Researchers are compiling background material and aiding JPL personnel in this project definition phase of GRIS. A bibliography of past studies and current work on large scale information systems is compiled. The material in this bibliography will be continuously updated throughout the lifetime of this grant. Project management, systems architecture, and user applications are also discussed.

Estes, J. E.↗

Commercializing the transfer orbit stage

Key milestones necessary to establish the transfer orbit stage are examined. The selection of the project concept and synthesis of the company are described followed by an analysis venture capability support and the selection of a major aerospace company as prime contractor. A landmark agreement with NASA sanctioned the commercial TOS concept and provided the critical support necessary to raise the next round of venture capital. Project management and customer commitments are also discussed.

Miller, M. W.↗

Data Requirement (DR) MA-03: Payload missions integration

Project management and payload integration requirements definition activities are reported. Mission peculiar equipment; systems integration; ground operations analysis and requirement definition; safety and quality assurance; and support systems development are examined for payloads planned for the following missions: EOM-1; SL-2; Sl-3 Astro-1; MSL-2; EASE/ACCESS; MPESS; and the middeck ADSF flight.

Source record↗

Definition of ground test for Large Space Structure (LSS) control verification

An overview for the definition of a ground test for the verification of Large Space Structure (LSS) control is given. The definition contains information on the description of the LSS ground verification experiment, the project management scheme, the design, development, fabrication and checkout of the subsystems, the systems engineering and integration, the hardware subsystems, the software, and a summary which includes future LSS ground test plans. Upon completion of these items, NASA/Marshall Space Flight Center will have an LSS ground test facility which will provide sufficient data on dynamics and control verification of LSS so that LSS flight system operations can be reasonably ensured.

Waites, H. B.↗

Results of an irrigated lands assessment for water management in California

Periodic assessment of existing and future demands for water within California is one responsibility of the California Department of Water Resources (CDWR). The California Irrigated Lands Assessment for Water Management Project represented a 5-year joint research effort between the NASA and the CDWR with technical support from the University of California (UC) at Berkeley and at Santa Barbara. The objectives were: (1) to develop and demonstrate procedures for providing highly precise, timely, estimates of irrigated area on a statewide basis using Landsat sensor data, and (2) to develop, through research with small demonstration sites, a procedure for the inventory and mapping of crop groups on a regional basis. Both manual and computer-assisted analyses were investigated. This paper highlights the statewide irrigated lands inventory where a procedure for statewide estimation of irrigated land using full frame Landsat MSS imagery and sampled ground data was successfully demonstrated. The statewide estimate of 3 990 112 hectares was within + or - 1.32 percent relative standard error at the 95-percent Confidence Interval, well within the design goal. This procedure represents a new capability for obtaining near-real time data on changes in agricultural water use throughout the state.

Bauer, E. H.↗

R and D Productivity: New Challenges for the US Space Program

Various topics related to research and development activities applicable to their U.S. space program are discussed. Project management, automatic control technology, human resources, management information systems, computer aided design, systems engineering, and personnel management were among the topics covered.

Otis W Baskin↗

Space crew productivity: A driving factor in space station design

The criteria of performance, cost, and mission success probability (program confidence) are the principal factors that program or project managers and system engineers use in selecting the optimum design approach for meeting mission objectives. A frame of reference is discussed in which the interrelationships of these pertinent parameters can be made visible, and from which rational or informed decisions can be derived regarding the potential impact of adjustments in crew productivity on total Space Station System effectiveness.

Wolbers, H. L.↗

Mod-5A wind turbine generator program design report. Volume 4: Drawings and specifications, book 2

The design, development and analysis of the 7.3 MW MOD-5A wind turbine generator is documented. There are four volumes. This volume contains the drawings and specifications that were developed in preparation for building the MOD-5A wind turbine generator. This is the second book of volume four. Some of the items it contains are specs for the emergency shutdown panel, specs for the simulator software, simulator hardware specs, site operator terminal requirements, control data system requirements, software project management plan, elastomeric teeter bearing requirement specs, specs for the controls electronic cabinet, and specs for bolt pretensioning.

Source record↗

Advanced Gas Turbine (AGT) Technology Development Project annual report

This report is the tenth in a series of Technical Summary reports for the Advanced Gas Turbine (AGT) Technology Development Project, authorized under NASA Contract DEN3-167, and sponsored by the Department of Energy (DOE). This report was prepared by Garrett Turbine Engine Company, A Division of the Garrett Corporation, and includes information provided by Ford Motor Company, the Carborundum Company, and AiResearch Casting Company. The Project is administered by Mr. Thomas N. Strom, Project Manager, NASA-Lewis Research Center, Cleveland, Ohio. This report covers plans and progress for the period July 1, 1984 through June 30, 1985.

Source record↗

The growth and harvesting of algae in a micro-gravity environment

Algae growth in a micro-gravity environment is an important factor in supporting man's permanent presence in space. Algae can be used to produce food, oxygen, and pure water in a manned space station. A space station is one example of a situation where a Controlled Ecological Life Support System (CELSS) is imperative. In setting up a CELSS with an engineering approach at the Aerospace department of the University of Colorado, questions concerning algae growth in micro-g have arisen. The Get Away Special (GAS) Fluids Management project is a means through which many questions about the effects of a micro-g environment on the adequacy of growth rates, the viability of micro-organisms, and separation of gases and solids for harvesting purposes can be answered. In order to be compatible with the GAS tests, the algae must satisfy the following criteria: (1) rapid growth rates, (2) sustain viability over long periods of non-growth storage, and (3) very brief latency from storage to rapid growth. Testing indicates that the overall growth characteristics of Anacystis Nidulans satisfy the specifications of GAS's design constraints. In addition, data acquisition and the method of growth instigation are two specific problems being examined, as they will be encountered in interfacing with the GAS project. Flight testing will be two-fold, measurement of algae growth in micro-g and separation of algae from growth medium in an artificial gravitation field. Post flight results will provide information on algae viability in a micro-g environment as reflected by algal growth rates in space. Other post flight results will provide a basis for evaluating techniques for harvesting algae. The results from the GAS project will greatly assist the continuing effort of developing the CELSS and its applications for space.

Wiltberger, Nancy L.↗

The evolution of the Mission Control Center

A discussion of the function and history of the Space Shuttle Mission Control Center describes the communications and data processing facilities, with an emphasis on display system changes. The current display system will be replaced by new technology as part of a project called the Mission Control Center Upgrade. That upgrade will implement a set of high-performance Local Area Networks (LANs) which transmit real-time and historical data to engineering workstations for processing and display. The benefits from such an architecture include a more flexible software development environment and a more modular system which will promote future upgrades. The proposed upgrade architecture is explored, and the engineering and project management challenges of that effort are described, emphasizing the local area networks task.

Kearney, Michael W., III↗